2. • Define Capacity
• Explain What is meant by ‘Capacity Planning’
• Describe the Types of Capacity Planning
• Explain Operations Scheduling and Workplace Planning
• Describe the Types of Operations Scheduling
• Explain What is Aggregate Planning
• Explain the Strategies of Aggregate Planning
• Explain Production Planning and Control
• Explain the Inventory Models
• Describe the Principles of Material Handling
• Explain Planning and Scheduling Maintenance
• Explain the Principles of World Class Manufacturing
• Describe World Class Manufacturing Techniques
Course Objectives
Wednesday, 20 January 2021 2
3. Introduction
“Capacity Would Be The Ability
Of A Given System To Produce
Output Within The Specific Time
Period”
Wednesday, 20 January 2021 3
4. Introduction
“Capacity Is Referred As Maximum Production
Capacity, Which Can Be Attained Within A Normal
Working Schedule”
Wednesday, 20 January 2021 4
5. Strategic Capacity Planning
Strategic Capacity Planning Is Utilized For Capital Intensive Resource
Like Plant, Machinery, Labor, Etc.
Capacity Planning Classification
classified into three main categories :
1-long range
2-medium rang
3-short range.
Wednesday, 20 January 2021 5
6. categories
Long range capacity of an
organization is dependent on various
other capacities like design capacity,
production capacity, sustainable
capacity and effective capacity
Wednesday, 20 January 2021 6
7. Categories of capacity
Design capacity is the maximum output possible as indicated by
equipment manufacturer under ideal working condition.
Wednesday, 20 January 2021 7
8. Categories of capacity
Production capacity is the maximum output possible from equipment
under normal working condition or day
Wednesday, 20 January 2021 8
9. Categories of capacity
Effective capacity is the optimum production level under pre-defined
job and work-schedules, normal machine breakdown, maintenance
Wednesday, 20 January 2021 9
10. Effective Categories of capacity
The management passed on instructions to its manufacturing plant that
they wanted at least an increase of 15% in the daily production level at the
plant.
The management hopes that this increased production levels would help
meet the current market demand and the company can make huge profits
from this situation if they succeed in meeting this surge in demand.
Wednesday, 20 January 2021 10
11. Medium Term Capacity:
The strategic capacity
planning undertaken by
organization for 2 to 3
Month of a time frame is
referred to as medium
term capacity planning.
Wednesday, 20 January 2021 11
12. Short Term Capacity:
The strategic planning
undertaken by organization
for a daily weekly or
quarterly time frame is
referred to as short term
capacity planning.
Wednesday, 20 January 2021 12
13. Goal of Capacity Planning
The ultimate goal of capacity planning is to meet the current and
future level of the requirement at a minimal wastage.
Wednesday, 20 January 2021 13
14. Factors Affecting Capacity Planning
There are several factors that affect the efficiency and effectiveness of
capacity planning such as follows:
Production Technology Product Line or Matrix
External Structure (such as policies, safety regulations etc.)
Operational Structure (such as scheduling, quality assurance etc.)
Human Capital (such as job design, compensation etc.)
Production Facility (such as layout, design, and location etc.)
Wednesday, 20 January 2021 14
15. Forecasting v/s Capacity Planning
There would be a scenario where
capacity planning done on a basis of
forecasting may not exactly match.
For example, there could be a scenario
where demand is more than production
capacity; in this situation, a company
needs to fulfill its requirement by buying
from outside. If demand is equal to
production capacity; company is in a
position to use its production capacity to
the fullest. If the demand is less than the
production capacity, company can
choose to reduce the production or
share it output with other
manufacturers.
Wednesday, 20 January 2021 15
16. Capacity Rate
• Capacity is the rate of productive capability of a facility.
• Capacity is usually expressed as volume of output per time period.
• It is the process of determining the necessary to meet the
production objectives.
Wednesday, 20 January 2021 16
17. Capacity Calculation:
To maintain a balance
between required
capacity and available
capacity
(number of machines & workers) × (number
of shifts) × (utilization) × (efficiency).
To identify and solve
capacity problem in a
timely manner to meet
consumer needs.
Wednesday, 20 January 2021 17
18. How To Capacity Measures?
• Volume of Produce New goods , Products , Items.
Wednesday, 20 January 2021 18
19. How to Measure Capacity?
• As a substitute, capacity can be expressed in terms of input.
A Class may express capacity in terms of the number of
students per session
• A Garments factory may express capacity in terms of
available labour hours and/or machine hours per week,
month, or year.
• General Motors Corporation can use “numbers of
automobiles per year.
Wednesday, 20 January 2021 19
20. This uses different inputs
mainly including 6M’s namely, man, material, machine, money, method and
management.:
Production by assembly: car,
television, furniture
Production by extraction or
separation.
6Ms for Production Capacity:
Wednesday, 20 January 2021 20