Guided by Dr. D. G. Regulwar
Presentated by
Nikhil kulkarni BE09 F01 F001
Rahul Agrawal BE09 F01 F017
Sanket Singi BE09 F01 F059
Ashutosh Pawar BE09 F01 F060
Kishor Sondge BE09 F01 F063
Planning, Scheduling,
Monitoring and Tracking of
Construction Project
GOVT. COLLEGE OF ENGINEERING, AURANGABAD
Introduction
1 May 2013 2
• To study and use primavera P3 for planning,
scheduling, monitoring and tracking of
construction project.
• Planning and scheduling aims at timely
execution of work.
• Monitoring and tracking is important to find
the deviation from the planned schedule.
Construction Project Management
1 May 2013 3
• Construction project is a high value time
bound with predetermined performance
objectives.
• Human and non human resources
(completion).
Function of Project Management
1 May 2013 4
• Planning : course of action to guide Project
completion
• Organizing : arrangement of resources
• Staffing : selection of expertise
• Directing : guiding of work
• Controlling : creation of system to measure
report and forecast deviation.
Time Planning Process
1 May 2013 5
• Project Work Breakdown : breaking down into
sub project
• Modeling & Analyzing Network : developing a
logic diagram
• Scheduling Work Programs : putting time plan
on calendar basis
Resources Planning Process
1 May 2013 6
• Manpower
• Material
• Equipment
• Standard Cost
• Budget
5/1/2013
2
Objective of Project
1 May 2013 7
• To prepare CPM (critical path method), Chart
for a building being built.
• To acquire good Knowledge of primavera P3
software which is globally used.
Desired results of Planning and
scheduling
1 May 2013 8
• To have un-interrupted flow of work
• To reduce amount of re-work
• To minimize confusion and misunderstanding
• To get the understanding of amount of work done
by each labour
• To integrate all work and ensure a quality project.
Factors affecting work Scheduling
1 May 2013 9
• Time
• Manpower
• Materials
• Machinery
• Capital
Techniques for planning and
scheduling
1 May 2013 10
• Bar Chart
• Network Technique
– Critical Path Method
– Program Evaluation and Review Technique
Introduction to Primavera Project
Planner
1 May 2013 11
• It is product of Primavera systems Inc., USA.
• It is a multi-user product that operate on LAN Local Area
Network.
• Can manage up to one lakh activities.
• It help to build project network quickly and graphically.
• We can impose up to ten restrictions.
Primavera File Structure
1 May 2013 12
• The project has mandatory four characters for
project name.
• All files will have P3 extension.
• All files are preferred with four characters file name.
• It works with one file type only. i.e. P3
5/1/2013
3
Project Overview
1 May 2013 13
• A Building of configuration G+1 of an approximate area of 1100 Sq ft is
considered in this project.
• The building is being built for residential purposes in Shahnoorwadi.
• The actual work is started in December 2012.
• The software tool Primavera Project Planner is used for planning,
scheduling and controlling.
• The activities required to complete the building structure (excluding the
interiors) was identified and was fed as an input to Primavera along with
their durations.
• The critical activities and the project time which is represented by the
summation of critical path durations are obtained from the primavera
schedule.
1 May 2013 14
STEPS FOR PLANNING & SCHEDULING
i. Creating A Project
• Open a new project name & is given as ABCD.
• The client name & location is selected.
• The planning unit is selected in days.
• The project start date is entered.
ii. Defining Calendars
• Before the activity list is entered , the calendar are defined.
• Calendars are used to model the working time for each activity.
Planning and Scheduling
in Primavera
Add New Project
1 May 2013 15
Assigning the Start and Finish
1 May 2013 16
Blank Page
1 May 2013 17 1 May 2013 18
Identification Of Project Activities
• The activities required to complete the project is identified and
the activity list is entered
Sequencing the Activities
• Finish to start relationship : Start of successor activity depends on
the completion of predecessor.
• Start to Start relationship : start of successor activity depends on
start of predecessor activity.
• Finish to Finish relationship : finish of successor activity depends
on finish of its predecessor activity.
• Start to Finish relationship : successor activity can’t complete until
its predecessor activity start.
Activity’s Description
5/1/2013
4
Activity’s Description
1 May 2013 19
List of Activities
1 May 2013 20
Activity Form
1 May 2013 21 1 May 2013 22
Cost and Resources
1 May 2013 23
Editing Bar
1 May 2013 24
5/1/2013
5
End Point of the Bar
1 May 2013 25
Time Scale
1 May 2013 26
Editing Bar
1 May 2013 27 1 May 2013 28
GENERATION OF REPORT SCHEDULE
•Schedule reports contain a tabular list schedule
data, including activity ID’s description, durations,
float early & late schedule dates.
•Additional data relating to this report shows the
activity ID, successors, predecessors & total float for
that particular activity.
Tabular Reports
1 May 2013 29
Tabular Reports
1 May 2013 30
5/1/2013
6
Tabular Reports
1 May 2013 31
Time Scale Logic..
1 May 2013 32
Time Scale Logic..
1 May 2013 33
Time Scale Logic..
1 May 2013 34
PERT….
1 May 2013 35 1 May 2013 36
• CPM of the building G+1 is obtained using the planning and scheduling
software using primavera project planner P3.
• The activity required to complete the structure are identified and put
in to primavera project planner.
• The scheduled network was then analyzed & schedule report was
generated using Primavera.
• Obtaining optimum network diagram & minimizing the time and cost
is the major objective.
• It has helped us to understand fundamental principles & techniques of
construction project management.
• An important part of project was acquisition of knowledge about
Primavera Project Planner.
Conclusion
5/1/2013
7
1 May 2013 37
1. Primavera Reference Guide (2004), CADD Centre Training Services Pvt.
Ltd.
2. Garold D. Oberlender (2000), Project Management for Engineering and
Construction, McGraw Hil
3. Chitkara K. K. (2001), “Construction Project Management” Tata
McGraw Hill Publishing, New Delhi
4. Sandeep Mantri, “ A to Z Practical Building Construction and its
Management”, 8th edition, Satya Prakashan, New Delhi.
References
1 May 2013 38

Weitere ähnliche Inhalte

Was ist angesagt?

Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
B Sai Prasad
 
Cpa & pert charts
Cpa & pert chartsCpa & pert charts
Cpa & pert charts
Golban Oana
 
Project Defense
Project DefenseProject Defense
Project Defense
Ali Zannah
 
Introduction - organization
Introduction - organizationIntroduction - organization
Introduction - organization
SOPUGent
 

Was ist angesagt? (20)

Project Tracking & SPC
Project Tracking & SPCProject Tracking & SPC
Project Tracking & SPC
 
Successful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project ScheduleSuccessful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project Schedule
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
 
AgileProject
AgileProjectAgileProject
AgileProject
 
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using PrimaveraTracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using Primavera
 
Cpa & pert charts
Cpa & pert chartsCpa & pert charts
Cpa & pert charts
 
Cpm contractor slide-Amit Payal
Cpm contractor slide-Amit PayalCpm contractor slide-Amit Payal
Cpm contractor slide-Amit Payal
 
Project Defense
Project DefenseProject Defense
Project Defense
 
PROJECT SCHEDULING
PROJECT SCHEDULINGPROJECT SCHEDULING
PROJECT SCHEDULING
 
09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1
 
Project management
Project managementProject management
Project management
 
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013
 
Ayoga Planner - Construction Project Management Software
Ayoga Planner - Construction Project Management SoftwareAyoga Planner - Construction Project Management Software
Ayoga Planner - Construction Project Management Software
 
Project scheduling and tracking
Project scheduling and  trackingProject scheduling and  tracking
Project scheduling and tracking
 
Construction Project Schedule | CONSYSA
Construction Project Schedule | CONSYSAConstruction Project Schedule | CONSYSA
Construction Project Schedule | CONSYSA
 
Session 8 4th edition PMP
Session 8 4th edition PMPSession 8 4th edition PMP
Session 8 4th edition PMP
 
Project Scheduling
Project Scheduling Project Scheduling
Project Scheduling
 
Introduction - organization
Introduction - organizationIntroduction - organization
Introduction - organization
 

Ähnlich wie Primavera p3 [compatibility mode]

Sharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptxSharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptx
LukasDhani
 
MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docxMBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
alfredacavx97
 
Day 3 Schedule -walaa (3).pptx
Day 3 Schedule -walaa (3).pptxDay 3 Schedule -walaa (3).pptx
Day 3 Schedule -walaa (3).pptx
MohanadRabea1
 

Ähnlich wie Primavera p3 [compatibility mode] (20)

Sharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptxSharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptx
 
Project Sheduling.pptx
Project Sheduling.pptxProject Sheduling.pptx
Project Sheduling.pptx
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdf
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docxMBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Lecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdfLecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdf
 
Chapter 4.pptx
Chapter 4.pptxChapter 4.pptx
Chapter 4.pptx
 
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
 
06 projecttimemanagement
06 projecttimemanagement06 projecttimemanagement
06 projecttimemanagement
 
Session 5 4th edition PMP
Session 5 4th edition PMPSession 5 4th edition PMP
Session 5 4th edition PMP
 
Unit 3 Project scheduling - gantt chart.pptx
Unit 3 Project scheduling - gantt chart.pptxUnit 3 Project scheduling - gantt chart.pptx
Unit 3 Project scheduling - gantt chart.pptx
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
Day 3 Schedule -walaa (3).pptx
Day 3 Schedule -walaa (3).pptxDay 3 Schedule -walaa (3).pptx
Day 3 Schedule -walaa (3).pptx
 
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
 

Mehr von Rahul

Retaining walls
Retaining wallsRetaining walls
Retaining walls
Rahul
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Rahul
 
Indiandrinking
IndiandrinkingIndiandrinking
Indiandrinking
Rahul
 

Mehr von Rahul (20)

ACEP Magazine 3.pdf
ACEP Magazine 3.pdfACEP Magazine 3.pdf
ACEP Magazine 3.pdf
 
ACEP Magazine 2.pdf
ACEP Magazine 2.pdfACEP Magazine 2.pdf
ACEP Magazine 2.pdf
 
GECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfGECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdf
 
ACEP Magazine.pdf
ACEP Magazine.pdfACEP Magazine.pdf
ACEP Magazine.pdf
 
Scope of geology in engineering
Scope of geology in engineeringScope of geology in engineering
Scope of geology in engineering
 
Engineering project writing
Engineering project writingEngineering project writing
Engineering project writing
 
Wce agronomic water conservation measures
Wce agronomic water conservation measuresWce agronomic water conservation measures
Wce agronomic water conservation measures
 
WCE -- watershed management
WCE -- watershed managementWCE -- watershed management
WCE -- watershed management
 
Unit i gel space ratio rpa
Unit i gel space ratio rpaUnit i gel space ratio rpa
Unit i gel space ratio rpa
 
Unit vi ferro cement rpa
Unit vi ferro cement rpaUnit vi ferro cement rpa
Unit vi ferro cement rpa
 
Acem water cement ratio MCQ
Acem water cement ratio MCQAcem water cement ratio MCQ
Acem water cement ratio MCQ
 
Formwork
FormworkFormwork
Formwork
 
April bulletin
April bulletinApril bulletin
April bulletin
 
Construction equpiment
Construction equpimentConstruction equpiment
Construction equpiment
 
Egrm
EgrmEgrm
Egrm
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey building
 
Indiandrinking
IndiandrinkingIndiandrinking
Indiandrinking
 
Circular slabs
Circular slabsCircular slabs
Circular slabs
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 

Primavera p3 [compatibility mode]

  • 1. 5/1/2013 1 1 May 2013 1 Guided by Dr. D. G. Regulwar Presentated by Nikhil kulkarni BE09 F01 F001 Rahul Agrawal BE09 F01 F017 Sanket Singi BE09 F01 F059 Ashutosh Pawar BE09 F01 F060 Kishor Sondge BE09 F01 F063 Planning, Scheduling, Monitoring and Tracking of Construction Project GOVT. COLLEGE OF ENGINEERING, AURANGABAD Introduction 1 May 2013 2 • To study and use primavera P3 for planning, scheduling, monitoring and tracking of construction project. • Planning and scheduling aims at timely execution of work. • Monitoring and tracking is important to find the deviation from the planned schedule. Construction Project Management 1 May 2013 3 • Construction project is a high value time bound with predetermined performance objectives. • Human and non human resources (completion). Function of Project Management 1 May 2013 4 • Planning : course of action to guide Project completion • Organizing : arrangement of resources • Staffing : selection of expertise • Directing : guiding of work • Controlling : creation of system to measure report and forecast deviation. Time Planning Process 1 May 2013 5 • Project Work Breakdown : breaking down into sub project • Modeling & Analyzing Network : developing a logic diagram • Scheduling Work Programs : putting time plan on calendar basis Resources Planning Process 1 May 2013 6 • Manpower • Material • Equipment • Standard Cost • Budget
  • 2. 5/1/2013 2 Objective of Project 1 May 2013 7 • To prepare CPM (critical path method), Chart for a building being built. • To acquire good Knowledge of primavera P3 software which is globally used. Desired results of Planning and scheduling 1 May 2013 8 • To have un-interrupted flow of work • To reduce amount of re-work • To minimize confusion and misunderstanding • To get the understanding of amount of work done by each labour • To integrate all work and ensure a quality project. Factors affecting work Scheduling 1 May 2013 9 • Time • Manpower • Materials • Machinery • Capital Techniques for planning and scheduling 1 May 2013 10 • Bar Chart • Network Technique – Critical Path Method – Program Evaluation and Review Technique Introduction to Primavera Project Planner 1 May 2013 11 • It is product of Primavera systems Inc., USA. • It is a multi-user product that operate on LAN Local Area Network. • Can manage up to one lakh activities. • It help to build project network quickly and graphically. • We can impose up to ten restrictions. Primavera File Structure 1 May 2013 12 • The project has mandatory four characters for project name. • All files will have P3 extension. • All files are preferred with four characters file name. • It works with one file type only. i.e. P3
  • 3. 5/1/2013 3 Project Overview 1 May 2013 13 • A Building of configuration G+1 of an approximate area of 1100 Sq ft is considered in this project. • The building is being built for residential purposes in Shahnoorwadi. • The actual work is started in December 2012. • The software tool Primavera Project Planner is used for planning, scheduling and controlling. • The activities required to complete the building structure (excluding the interiors) was identified and was fed as an input to Primavera along with their durations. • The critical activities and the project time which is represented by the summation of critical path durations are obtained from the primavera schedule. 1 May 2013 14 STEPS FOR PLANNING & SCHEDULING i. Creating A Project • Open a new project name & is given as ABCD. • The client name & location is selected. • The planning unit is selected in days. • The project start date is entered. ii. Defining Calendars • Before the activity list is entered , the calendar are defined. • Calendars are used to model the working time for each activity. Planning and Scheduling in Primavera Add New Project 1 May 2013 15 Assigning the Start and Finish 1 May 2013 16 Blank Page 1 May 2013 17 1 May 2013 18 Identification Of Project Activities • The activities required to complete the project is identified and the activity list is entered Sequencing the Activities • Finish to start relationship : Start of successor activity depends on the completion of predecessor. • Start to Start relationship : start of successor activity depends on start of predecessor activity. • Finish to Finish relationship : finish of successor activity depends on finish of its predecessor activity. • Start to Finish relationship : successor activity can’t complete until its predecessor activity start. Activity’s Description
  • 4. 5/1/2013 4 Activity’s Description 1 May 2013 19 List of Activities 1 May 2013 20 Activity Form 1 May 2013 21 1 May 2013 22 Cost and Resources 1 May 2013 23 Editing Bar 1 May 2013 24
  • 5. 5/1/2013 5 End Point of the Bar 1 May 2013 25 Time Scale 1 May 2013 26 Editing Bar 1 May 2013 27 1 May 2013 28 GENERATION OF REPORT SCHEDULE •Schedule reports contain a tabular list schedule data, including activity ID’s description, durations, float early & late schedule dates. •Additional data relating to this report shows the activity ID, successors, predecessors & total float for that particular activity. Tabular Reports 1 May 2013 29 Tabular Reports 1 May 2013 30
  • 6. 5/1/2013 6 Tabular Reports 1 May 2013 31 Time Scale Logic.. 1 May 2013 32 Time Scale Logic.. 1 May 2013 33 Time Scale Logic.. 1 May 2013 34 PERT…. 1 May 2013 35 1 May 2013 36 • CPM of the building G+1 is obtained using the planning and scheduling software using primavera project planner P3. • The activity required to complete the structure are identified and put in to primavera project planner. • The scheduled network was then analyzed & schedule report was generated using Primavera. • Obtaining optimum network diagram & minimizing the time and cost is the major objective. • It has helped us to understand fundamental principles & techniques of construction project management. • An important part of project was acquisition of knowledge about Primavera Project Planner. Conclusion
  • 7. 5/1/2013 7 1 May 2013 37 1. Primavera Reference Guide (2004), CADD Centre Training Services Pvt. Ltd. 2. Garold D. Oberlender (2000), Project Management for Engineering and Construction, McGraw Hil 3. Chitkara K. K. (2001), “Construction Project Management” Tata McGraw Hill Publishing, New Delhi 4. Sandeep Mantri, “ A to Z Practical Building Construction and its Management”, 8th edition, Satya Prakashan, New Delhi. References 1 May 2013 38