SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Ramakant Kushwaha
D.no:605 L, Loco Colony
Civil Line,
Allahabad( Dist),U.P,
Email ID :ramakant.1980@rediff mail.com
D.O.B – 06/01/1980,
ph#: 7218143423
I T I in Electrical – PROJECT EXECUTION – 11+ EXP
Objective :
To Obtain a position where I can apply acquired knowledge and skills, to strive and excel in
Whatever Works those are undertaken, there by continuously growing and contributing to the
Main objective of the organization.
TECHINICAL QUALIFICATION
1. I T I in WIREMAN
Year of completion : 2002
Institute : Government ITI, Naini, Allahabad.
2. NCVT in WIREMAN
Year of completion : 2005
Institute : Government ITI, Naini, Allahabad.
ACADEMIC QUALIFICATION
1. Passed B.A From University of Allahabad in year of 2001
OTHERS
1. Possessing a Wireman License permit from UP Govt, Lucknow valid from 12/03/2004 to
11/03/2019.
2. One year Apprentice with M/s Alstom Limited, Naini, Allahabad Since 05/03/2004 to
04/03/2005.
TRAINING PROGRAMMS ATTENDED:
1. SAFETY PROCEDURES, PRACTICES & PRECAUTIONS IN CONSTRUCTION
a. Practices to be followed while working in heavy electrical construction division
b. Safety precautions to be followed while working heights.
c. Safety against fire & fire fighting devices.
d. Using of PPE (PERSONAL PROTECTIVE EQUIPMENT) like safety belt, safety helmets
safety shoes etc.
Experience
1).M/s TECHNOLOGICAL ASSOCIATES.
Designation: Site Supervisor maintenance works in UPPCL.
Duration: APRIL-2005 to MAY 2006.
1. As per survey pit marking, with Board officials.
2. Pole Erection STRINGING And DTR erection.
4. Over all Responsible for site activities.
5. Manpower Management.
2).M/S MAYTAS INFRA LIMITED
Designation: Supervisor - Electrical - Project execution & Erection & Commissioning
Duration : June 2006 to July 2010
Projects Done so far :
1) Rural Electrification works at MAU, UP.(PGCIL)
2) Rural Electrification works at Chhindwara, MP (MPPKVVCL)
3) Feeder Separation works at Ujjain, M.P. (MPPKVVCL
3).M/S VIJAI ELECTRICALS LIMITED
Designation: Supervisor - Electrical - Project execution Erection & Commissioning
Duration : August 2010 To Till Date
Projects Done so far
1) Feeder Separation works at Dewas Dist, M.P. (MPPKVVCL).
2) R & M of PSS and Feeder Separation work, BRGF-190 Special plan at west Champaran,
BIHAR (NBPDCIL).
3) Project: INFRA PLAN PHASE – I & II under MSEDCL (MH) Maintenance work running
Activates Organized:
1. Submitting the drawings to the client. Getting the Drawings Approval from client. Necessary Technical
discussions with client and make the necessary changes in the drawings and getting the drawings
approval from client.
2. Detailed study of the drawings and preparing the Bill of Quantities according to the Drawings.
3. Proper planning for the execution of the project.
PROJECT DONE UNDER CLIENT :
1.Project: Rural Electrification RGGVY under PGCIL (UP)
2. Project: Rural Electrification RGGVY under MPPKVVCL,CHHINDWARA(MP)
3. Project: Feeder separation under MPPKVVCL,DEWAS ( MP)
4. Project: BRGF-190Special plan (R &M WORK) under NBPDCL,(BH)
5. Project: INFRA PLAN PHASE – I & II under MSEDCL (MH)
Executing the said job as a Supervisor (Both Site planning and execution) and the following are the high
lights of the project.
 Preparation of the cost estimation and arriving at the sub contractor price for different works for
erection.
 Preparation of the invoicing schedule for the zone and man power requirement schedules
 Survey & Construction of LT & HT Lines
 Pole erection as per approved drawing with client.
 Erection of stay sets & earthing ( Pipe, spike & coil earthing)
 Erection & Commission of PTR/DTR at subs stations & Load location.
 Service connections for BPL/APL etc.
 Erection of 33kv & 11kv VCB, Bay extension, AB Switch/Isolator, LA etc.
 Layout & SLD preparation/estimation of 33/11kv substation equipments.
 Complete Planning for Execution of the project at site.
 Quantification of all required materials and supply monitoring.
 Material follows up with concern dept and ensuring the availability of the material at site for
construction to have an uninterrupted work flow to avoid the man day loss.
 Handing over formalities with client and organizing the handing over of the same.
Declaration:
I hereby declare that above furnished information are correct and true to the best of my knowledge and
belief.
Place: Nagpur
Date: RAMAKANT KUSHWAHA

Weitere ähnliche Inhalte

Was ist angesagt? (19)

Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec Designer
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
anindya maity-cv
anindya maity-cvanindya maity-cv
anindya maity-cv
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Peter Scadding's CV 05.01.2016
Peter Scadding's CV 05.01.2016Peter Scadding's CV 05.01.2016
Peter Scadding's CV 05.01.2016
 
Curriculum Vitae 2016
Curriculum Vitae 2016Curriculum Vitae 2016
Curriculum Vitae 2016
 
Abhilash CV
Abhilash CVAbhilash CV
Abhilash CV
 
Resume_(2)
Resume_(2)Resume_(2)
Resume_(2)
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
Sami Abu Louz, Curriculum Vitae
Sami Abu Louz, Curriculum VitaeSami Abu Louz, Curriculum Vitae
Sami Abu Louz, Curriculum Vitae
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 

Andere mochten auch

Tarea 1 agrupamientos
Tarea 1 agrupamientosTarea 1 agrupamientos
Tarea 1 agrupamientosjulio aguerri
 
Trabajo de sistema de numeracion
Trabajo de sistema de numeracionTrabajo de sistema de numeracion
Trabajo de sistema de numeracionicelfernandez0395
 
Module 5: MOYENS DE SUBSISTANCE
Module 5: MOYENS DE SUBSISTANCEModule 5: MOYENS DE SUBSISTANCE
Module 5: MOYENS DE SUBSISTANCE GBV Guidelines
 
Paris – We Are Not Alone – John Bell
Paris – We Are Not Alone – John BellParis – We Are Not Alone – John Bell
Paris – We Are Not Alone – John Belljaneandjury
 
Evolution of the Drumset – Chris Bodegraven
Evolution of the Drumset – Chris BodegravenEvolution of the Drumset – Chris Bodegraven
Evolution of the Drumset – Chris Bodegravenjaneandjury
 
Sistema de numeracion cuartotrabajo
Sistema de numeracion cuartotrabajoSistema de numeracion cuartotrabajo
Sistema de numeracion cuartotrabajoicelfernandez0395
 
INGELOX PORTFOLIO 2016
INGELOX PORTFOLIO 2016INGELOX PORTFOLIO 2016
INGELOX PORTFOLIO 2016INGELOX SAS
 

Andere mochten auch (12)

HOJA DE VIDA
HOJA DE VIDAHOJA DE VIDA
HOJA DE VIDA
 
Tarea 1 agrupamientos
Tarea 1 agrupamientosTarea 1 agrupamientos
Tarea 1 agrupamientos
 
Trabajo de sistema de numeracion
Trabajo de sistema de numeracionTrabajo de sistema de numeracion
Trabajo de sistema de numeracion
 
Module 5: MOYENS DE SUBSISTANCE
Module 5: MOYENS DE SUBSISTANCEModule 5: MOYENS DE SUBSISTANCE
Module 5: MOYENS DE SUBSISTANCE
 
Paris – We Are Not Alone – John Bell
Paris – We Are Not Alone – John BellParis – We Are Not Alone – John Bell
Paris – We Are Not Alone – John Bell
 
Evolution of the Drumset – Chris Bodegraven
Evolution of the Drumset – Chris BodegravenEvolution of the Drumset – Chris Bodegraven
Evolution of the Drumset – Chris Bodegraven
 
Module 5: SANTÉ
Module 5: SANTÉModule 5: SANTÉ
Module 5: SANTÉ
 
Powerpnt
PowerpntPowerpnt
Powerpnt
 
Brunel Broker pack 2017
Brunel Broker pack 2017Brunel Broker pack 2017
Brunel Broker pack 2017
 
Sistema de numeracion cuartotrabajo
Sistema de numeracion cuartotrabajoSistema de numeracion cuartotrabajo
Sistema de numeracion cuartotrabajo
 
INGELOX PORTFOLIO 2016
INGELOX PORTFOLIO 2016INGELOX PORTFOLIO 2016
INGELOX PORTFOLIO 2016
 
Pedagogika
PedagogikaPedagogika
Pedagogika
 

Ähnlich wie ramakant_23.9.2016 (1)

Ähnlich wie ramakant_23.9.2016 (1) (20)

VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
muok cv
muok cvmuok cv
muok cv
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
Akhlaque Ahmad
Akhlaque AhmadAkhlaque Ahmad
Akhlaque Ahmad
 
Ashutosh Mishra DOC
Ashutosh Mishra DOCAshutosh Mishra DOC
Ashutosh Mishra DOC
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
 
MujibCV
MujibCVMujibCV
MujibCV
 
New Resume JPSD
New Resume JPSDNew Resume JPSD
New Resume JPSD
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
Ben's CV
Ben's CVBen's CV
Ben's CV
 
RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016
 
N.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UDN.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UD
 

ramakant_23.9.2016 (1)

  • 1. Ramakant Kushwaha D.no:605 L, Loco Colony Civil Line, Allahabad( Dist),U.P, Email ID :ramakant.1980@rediff mail.com D.O.B – 06/01/1980, ph#: 7218143423 I T I in Electrical – PROJECT EXECUTION – 11+ EXP Objective : To Obtain a position where I can apply acquired knowledge and skills, to strive and excel in Whatever Works those are undertaken, there by continuously growing and contributing to the Main objective of the organization. TECHINICAL QUALIFICATION 1. I T I in WIREMAN Year of completion : 2002 Institute : Government ITI, Naini, Allahabad. 2. NCVT in WIREMAN Year of completion : 2005 Institute : Government ITI, Naini, Allahabad. ACADEMIC QUALIFICATION 1. Passed B.A From University of Allahabad in year of 2001 OTHERS 1. Possessing a Wireman License permit from UP Govt, Lucknow valid from 12/03/2004 to 11/03/2019. 2. One year Apprentice with M/s Alstom Limited, Naini, Allahabad Since 05/03/2004 to 04/03/2005. TRAINING PROGRAMMS ATTENDED: 1. SAFETY PROCEDURES, PRACTICES & PRECAUTIONS IN CONSTRUCTION a. Practices to be followed while working in heavy electrical construction division b. Safety precautions to be followed while working heights. c. Safety against fire & fire fighting devices. d. Using of PPE (PERSONAL PROTECTIVE EQUIPMENT) like safety belt, safety helmets safety shoes etc.
  • 2. Experience 1).M/s TECHNOLOGICAL ASSOCIATES. Designation: Site Supervisor maintenance works in UPPCL. Duration: APRIL-2005 to MAY 2006. 1. As per survey pit marking, with Board officials. 2. Pole Erection STRINGING And DTR erection. 4. Over all Responsible for site activities. 5. Manpower Management. 2).M/S MAYTAS INFRA LIMITED Designation: Supervisor - Electrical - Project execution & Erection & Commissioning Duration : June 2006 to July 2010 Projects Done so far : 1) Rural Electrification works at MAU, UP.(PGCIL) 2) Rural Electrification works at Chhindwara, MP (MPPKVVCL) 3) Feeder Separation works at Ujjain, M.P. (MPPKVVCL 3).M/S VIJAI ELECTRICALS LIMITED Designation: Supervisor - Electrical - Project execution Erection & Commissioning Duration : August 2010 To Till Date Projects Done so far 1) Feeder Separation works at Dewas Dist, M.P. (MPPKVVCL). 2) R & M of PSS and Feeder Separation work, BRGF-190 Special plan at west Champaran, BIHAR (NBPDCIL). 3) Project: INFRA PLAN PHASE – I & II under MSEDCL (MH) Maintenance work running Activates Organized: 1. Submitting the drawings to the client. Getting the Drawings Approval from client. Necessary Technical discussions with client and make the necessary changes in the drawings and getting the drawings approval from client. 2. Detailed study of the drawings and preparing the Bill of Quantities according to the Drawings. 3. Proper planning for the execution of the project.
  • 3. PROJECT DONE UNDER CLIENT : 1.Project: Rural Electrification RGGVY under PGCIL (UP) 2. Project: Rural Electrification RGGVY under MPPKVVCL,CHHINDWARA(MP) 3. Project: Feeder separation under MPPKVVCL,DEWAS ( MP) 4. Project: BRGF-190Special plan (R &M WORK) under NBPDCL,(BH) 5. Project: INFRA PLAN PHASE – I & II under MSEDCL (MH) Executing the said job as a Supervisor (Both Site planning and execution) and the following are the high lights of the project.  Preparation of the cost estimation and arriving at the sub contractor price for different works for erection.  Preparation of the invoicing schedule for the zone and man power requirement schedules  Survey & Construction of LT & HT Lines  Pole erection as per approved drawing with client.  Erection of stay sets & earthing ( Pipe, spike & coil earthing)  Erection & Commission of PTR/DTR at subs stations & Load location.  Service connections for BPL/APL etc.  Erection of 33kv & 11kv VCB, Bay extension, AB Switch/Isolator, LA etc.  Layout & SLD preparation/estimation of 33/11kv substation equipments.  Complete Planning for Execution of the project at site.  Quantification of all required materials and supply monitoring.  Material follows up with concern dept and ensuring the availability of the material at site for construction to have an uninterrupted work flow to avoid the man day loss.  Handing over formalities with client and organizing the handing over of the same. Declaration: I hereby declare that above furnished information are correct and true to the best of my knowledge and belief. Place: Nagpur Date: RAMAKANT KUSHWAHA