M.V. Nombre Barco

                                          Ballast Water Management Plan
                                           Refer to IMO Publication Resolution A.868(20)

Person Incharge: Chief (Operating) Officer
          Duties: To ensure proper ballast water management and/or treatment procedures are followed and to maintain
                    applicable records.
                    WATER BALLAST Tanks                             Sampling Points:
                                                                             Individual Sounding Pipes. Where this does
 COMPARTMENT         Volume m³  Location         Frame No.
                                                                             not suffice, Manholes for individual tanks. See
Fore Peak Tank          352.20       Center       166-F.E.
                                                                             Vessel Plans for locations.
No. 1 WBT               402.30       Center       156-169
No. 3 WBT (P+S)         128.80        P/S          77-94
                                                                                                200 - 100 m³/Hr
No. 4 WBT (P+S)         106.90        P/S          55-77             Ballast Pump Capacity:
                                                                                     Type:      Centrifugal
After Peak Tank         248.40       Center        A.E-17
     TOTAL Volume       1238.60

                                                           Objectives
1.   Minimize risk of introducing harmful aquatic organisms and pathogens & associated sediment from ship's ballast water.
2.   Awareness of risk to environment and possibility of contamination due to discharge of ballast water.
3.   Training and education in management and treatment and maintenance of appropriate records.
4.   Safe, effective procedures for Ballast operations and facilitate environmentally safe disposal of ballast tank sediments.

                                                           Guidelines
Precautionary Practices-
1.   Minimize Uptake in-
       a. Areas known to contain potentially harmful organisms, sediment or pathogens.
       b. In darkness when bottom-dwelling organisms tend to rise.
       c. In shallow waters where propellers or strong currents may stir up sediment.
2.   Routine cleaning of ballast tanks to remove sediments should be carried out when possible.
3.   Avoid unnecessary discharge of Ballast water in ports. Plan ahead.
Ballast Water Exchange:
1.   Where possible, exchange of ballast water should take place in deep water, open ocean as far as possible from shore.
2.   Where above is not possible, requirements developed in regional agreements may be in operation - take note.
3.   When flow through method is used, minimum three times the tank volume should be pumped through the tank.
4.   When sequential method of exchange is used, all old ballast water should be pumped out until suction is lost.
5.   When ballast exchange is not possible, follow other ballast exchange options approved by the state.
6.   Keep Ballast Water Exchange Form ready for Port State Authority [Appendix I of IMO Res A.868(20)].
Method:
1.   Sequential Exchange Method: Ballast tanks are pumped out and refilled with clean water. See safety below.
2.   Flow-through Method: Ballast tanks are simultaneously filled and discharged by pumping in clean water. In this method
     the tank is over flowed through air pipes and is not recommended on this vessel.
3.   Discharge to reception facilities: May be provided by port State and where appropriate can be utilized.
4.   New Technology treatments: Filtration, UV disinfecting, chemical or other acceptable treatments.

                                                    Safety Considerations
During Ballast exchange at sea, following should be taken into account-
1. Stability – Keep in mind free surface created during exchange operations.
2. Shear forces, Bending Moments – Permissible seagoing strength limits should never be exceeded.
3. Draft – Minimum, maximum drafts and associated trim condition will change.
4. Weather – in areas of frequent weather changes, cyclones and in heavy icing conditions take allied precautions.
      a. Ship has bottom for’d strengthening for a minimum draft of 3.8m when slamming is expected.
      b. Avoid exchange in freezing weather conditions as air pipes and other openings may be frozen.
      c. Accretion of ice has additional effect on vessel stability.
5. Avoid over- and under-pressurization of tanks. Monitor exchange with regular soundings.
6. Contingencies such as pump failure, loss of power, deteriorating weather.

                                                  Recording and Reporting

     All ballast operations to be recorded in “Ballast Operations log”.
1.
2.   Details as required on Ballast reporting form for Port State Authority to be maintained.
     Check Domestic laws, regulations before visiting Ports – Guide to Port Entry, etc.
3.


                                                                                                                      by Capt. P. Kohli
M.V. Nombre Barco

                                                     Ballast Water Management Plan




                               Accommodation
                                                                                                                                            MV Nombre

         Fresh Water

                                                                                                                                           Fore
                       Aft    Engine Room                                                                                                  Peak
                                                                                                                         1 Fore Tank
                       Peak
                                                                                                                                           Tank
                                                                                                            No.1
                       Tank                                                                                H.F.O.T.
                                               4 P+S Tanks                              No. 2 H.F.O Tank
                                                                 3 Ballast P+S Tanks




                                                                                                                                           166 – F.E.
                 A.E. - 17                     56 - 77               77-94                                                     156-169
Frames-
                 248.40                        106.90                128.80                                                    402.30       352.20
Capacity (m³)-                                                                                                                                                (m³)


                                                                    3 Ballast (P)
                                                   4 WBT (P)
                                                                                       2 H.F.O.T.
                                                                                          (P)
           Aft Peak                                                 No. 3 H.F.O.T
                                               No. 4 H.F.O.T                                               1 H.F.O.T.        1 Fore          Fore Peak
            Tank                                                                                                             Tank              Tank
                                                                                       2 H.F.O.T.
                                                                                          (S)
                                                   4 WBT (S)         3 Ballast (S)                                                              by Capt. P. Kohli




                                                                                                           Modified Sampling of Actual Ballast Management Plan created in 1995

Weitere ähnliche Inhalte

Was ist angesagt? (12)

FPSO Dynamic positioning
FPSO Dynamic positioningFPSO Dynamic positioning
FPSO Dynamic positioning
 
Bill robllee, drydock issues
Bill robllee, drydock issuesBill robllee, drydock issues
Bill robllee, drydock issues
 
Spe 180818-ms ttec 2016
Spe 180818-ms ttec 2016Spe 180818-ms ttec 2016
Spe 180818-ms ttec 2016
 
Ship dry docking
Ship dry dockingShip dry docking
Ship dry docking
 
Emma maersk
Emma  maerskEmma  maersk
Emma maersk
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
Advanced Methods for ULS and FLS
Advanced Methods for ULS and FLSAdvanced Methods for ULS and FLS
Advanced Methods for ULS and FLS
 
Spe 151819-ms
Spe 151819-msSpe 151819-ms
Spe 151819-ms
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
SPE-15101-PA
SPE-15101-PASPE-15101-PA
SPE-15101-PA
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit
 
Spe 123010-ms
Spe 123010-msSpe 123010-ms
Spe 123010-ms
 

Andere mochten auch

Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)
diegocely700615
 
MDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSELMDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSEL
Mustafa Bello
 
MDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement planMDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement plan
Mustafa Bello
 
Safety Tips for People New to Boating
Safety Tips for People New to BoatingSafety Tips for People New to Boating
Safety Tips for People New to Boating
Darin H. Mangum
 
VEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry ApplicationsVEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry Applications
Thorne & Derrick UK
 
Ship-to-Shore Solutions
Ship-to-Shore SolutionsShip-to-Shore Solutions
Ship-to-Shore Solutions
Jon Marcy
 
Example bunker checklist
Example bunker checklistExample bunker checklist
Example bunker checklist
Nor Masyiah
 

Andere mochten auch (20)

Ballast Water Management
Ballast Water ManagementBallast Water Management
Ballast Water Management
 
Ballast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.pptBallast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.ppt
 
Psc checklist
Psc checklistPsc checklist
Psc checklist
 
Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systems
 
MDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSELMDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSEL
 
Striegel 2011 gws presentation compressed
Striegel 2011 gws  presentation compressedStriegel 2011 gws  presentation compressed
Striegel 2011 gws presentation compressed
 
MDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement planMDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement plan
 
Life saving signals
Life saving signalsLife saving signals
Life saving signals
 
Safety Tips for People New to Boating
Safety Tips for People New to BoatingSafety Tips for People New to Boating
Safety Tips for People New to Boating
 
LPG CARRIER
LPG CARRIERLPG CARRIER
LPG CARRIER
 
VEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry ApplicationsVEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry Applications
 
Ship-to-Shore Solutions
Ship-to-Shore SolutionsShip-to-Shore Solutions
Ship-to-Shore Solutions
 
Kevins Presentation on GIS and Oil Spill Hazards
Kevins Presentation on GIS and Oil Spill HazardsKevins Presentation on GIS and Oil Spill Hazards
Kevins Presentation on GIS and Oil Spill Hazards
 
Fire drill information
Fire drill informationFire drill information
Fire drill information
 
Anti Piracy Solutions
Anti Piracy SolutionsAnti Piracy Solutions
Anti Piracy Solutions
 
Measurement of exhaust emissions
Measurement of exhaust emissionsMeasurement of exhaust emissions
Measurement of exhaust emissions
 
Drill Board
Drill BoardDrill Board
Drill Board
 
Example bunker checklist
Example bunker checklistExample bunker checklist
Example bunker checklist
 
Internal audit ctpf
Internal audit ctpfInternal audit ctpf
Internal audit ctpf
 

Mehr von Pawanexh Kohli

Mehr von Pawanexh Kohli (20)

Cold Chain Personality - citation
Cold Chain Personality - citationCold Chain Personality - citation
Cold Chain Personality - citation
 
Paper in TAA (Tropical Agriculture Assoc) Journal, AG4 Dev36 spring 2019
Paper in TAA (Tropical Agriculture Assoc) Journal, AG4 Dev36 spring 2019Paper in TAA (Tropical Agriculture Assoc) Journal, AG4 Dev36 spring 2019
Paper in TAA (Tropical Agriculture Assoc) Journal, AG4 Dev36 spring 2019
 
Capturing Stranded Cold
Capturing Stranded Cold Capturing Stranded Cold
Capturing Stranded Cold
 
Reefer Vehicle Redressal Program
Reefer Vehicle Redressal ProgramReefer Vehicle Redressal Program
Reefer Vehicle Redressal Program
 
Cold-chain in emerging markets
Cold-chain in emerging marketsCold-chain in emerging markets
Cold-chain in emerging markets
 
Looking Back, Looking Ahead: 2012-13
Looking Back, Looking Ahead: 2012-13Looking Back, Looking Ahead: 2012-13
Looking Back, Looking Ahead: 2012-13
 
Cold chain: a Debate
Cold chain: a DebateCold chain: a Debate
Cold chain: a Debate
 
Organised Retail & Supply chain
Organised Retail & Supply chainOrganised Retail & Supply chain
Organised Retail & Supply chain
 
India's NCCD takes the Supply Chain route
India's NCCD takes the Supply Chain routeIndia's NCCD takes the Supply Chain route
India's NCCD takes the Supply Chain route
 
Supply Chain & Food Wastage
Supply Chain & Food WastageSupply Chain & Food Wastage
Supply Chain & Food Wastage
 
Transport Operators; skill development in cold chain
Transport Operators; skill development in cold chainTransport Operators; skill development in cold chain
Transport Operators; skill development in cold chain
 
Piracy Incident: Enrica Lexie (Opinion)
Piracy Incident: Enrica Lexie (Opinion)Piracy Incident: Enrica Lexie (Opinion)
Piracy Incident: Enrica Lexie (Opinion)
 
Interview (IBM/Gartner): Smart Supply Chain
Interview (IBM/Gartner): Smart Supply ChainInterview (IBM/Gartner): Smart Supply Chain
Interview (IBM/Gartner): Smart Supply Chain
 
Logistic Times Feature - column
Logistic Times Feature - columnLogistic Times Feature - column
Logistic Times Feature - column
 
Transcript of recording by Logistics times
Transcript of recording by Logistics timesTranscript of recording by Logistics times
Transcript of recording by Logistics times
 
Pharmaceutical Cold chain Distribution
Pharmaceutical Cold chain DistributionPharmaceutical Cold chain Distribution
Pharmaceutical Cold chain Distribution
 
Bottlenecks to Cold-chain Development
Bottlenecks to Cold-chain DevelopmentBottlenecks to Cold-chain Development
Bottlenecks to Cold-chain Development
 
Disaster Management & Humanitarian Logistics
Disaster Management & Humanitarian LogisticsDisaster Management & Humanitarian Logistics
Disaster Management & Humanitarian Logistics
 
Cold chain Incentive schemes
Cold chain Incentive schemesCold chain Incentive schemes
Cold chain Incentive schemes
 
GCCA - ICE Magazine - Interview
GCCA - ICE Magazine - InterviewGCCA - ICE Magazine - Interview
GCCA - ICE Magazine - Interview
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 

Simple Ballast Plan

  • 1. M.V. Nombre Barco Ballast Water Management Plan Refer to IMO Publication Resolution A.868(20) Person Incharge: Chief (Operating) Officer Duties: To ensure proper ballast water management and/or treatment procedures are followed and to maintain applicable records. WATER BALLAST Tanks Sampling Points: Individual Sounding Pipes. Where this does COMPARTMENT Volume m³ Location Frame No. not suffice, Manholes for individual tanks. See Fore Peak Tank 352.20 Center 166-F.E. Vessel Plans for locations. No. 1 WBT 402.30 Center 156-169 No. 3 WBT (P+S) 128.80 P/S 77-94 200 - 100 m³/Hr No. 4 WBT (P+S) 106.90 P/S 55-77 Ballast Pump Capacity: Type: Centrifugal After Peak Tank 248.40 Center A.E-17 TOTAL Volume 1238.60 Objectives 1. Minimize risk of introducing harmful aquatic organisms and pathogens & associated sediment from ship's ballast water. 2. Awareness of risk to environment and possibility of contamination due to discharge of ballast water. 3. Training and education in management and treatment and maintenance of appropriate records. 4. Safe, effective procedures for Ballast operations and facilitate environmentally safe disposal of ballast tank sediments. Guidelines Precautionary Practices- 1. Minimize Uptake in- a. Areas known to contain potentially harmful organisms, sediment or pathogens. b. In darkness when bottom-dwelling organisms tend to rise. c. In shallow waters where propellers or strong currents may stir up sediment. 2. Routine cleaning of ballast tanks to remove sediments should be carried out when possible. 3. Avoid unnecessary discharge of Ballast water in ports. Plan ahead. Ballast Water Exchange: 1. Where possible, exchange of ballast water should take place in deep water, open ocean as far as possible from shore. 2. Where above is not possible, requirements developed in regional agreements may be in operation - take note. 3. When flow through method is used, minimum three times the tank volume should be pumped through the tank. 4. When sequential method of exchange is used, all old ballast water should be pumped out until suction is lost. 5. When ballast exchange is not possible, follow other ballast exchange options approved by the state. 6. Keep Ballast Water Exchange Form ready for Port State Authority [Appendix I of IMO Res A.868(20)]. Method: 1. Sequential Exchange Method: Ballast tanks are pumped out and refilled with clean water. See safety below. 2. Flow-through Method: Ballast tanks are simultaneously filled and discharged by pumping in clean water. In this method the tank is over flowed through air pipes and is not recommended on this vessel. 3. Discharge to reception facilities: May be provided by port State and where appropriate can be utilized. 4. New Technology treatments: Filtration, UV disinfecting, chemical or other acceptable treatments. Safety Considerations During Ballast exchange at sea, following should be taken into account- 1. Stability – Keep in mind free surface created during exchange operations. 2. Shear forces, Bending Moments – Permissible seagoing strength limits should never be exceeded. 3. Draft – Minimum, maximum drafts and associated trim condition will change. 4. Weather – in areas of frequent weather changes, cyclones and in heavy icing conditions take allied precautions. a. Ship has bottom for’d strengthening for a minimum draft of 3.8m when slamming is expected. b. Avoid exchange in freezing weather conditions as air pipes and other openings may be frozen. c. Accretion of ice has additional effect on vessel stability. 5. Avoid over- and under-pressurization of tanks. Monitor exchange with regular soundings. 6. Contingencies such as pump failure, loss of power, deteriorating weather. Recording and Reporting All ballast operations to be recorded in “Ballast Operations log”. 1. 2. Details as required on Ballast reporting form for Port State Authority to be maintained. Check Domestic laws, regulations before visiting Ports – Guide to Port Entry, etc. 3. by Capt. P. Kohli
  • 2. M.V. Nombre Barco Ballast Water Management Plan Accommodation MV Nombre Fresh Water Fore Aft Engine Room Peak 1 Fore Tank Peak Tank No.1 Tank H.F.O.T. 4 P+S Tanks No. 2 H.F.O Tank 3 Ballast P+S Tanks 166 – F.E. A.E. - 17 56 - 77 77-94 156-169 Frames- 248.40 106.90 128.80 402.30 352.20 Capacity (m³)- (m³) 3 Ballast (P) 4 WBT (P) 2 H.F.O.T. (P) Aft Peak No. 3 H.F.O.T No. 4 H.F.O.T 1 H.F.O.T. 1 Fore Fore Peak Tank Tank Tank 2 H.F.O.T. (S) 4 WBT (S) 3 Ballast (S) by Capt. P. Kohli Modified Sampling of Actual Ballast Management Plan created in 1995