Agenda
8/2/17
• Public Involvement
• Windjammer Park Phase 1 - 60% design progress
• Next steps
Agenda
8/2/17
• Public Involvement
• Windjammer Park Phase 1 - 60% design progress
• Next steps
• Clean Water Facility construction requires mitigation
and restoration in Windjammer Park
• Builds on previous reports and plans
• Establishes major park elements and phasing
Windjammer Park Integration Plan
8/2/17
• Public involvement included a Community Advisory
Group and 2 public open houses
• 17 members representing diverse community interests
• 5 meetings
• 2 public meetings and an online open house
• Council approved Windjammer Park Integration Plan
on June 7, 2016
Windjammer Park Integration Plan
8/2/17
What We Heard
8/2/17
• “Given” elements must be included (e.g. – restrooms,
kitchens, parking, playgrounds, waterfront trail, sport courts)
• Family-friendly elements should be prioritized
• Current RV park standards are not an efficient use of the
park space
• Views of the water are important
• The ballfields should be relocated in the long term
Windjammer
Park
Integration
Plan
Adopted
June 7, 2016
Resolution 16-15
7
8/2/17
Phasing
Map
8/2/17
Proposed
Phase 1
8/2/17
Windjammer Park Design: Phase 1
8/2/17
• First phase of design and
construction
• Includes Clean Water
Facility mitigation and
restoration
• Incorporates community
feedback
Phase 1 (pre-30%)
In-person and Online Open House
8/2/17
• 167 community members attended in-person and online open
houses in January 2017
• Highest priority elements are restrooms, walkways, a nature
play area, park furnishings, and a splash park
• Participants preferred a natural, simple aesthetic
• Park spaces should be flexible and multi-purpose
Windjammer Park Phase 1
Resolution 17-08
8/2/17
• Adopted by City Council on April 18, 2017
• Accepted the 30% Phase 1 Windjammer Park Design
• Authorized staff to proceed with design, permits and funding
• Authorized staff to continue with the existing design and const. team
• Authorized the closure of the RV Park on October 15th, 2017
• Authorized staff to proceed with design
Agenda
8/2/17
• Public Involvement
• Windjammer Park Phase 1 - 60% design progress
• Next steps
Placeholder: Phase 1 Site Plan (more detailed)
8/2/17
8/2/17
8/2/17
Splash Park
8/2/17
8/2/17
8/2/17
Kitchen/Shelters
8/2/17
8/2/17
Placeholder: Phase 1 Site Plan (more detailed)
8/2/17
Pavilion
8/2/17
Plaza 3d
8/2/17
Park Furnishings: lighting, seating, etc.
8/2/17
light pillars
light bollards
removable bollards
benches
bike racks
tree grates
trash
8/2/17
Park Access
P
P
P
P
Implementing Phase 1
• Phase 1 Cost Estimate
• Currently being prepared by our
designer and GC/CM
• Funding
• Mitigation for Clean Water Facility
construction
• Grant funds for splash park
• Windjammer Park funds
• Recreation and Conservation Grant
(RCO)
• Real estate excise tax
• Other sources: grants, civic
organizations
8/2/17
Agenda
8/2/17
• Public Involvement
• Windjammer Park Phase 1 - 60% design progress
• Next steps
• Newsletter and web update – Early August
• Online design walk-through – Early August
• Meeting with Parks Board – August 14
• Open House – August 24th – 5 to 7pm, Council Chambers
• Continued Arts Commission coordination
• Continued weekly email updates
Outreach Next Steps
8/2/17
• Continue Permitting Process
• Finalize design by fall 2017
• Prepare bids for fall 2017
• Begin implementing changes
winter 2017
• Plan future phases as funding
allows; including public input
• Strive to allow events to
continue in park during const.
Windjammer Park Next Steps
8/2/17
8/2/17
90% design
(Sept)
Final design
(Oct)
Questions?
8/2/17

Weitere ähnliche Inhalte

Was ist angesagt?

2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brmpublicinvolvement
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan publicinvolvement
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open housepublicinvolvement
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summarypublicinvolvement
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Updatepublicinvolvement
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forumpublicinvolvement
 
Oak Harbor Design Open House
Oak Harbor Design Open HouseOak Harbor Design Open House
Oak Harbor Design Open Housepublicinvolvement
 
Design charrette council presentation
Design charrette council presentationDesign charrette council presentation
Design charrette council presentationpublicinvolvement
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pmRamaChilamkurthy
 
Hearst community meeting 04.05.2018
Hearst community meeting   04.05.2018Hearst community meeting   04.05.2018
Hearst community meeting 04.05.2018RamaChilamkurthy
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020RamaChilamkurthy
 
Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019RamaChilamkurthy
 
Emmp community meeting#5 12-12-2019_presentation
Emmp community meeting#5 12-12-2019_presentationEmmp community meeting#5 12-12-2019_presentation
Emmp community meeting#5 12-12-2019_presentationRamaChilamkurthy
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyerRamaChilamkurthy
 
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...DC Department of General Services
 
Emmp emmpat mtg 12 12-18-2019_final
Emmp emmpat mtg 12 12-18-2019_finalEmmp emmpat mtg 12 12-18-2019_final
Emmp emmpat mtg 12 12-18-2019_finalRamaChilamkurthy
 
Progress update please do not remove
Progress update   please do not removeProgress update   please do not remove
Progress update please do not removeamberaley
 

Was ist angesagt? (20)

2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open house
 
Oh workshop02 full_final
Oh workshop02 full_finalOh workshop02 full_final
Oh workshop02 full_final
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summary
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Update
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
 
Oak Harbor Design Open House
Oak Harbor Design Open HouseOak Harbor Design Open House
Oak Harbor Design Open House
 
Design charrette council presentation
Design charrette council presentationDesign charrette council presentation
Design charrette council presentation
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
Hearst community meeting 04.05.2018
Hearst community meeting   04.05.2018Hearst community meeting   04.05.2018
Hearst community meeting 04.05.2018
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 
Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019Emmp community meeting 04 07-31-2019
Emmp community meeting 04 07-31-2019
 
Emmp community meeting#5 12-12-2019_presentation
Emmp community meeting#5 12-12-2019_presentationEmmp community meeting#5 12-12-2019_presentation
Emmp community meeting#5 12-12-2019_presentation
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
 
City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
 
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
Benning Stoddert Recreation Center Community Meeting Presentation (April 8, 2...
 
Emmp emmpat mtg 12 12-18-2019_final
Emmp emmpat mtg 12 12-18-2019_finalEmmp emmpat mtg 12 12-18-2019_final
Emmp emmpat mtg 12 12-18-2019_final
 
December 6 Public Forum
December 6 Public ForumDecember 6 Public Forum
December 6 Public Forum
 
Progress update please do not remove
Progress update   please do not removeProgress update   please do not remove
Progress update please do not remove
 

Ähnlich wie Presentation of Windjammer Park 60% Design to City Council

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13publicinvolvement
 
Clean Water Facility Update
Clean Water Facility UpdateClean Water Facility Update
Clean Water Facility UpdateJackie Dagger
 
January 29, 2022 Grand Avenue Members Association l Community meeting
January 29, 2022 Grand Avenue Members Association l Community meetingJanuary 29, 2022 Grand Avenue Members Association l Community meeting
January 29, 2022 Grand Avenue Members Association l Community meetingPlanetCommunities
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdatePlanetCommunities
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOCity of College Station
 
Capital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown MerchantsCapital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown MerchantsStateCollegePA
 
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingClean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingSweet Water
 
Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013StateCollegePA
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)DC Department of General Services
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyCity of College Station
 
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...Park Pride
 
Kalorama Park & Playground ANC Presentation (December 3, 2014)
Kalorama Park & Playground ANC Presentation (December 3, 2014)Kalorama Park & Playground ANC Presentation (December 3, 2014)
Kalorama Park & Playground ANC Presentation (December 3, 2014)DC Department of General Services
 

Ähnlich wie Presentation of Windjammer Park 60% Design to City Council (20)

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13
 
Clean Water Facility Update
Clean Water Facility UpdateClean Water Facility Update
Clean Water Facility Update
 
Benning Park Meeting Presentation (July 28, 2016)
Benning Park Meeting Presentation (July 28, 2016)Benning Park Meeting Presentation (July 28, 2016)
Benning Park Meeting Presentation (July 28, 2016)
 
January 29, 2022 Grand Avenue Members Association l Community meeting
January 29, 2022 Grand Avenue Members Association l Community meetingJanuary 29, 2022 Grand Avenue Members Association l Community meeting
January 29, 2022 Grand Avenue Members Association l Community meeting
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue Update
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
Hearst Park & Pool Meeting Presentation (May 10, 2016)
Hearst Park & Pool Meeting Presentation (May 10, 2016)Hearst Park & Pool Meeting Presentation (May 10, 2016)
Hearst Park & Pool Meeting Presentation (May 10, 2016)
 
Capital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown MerchantsCapital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown Merchants
 
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben GramlingClean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
Clean Rivers, Clean Lake 8 -- Home BMPs in the KK -- Ben Gramling
 
Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013
 
Display boards
Display boardsDisplay boards
Display boards
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
 
Hearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm finalHearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm final
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park Property
 
Draft FY16 Capital Plan
Draft FY16 Capital PlanDraft FY16 Capital Plan
Draft FY16 Capital Plan
 
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
20-20 Vision: The Role of Park Visioning in Shaping the Future of Your Greens...
 
Kalorama Park & Playground ANC Presentation (December 3, 2014)
Kalorama Park & Playground ANC Presentation (December 3, 2014)Kalorama Park & Playground ANC Presentation (December 3, 2014)
Kalorama Park & Playground ANC Presentation (December 3, 2014)
 

Mehr von publicinvolvement

Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9publicinvolvement
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5publicinvolvement
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7publicinvolvement
 
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Roompublicinvolvement
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Financepublicinvolvement
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimatepublicinvolvement
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Previewpublicinvolvement
 
140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentationpublicinvolvement
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Updatepublicinvolvement
 
2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentationpublicinvolvement
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshoppublicinvolvement
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revisedpublicinvolvement
 

Mehr von publicinvolvement (14)

Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7
 
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Finance
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimate
 
Oak Harbor Rate Study
Oak Harbor Rate StudyOak Harbor Rate Study
Oak Harbor Rate Study
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Preview
 
140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update
 
2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshop
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
 
Volume i executive summary
Volume i executive summaryVolume i executive summary
Volume i executive summary
 

Kürzlich hochgeladen

VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...robinsonayot
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...SUHANI PANDEY
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSgovindsharma81649
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 

Presentation of Windjammer Park 60% Design to City Council

  • 1. Windjammer Park 60% Design Preview City Council Meeting – August 2, 2017
  • 2. Agenda 8/2/17 • Public Involvement • Windjammer Park Phase 1 - 60% design progress • Next steps
  • 3. Agenda 8/2/17 • Public Involvement • Windjammer Park Phase 1 - 60% design progress • Next steps
  • 4. • Clean Water Facility construction requires mitigation and restoration in Windjammer Park • Builds on previous reports and plans • Establishes major park elements and phasing Windjammer Park Integration Plan 8/2/17
  • 5. • Public involvement included a Community Advisory Group and 2 public open houses • 17 members representing diverse community interests • 5 meetings • 2 public meetings and an online open house • Council approved Windjammer Park Integration Plan on June 7, 2016 Windjammer Park Integration Plan 8/2/17
  • 6. What We Heard 8/2/17 • “Given” elements must be included (e.g. – restrooms, kitchens, parking, playgrounds, waterfront trail, sport courts) • Family-friendly elements should be prioritized • Current RV park standards are not an efficient use of the park space • Views of the water are important • The ballfields should be relocated in the long term
  • 10. Windjammer Park Design: Phase 1 8/2/17 • First phase of design and construction • Includes Clean Water Facility mitigation and restoration • Incorporates community feedback
  • 11. Phase 1 (pre-30%) In-person and Online Open House 8/2/17 • 167 community members attended in-person and online open houses in January 2017 • Highest priority elements are restrooms, walkways, a nature play area, park furnishings, and a splash park • Participants preferred a natural, simple aesthetic • Park spaces should be flexible and multi-purpose
  • 12. Windjammer Park Phase 1 Resolution 17-08 8/2/17 • Adopted by City Council on April 18, 2017 • Accepted the 30% Phase 1 Windjammer Park Design • Authorized staff to proceed with design, permits and funding • Authorized staff to continue with the existing design and const. team • Authorized the closure of the RV Park on October 15th, 2017 • Authorized staff to proceed with design
  • 13. Agenda 8/2/17 • Public Involvement • Windjammer Park Phase 1 - 60% design progress • Next steps
  • 14. Placeholder: Phase 1 Site Plan (more detailed) 8/2/17
  • 22. Placeholder: Phase 1 Site Plan (more detailed) 8/2/17 Pavilion
  • 25. Park Furnishings: lighting, seating, etc. 8/2/17 light pillars light bollards removable bollards benches bike racks tree grates trash
  • 27. Implementing Phase 1 • Phase 1 Cost Estimate • Currently being prepared by our designer and GC/CM • Funding • Mitigation for Clean Water Facility construction • Grant funds for splash park • Windjammer Park funds • Recreation and Conservation Grant (RCO) • Real estate excise tax • Other sources: grants, civic organizations 8/2/17
  • 28. Agenda 8/2/17 • Public Involvement • Windjammer Park Phase 1 - 60% design progress • Next steps
  • 29. • Newsletter and web update – Early August • Online design walk-through – Early August • Meeting with Parks Board – August 14 • Open House – August 24th – 5 to 7pm, Council Chambers • Continued Arts Commission coordination • Continued weekly email updates Outreach Next Steps 8/2/17
  • 30. • Continue Permitting Process • Finalize design by fall 2017 • Prepare bids for fall 2017 • Begin implementing changes winter 2017 • Plan future phases as funding allows; including public input • Strive to allow events to continue in park during const. Windjammer Park Next Steps 8/2/17

Hinweis der Redaktion

  1. Public involvement included : Community Advisory Group 17 members representing diverse community interests 5 meetings Endorsed final plan 2 in-person and online public meetings
  2. Public involvement included : Community Advisory Group 17 members representing diverse community interests 5 meetings Endorsed final plan 2 in-person and online public meetings
  3. Approved by City Council June 7, 2016 Endorsed by community advisory group
  4. Much of the feedback confirmed project team assumptions Highest priority elements are restrooms, walkways, a nature play area, park furnishings, and a splash park Participants preferred a natural, simple aesthetic Park spaces should be flexible and multi-purpose Thoughts on style inspirations for the plaza, splash park, nature play area, wind shelters, kitchens, restrooms, walkways, and furnishings