SlideShare ist ein Scribd-Unternehmen logo
1 von 34
HYDRO ELECTRICITY AND HYDRO 
POWER PLANT 
By- RAJKUMAR PARIHAR (B11074)
HISTORY OF HYDROPOWER 
 The first hydroelectric power dam in the world was built in 
Appleton, Wisconsin in 1882. 
 In India, Jamshed ji Tata built the first hydroelectric power dam 
in the Western Ghats of Maharashtra in the early 1900s to supply 
power to Bombay’s Cotton and Textile Mills. 
 He took the British Government’s permission to build dams, 
namely the Andhra, Sirowata, Valvan and Mulshi hydel dams in 
the Western Ghats to generate electricity using high rainfalls in 
the hills as storage.
Hydroelectric power 
•India ranks 5th in terms of exploitable hydro-potential on 
global scenario. 
•In 2012, India is the 7th largest producer of hydroelectric 
power with 114,000 GW hours 
•With installed capacity of 37 GW , it produces 3.3% of the 
world's total.
Hydropower is a renewable, non-polluting and environment 
friendly source of energy. 
Oldest energy technique known to mankind for conversion of 
mechanical energy into electrical energy. 
Contributes around 22% of the world electricity supply 
generated. 
The Working Group of the Planning Commission for the Twelfth 
Plan has estimated a total requirement of 1403 Billion Units(BU) 
per annum by the end of 12th Five Year Plan (2016–17) out of 
which share of hydro generation is expected to be 12%. As per 
Planning Commission, the capacity addition for the 12th Five Year 
Plan on an all-India comprises 10,897 MW for Hydro.
•The public sector has a predominant share of 97% in this 
sector, 
•National Hydroelectric Power Corporation (NHPC), 
•Northeast Electric Power Company (NEEPCO), 
• Satluj Jal Vidyut Nigam (SJVNL), 
• THDC, 
• NTPC-Hydro 
• are a few public sector companies engaged in 
development of Hydroelectric Power in India.
•The hydro power plants at Darjeeling and Shimsha 
(Shivanasamudra) were established in 1898 and 1902 
respectively and are among the first in Asia. 
•It is the most widely used form of renewable energy. 
•The present installed capacity as on September 30, 2013 is 
approximately 39,788.40 MW which is 17.39% of total 
electricity generation in India.
•Bhakra Beas Management Board (BBMB), an illustrative state 
owned enterprise in north India, has an installed capacity of 2.9 
GW and generates 12,000-14,000 million units per year. The cost 
of generation of energy after four decades of operation is about 
20 paise/kWh. 
•BBMB reservoirs annually supply water for irrigation to 
12.5 million acres (51,000 km2; 19,500 sq mi) of agricultural land 
of partner states, enabling northern India in its green revolution.
Working Principle
DAM TURBINE 
POWER HOUSE 
INTAKE 
GENERATOR 
PENSTOCK 
RESEVOIR 
POWER LINE 
TRANSFORMER
The movement of water can be used to make electricity. 
Energy from 
water is created by the force of water moving from a higher 
elevation 
to a lower elevation through a large pipe (penstock). When the 
water 
reaches the end of the pipe, it hits and spins a water wheel or 
turbine. 
The turbine rotates the connected shaft, which then turns the 
generator, making electricity.
 its function is to convert the K.E of moving water into 
mechanical energy 
 The water strikes and turns the large blades of a turbine, which 
is attached to a generator above it by way of a shaft.
BASIC PRINCIPAL 
 Heart of the hydroelectric . 
 The basic process is to rotate a series of gaint magnets inside 
coils of wire. This process moves electrons, which 
produces electrical current.
INSIDE THE GENERATOR:- 
• 1. Shaft 
2. Excitor 
3. Rotor 
4. Stator
Principle 
• As the turbine turns, the excitor sends an electrical current 
to the rotor. The rotor is a series of large electromagnets 
that spins inside a tightly-wound coil of copper wire, called 
the stator. The magnetic field between the coil and the 
magnets creates an electric current.
POWER HOUSE AND EQUIPMENTS:- 
In the scheme of hydropower the role of power house is to 
protect the electromechanical equipment that convert the 
potential energy of water into electricity. 
Following are the equipments of power plant: 
1.Valve 5.Condensor 
2.Turbine 6.Protection System 
3.Generator 7.DC emergency Supply 
4.Control System 8.Power and current transformer
Efficiency 
• A hydroelectric power plant operates under the 
following conditions: 
Water flow rate: 1.25 m3/s 
River inlet: 1 atm., 4.7°C 
Discharge: 1 atm., 5.1°C, 254 m below intake. 
Assuming that water intlet and discharge ducts 
have the same areas, and that no heat is 
transferred to or absorbed from the 
surroundings.
Efficiency 
• density of water = 0.998 g/cm³ = 998 kg/m³ 
1.25m³ x 998 kg/m³ = 1248 kg 
PE of the water is 1248 kg x 9.81 x 254 = 
3.108e6 joules 
E lost due to heating is 
E = 4.17 kJ/(kg.K) x 1248 kg x 0.4K = 2082 kJ 
Subtracting 
E gained = 3108 kJ - 2082 kJ = 1026 kJ 
eff = 1026/3108 = 33%
World’s hydroelectric capacity
Major hydro power plants in India
Station Operator State Generator 
Units 
Capacity 
(MW) 
Tehri Dam THDC Uttarakhand 4 x 250, 4 x 100, 
4 x 250 
2,400 
Koyna MahaGenco Maharashtra 4 x 70, 4 x 80, 2 x 
20, 4 x 80, 4 x 
250 
1.960 
Srisailam Dam APGenco Andhra Pradesh 6 x 150, 7 x 110 1,670 
Nathpa Jhakri SJVNL Himachal 
Pradesh 
6 x 250 1,500 
Sharavathi KPCL Karnataka 10 x 103.5, 2 x 
27.5, 4 x 60 
1,469 
Sardar Sarovar Sardar Sarovar 
Narmada Nigam 
Gujarat 6 x 200, 5 x 140 1,450 
Bhakra Dam BBMB Punjab 5 x 108, 5 x 157 1,325 
Kalinadi KPCL Karnataka 2 x 50, 1 x 135, 5 
x 150, 3 x 50, 3 x 
40 
1,240 
Chamera Dam NHPC Himachal 
Pradesh 
3 x 180, 3 x 100, 
3 x 77 
1,071
Major hydro power plants in World
NAME COUNTRY INSTALLED CAPACITY 
(MW) 
Three Gorges Dam People's Republic of China 22,500 
Itaipu Dam Brazil 14,000 
Guri Venezuela 8,850 
Tucuruí Brazil 8,370 
Grand Coulee United States 6,809 
Longtan Dam People's Republic of China 6,426 
Krasnoyarsk Russia 6,000 
Robert-Bourassa Canada 5,616 
Churchill Falls Canada 5,428
Top 5 Hydropower Producing Countries
India’s past hydro growth data
In the last 30 years, the proportion of 
hydroelectric capacity in the Indian power 
system has considerably reduced. 
Dropped from 46% in 1970 to 40% in 1980, 29% 
in 1990 and 25% in 2008. 
Reasons:- 
Indian power supply industry has always 
experienced the situation of shortages both in 
energy and peaking requirements. To tide over 
the shortage in shortest possible time, more 
dependence was placed on sources of power 
generation with shorter gestation period.
Future of hydroelectric power in India 
The Working Group of the Planning Commission 
for the Twelfth Plan has estimated a total 
requirement of 1403 Billion Units(BU) per 
annum by the end of 12th Five Year Plan 
(2016–17), out of which share of hydro 
generation is expected to be 12%. As per 
Planning Commission, the capacity addition 
for the 12th Five Year Plan on an all-India 
comprises 10,897 MW for Hydro.
Acceptability in Society 
Hydropower, while being projected as a clean and renewable 
energy source, has time and again been resisted vociferously 
in North East India in recent times because of the obvious and 
unintended social and environmental impacts. 
The anticipated negative impacts of the associated dam and 
reservoir construction have cast a threat to the security of the 
indigenous people in terms of water, food, livelihood, energy 
and above all, the related socio-economic concerns. 
This is all the more due to the uncertainties flowing from an 
inadequate understanding of the possible geo-environmental 
impacts in a highly sensitive terrain. To cope and live with the 
potential negative ramifications of hydropower projects, a 
comprehensive hydropower policy with emphasis on long-term 
environmental and social security and sustainability is 
imperative.
ADVANTAGES: 
1) No fuel required 
2) Cost of electricity is constant 
3) No air-pollution is created 
4) Long life 
5) Cost of generation of electricity 
6) Can easily work during high peak daily loads 
7) Irrigation of farms 
8) Water sports and gardens 
9) Prevents floods
DISADVANTAGES: 
1) Disrupts the aquatic ecosystems 
2) Disruption in the surrounding areas 
3) Requires large areas 
4) Large scale human displacement 
5) Very high capital cost or investment 
6) High quality construction 
7) Site specific 
8) Effects on environment 
9) Safety of the dams
CONCLUSIONS: 
Hydroelectric power has always been an important part of the 
world’s electricity supply, providing reliable, cost efficient, 
electricity, and will continue to do so in the future. 
Hydropower has environmental impacts, which are very different 
from those of fossil fuel power plants. The actual effects of dams 
and reservoirs on various ecosystems are only now becoming 
understood. 
The future demand of hydro electricity will depend on future 
demand for electricity, as well as how societies value the 
environmental impacts of hydro electric power compared to the 
impacts of other sources of electricity.

Weitere ähnliche Inhalte

Was ist angesagt?

Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plantRatan Debnath
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantsnelkoli
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantpparth004
 
Hydroelectric power plants
Hydroelectric power plantsHydroelectric power plants
Hydroelectric power plantsgosia
 
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Ryan Triadhitama
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plantShaik Afzal
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104Mohammad Asif
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Suryasuryakant soni
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecturec3b2a1
 
Project Report Hydraulic Power Plant
Project Report Hydraulic Power PlantProject Report Hydraulic Power Plant
Project Report Hydraulic Power PlantSanjay Duttamukhya
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantSiraskarCom
 

Was ist angesagt? (20)

Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plant
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydroelectric power plants
Hydroelectric power plantsHydroelectric power plants
Hydroelectric power plants
 
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)
 
Pump storage Hydroelectricity
Pump storage HydroelectricityPump storage Hydroelectricity
Pump storage Hydroelectricity
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydropower
HydropowerHydropower
Hydropower
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Surya
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
 
Hydropower
HydropowerHydropower
Hydropower
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Tidal energy technology
Tidal energy technologyTidal energy technology
Tidal energy technology
 
Project Report Hydraulic Power Plant
Project Report Hydraulic Power PlantProject Report Hydraulic Power Plant
Project Report Hydraulic Power Plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydropower
HydropowerHydropower
Hydropower
 

Andere mochten auch

Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant Prasad Vejendla
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plantpranavn007
 
Hydropower
HydropowerHydropower
Hydropowerfscseema
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantNishkam Dhiman
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantYuri Melliza
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Pratik Diyora
 
Hydro power ppt
Hydro power pptHydro power ppt
Hydro power pptsrgirlsdk
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Planttavinav
 
Hydro Power Plant (P)
Hydro Power Plant (P)Hydro Power Plant (P)
Hydro Power Plant (P)Gaurav Maniar
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plantDario Caelli
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSRAJ BAIRWA
 
koteshwar hydro electric power plant 400 mw
koteshwar hydro electric power plant 400 mwkoteshwar hydro electric power plant 400 mw
koteshwar hydro electric power plant 400 mwSAIF ALI ZAIDI
 
Hydropower slide show.
Hydropower slide show.Hydropower slide show.
Hydropower slide show.abdulla4p34h
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Sheel Shah
 
Hydroelectricity or Hydropower
Hydroelectricity or HydropowerHydroelectricity or Hydropower
Hydroelectricity or HydropowerPinguandme23
 
Hydroelectric power
Hydroelectric powerHydroelectric power
Hydroelectric powertams
 
Hydroelectric powerplant
Hydroelectric  powerplantHydroelectric  powerplant
Hydroelectric powerplantAbhi1900
 
[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plantU.E.T Lahore Pakistan
 

Andere mochten auch (20)

Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Hydropower
HydropowerHydropower
Hydropower
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
 
Hydro power ppt
Hydro power pptHydro power ppt
Hydro power ppt
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
 
Hydro Power Plant (P)
Hydro Power Plant (P)Hydro Power Plant (P)
Hydro Power Plant (P)
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Hydroelectric power
Hydroelectric powerHydroelectric power
Hydroelectric power
 
Hydroelectric Power
Hydroelectric PowerHydroelectric Power
Hydroelectric Power
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTS
 
koteshwar hydro electric power plant 400 mw
koteshwar hydro electric power plant 400 mwkoteshwar hydro electric power plant 400 mw
koteshwar hydro electric power plant 400 mw
 
Hydropower slide show.
Hydropower slide show.Hydropower slide show.
Hydropower slide show.
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
 
Hydroelectricity or Hydropower
Hydroelectricity or HydropowerHydroelectricity or Hydropower
Hydroelectricity or Hydropower
 
Hydroelectric power
Hydroelectric powerHydroelectric power
Hydroelectric power
 
Hydroelectric powerplant
Hydroelectric  powerplantHydroelectric  powerplant
Hydroelectric powerplant
 
[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant
 

Ähnlich wie Hydro electricity and hydro power plant

hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptxhydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptxlakshmanaraoJeeru1
 
Modelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage TransmissionModelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage Transmissiontheijes
 
Portable Micro Hydro Electrical Generator
Portable Micro Hydro Electrical GeneratorPortable Micro Hydro Electrical Generator
Portable Micro Hydro Electrical GeneratorIOSR Journals
 
Hydro Electric Power Plant
Hydro  Electric  Power  PlantHydro  Electric  Power  Plant
Hydro Electric Power PlantANKIT KUMAR
 
Final floating hydro turbine
Final floating hydro turbineFinal floating hydro turbine
Final floating hydro turbineSushant Patil
 
Hydro Electric Power Plant
Hydro Electric Power Plant Hydro Electric Power Plant
Hydro Electric Power Plant ANKIT KUMAR
 
NPCIL RAWATBHATA PPT
NPCIL RAWATBHATA PPTNPCIL RAWATBHATA PPT
NPCIL RAWATBHATA PPTLekhraJ Meena
 
Renewable Energy.pdf
Renewable Energy.pdfRenewable Energy.pdf
Renewable Energy.pdfAkashSahoo47
 
NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015LekhraJ Meena
 
npcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdfnpcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdfSamarthBhatnagar14
 
Hydro electric power
Hydro electric powerHydro electric power
Hydro electric powerLEE-MALAK
 
Report on-water-turbines
Report on-water-turbinesReport on-water-turbines
Report on-water-turbinesKANAIYABHATT
 
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT Al KAREEM SHAIKH
 
Industrial Training Report.pdf
Industrial Training Report.pdfIndustrial Training Report.pdf
Industrial Training Report.pdfZahidLateef2
 

Ähnlich wie Hydro electricity and hydro power plant (20)

hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptxhydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
 
Thesis on Hydro Power Plant
Thesis on Hydro Power PlantThesis on Hydro Power Plant
Thesis on Hydro Power Plant
 
hydro-181014224840.pdf
hydro-181014224840.pdfhydro-181014224840.pdf
hydro-181014224840.pdf
 
Hydro ppt
Hydro pptHydro ppt
Hydro ppt
 
Modelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage TransmissionModelling Of Underground Cables for High Voltage Transmission
Modelling Of Underground Cables for High Voltage Transmission
 
Portable Micro Hydro Electrical Generator
Portable Micro Hydro Electrical GeneratorPortable Micro Hydro Electrical Generator
Portable Micro Hydro Electrical Generator
 
Hydro Electric Power Plant
Hydro  Electric  Power  PlantHydro  Electric  Power  Plant
Hydro Electric Power Plant
 
Final floating hydro turbine
Final floating hydro turbineFinal floating hydro turbine
Final floating hydro turbine
 
Renewable Energy Sources
Renewable Energy SourcesRenewable Energy Sources
Renewable Energy Sources
 
Hydro Electric Power Plant
Hydro Electric Power Plant Hydro Electric Power Plant
Hydro Electric Power Plant
 
NPCIL RAWATBHATA PPT
NPCIL RAWATBHATA PPTNPCIL RAWATBHATA PPT
NPCIL RAWATBHATA PPT
 
Renewable Energy.pdf
Renewable Energy.pdfRenewable Energy.pdf
Renewable Energy.pdf
 
NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015
 
npcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdfnpcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdf
 
Hydro electric power
Hydro electric powerHydro electric power
Hydro electric power
 
Report on-water-turbines
Report on-water-turbinesReport on-water-turbines
Report on-water-turbines
 
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
MICRO PROJECT ON , HYDROELECTRICITY & HYDROELECTRIC POWER PLANT
 
Industrial Training Report.pdf
Industrial Training Report.pdfIndustrial Training Report.pdf
Industrial Training Report.pdf
 
Resources and power development
Resources and power developmentResources and power development
Resources and power development
 
Hydropower energy
Hydropower energyHydropower energy
Hydropower energy
 

Kürzlich hochgeladen

Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Kürzlich hochgeladen (20)

Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

Hydro electricity and hydro power plant

  • 1. HYDRO ELECTRICITY AND HYDRO POWER PLANT By- RAJKUMAR PARIHAR (B11074)
  • 2. HISTORY OF HYDROPOWER  The first hydroelectric power dam in the world was built in Appleton, Wisconsin in 1882.  In India, Jamshed ji Tata built the first hydroelectric power dam in the Western Ghats of Maharashtra in the early 1900s to supply power to Bombay’s Cotton and Textile Mills.  He took the British Government’s permission to build dams, namely the Andhra, Sirowata, Valvan and Mulshi hydel dams in the Western Ghats to generate electricity using high rainfalls in the hills as storage.
  • 3. Hydroelectric power •India ranks 5th in terms of exploitable hydro-potential on global scenario. •In 2012, India is the 7th largest producer of hydroelectric power with 114,000 GW hours •With installed capacity of 37 GW , it produces 3.3% of the world's total.
  • 4. Hydropower is a renewable, non-polluting and environment friendly source of energy. Oldest energy technique known to mankind for conversion of mechanical energy into electrical energy. Contributes around 22% of the world electricity supply generated. The Working Group of the Planning Commission for the Twelfth Plan has estimated a total requirement of 1403 Billion Units(BU) per annum by the end of 12th Five Year Plan (2016–17) out of which share of hydro generation is expected to be 12%. As per Planning Commission, the capacity addition for the 12th Five Year Plan on an all-India comprises 10,897 MW for Hydro.
  • 5. •The public sector has a predominant share of 97% in this sector, •National Hydroelectric Power Corporation (NHPC), •Northeast Electric Power Company (NEEPCO), • Satluj Jal Vidyut Nigam (SJVNL), • THDC, • NTPC-Hydro • are a few public sector companies engaged in development of Hydroelectric Power in India.
  • 6. •The hydro power plants at Darjeeling and Shimsha (Shivanasamudra) were established in 1898 and 1902 respectively and are among the first in Asia. •It is the most widely used form of renewable energy. •The present installed capacity as on September 30, 2013 is approximately 39,788.40 MW which is 17.39% of total electricity generation in India.
  • 7. •Bhakra Beas Management Board (BBMB), an illustrative state owned enterprise in north India, has an installed capacity of 2.9 GW and generates 12,000-14,000 million units per year. The cost of generation of energy after four decades of operation is about 20 paise/kWh. •BBMB reservoirs annually supply water for irrigation to 12.5 million acres (51,000 km2; 19,500 sq mi) of agricultural land of partner states, enabling northern India in its green revolution.
  • 9.
  • 10.
  • 11. DAM TURBINE POWER HOUSE INTAKE GENERATOR PENSTOCK RESEVOIR POWER LINE TRANSFORMER
  • 12. The movement of water can be used to make electricity. Energy from water is created by the force of water moving from a higher elevation to a lower elevation through a large pipe (penstock). When the water reaches the end of the pipe, it hits and spins a water wheel or turbine. The turbine rotates the connected shaft, which then turns the generator, making electricity.
  • 13.
  • 14.  its function is to convert the K.E of moving water into mechanical energy  The water strikes and turns the large blades of a turbine, which is attached to a generator above it by way of a shaft.
  • 15. BASIC PRINCIPAL  Heart of the hydroelectric .  The basic process is to rotate a series of gaint magnets inside coils of wire. This process moves electrons, which produces electrical current.
  • 16. INSIDE THE GENERATOR:- • 1. Shaft 2. Excitor 3. Rotor 4. Stator
  • 17. Principle • As the turbine turns, the excitor sends an electrical current to the rotor. The rotor is a series of large electromagnets that spins inside a tightly-wound coil of copper wire, called the stator. The magnetic field between the coil and the magnets creates an electric current.
  • 18. POWER HOUSE AND EQUIPMENTS:- In the scheme of hydropower the role of power house is to protect the electromechanical equipment that convert the potential energy of water into electricity. Following are the equipments of power plant: 1.Valve 5.Condensor 2.Turbine 6.Protection System 3.Generator 7.DC emergency Supply 4.Control System 8.Power and current transformer
  • 19. Efficiency • A hydroelectric power plant operates under the following conditions: Water flow rate: 1.25 m3/s River inlet: 1 atm., 4.7°C Discharge: 1 atm., 5.1°C, 254 m below intake. Assuming that water intlet and discharge ducts have the same areas, and that no heat is transferred to or absorbed from the surroundings.
  • 20. Efficiency • density of water = 0.998 g/cm³ = 998 kg/m³ 1.25m³ x 998 kg/m³ = 1248 kg PE of the water is 1248 kg x 9.81 x 254 = 3.108e6 joules E lost due to heating is E = 4.17 kJ/(kg.K) x 1248 kg x 0.4K = 2082 kJ Subtracting E gained = 3108 kJ - 2082 kJ = 1026 kJ eff = 1026/3108 = 33%
  • 22. Major hydro power plants in India
  • 23. Station Operator State Generator Units Capacity (MW) Tehri Dam THDC Uttarakhand 4 x 250, 4 x 100, 4 x 250 2,400 Koyna MahaGenco Maharashtra 4 x 70, 4 x 80, 2 x 20, 4 x 80, 4 x 250 1.960 Srisailam Dam APGenco Andhra Pradesh 6 x 150, 7 x 110 1,670 Nathpa Jhakri SJVNL Himachal Pradesh 6 x 250 1,500 Sharavathi KPCL Karnataka 10 x 103.5, 2 x 27.5, 4 x 60 1,469 Sardar Sarovar Sardar Sarovar Narmada Nigam Gujarat 6 x 200, 5 x 140 1,450 Bhakra Dam BBMB Punjab 5 x 108, 5 x 157 1,325 Kalinadi KPCL Karnataka 2 x 50, 1 x 135, 5 x 150, 3 x 50, 3 x 40 1,240 Chamera Dam NHPC Himachal Pradesh 3 x 180, 3 x 100, 3 x 77 1,071
  • 24.
  • 25. Major hydro power plants in World
  • 26. NAME COUNTRY INSTALLED CAPACITY (MW) Three Gorges Dam People's Republic of China 22,500 Itaipu Dam Brazil 14,000 Guri Venezuela 8,850 Tucuruí Brazil 8,370 Grand Coulee United States 6,809 Longtan Dam People's Republic of China 6,426 Krasnoyarsk Russia 6,000 Robert-Bourassa Canada 5,616 Churchill Falls Canada 5,428
  • 27. Top 5 Hydropower Producing Countries
  • 28. India’s past hydro growth data
  • 29. In the last 30 years, the proportion of hydroelectric capacity in the Indian power system has considerably reduced. Dropped from 46% in 1970 to 40% in 1980, 29% in 1990 and 25% in 2008. Reasons:- Indian power supply industry has always experienced the situation of shortages both in energy and peaking requirements. To tide over the shortage in shortest possible time, more dependence was placed on sources of power generation with shorter gestation period.
  • 30. Future of hydroelectric power in India The Working Group of the Planning Commission for the Twelfth Plan has estimated a total requirement of 1403 Billion Units(BU) per annum by the end of 12th Five Year Plan (2016–17), out of which share of hydro generation is expected to be 12%. As per Planning Commission, the capacity addition for the 12th Five Year Plan on an all-India comprises 10,897 MW for Hydro.
  • 31. Acceptability in Society Hydropower, while being projected as a clean and renewable energy source, has time and again been resisted vociferously in North East India in recent times because of the obvious and unintended social and environmental impacts. The anticipated negative impacts of the associated dam and reservoir construction have cast a threat to the security of the indigenous people in terms of water, food, livelihood, energy and above all, the related socio-economic concerns. This is all the more due to the uncertainties flowing from an inadequate understanding of the possible geo-environmental impacts in a highly sensitive terrain. To cope and live with the potential negative ramifications of hydropower projects, a comprehensive hydropower policy with emphasis on long-term environmental and social security and sustainability is imperative.
  • 32. ADVANTAGES: 1) No fuel required 2) Cost of electricity is constant 3) No air-pollution is created 4) Long life 5) Cost of generation of electricity 6) Can easily work during high peak daily loads 7) Irrigation of farms 8) Water sports and gardens 9) Prevents floods
  • 33. DISADVANTAGES: 1) Disrupts the aquatic ecosystems 2) Disruption in the surrounding areas 3) Requires large areas 4) Large scale human displacement 5) Very high capital cost or investment 6) High quality construction 7) Site specific 8) Effects on environment 9) Safety of the dams
  • 34. CONCLUSIONS: Hydroelectric power has always been an important part of the world’s electricity supply, providing reliable, cost efficient, electricity, and will continue to do so in the future. Hydropower has environmental impacts, which are very different from those of fossil fuel power plants. The actual effects of dams and reservoirs on various ecosystems are only now becoming understood. The future demand of hydro electricity will depend on future demand for electricity, as well as how societies value the environmental impacts of hydro electric power compared to the impacts of other sources of electricity.