Definition
 A Software Project planning is the complete methodology
of programming advancement from requirement gathering
to testing and support, completed by the execution
procedures, in a specified period to achieve intended
software product.
Objectives of project planning
 The Objectives of project planning are listed below :
 It defines the roles and responsibilities of the project
management team members.
 It ensures that the project management team works
according to the business objectives.
 It checks feasibility of the schedule and user
requirements.
 It determines project constraints.
Principles Of Software Project planning
 Planning is necessary: Planning should be done before a project begins.
For effective planning, objectives and schedules should be clear and
understandable.
 Risk analysis: Before starting the project, senior management and the
project management team should consider the risks that may affect the
project.

 Tracking of project plan: Once the project plan is prepared, it should be
tracked and modified accordingly.
 Meet quality standards and produce quality deliverables: The project
plan should identify processes by which the project management team can
ensure quality in software. Based on the process selected for ensuring
quality, the time and cost for the project is estimated.
Issues In Software Project planning
 Issues with Time Management
1. Determining short time
2. Wastage of time by team
3. Wastage of time by manager
4. Wastage of time due to incident
 Issues with Finance Management
1. Short budget
2. Late payment from customer
3. Improper use of budget
Issues in software project planning
 Issues with man power
1. Poor induction
2. Untrained personnel
3. Lack of trust among team member
4. Mentally unconfident teams
 Issues with Management itself
1. Lack of interest
2. Mentally not clear about project
3. Manager himself not expert
Issues In project planning
 Software Requirements: Changing, Missing or
Unclear: A project plan is based on requirements. It goes
without saying that if you change your requirements or
identify missing requirements during the project, the
project scope will be impacted.
Activities in Software project planning
 Project planning process comprises several activities,
which are essential for carrying out a project
systematically. These activities refer to the series of tasks
performed over a period of time for developing the
software. These activities include estimation of time,
effort, and resources required and risks associated with the
project.
Activities in software project planning
Software project planning Activities
Project planning process consists of the following activities :
 Identification of project requirements: Before starting a project, it is
essential to identify the project requirements as identification of project
requirements helps in performing the activities in a systematic manner.
These requirements comprise information such as project scope, data
and functionality required in the software, and roles of the project
management team members.
 Identification of cost estimates: Along with the estimation of effort
and time, it is necessary to estimate the cost that is to be incurred on a
project. The cost estimation includes the cost of hardware, network
connections, and the cost required for the maintenance of hardware
components. In addition, cost is estimated for the individuals involved
in the project.
Software project planning activities
 Identification of risks: Risks are unexpected events that
have an adverse effect on the project. Software project
involves several risks (like technical risks and business
risks) that affect the project schedule and increase the cost
of the project. Identifying risks before a project begins
helps in understanding their probable extent of impact on
the project.
 Identification of critical success factors: For making
a project successful, critical success factors are followed.
These factors refer to the conditions that ensure greater
chances of success of a project. Generally, these factors
include support from management, appropriate budget,
appropriate schedule, and skilled software engineers.
Software project planning activities
 Preparation of project charter: A project charter provides a brief
description of the project scope, quality, time, cost, and resource
constraints as described during project planning. It is prepared by
the management for approval from the sponsor of the project.
 Preparation of project plan: A project plan provides information
about the resources that are available for the project, individuals
involved in the project, and the schedule according to which the
project is to be carried out.
 Commencement of the project: Once the project planning is
complete and resources are assigned to team members, the software
project commences.
Master Scheduling
 This master schedule represents a summary-level project
schedule the purpose of which is to identify all of the
major deliverables for the project as well as all
individual work. It contains definitions and dates for
every milestone of the project.
Inside the project master schedule is the allocation of the
time required to achieve every objective and the
documentation and illustration of the relationships
between all activities.
Components of Master Schedule
 The master schedule depends on the adequate
construction of the master project plan and the detailed
work schedules for the project to enable it to accurately
determine the accurate time each milestone will be
completed and each deliverable will be produced.
Components are:
1. Master Project plan
2. Detailed work schedule
Master project plan
Formulation of a reliable and accurate master schedule
cannot begin until a master project plan is in place. The
project master plan is primarily intended for the project
team and includes:
 Project scope and work statement.
 Project organization, resources, and training requirements.
 Technical details of every significant project activity. This
includes the work breakdown structure (WBS) that is
essential for the formulation of the detailed work
schedules required by the project master schedule.
Detailed work schedule
 The creation of the master project schedule is a process that is
formed from the bottom up. That means that the work schedules
from each team member and element must be defined before they
can be included in the master schedule. This also means that the
those who will actually do the work should be involved in
estimating the schedule for each task. This not only improves the
accuracy of the master schedule as a whole, but it helps to assure
the support of every member of the team.
Software project planning

Weitere ähnliche Inhalte

Was ist angesagt?

Software project management
Software project managementSoftware project management
Software project management
R A Akerkar
 
Prototype model
Prototype modelPrototype model
Prototype model
sadhana8
 
Software estimation
Software estimationSoftware estimation
Software estimation
Md Shakir
 

Was ist angesagt? (20)

Defining the Problem - Goals and requirements
Defining the Problem - Goals and requirementsDefining the Problem - Goals and requirements
Defining the Problem - Goals and requirements
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Software project management- Software Engineering
Software project management- Software EngineeringSoftware project management- Software Engineering
Software project management- Software Engineering
 
Language and Processors for Requirements Specification
Language and Processors for Requirements SpecificationLanguage and Processors for Requirements Specification
Language and Processors for Requirements Specification
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
Staffing level estimation
Staffing level estimation Staffing level estimation
Staffing level estimation
 
Modules and modularization criteria
Modules and modularization criteriaModules and modularization criteria
Modules and modularization criteria
 
Design Concept software engineering
Design Concept software engineeringDesign Concept software engineering
Design Concept software engineering
 
Design Model & User Interface Design in Software Engineering
Design Model & User Interface Design in Software EngineeringDesign Model & User Interface Design in Software Engineering
Design Model & User Interface Design in Software Engineering
 
Fundamental design concepts
Fundamental design conceptsFundamental design concepts
Fundamental design concepts
 
Architecture design in software engineering
Architecture design in software engineeringArchitecture design in software engineering
Architecture design in software engineering
 
Software project management
Software project managementSoftware project management
Software project management
 
Prototype model
Prototype modelPrototype model
Prototype model
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
Evolutionary models
Evolutionary modelsEvolutionary models
Evolutionary models
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
Programming team structure
Programming team structureProgramming team structure
Programming team structure
 
Design notation
Design notationDesign notation
Design notation
 
Rad model
Rad modelRad model
Rad model
 
Software project estimation
Software project estimationSoftware project estimation
Software project estimation
 

Ähnlich wie Software project planning

Quality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdfQuality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdf
alokkesh
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9
Ian Sommerville
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptx
ALI2H
 
Welcome to My Presentation Project Planning Phase.pptx
Welcome to My Presentation Project Planning Phase.pptxWelcome to My Presentation Project Planning Phase.pptx
Welcome to My Presentation Project Planning Phase.pptx
ssuser060f5f2
 

Ähnlich wie Software project planning (20)

SOFTWARE PROJECT PLANNING on Software Engineering
SOFTWARE PROJECT PLANNING on Software EngineeringSOFTWARE PROJECT PLANNING on Software Engineering
SOFTWARE PROJECT PLANNING on Software Engineering
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Project typed
Project typedProject typed
Project typed
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Software Project Management (SPM)
Software Project Management (SPM)Software Project Management (SPM)
Software Project Management (SPM)
 
Quality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdfQuality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdf
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9
 
Project Planning & Management
Project Planning & Management Project Planning & Management
Project Planning & Management
 
Activities of project planning
Activities of  project planningActivities of  project planning
Activities of project planning
 
CH. 5.pdf
CH. 5.pdfCH. 5.pdf
CH. 5.pdf
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practice
 
Project planning
Project planningProject planning
Project planning
 
Ch23
Ch23Ch23
Ch23
 
Chapter7 database management system.pptx
Chapter7 database management system.pptxChapter7 database management system.pptx
Chapter7 database management system.pptx
 
04. Project planning and management.pptx
04. Project planning and management.pptx04. Project planning and management.pptx
04. Project planning and management.pptx
 
Welcome to My Presentation Project Planning Phase.pptx
Welcome to My Presentation Project Planning Phase.pptxWelcome to My Presentation Project Planning Phase.pptx
Welcome to My Presentation Project Planning Phase.pptx
 

KĂźrzlich hochgeladen

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

KĂźrzlich hochgeladen (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Software project planning

  • 2. Definition  A Software Project planning is the complete methodology of programming advancement from requirement gathering to testing and support, completed by the execution procedures, in a specified period to achieve intended software product.
  • 3. Objectives of project planning  The Objectives of project planning are listed below :  It defines the roles and responsibilities of the project management team members.  It ensures that the project management team works according to the business objectives.  It checks feasibility of the schedule and user requirements.  It determines project constraints.
  • 4. Principles Of Software Project planning  Planning is necessary: Planning should be done before a project begins. For effective planning, objectives and schedules should be clear and understandable.  Risk analysis: Before starting the project, senior management and the project management team should consider the risks that may affect the project.   Tracking of project plan: Once the project plan is prepared, it should be tracked and modified accordingly.  Meet quality standards and produce quality deliverables: The project plan should identify processes by which the project management team can ensure quality in software. Based on the process selected for ensuring quality, the time and cost for the project is estimated.
  • 5. Issues In Software Project planning  Issues with Time Management 1. Determining short time 2. Wastage of time by team 3. Wastage of time by manager 4. Wastage of time due to incident  Issues with Finance Management 1. Short budget 2. Late payment from customer 3. Improper use of budget
  • 6. Issues in software project planning  Issues with man power 1. Poor induction 2. Untrained personnel 3. Lack of trust among team member 4. Mentally unconfident teams  Issues with Management itself 1. Lack of interest 2. Mentally not clear about project 3. Manager himself not expert
  • 7. Issues In project planning  Software Requirements: Changing, Missing or Unclear: A project plan is based on requirements. It goes without saying that if you change your requirements or identify missing requirements during the project, the project scope will be impacted.
  • 8. Activities in Software project planning  Project planning process comprises several activities, which are essential for carrying out a project systematically. These activities refer to the series of tasks performed over a period of time for developing the software. These activities include estimation of time, effort, and resources required and risks associated with the project.
  • 9. Activities in software project planning
  • 10. Software project planning Activities Project planning process consists of the following activities :  Identification of project requirements: Before starting a project, it is essential to identify the project requirements as identification of project requirements helps in performing the activities in a systematic manner. These requirements comprise information such as project scope, data and functionality required in the software, and roles of the project management team members.  Identification of cost estimates: Along with the estimation of effort and time, it is necessary to estimate the cost that is to be incurred on a project. The cost estimation includes the cost of hardware, network connections, and the cost required for the maintenance of hardware components. In addition, cost is estimated for the individuals involved in the project.
  • 11. Software project planning activities  Identification of risks: Risks are unexpected events that have an adverse effect on the project. Software project involves several risks (like technical risks and business risks) that affect the project schedule and increase the cost of the project. Identifying risks before a project begins helps in understanding their probable extent of impact on the project.  Identification of critical success factors: For making a project successful, critical success factors are followed. These factors refer to the conditions that ensure greater chances of success of a project. Generally, these factors include support from management, appropriate budget, appropriate schedule, and skilled software engineers.
  • 12. Software project planning activities  Preparation of project charter: A project charter provides a brief description of the project scope, quality, time, cost, and resource constraints as described during project planning. It is prepared by the management for approval from the sponsor of the project.  Preparation of project plan: A project plan provides information about the resources that are available for the project, individuals involved in the project, and the schedule according to which the project is to be carried out.  Commencement of the project: Once the project planning is complete and resources are assigned to team members, the software project commences.
  • 13. Master Scheduling  This master schedule represents a summary-level project schedule the purpose of which is to identify all of the major deliverables for the project as well as all individual work. It contains definitions and dates for every milestone of the project. Inside the project master schedule is the allocation of the time required to achieve every objective and the documentation and illustration of the relationships between all activities.
  • 14. Components of Master Schedule  The master schedule depends on the adequate construction of the master project plan and the detailed work schedules for the project to enable it to accurately determine the accurate time each milestone will be completed and each deliverable will be produced. Components are: 1. Master Project plan 2. Detailed work schedule
  • 15. Master project plan Formulation of a reliable and accurate master schedule cannot begin until a master project plan is in place. The project master plan is primarily intended for the project team and includes:  Project scope and work statement.  Project organization, resources, and training requirements.  Technical details of every significant project activity. This includes the work breakdown structure (WBS) that is essential for the formulation of the detailed work schedules required by the project master schedule.
  • 16. Detailed work schedule  The creation of the master project schedule is a process that is formed from the bottom up. That means that the work schedules from each team member and element must be defined before they can be included in the master schedule. This also means that the those who will actually do the work should be involved in estimating the schedule for each task. This not only improves the accuracy of the master schedule as a whole, but it helps to assure the support of every member of the team.