Deploying High Maturity Practices Globally


                                              Kaliappan M, Head Quality
                                                                  - HP




1   ©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice
Deploying High Maturity
Practices Globally




Kaliappan, M
May 2010
Hewlett-Packard


2   ©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice
Overview

– While High Maturity deployment
  in general has many
  challenges, implementing them
  across global centers pose
  unique challenges.                             1. Challenges to High Maturity
– To gain maximum business                       2. Intent of HM Practices
  benefit, the intent of the HM
  practices need to be understood                3. Foundational elements
  and the critical aspects of                    4. Deploying HM Globally
  deployment to be considered.
                                                 5. Recap and Q&A
– This presentation will address
  the challenges as well as
  essential elements for robust
  deployment based on the
  experience.
3   Deploying High Maturity Practices Globally
Section 1 – Challenges to High Maturity


                                                 1. Challenges to High Maturity




1                                                2. Intent of HM Practices
                                                 3. Foundational elements
                                                 4. Deploying HM Globally
                                                 5. Recap and Q&A




4   Deploying High Maturity Practices Globally
High Maturity Challenges

– To maximize business benefits, the
  HM implementation needs to be
  effective
– Greater attention to detail in
  deployment is expected during
  HM Appraisals
– Increased competition in the
  market place
– Lead time to reach higher maturity has
  come down from CMM days
– Global deployment challenges
                                                 Charts from SEI Maturity Profile Aug 92 and Mar
                                                                10 Respectively


5   Deploying High Maturity Practices Globally
Major Obstacles for High Maturity
      – Lack of contextual information for proper segmentation/stratification
      – Not enough consistency in measures to aggregate/disaggregate them
      – Resistance to collect new or additional measure after achieving ML 3
      – Didn't collect data frequently enough to make mid-course corrections
      – Not enough coaching to the performance model developers
      – Process Performance Model developers didn't have enough statistical
        expertise or access to experts
      – Spent too much time in preparing Management Review report rather than
        doing thorough analysis
      – Models focus only on final project outcomes rather than
        interim outcomes
      – Failed to align and prioritize M&A practices to the business objectives


Note: Listed from high to Low order                            Ref: SEI Technical Report 2008-TR-024


6   Deploying High Maturity Practices Globally
Section 2 – Intent of HM Practices


                                                 1. Challenges to High Maturity




2                                                2. Intent of HM Practices
                                                 3. Foundational elements
                                                 4. Deploying HM Globally
                                                 5. Recap and Q&A




7   Deploying High Maturity Practices Globally
Baselines and Models
                                                                     – Do not generalize
                                                                       across domains and
                                                                       project types

                                                                     – Do not aggregate data
                                                  Basic                from heterogeneous
                                                 measures              processes
                                                                       •   Homogeneity of data
                                                                           leads to meaningful PPB
                                                                           analysis

                                                                       •   Homogeneity is ensured
                 Sub-process                                               by segmentation and
                                                                           stratification
                  measures
                     and                              Controllable   – Ensure Operational
                  indicators                              and          Definitions are available
                                                      segmenting       at adequate level of
                                                        factors        detail




8   Deploying High Maturity Practices Globally
Characterizing the Process/Sub-process

                                                 Statistics (dispersion
                                                 and central tendency)
                                                   and distributions


                  Context (domain                                         Stability and
                   and tailoring                                           capability
                      impact)                                             information



                                                     Process                        Inter-
         Cause- effect                             performance                relationships of
         relationships                              baselines/                measures, facto
                                                     Models                      rs, actions



9   Deploying High Maturity Practices Globally
Ingredients of Performance Baselines
                 Addresses measures from processes and sub-processes

                 Distribution is known

                 Appropriate central tendency and dispersion statistics used

                 Ensure homogeneity in data while grouping
                  Use Statistical techniques to decide significance and
                 segmentation

                 Indicates the stability and capability of the sub-processes

                 Demonstrates trends between baselines
                  Includes data on controllable factors (‘x’) as well as responses
                 (‘y’)

                 Supports the projects in 'composing' the process
10   Deploying High Maturity Practices Globally
Controllable Factors
– Has influence over one or more project outcomes
– Controllable factors relates to any of the following:
         •   People, Environment, Technology, Tools, Process and Stakeholders


             Controllable Factors (X)                  Response (Y)          Controllable Factors (X)    Response (Y)
                                                                         −   Domain experience
     −       Review types                                                    (H, M, L)
     −       Design method                                               −   DLC Model                  Productivity
     −       Testing type                                                −   Complexity
     −       Language                                                    −   Staff turn over
                                                      Delivered defect
     −       Design and code                          density            −   Estimation method
             complexity
                                                                         −   Estimator skill
     −       Requirements Volatility                                                                    Cost and Effort
                                                                         −   Project type
     −       Test coverage                                                                              Variance
                                                                         −   Complexity
     −       Review coverage
                                                                         −   Staff turn over



11       Deploying High Maturity Practices Globally
Influence of Controllable Factors
     Review Method                                                                 This is defect detection example.
         Review Efficiency
                                                                                   Similarly, defect prevention factors can be
                                                       PPM1                        related.

 Design
                                  Design
                                  Review                              Design Defect Density

      Preparation rate
                                             Size/ Review session
     Reviewer Skill
                                                   Review Method
                                                            Review Rate                                                         Lagging
                                                                                      PPM2                                     Indicators
      Leading                                                                                       Code Defect Density
                                                                            Code
                                                    Code
      Indicators                                                           Review
                                                      Preparation rate
                                                     Reviewer Skill                 Testing Type
                                                                                           Test Coverage
                                       Review Session Duration
                                                                                                                 PPM3
                                                                                                                          Test Defect
                                                                                Product                                     Density
                                                                              Test Cases                   Testing
                                                                                                                                         PPM4
                                                                                    Code Coverage

                                                                                     Tester Skill                         Delivered Defect Density


12    Deploying High Maturity Practices Globally
Controllable Factors in PPMs
                                                                                                            Fitted Line Plot
                                                                              Code Review Defect Density(Defe = 0.8667 - 2.928 Code Review Rate(Person-hours/K
                                                                                                + 2.627 Code Review Rate(Person-hours/K**2
                                                                              12                                                                 S           0.848127




                                            Code Review Defect Density(Defe
                                                                                                                                                 R-Sq          94.3%
                                                                                                                                                 R-Sq(adj)     93.2%
                                                                              10

                                                                               8

                                                                               6

                                                                               4

                                                                               2

                                                                               0

                                                                                   0.0    0.5      1.0     1.5      2.0     2.5            3.0
                                                                                             Code Review Rate(Person-hours/K



          Size/ Review session
                  Review Method
                           Review Rate


                                                                                                                                   Code Defect Density
                                                                                     Code
                Code
                                                                                    Review
                    Preparation rate
                   Reviewer Skill
     Review Session Duration




13    Deploying High Maturity Practices Globally
Ingredients of Performance Models
                 Statistical, Probabilistic or Simulation in nature

                 Logical relationship between X's and Y

                 PPMs developed / calibrated based on ORG data

                 Predicts interim or final project outcomes

                 Connects 'upstream' activity with 'downstream' activity

                 Prediction & Confidence levels supported

                 1 or more Controllable & 0 or more non-controllable factors

                 Factors relate to sub-process to conduct prediction

                 Enable projects to achieve mid-course corrections
                  Enable 'What-if Analysis' for planning, dynamic re-planning
                 and problem resolution
 Extracted from SEI presentation ‘A tutorial on CMMI Process Performance Models’
14   Deploying High Maturity Practices Globally
Sub-process Management
        – Statistical management at sub-
          processes than overall project level
             •     Measurements at project level are
                   masked by behavior of multiple sub-
                   processes
             •     Focus on ‘Analysis measures’
        – Use statistical methods to analyze,
          understand and characterize sub-
          process variation
             •     Control charts, Box and Whisker plots,
                   Histograms, etc
        – Do not simply implement control charts
             •     Understand the special cause patterns
             •     Implement in real time
             •     Investigate for multiple cause systems

15   Deploying High Maturity Practices Globally
Analyzing for Root Causes
        – Not just defects and problems
             •     Achieving or non-achieving of
                   objectives; and improving
                   performance
        – Look for both types of causes
             •     Causes of successes and failures
        – Reactive as well as proactive
        – Sound outcome selection for CAR
          analysis
             •     Using Pareto, Histograms, Box and
                   Whisker plots, capability analysis
        – Judge improvements for statistical
          significance when applicable

16   Deploying High Maturity Practices Globally
Composing a process
                     RA Method
                                                                                              Composing a process
              RA
                                                                                              involves a quantitative
Review Method
                                               Complexity                                     analysis of one or more
Reviewer Skill
                                       Design Method
                                                                                              alternatives for the project’s
                           Reqts. Defect Density
            Reqts.                                        Design                              defined process to determine
            Review                                                   Design Defect Density    the probability of achieving
                                                                                              the project’s quality and
             Design Review
                 Checklist
                                                 Design
                                   Review Method
                                                 Review
                           Preparation rate
                                                                                              process performance
                          Reviewer Skill                                                      objectives
                                                   Code Reuse                  Coding
                                                                                       Code Defect Density
                                                 Code Review
                                                  Checklist                         Code
                                                                                  Review
                                                          Review and Preparation rate        Testing Type
                                                             Reviewer Skill
                                                                                                  Test Coverage        Test Defect
                                                          Review Method
                                                                                                                         Density     Release
                                                                                       Product
                                                                                                                  Testing
                                                                                     Test Cases
                                                                                                                                          Delivered
                           Rewor                                                             Code Coverage                              Defect Density
                             k                                                               Tester Skill
       17    Deploying High Maturity Practices Globally
Evolution of Process Composition

                                    Still linking sub-process capabilities to
                                   goal achievement might be a challenge

                                                                                             Level 5
                                                                                             − Simulations used to
                                                                                               link sub-process
                                                                      Level 4
                                                                                               capabilities to
                                                                      − Use PPBs for sub-
                                                                                               project goals
                                                                        process selection
                                                  Level 3                                    − Sub-process/
                                                                      − Use PPMs with
                                                  − Use past project    controllable factors
                                                                                               methods selection
                                                    learning                                   based on trade-off
Level 2                                                               − Fine tune sub-
                                                  − Fine tune           processes/methods
                                                                                               decisions
− Select right LC                                   processes/method
− Identify phases/                                                      quantitatively
                                                    s qualitatively
  processes based                                   through tailoring
  on scope




18   Deploying High Maturity Practices Globally
Section 3 – Foundational Elements


                                                  1. Challenges to High Maturity




3                                                 2. Intent of HM Practices
                                                  3. Foundational elements
                                                  4. Deploying HM Globally
                                                  5. Recap and Q&A




19   Deploying High Maturity Practices Globally
Constancy of Purpose
        – Focus all actions on one aspect –
          meeting business objectives
        – Demonstrate High maturity by
          building business value
        – Target both process as well as
          product/service quality
          improvements
        – Maximize structured decisions
          based on data
        – Eliminate waste – do not over do
             •   Decision processes, Causal
                 analysis, Statistical analysis, Sub-process
                 management and model development


20   Deploying High Maturity Practices Globally
Systems Thinking
                                                   – Multiple sub-processes need to be monitored to validate
     Processes are                                   achievement of objectives
     Interconnecte
     d                                             – Multiple measures and factors needed to understand a sub-
                                                     process

     Never attempt
     implementing                                  – OPP, QPM, OID and CAR – all are highly inter-related
     HM PAs in                                     – HM PAs interact with lower level PAs
     isolation




21    Deploying High Maturity Practices Globally
HM Process Interactions
                                                                                                                 RD, T
                                            MA                                                                    S
                                                                                                                 DAR
                                           OPD
                                                                                                                  VAL
                                           RSKM
                                                  OU level
                                                                                                                  VER
                                                                  DAR
                                                                                                                   MA
     MA                                                 OID                                                                      PP
                                                       QPPO                                                       IPM
                                                                                                                                PMC
     OU level                                                                                                    RSKM
                                                                     CAR
               OPP                                                                                  QPM
               QPPO
                                                                                                 ‘Quantitative
                                                                                          QPPO     Control’
                                   PPM                                                               CAR
                                   PPB                         Project
                        Set of sub-processes                    Level
                                                              QPPO


                                                                          PPM
                                                                          PPB                                       QPM
                                                                   Set of sub-processes               Sub-       ‘Statistical
                                                                                                     Process
                                                                                                    Objectives
                                                                                                                  Control’
                                                                                                                     CAR
      QPPO – Quality and Process Performance Objectives


22   Deploying High Maturity Practices Globally
Robust Measurement System
        – Automation is critical for HM
          Initiative’s success
             •     Enhances data quality aspects;
             •     Facilitates timely analysis and actions

        – Inferential analysis is critical in High
          Maturity journey
             •     Analysis done more often;
             •     Inferential analysis as against status
                   reporting

        – Facilitates real time analysis and action
             •     Data collection, data analysis, Root
                   cause analysis and taking corrective
                   action in real time



23   Deploying High Maturity Practices Globally
Robust Measurement System (cont’d)
        – Granularity and quality of data
             •     Granularity of data collection needs to be
                   at the right level
             •     Increased usage levels of
                   progress, success and analysis
                   indicators
             •     Quality of data collected

        – Optimize cost of data collection
          and analysis
             •     More granularity only for those sub-
                   processes selected
             •     Sub-processes and measures aligned to
                   the objective – instrument them as
                   needed



24   Deploying High Maturity Practices Globally
Enablers for Initiative’s Success − Survey
                                                     Enablers for Delivery Excellence
                     14


                     12


                     10
     # Respondents




                      8


                      6


                      4


                      2


                      0




Based on a short survey conducted by the author across IT industry in March 2010.
25      Deploying High Maturity Practices Globally
Foundation for Initiative’s Success

                                                    Infrastructure     • Core team
                                                                       • Virtual team

                                                    Constancy of       • Goal Deployment
                                                      Purpose          • Metrics program
                                                                         alignment




                                                                       • Integrated Initiatives
                                                     Integration
                                                                       • Business Integration

                                                    Rewards and        • Positive
                                                    Recognition          Reinforcement

                                                                       • Iterate for Quick
                                                  Iterative Approach     Wins


26   Deploying High Maturity Practices Globally
Critical Elements of Initiative Process

                                                               Celebrate &      Prepare
                                                                 Learn          Strategy


                                                  Implement
                                                                                           Develop
                                                                                           Capability




                                                  Detailed                                Readiness
                                                  Planning                                Assessmen
                                                                                              t

                                                               Impact
                                                                             Initiative
                                                              Analysis
                                                                              Design



                                                              Monitoring
                                                            Communication
                                                          Education & Training
                                                        Stakeholder Involvement
27   Deploying High Maturity Practices Globally
Section 4 – Deploying HM Globally


                                                  1. Challenges to High Maturity




4                                                 2. Intent of HM Practices
                                                  3. Foundational elements
                                                  4. Deploying HM Globally
                                                  5. Recap and Q&A




28   Deploying High Maturity Practices Globally
HM Capability Development
                           − Interim Checks
                           − Coach Qualification

                                                               Capability
                                                                             Strategy
                                                               Assessme
                                                                  nt


                                                       HM                          Models and   − Development
       − Best Practice Sharing                                     HM Capability
                                                     Communit                      Baselines    − Reviews
       − Enable reuse                                              Development
                                                        y



                                                                Assets      Deployment
                                                                            Management
                                                  − Training                             − Planning
                                                  − Guidance                             − Execution




29   Deploying High Maturity Practices Globally
Training
                                       Team                     Project              Model Developers
                                      Members                  Managers                 & Coaches

                     − Introduction to HM              − High Maturity Workshop   − Advanced Metrics and
                       Concepts                          for Managers               Statistics




                           Team                           Quality
                          Members                        Managers
        − Introduction to HM                      − HM Deployment
          Concepts                                  Management




30   Deploying High Maturity Practices Globally
HM Roles


                                               HM        − Having experience in HM implementation/consulting
                                            Consultant   − Either groomed within the Organization/or in the region


                                    Model Developers         − Completed ‘Advanced HM Training’ and passed
                                    and HM Coaches             an ‘Exam’


                                                                   − Successfully completed ‘High Maturity
                                    Project Managers                 Workshop for Managers’

                                                                          − Introductory courses in High Maturity
                                       Team Members                         Concepts




31   Deploying High Maturity Practices Globally
HM Deployment Management
                               – Effectiveness of High Maturity
                                 Deployment is impacted by various
                                 factors within
                                 the Organization
                                    • Organization    Context
                                    • Process     Improvement history
                                    • Foundations    for ML2 and ML3 for High Maturity
                                    • Modeling    and Baseline considerations
                                    • Resourcing     considerations

                               – HM Initiative to be managed as a project
                                 in an iterative life cycle


32   Deploying High Maturity Practices Globally
Approach to High Maturity
                                                     HM Initiative Duration



                 Plan                                      Execute                 Appraise
 – HM Planning                                    – Create PPMs and Baselines   – PIIDs
 – HM Initiative                                  – Deploy processes            – SCAMPI –A
   Duration                                                                      Appraisal
   Estimation                                     – HM Coaching

 – Training &                                     – HM Interim Checks
   Qualification                                    • HM Risk Assessment Grid

 – Initial Gap                                    – SCAMPI-B Appraisal
   Analysis




33   Deploying High Maturity Practices Globally
HM Risk Assessment Grid
                             Grid Attributes
     HM Code            Check item                Attributes




                                                               Risk Reporting




                     Target Grid Mapping




34   Deploying High Maturity Practices Globally
Section 5 – Recap and Q&A


                                                  1. Challenges to High Maturity




5                                                 2. Intent of HM Practices
                                                  3. Foundational elements
                                                  4. Deploying HM Globally
                                                  5. Recap and Q&A




35   Deploying High Maturity Practices Globally
Recap

     Understanding the
     challenges and intent of
     High Maturity practices helps
     structure our actions for
     deployment effectively.

     Adequate focus on the
     foundational elements help
     not only enhancing the
     business benefits, but also
     accelerate the HM
     deployment.

36   Deploying High Maturity Practices Globally
Questions?

                                                  M. Kaliappan
                                                  HP Best Shore Application Services
                                                  Hewlett-Packard
                                                  HP Avenue, 39/40 Electronic City,
                                                  Bangalore – 560100

                                                  +91 80 26182123
                                                  marappa.kaliappan@hp.com



37   Deploying High Maturity Practices Globally
Outcomes that matter.




38   Deploying High Maturity Practices Globally
Click here for:


                         High Maturity best practices
                         HMBP 2010 Presentations
                         organized by QAI

                                                  Click here




39   Deploying High Maturity Practices Globally

Weitere ähnliche Inhalte

Was ist angesagt?

Control y seguimiento del proyecto herramientas
Control y seguimiento del proyecto   herramientasControl y seguimiento del proyecto   herramientas
Control y seguimiento del proyecto herramientasProColombia
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process MeasurementLeanleaders.org
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateLeanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
Ejecución del proyecto gestión de problemas
Ejecución del proyecto    gestión de problemasEjecución del proyecto    gestión de problemas
Ejecución del proyecto gestión de problemasProColombia
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of CustomerLeanleaders.org
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapLeanleaders.org
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningLeanleaders.org
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateLeanleaders.org
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsLeanleaders.org
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsLeanleaders.org
 
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...babak danyal
 
Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3Paul Bullock
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of ContentsLeanleaders.org
 

Was ist angesagt? (20)

Control y seguimiento del proyecto herramientas
Control y seguimiento del proyecto   herramientasControl y seguimiento del proyecto   herramientas
Control y seguimiento del proyecto herramientas
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE Tollgate
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
Ejecución del proyecto gestión de problemas
Ejecución del proyecto    gestión de problemasEjecución del proyecto    gestión de problemas
Ejecución del proyecto gestión de problemas
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of Customer
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project Planning
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Dallas Mpug
Dallas MpugDallas Mpug
Dallas Mpug
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of Experiments
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
 
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...
 
Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of Contents
 

Andere mochten auch

CMMI Implementation with Digité Enterprise
CMMI Implementation with Digité EnterpriseCMMI Implementation with Digité Enterprise
CMMI Implementation with Digité EnterpriseDigite Inc
 
Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...
Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...
Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...Paula Gomes
 
2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...
2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...
2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...Emerasoft, solutions to collaborate
 
Changes in CMMI-DEV and SCAMPI-A v1.3 - An Implementation Perspective
Changes in CMMI-DEV and SCAMPI-A v1.3 - An Implementation PerspectiveChanges in CMMI-DEV and SCAMPI-A v1.3 - An Implementation Perspective
Changes in CMMI-DEV and SCAMPI-A v1.3 - An Implementation PerspectiveRajesh Naik
 
CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...
CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...
CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...Paula Gomes
 
2011 Sep CMMI Process Maturity Report
2011 Sep CMMI Process Maturity Report2011 Sep CMMI Process Maturity Report
2011 Sep CMMI Process Maturity ReportArvinder Singh
 
Change Management Practices (Primavera BSS)plementing CMMI - Henrique Narciso
Change Management Practices (Primavera BSS)plementing CMMI - Henrique NarcisoChange Management Practices (Primavera BSS)plementing CMMI - Henrique Narciso
Change Management Practices (Primavera BSS)plementing CMMI - Henrique NarcisoPaula Gomes
 
CMMI Project Planning Presentation
CMMI Project Planning PresentationCMMI Project Planning Presentation
CMMI Project Planning PresentationTiago Teixeira
 
Overview of cmmi v1.3
Overview of cmmi v1.3Overview of cmmi v1.3
Overview of cmmi v1.3dp4824
 
CMMI Explored - Concept of Maturity
 CMMI Explored - Concept of Maturity CMMI Explored - Concept of Maturity
CMMI Explored - Concept of MaturityAlignMentor
 
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...rhefner
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Ivan Lanin
 
CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)Robert Levy
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration Anand Subramaniam
 

Andere mochten auch (20)

CMMI Implementation with Digité Enterprise
CMMI Implementation with Digité EnterpriseCMMI Implementation with Digité Enterprise
CMMI Implementation with Digité Enterprise
 
Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...
Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...
Is CMMI a guarantee of performance improvement? - Isabel Margarido (Critical ...
 
2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...
2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...
2. Webinar CMMi, 6 marzo 2012 - Tutorial CMMi Business Strategy (Fernando Man...
 
What is cmmi & understanding
What is cmmi & understandingWhat is cmmi & understanding
What is cmmi & understanding
 
Changes in CMMI-DEV and SCAMPI-A v1.3 - An Implementation Perspective
Changes in CMMI-DEV and SCAMPI-A v1.3 - An Implementation PerspectiveChanges in CMMI-DEV and SCAMPI-A v1.3 - An Implementation Perspective
Changes in CMMI-DEV and SCAMPI-A v1.3 - An Implementation Perspective
 
CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...
CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...
CMMI ML5: How to Fail? High Maturity Pitfalls and Misconceptions - José Gonça...
 
it4116_04_scampi
it4116_04_scampiit4116_04_scampi
it4116_04_scampi
 
2011 Sep CMMI Process Maturity Report
2011 Sep CMMI Process Maturity Report2011 Sep CMMI Process Maturity Report
2011 Sep CMMI Process Maturity Report
 
Change Management Practices (Primavera BSS)plementing CMMI - Henrique Narciso
Change Management Practices (Primavera BSS)plementing CMMI - Henrique NarcisoChange Management Practices (Primavera BSS)plementing CMMI - Henrique Narciso
Change Management Practices (Primavera BSS)plementing CMMI - Henrique Narciso
 
CMMI Project Planning Presentation
CMMI Project Planning PresentationCMMI Project Planning Presentation
CMMI Project Planning Presentation
 
Cmmi
CmmiCmmi
Cmmi
 
Overview of cmmi v1.3
Overview of cmmi v1.3Overview of cmmi v1.3
Overview of cmmi v1.3
 
CMMI Explored - Concept of Maturity
 CMMI Explored - Concept of Maturity CMMI Explored - Concept of Maturity
CMMI Explored - Concept of Maturity
 
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
 
CMMi = Scrum, Keynote, Recife May 08
CMMi = Scrum, Keynote, Recife May 08CMMi = Scrum, Keynote, Recife May 08
CMMi = Scrum, Keynote, Recife May 08
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)
 
Introduction to CMMI-DEV v1.3 - Day 1
Introduction to CMMI-DEV v1.3  - Day 1Introduction to CMMI-DEV v1.3  - Day 1
Introduction to CMMI-DEV v1.3 - Day 1
 
CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)
 
Capability maturity model
Capability maturity modelCapability maturity model
Capability maturity model
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 

Ähnlich wie CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practices Globally by Kaliappan M

The path to implementing global payroll for international (MultiNational) com...
The path to implementing global payroll for international (MultiNational) com...The path to implementing global payroll for international (MultiNational) com...
The path to implementing global payroll for international (MultiNational) com...Chris Bradshaw
 
DEVELOPMENT PROCESS OF MIS
DEVELOPMENT PROCESS OF MISDEVELOPMENT PROCESS OF MIS
DEVELOPMENT PROCESS OF MISHiren Selani
 
Development process of mis
Development process of misDevelopment process of mis
Development process of misHiren Selani
 
The Proven Path to Supply Chain Cost Savings
The Proven Path to Supply Chain Cost SavingsThe Proven Path to Supply Chain Cost Savings
The Proven Path to Supply Chain Cost Savingsjimmybear
 
Dean.david
Dean.davidDean.david
Dean.davidNASAPMC
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
Cmmi svc july 2011
Cmmi svc   july 2011Cmmi svc   july 2011
Cmmi svc july 2011Jorge Boria
 
Rhodes.donna
Rhodes.donnaRhodes.donna
Rhodes.donnaNASAPMC
 
nickelring OAP final submission
nickelring OAP final submissionnickelring OAP final submission
nickelring OAP final submissionSandeep Rao
 
Process Improvement for better Software Technical Quality under Global Crisis...
Process Improvement for better Software Technical Quality under Global Crisis...Process Improvement for better Software Technical Quality under Global Crisis...
Process Improvement for better Software Technical Quality under Global Crisis...Optimyth Software
 
Enhancing learning transfer in the workplace
Enhancing learning transfer in the workplaceEnhancing learning transfer in the workplace
Enhancing learning transfer in the workplaceEd Holton
 
Using data for impact_Pelletier_5.1.12
Using data for impact_Pelletier_5.1.12Using data for impact_Pelletier_5.1.12
Using data for impact_Pelletier_5.1.12CORE Group
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]JULIO GONZALEZ SANZ
 
Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)Glen Alleman
 
Developing Supply Chain Roadmap
Developing Supply Chain RoadmapDeveloping Supply Chain Roadmap
Developing Supply Chain Roadmapsinghmk74
 

Ähnlich wie CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practices Globally by Kaliappan M (20)

IRH Lessons Learned in "Embracing Scale Up Error" in Five Countries
IRH Lessons Learned in "Embracing Scale Up Error" in Five CountriesIRH Lessons Learned in "Embracing Scale Up Error" in Five Countries
IRH Lessons Learned in "Embracing Scale Up Error" in Five Countries
 
The path to implementing global payroll for international (MultiNational) com...
The path to implementing global payroll for international (MultiNational) com...The path to implementing global payroll for international (MultiNational) com...
The path to implementing global payroll for international (MultiNational) com...
 
IaaS
IaaSIaaS
IaaS
 
DEVELOPMENT PROCESS OF MIS
DEVELOPMENT PROCESS OF MISDEVELOPMENT PROCESS OF MIS
DEVELOPMENT PROCESS OF MIS
 
Development process of mis
Development process of misDevelopment process of mis
Development process of mis
 
The Proven Path to Supply Chain Cost Savings
The Proven Path to Supply Chain Cost SavingsThe Proven Path to Supply Chain Cost Savings
The Proven Path to Supply Chain Cost Savings
 
Dean.david
Dean.davidDean.david
Dean.david
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
Cmmi svc july 2011
Cmmi svc   july 2011Cmmi svc   july 2011
Cmmi svc july 2011
 
Rhodes.donna
Rhodes.donnaRhodes.donna
Rhodes.donna
 
nickelring OAP final submission
nickelring OAP final submissionnickelring OAP final submission
nickelring OAP final submission
 
Process Improvement for better Software Technical Quality under Global Crisis...
Process Improvement for better Software Technical Quality under Global Crisis...Process Improvement for better Software Technical Quality under Global Crisis...
Process Improvement for better Software Technical Quality under Global Crisis...
 
Enterprise software delivery
Enterprise software deliveryEnterprise software delivery
Enterprise software delivery
 
Enhancing learning transfer in the workplace
Enhancing learning transfer in the workplaceEnhancing learning transfer in the workplace
Enhancing learning transfer in the workplace
 
The Role of Evaluation in Strengthening Agricultural R&D in Sub-Saharan Afric...
The Role of Evaluation in Strengthening Agricultural R&D in Sub-Saharan Afric...The Role of Evaluation in Strengthening Agricultural R&D in Sub-Saharan Afric...
The Role of Evaluation in Strengthening Agricultural R&D in Sub-Saharan Afric...
 
Using data for impact_Pelletier_5.1.12
Using data for impact_Pelletier_5.1.12Using data for impact_Pelletier_5.1.12
Using data for impact_Pelletier_5.1.12
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]
 
Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)Performance based planning in a nut shell (V5)
Performance based planning in a nut shell (V5)
 
Developing Supply Chain Roadmap
Developing Supply Chain RoadmapDeveloping Supply Chain Roadmap
Developing Supply Chain Roadmap
 
Avoid Month End Panic PAC Webinar - Apr 28 2011
Avoid Month End Panic PAC Webinar - Apr 28 2011Avoid Month End Panic PAC Webinar - Apr 28 2011
Avoid Month End Panic PAC Webinar - Apr 28 2011
 

Mehr von QAI

People CMM
People CMMPeople CMM
People CMMQAI
 
CMMI Version 1.2
CMMI Version 1.2CMMI Version 1.2
CMMI Version 1.2QAI
 
CMMI v 1.2 Basics
CMMI v 1.2 BasicsCMMI v 1.2 Basics
CMMI v 1.2 BasicsQAI
 
What is Software Engineering?
What is Software Engineering?What is Software Engineering?
What is Software Engineering?QAI
 
ITIL overview
ITIL overviewITIL overview
ITIL overviewQAI
 
ITIL Benefits
ITIL BenefitsITIL Benefits
ITIL BenefitsQAI
 
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...QAI
 
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...QAI
 
CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...
CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...
CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...QAI
 

Mehr von QAI (9)

People CMM
People CMMPeople CMM
People CMM
 
CMMI Version 1.2
CMMI Version 1.2CMMI Version 1.2
CMMI Version 1.2
 
CMMI v 1.2 Basics
CMMI v 1.2 BasicsCMMI v 1.2 Basics
CMMI v 1.2 Basics
 
What is Software Engineering?
What is Software Engineering?What is Software Engineering?
What is Software Engineering?
 
ITIL overview
ITIL overviewITIL overview
ITIL overview
 
ITIL Benefits
ITIL BenefitsITIL Benefits
ITIL Benefits
 
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
 
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
CMMI High Maturity Best Practices HMBP 2010: CMMI® FOR SERVICES: INSIGHTS AND...
 
CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...
CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...
CMMI High Maturity Best Practices HMBP 2010: Process Performance Models:Not N...
 

Kürzlich hochgeladen

A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 

Kürzlich hochgeladen (20)

A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 

CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practices Globally by Kaliappan M

  • 1. Deploying High Maturity Practices Globally Kaliappan M, Head Quality - HP 1 ©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice
  • 2. Deploying High Maturity Practices Globally Kaliappan, M May 2010 Hewlett-Packard 2 ©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice
  • 3. Overview – While High Maturity deployment in general has many challenges, implementing them across global centers pose unique challenges. 1. Challenges to High Maturity – To gain maximum business 2. Intent of HM Practices benefit, the intent of the HM practices need to be understood 3. Foundational elements and the critical aspects of 4. Deploying HM Globally deployment to be considered. 5. Recap and Q&A – This presentation will address the challenges as well as essential elements for robust deployment based on the experience. 3 Deploying High Maturity Practices Globally
  • 4. Section 1 – Challenges to High Maturity 1. Challenges to High Maturity 1 2. Intent of HM Practices 3. Foundational elements 4. Deploying HM Globally 5. Recap and Q&A 4 Deploying High Maturity Practices Globally
  • 5. High Maturity Challenges – To maximize business benefits, the HM implementation needs to be effective – Greater attention to detail in deployment is expected during HM Appraisals – Increased competition in the market place – Lead time to reach higher maturity has come down from CMM days – Global deployment challenges Charts from SEI Maturity Profile Aug 92 and Mar 10 Respectively 5 Deploying High Maturity Practices Globally
  • 6. Major Obstacles for High Maturity – Lack of contextual information for proper segmentation/stratification – Not enough consistency in measures to aggregate/disaggregate them – Resistance to collect new or additional measure after achieving ML 3 – Didn't collect data frequently enough to make mid-course corrections – Not enough coaching to the performance model developers – Process Performance Model developers didn't have enough statistical expertise or access to experts – Spent too much time in preparing Management Review report rather than doing thorough analysis – Models focus only on final project outcomes rather than interim outcomes – Failed to align and prioritize M&A practices to the business objectives Note: Listed from high to Low order Ref: SEI Technical Report 2008-TR-024 6 Deploying High Maturity Practices Globally
  • 7. Section 2 – Intent of HM Practices 1. Challenges to High Maturity 2 2. Intent of HM Practices 3. Foundational elements 4. Deploying HM Globally 5. Recap and Q&A 7 Deploying High Maturity Practices Globally
  • 8. Baselines and Models – Do not generalize across domains and project types – Do not aggregate data Basic from heterogeneous measures processes • Homogeneity of data leads to meaningful PPB analysis • Homogeneity is ensured Sub-process by segmentation and stratification measures and Controllable – Ensure Operational indicators and Definitions are available segmenting at adequate level of factors detail 8 Deploying High Maturity Practices Globally
  • 9. Characterizing the Process/Sub-process Statistics (dispersion and central tendency) and distributions Context (domain Stability and and tailoring capability impact) information Process Inter- Cause- effect performance relationships of relationships baselines/ measures, facto Models rs, actions 9 Deploying High Maturity Practices Globally
  • 10. Ingredients of Performance Baselines  Addresses measures from processes and sub-processes  Distribution is known  Appropriate central tendency and dispersion statistics used  Ensure homogeneity in data while grouping Use Statistical techniques to decide significance and  segmentation  Indicates the stability and capability of the sub-processes  Demonstrates trends between baselines Includes data on controllable factors (‘x’) as well as responses  (‘y’)  Supports the projects in 'composing' the process 10 Deploying High Maturity Practices Globally
  • 11. Controllable Factors – Has influence over one or more project outcomes – Controllable factors relates to any of the following: • People, Environment, Technology, Tools, Process and Stakeholders Controllable Factors (X) Response (Y) Controllable Factors (X) Response (Y) − Domain experience − Review types (H, M, L) − Design method − DLC Model Productivity − Testing type − Complexity − Language − Staff turn over Delivered defect − Design and code density − Estimation method complexity − Estimator skill − Requirements Volatility Cost and Effort − Project type − Test coverage Variance − Complexity − Review coverage − Staff turn over 11 Deploying High Maturity Practices Globally
  • 12. Influence of Controllable Factors Review Method This is defect detection example. Review Efficiency Similarly, defect prevention factors can be PPM1 related. Design Design Review Design Defect Density Preparation rate Size/ Review session Reviewer Skill Review Method Review Rate Lagging PPM2 Indicators Leading Code Defect Density Code Code Indicators Review Preparation rate Reviewer Skill Testing Type Test Coverage Review Session Duration PPM3 Test Defect Product Density Test Cases Testing PPM4 Code Coverage Tester Skill Delivered Defect Density 12 Deploying High Maturity Practices Globally
  • 13. Controllable Factors in PPMs Fitted Line Plot Code Review Defect Density(Defe = 0.8667 - 2.928 Code Review Rate(Person-hours/K + 2.627 Code Review Rate(Person-hours/K**2 12 S 0.848127 Code Review Defect Density(Defe R-Sq 94.3% R-Sq(adj) 93.2% 10 8 6 4 2 0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Code Review Rate(Person-hours/K Size/ Review session Review Method Review Rate Code Defect Density Code Code Review Preparation rate Reviewer Skill Review Session Duration 13 Deploying High Maturity Practices Globally
  • 14. Ingredients of Performance Models  Statistical, Probabilistic or Simulation in nature  Logical relationship between X's and Y  PPMs developed / calibrated based on ORG data  Predicts interim or final project outcomes  Connects 'upstream' activity with 'downstream' activity  Prediction & Confidence levels supported  1 or more Controllable & 0 or more non-controllable factors  Factors relate to sub-process to conduct prediction  Enable projects to achieve mid-course corrections Enable 'What-if Analysis' for planning, dynamic re-planning  and problem resolution Extracted from SEI presentation ‘A tutorial on CMMI Process Performance Models’ 14 Deploying High Maturity Practices Globally
  • 15. Sub-process Management – Statistical management at sub- processes than overall project level • Measurements at project level are masked by behavior of multiple sub- processes • Focus on ‘Analysis measures’ – Use statistical methods to analyze, understand and characterize sub- process variation • Control charts, Box and Whisker plots, Histograms, etc – Do not simply implement control charts • Understand the special cause patterns • Implement in real time • Investigate for multiple cause systems 15 Deploying High Maturity Practices Globally
  • 16. Analyzing for Root Causes – Not just defects and problems • Achieving or non-achieving of objectives; and improving performance – Look for both types of causes • Causes of successes and failures – Reactive as well as proactive – Sound outcome selection for CAR analysis • Using Pareto, Histograms, Box and Whisker plots, capability analysis – Judge improvements for statistical significance when applicable 16 Deploying High Maturity Practices Globally
  • 17. Composing a process RA Method Composing a process RA involves a quantitative Review Method Complexity analysis of one or more Reviewer Skill Design Method alternatives for the project’s Reqts. Defect Density Reqts. Design defined process to determine Review Design Defect Density the probability of achieving the project’s quality and Design Review Checklist Design Review Method Review Preparation rate process performance Reviewer Skill objectives Code Reuse Coding Code Defect Density Code Review Checklist Code Review Review and Preparation rate Testing Type Reviewer Skill Test Coverage Test Defect Review Method Density Release Product Testing Test Cases Delivered Rewor Code Coverage Defect Density k Tester Skill 17 Deploying High Maturity Practices Globally
  • 18. Evolution of Process Composition Still linking sub-process capabilities to goal achievement might be a challenge Level 5 − Simulations used to link sub-process Level 4 capabilities to − Use PPBs for sub- project goals process selection Level 3 − Sub-process/ − Use PPMs with − Use past project controllable factors methods selection learning based on trade-off Level 2 − Fine tune sub- − Fine tune processes/methods decisions − Select right LC processes/method − Identify phases/ quantitatively s qualitatively processes based through tailoring on scope 18 Deploying High Maturity Practices Globally
  • 19. Section 3 – Foundational Elements 1. Challenges to High Maturity 3 2. Intent of HM Practices 3. Foundational elements 4. Deploying HM Globally 5. Recap and Q&A 19 Deploying High Maturity Practices Globally
  • 20. Constancy of Purpose – Focus all actions on one aspect – meeting business objectives – Demonstrate High maturity by building business value – Target both process as well as product/service quality improvements – Maximize structured decisions based on data – Eliminate waste – do not over do • Decision processes, Causal analysis, Statistical analysis, Sub-process management and model development 20 Deploying High Maturity Practices Globally
  • 21. Systems Thinking – Multiple sub-processes need to be monitored to validate Processes are achievement of objectives Interconnecte d – Multiple measures and factors needed to understand a sub- process Never attempt implementing – OPP, QPM, OID and CAR – all are highly inter-related HM PAs in – HM PAs interact with lower level PAs isolation 21 Deploying High Maturity Practices Globally
  • 22. HM Process Interactions RD, T MA S DAR OPD VAL RSKM OU level VER DAR MA MA OID PP QPPO IPM PMC OU level RSKM CAR OPP QPM QPPO ‘Quantitative QPPO Control’ PPM CAR PPB Project Set of sub-processes Level QPPO PPM PPB QPM Set of sub-processes Sub- ‘Statistical Process Objectives Control’ CAR QPPO – Quality and Process Performance Objectives 22 Deploying High Maturity Practices Globally
  • 23. Robust Measurement System – Automation is critical for HM Initiative’s success • Enhances data quality aspects; • Facilitates timely analysis and actions – Inferential analysis is critical in High Maturity journey • Analysis done more often; • Inferential analysis as against status reporting – Facilitates real time analysis and action • Data collection, data analysis, Root cause analysis and taking corrective action in real time 23 Deploying High Maturity Practices Globally
  • 24. Robust Measurement System (cont’d) – Granularity and quality of data • Granularity of data collection needs to be at the right level • Increased usage levels of progress, success and analysis indicators • Quality of data collected – Optimize cost of data collection and analysis • More granularity only for those sub- processes selected • Sub-processes and measures aligned to the objective – instrument them as needed 24 Deploying High Maturity Practices Globally
  • 25. Enablers for Initiative’s Success − Survey Enablers for Delivery Excellence 14 12 10 # Respondents 8 6 4 2 0 Based on a short survey conducted by the author across IT industry in March 2010. 25 Deploying High Maturity Practices Globally
  • 26. Foundation for Initiative’s Success Infrastructure • Core team • Virtual team Constancy of • Goal Deployment Purpose • Metrics program alignment • Integrated Initiatives Integration • Business Integration Rewards and • Positive Recognition Reinforcement • Iterate for Quick Iterative Approach Wins 26 Deploying High Maturity Practices Globally
  • 27. Critical Elements of Initiative Process Celebrate & Prepare Learn Strategy Implement Develop Capability Detailed Readiness Planning Assessmen t Impact Initiative Analysis Design Monitoring Communication Education & Training Stakeholder Involvement 27 Deploying High Maturity Practices Globally
  • 28. Section 4 – Deploying HM Globally 1. Challenges to High Maturity 4 2. Intent of HM Practices 3. Foundational elements 4. Deploying HM Globally 5. Recap and Q&A 28 Deploying High Maturity Practices Globally
  • 29. HM Capability Development − Interim Checks − Coach Qualification Capability Strategy Assessme nt HM Models and − Development − Best Practice Sharing HM Capability Communit Baselines − Reviews − Enable reuse Development y Assets Deployment Management − Training − Planning − Guidance − Execution 29 Deploying High Maturity Practices Globally
  • 30. Training Team Project Model Developers Members Managers & Coaches − Introduction to HM − High Maturity Workshop − Advanced Metrics and Concepts for Managers Statistics Team Quality Members Managers − Introduction to HM − HM Deployment Concepts Management 30 Deploying High Maturity Practices Globally
  • 31. HM Roles HM − Having experience in HM implementation/consulting Consultant − Either groomed within the Organization/or in the region Model Developers − Completed ‘Advanced HM Training’ and passed and HM Coaches an ‘Exam’ − Successfully completed ‘High Maturity Project Managers Workshop for Managers’ − Introductory courses in High Maturity Team Members Concepts 31 Deploying High Maturity Practices Globally
  • 32. HM Deployment Management – Effectiveness of High Maturity Deployment is impacted by various factors within the Organization • Organization Context • Process Improvement history • Foundations for ML2 and ML3 for High Maturity • Modeling and Baseline considerations • Resourcing considerations – HM Initiative to be managed as a project in an iterative life cycle 32 Deploying High Maturity Practices Globally
  • 33. Approach to High Maturity HM Initiative Duration Plan Execute Appraise – HM Planning – Create PPMs and Baselines – PIIDs – HM Initiative – Deploy processes – SCAMPI –A Duration Appraisal Estimation – HM Coaching – Training & – HM Interim Checks Qualification • HM Risk Assessment Grid – Initial Gap – SCAMPI-B Appraisal Analysis 33 Deploying High Maturity Practices Globally
  • 34. HM Risk Assessment Grid Grid Attributes HM Code Check item Attributes Risk Reporting Target Grid Mapping 34 Deploying High Maturity Practices Globally
  • 35. Section 5 – Recap and Q&A 1. Challenges to High Maturity 5 2. Intent of HM Practices 3. Foundational elements 4. Deploying HM Globally 5. Recap and Q&A 35 Deploying High Maturity Practices Globally
  • 36. Recap Understanding the challenges and intent of High Maturity practices helps structure our actions for deployment effectively. Adequate focus on the foundational elements help not only enhancing the business benefits, but also accelerate the HM deployment. 36 Deploying High Maturity Practices Globally
  • 37. Questions? M. Kaliappan HP Best Shore Application Services Hewlett-Packard HP Avenue, 39/40 Electronic City, Bangalore – 560100 +91 80 26182123 marappa.kaliappan@hp.com 37 Deploying High Maturity Practices Globally
  • 38. Outcomes that matter. 38 Deploying High Maturity Practices Globally
  • 39. Click here for: High Maturity best practices HMBP 2010 Presentations organized by QAI Click here 39 Deploying High Maturity Practices Globally