Fluor introduces its 3rd generation modular execution methodology for liquefied natural gas (LNG) projects. This new approach aims to move 60-80% of construction work offsite to optimize costs and schedule by using standardized modular designs. The methodology leverages Fluor's experience to address risks and allows for up to 20% reduction in total installed costs. Current LNG and oil sands projects are implementing this innovative modular approach.