            Coal-Fired Plants in India -
            Karnataka & Maharashtra




                                                                                                                                            Chandrapur
                                                                                                                                       Location: Maharashtra
                                                                                                                      Operator: Maharashtra State Power Generation Co
                                                                                                                                                  Ltd
                                                                                                                             Configuration: 4 X 210 MW, 3 X 500 MW
                        Bellary                                                                                                         Operation: 1983-1997
                  Location: Karnataka                                            Bhusawal                                               Fuel: bituminous coal
         Operator: Karnataka Power Corp Ltd                               Location: Maharashtra                            Boiler supplier: ACC Vickers Babcock Ltd,
              Configuration: 1 X 500 MW                   Operator: Maharashtra State Power Generation Co                        Combustion Engineering, BHEL
                    Operation: 2008                                                  Ltd                                           T/G supplier: BHEL, Siemens
                       Fuel: coal                               Configuration: 1 X 55 MW, 2 X 210 MW                          EPC: Development Consultants Pvt Ltd
                 Boiler supplier: BHEL                                     Operation: 1968-1982                       Quick facts: This mine-mouth power station is 6km
                  T/G supplier: BHEL                                       Fuel: bituminous coal                      from Chandrapur Town in far western Maharashtra.
                      EPC: BHEL                                      Boiler supplier: Cekop, BHEL                     The foundation stone for the first phase was laid on
 Quick facts: The first 500-MW unit of BTPS cost Rs                  T/G supplier: Siemens, BHEL                      16 Jan 1977 and Unit-1 was commissioned in Aug
  2,120 crore and was commissioned on 3 Nov 2008              Quick facts: This power station is 8km from               1983, followed by Unit-2 in Jul 1984. The station
 at the site near Kudatini Village, 22km from Bellary.   Bhusawal City and 450km from Mumbai. Unit-1 was was dedicated to the nation on 8 Oct 1984 by PM
   The unit zero date was 29 Dec 2003. Estimated          derated to 55 MW from 62.5 MW in Apr 2007.Two Indira Gandhi. The plant is the terminus of a 400kV
 cost of power is Rs 2.20/kWh and annual generation         more 500-MW sets are under construction for                double-circuit line from NTPC’s Korba STPS and
    is expected by be about 3,500 GWh. The unit           service in 2010/11. Cooling water is from the Tapi            originally the Chandrapur station had 3 X 400kV
       connects to the 400kV grid at Davangere                                      River.                                circuits delivering up to 1,200 MW of power to
  Substation. The stack is 275m tall. Fuel is from a                                                                      Mumbai. ABB and BHEL subsequently built a
       captive block of Western Coal Fields Ltd.         Photograph courtesy of Maharashtra State Power Generation Co       1,500-MW, 500kV HVDC line on the route
                                                                                     Ltd
                                                                              Posted 3 Feb 2010
                                                                                                                             Chandrapur-Padghe. The 753km link was
      Photograph courtesy of Karnataka Power Corp Ltd                                                                     commissioned in 1999 thereby allowing more
                    Posted 8 Nov 2008
                                                                                                                      efficient utilization of Chandrapur and facilitating the
                                                                                                                          development of two more 500-MW sets now in
                                                                                                                                               planning.

                                                                                                                            Photograph courtesy of maharashtra.bsnl.co.in
                                                                                                                                        Posted 10 Jan 2009




                                                                         Khaperkheda-I Phase 2                                   Khaperkheda-I Phase 2
                        Dahanu                                            Location: Maharashtra                                    Location: Maharashtra
                 Location: Maharashtra                      Operator: Maharashtra State Electricity Board           Operator: Maharashtra State Power Generation Co
              Operator: Reliance Energy                                  Configuration: 3 X 30 MW                                            Ltd
              Configuration: 2 X 250 MW                                    Operation: 1960-1964                                 Configuration: 4 X 210 MW
                    Operation: 1996                                        Fuel: bituminous coal                                    Operation: 1989-2001
                       Fuel: coal                                          Boiler supplier: B&W                                  Fuel: bituminous coal, oil
                 Boiler supplier: BHEL                                    T/G supplier: Siemens                       Boiler supplier: Combustion Engineering, BHEL
                  T/G supplier: BHEL                       Quick facts: This was one of the first-large-scale                        T/G supplier: BHEL
    EPC: Development Consultants Pvt Ltd, BHEL              power plants in the state with 3 X 10 MW sets                               EPCr: BHEL
   Quick facts: These were the first 250-MW BHEL           commissioned and handed over to the nation by             Quick facts: The first unit of the new Khaperkhed
   sets in India. The 275m stack was the tallest in        India's first President Dr. Rajendra Prasad on 27        plant was commissioned on 26 Mar 1989. The plant
    India at completion. Two 600-MW units are in          Dec 1950. The small units were scrapped in 1976.           has been putting out about 6 TWH/yr. A 500-MW

industcards.com/st-coal-india-kar-ma…                                                                                                                                       1/3
06-10-2010                                                         st-coal-india-kar-mah      pp                                   p     g                    y
                 planning for the site                        The 30-MW units were retired in Jun 1991.                                unit is in construction.

          Photograph courtesy of Reliance Energy         Photograph courtesy of Maharashtra State Power Generation Co Photograph courtesy of Maharashtra State Power Generation Co
                   Posted 19 May 2004                                                Ltd                                                          Ltd
                                                                              Posted 3 Feb 2010                                            Posted 3 Feb 2010




                         Raichur
                  Location: Karnataka
          Operator: Karnataka Power Corp Ltd
                Configuration: 7 X 210 MW
                  Operation: 1985-2003
                        Fuel: coal
                  Boiler supplier: BHEL                                       Ratnagiri
        T/G supplier: Shanghai, BHEL, Siemens                            Location: Karnataka                                               Trombay
        EPC: TCE Consulting Engineers, Mysore                        Operator: JSW Energy Ltd                                        Location: Maharashtra
               Construction, Gammon India                            Configuration: 4 X 300 MW                                      Operator: Tata Electric
     Quick facts: Raichur was developed per a 1978                         Operation: 2010                             Configuration: 1 X 150 MW, 2 X 500 MW, 1 X 180
     MOU with TCE Consulting Engineers who were                               Fuel: coal                                                    MW CC
  consultants for the first two stages. The 300ha site                Boiler supplier: Shanghai                                      Operation: 1965-1993
 is on the Krishna River in Raichur Dist about 500km                    T/G supplier: Shanghai                                     Fuel: coal, natural gas, oil
  from Bangalore. Unit-1 was completed in Mar 1985         EPC: EDAC Engineering, SEW Constructions,                               Boiler supplier: CE, BHEL
   and Unit-2 a year later. Construction of Unit-3 was                 Sunil HiTech Engineers                                 T/G supplier: BHEL, GE, Siemens
    started in 1986 and completed in Mar 1991 while       Quick facts: In Aug 2007, JSW Energy closed on                Quick facts: Trombay has India's first 500-MW
   Unit-4 was started in 1989 and completed in Sep           Ratnagiri Phase-I in Ratnagiri district. This            generating unit and the country's first FGD system.
   1994 These four units cost about Rs 13,860mn. In         Rs4,500cr project will burn about 4.1mn tpy of
 1996, three more units were started and these cost        imported coal. Power evacuation will be via two                         Photograph courtesy of Tata Electric
     Rs 15,450mn. Unit-7 was completed in a then-           400kV lines to Koyna and two more to Karad.                                   Posted 23 Mar 2002
    record 25mos at the end of 2002. An eighth 250-          MOEF clearance was received in Nov 2007.
     MW set is under construction and two 500-MW
 units are planned. About 7mn tpy of coal is delivered              Photograph courtesy of JSW Energy Ltd
                                                                             Posted 3 Apr 2010
   from Singareni Collieries, Western Coalfields Ltd.
   and Mahanadi Coalfields Ltd and station output is
 about 10 TWh/yr, up to 40% of the state’s electricity
  requirement. Unit-4 was financed by Japan’s ODA.

         Photograph courtesy of Gammon India Ltd
                   Posted 15 Nov 2008




                                                                             Wardha Warora
                                                                          Location: Maharashtra
                                                                Operator: KSK Energy Ventures Pvt Ltd
                                                                        Configuration: 4 X 135 MW
                                                                          Operation: 2010-2011
                                                                                Fuel: lignite
                                                                         Boiler supplier: Dongfang
                                                                      T/G supplier: Dongfang, Harbin
                                                               EPC: Sichuan Electric Power Designing &
                                                                             Consulting Co Ltd
                                                          Quick facts: In May 2007, KSK closed on the first
                                                          phase of its Wardha Warora project in Chandrapur
                                                             district. The foundation stone was laid shortly
                                                            thereafter. Steel maker Viraj Profiles has a 25yr
                                                           PPA for the entire 270 MW for captive use. KSK
                                                             has a coal supply agreement with the Gujarat
                                                           Mining Development Corp, which will supply coal
                                                          from a captive coal block in Chhattisgarh. The Rs
                                                           2,416cr plant began commissioning in Q1 2010.

                                                              Photograph courtesy of KSK Energy Ventures Pvt Ltd

industcards.com/st-coal-india-kar-ma…                                                                                                                                        2/3
06-10-2010                                                             st-coal-india-kar-mah
                                                                            Posted 24 Apr 2010




 Abbreviations

 Data: industcards, Platts UDI World Electric Power Plants Data Base


 Updated 04/24/10

 Home




industcards.com/st-coal-india-kar-ma…                                                            3/3

Weitere ähnliche Inhalte

Was ist angesagt?

ABWR Reactor Core Neutronics
ABWR Reactor Core NeutronicsABWR Reactor Core Neutronics
ABWR Reactor Core Neutronicsmyatom
 
Rec & Rpo Update April 2012 General Carbon
Rec & Rpo Update   April 2012   General CarbonRec & Rpo Update   April 2012   General Carbon
Rec & Rpo Update April 2012 General Carbonsatishkashyap
 
REC & RPO update April 2012 - General Carbon
REC & RPO update   April 2012 - General CarbonREC & RPO update   April 2012 - General Carbon
REC & RPO update April 2012 - General Carbongeneralcarbon
 
GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPOGCAdvisors
 
PV Grid Parity in India
PV Grid Parity in IndiaPV Grid Parity in India
PV Grid Parity in Indiamanasij_kar
 
Update on projects presentation
Update on projects presentationUpdate on projects presentation
Update on projects presentationMPX_RI
 
ENEL plans for storage introduction in Italian distribution network
ENEL plans for storage introduction in Italian distribution networkENEL plans for storage introduction in Italian distribution network
ENEL plans for storage introduction in Italian distribution networkGIFI
 
Sustainable solutions for faster construction of the higher tower and founda...
 Sustainable solutions for faster construction of the higher tower and founda... Sustainable solutions for faster construction of the higher tower and founda...
Sustainable solutions for faster construction of the higher tower and founda...Winterwind
 
Energy & power sector.docx
Energy & power sector.docxEnergy & power sector.docx
Energy & power sector.docxDipankar Biswas
 
Wind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyWind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyRadu Oleniuc
 

Was ist angesagt? (14)

ABWR Reactor Core Neutronics
ABWR Reactor Core NeutronicsABWR Reactor Core Neutronics
ABWR Reactor Core Neutronics
 
FSM Energy Policy-Summary
FSM Energy Policy-SummaryFSM Energy Policy-Summary
FSM Energy Policy-Summary
 
Rec & Rpo Update April 2012 General Carbon
Rec & Rpo Update   April 2012   General CarbonRec & Rpo Update   April 2012   General Carbon
Rec & Rpo Update April 2012 General Carbon
 
REC & RPO update April 2012 - General Carbon
REC & RPO update   April 2012 - General CarbonREC & RPO update   April 2012 - General Carbon
REC & RPO update April 2012 - General Carbon
 
GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPO
 
Geothermal
GeothermalGeothermal
Geothermal
 
PV Grid Parity in India
PV Grid Parity in IndiaPV Grid Parity in India
PV Grid Parity in India
 
Project report
Project reportProject report
Project report
 
Update on projects presentation
Update on projects presentationUpdate on projects presentation
Update on projects presentation
 
ENEL plans for storage introduction in Italian distribution network
ENEL plans for storage introduction in Italian distribution networkENEL plans for storage introduction in Italian distribution network
ENEL plans for storage introduction in Italian distribution network
 
Sustainable solutions for faster construction of the higher tower and founda...
 Sustainable solutions for faster construction of the higher tower and founda... Sustainable solutions for faster construction of the higher tower and founda...
Sustainable solutions for faster construction of the higher tower and founda...
 
Energy & power sector.docx
Energy & power sector.docxEnergy & power sector.docx
Energy & power sector.docx
 
0323 01b
0323 01b0323 01b
0323 01b
 
Wind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyWind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, Germany
 

Mehr von Project Sales Corp

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfProject Sales Corp
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Project Sales Corp
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyProject Sales Corp
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfProject Sales Corp
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024Project Sales Corp
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfProject Sales Corp
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalProject Sales Corp
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024Project Sales Corp
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024Project Sales Corp
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsProject Sales Corp
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabProject Sales Corp
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfProject Sales Corp
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdfProject Sales Corp
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023Project Sales Corp
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfProject Sales Corp
 

Mehr von Project Sales Corp (20)

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdf
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdf
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdf
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - Global
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety Tools
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
 
MOTORS IN STOCK.pdf
MOTORS IN STOCK.pdfMOTORS IN STOCK.pdf
MOTORS IN STOCK.pdf
 
RING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdfRING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdf
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdf
 
Stock - Filters.pdf
Stock - Filters.pdfStock - Filters.pdf
Stock - Filters.pdf
 
Stock - Ballasts.pdf
Stock - Ballasts.pdfStock - Ballasts.pdf
Stock - Ballasts.pdf
 
Stock - Junction Boxes.pdf
Stock - Junction Boxes.pdfStock - Junction Boxes.pdf
Stock - Junction Boxes.pdf
 

Kürzlich hochgeladen

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesBoston Institute of Analytics
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 

Kürzlich hochgeladen (20)

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 

Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Stations Call +91-891-2564393

  • 1. 06-10-2010 st-coal-india-kar-mah Coal-Fired Plants in India - Karnataka & Maharashtra Chandrapur Location: Maharashtra Operator: Maharashtra State Power Generation Co Ltd Configuration: 4 X 210 MW, 3 X 500 MW Bellary Operation: 1983-1997 Location: Karnataka Bhusawal Fuel: bituminous coal Operator: Karnataka Power Corp Ltd Location: Maharashtra Boiler supplier: ACC Vickers Babcock Ltd, Configuration: 1 X 500 MW Operator: Maharashtra State Power Generation Co Combustion Engineering, BHEL Operation: 2008 Ltd T/G supplier: BHEL, Siemens Fuel: coal Configuration: 1 X 55 MW, 2 X 210 MW EPC: Development Consultants Pvt Ltd Boiler supplier: BHEL Operation: 1968-1982 Quick facts: This mine-mouth power station is 6km T/G supplier: BHEL Fuel: bituminous coal from Chandrapur Town in far western Maharashtra. EPC: BHEL Boiler supplier: Cekop, BHEL The foundation stone for the first phase was laid on Quick facts: The first 500-MW unit of BTPS cost Rs T/G supplier: Siemens, BHEL 16 Jan 1977 and Unit-1 was commissioned in Aug 2,120 crore and was commissioned on 3 Nov 2008 Quick facts: This power station is 8km from 1983, followed by Unit-2 in Jul 1984. The station at the site near Kudatini Village, 22km from Bellary. Bhusawal City and 450km from Mumbai. Unit-1 was was dedicated to the nation on 8 Oct 1984 by PM The unit zero date was 29 Dec 2003. Estimated derated to 55 MW from 62.5 MW in Apr 2007.Two Indira Gandhi. The plant is the terminus of a 400kV cost of power is Rs 2.20/kWh and annual generation more 500-MW sets are under construction for double-circuit line from NTPC’s Korba STPS and is expected by be about 3,500 GWh. The unit service in 2010/11. Cooling water is from the Tapi originally the Chandrapur station had 3 X 400kV connects to the 400kV grid at Davangere River. circuits delivering up to 1,200 MW of power to Substation. The stack is 275m tall. Fuel is from a Mumbai. ABB and BHEL subsequently built a captive block of Western Coal Fields Ltd. Photograph courtesy of Maharashtra State Power Generation Co 1,500-MW, 500kV HVDC line on the route Ltd Posted 3 Feb 2010 Chandrapur-Padghe. The 753km link was Photograph courtesy of Karnataka Power Corp Ltd commissioned in 1999 thereby allowing more Posted 8 Nov 2008 efficient utilization of Chandrapur and facilitating the development of two more 500-MW sets now in planning. Photograph courtesy of maharashtra.bsnl.co.in Posted 10 Jan 2009 Khaperkheda-I Phase 2 Khaperkheda-I Phase 2 Dahanu Location: Maharashtra Location: Maharashtra Location: Maharashtra Operator: Maharashtra State Electricity Board Operator: Maharashtra State Power Generation Co Operator: Reliance Energy Configuration: 3 X 30 MW Ltd Configuration: 2 X 250 MW Operation: 1960-1964 Configuration: 4 X 210 MW Operation: 1996 Fuel: bituminous coal Operation: 1989-2001 Fuel: coal Boiler supplier: B&W Fuel: bituminous coal, oil Boiler supplier: BHEL T/G supplier: Siemens Boiler supplier: Combustion Engineering, BHEL T/G supplier: BHEL Quick facts: This was one of the first-large-scale T/G supplier: BHEL EPC: Development Consultants Pvt Ltd, BHEL power plants in the state with 3 X 10 MW sets EPCr: BHEL Quick facts: These were the first 250-MW BHEL commissioned and handed over to the nation by Quick facts: The first unit of the new Khaperkhed sets in India. The 275m stack was the tallest in India's first President Dr. Rajendra Prasad on 27 plant was commissioned on 26 Mar 1989. The plant India at completion. Two 600-MW units are in Dec 1950. The small units were scrapped in 1976. has been putting out about 6 TWH/yr. A 500-MW industcards.com/st-coal-india-kar-ma… 1/3
  • 2. 06-10-2010 st-coal-india-kar-mah pp p g y planning for the site The 30-MW units were retired in Jun 1991. unit is in construction. Photograph courtesy of Reliance Energy Photograph courtesy of Maharashtra State Power Generation Co Photograph courtesy of Maharashtra State Power Generation Co Posted 19 May 2004 Ltd Ltd Posted 3 Feb 2010 Posted 3 Feb 2010 Raichur Location: Karnataka Operator: Karnataka Power Corp Ltd Configuration: 7 X 210 MW Operation: 1985-2003 Fuel: coal Boiler supplier: BHEL Ratnagiri T/G supplier: Shanghai, BHEL, Siemens Location: Karnataka Trombay EPC: TCE Consulting Engineers, Mysore Operator: JSW Energy Ltd Location: Maharashtra Construction, Gammon India Configuration: 4 X 300 MW Operator: Tata Electric Quick facts: Raichur was developed per a 1978 Operation: 2010 Configuration: 1 X 150 MW, 2 X 500 MW, 1 X 180 MOU with TCE Consulting Engineers who were Fuel: coal MW CC consultants for the first two stages. The 300ha site Boiler supplier: Shanghai Operation: 1965-1993 is on the Krishna River in Raichur Dist about 500km T/G supplier: Shanghai Fuel: coal, natural gas, oil from Bangalore. Unit-1 was completed in Mar 1985 EPC: EDAC Engineering, SEW Constructions, Boiler supplier: CE, BHEL and Unit-2 a year later. Construction of Unit-3 was Sunil HiTech Engineers T/G supplier: BHEL, GE, Siemens started in 1986 and completed in Mar 1991 while Quick facts: In Aug 2007, JSW Energy closed on Quick facts: Trombay has India's first 500-MW Unit-4 was started in 1989 and completed in Sep Ratnagiri Phase-I in Ratnagiri district. This generating unit and the country's first FGD system. 1994 These four units cost about Rs 13,860mn. In Rs4,500cr project will burn about 4.1mn tpy of 1996, three more units were started and these cost imported coal. Power evacuation will be via two Photograph courtesy of Tata Electric Rs 15,450mn. Unit-7 was completed in a then- 400kV lines to Koyna and two more to Karad. Posted 23 Mar 2002 record 25mos at the end of 2002. An eighth 250- MOEF clearance was received in Nov 2007. MW set is under construction and two 500-MW units are planned. About 7mn tpy of coal is delivered Photograph courtesy of JSW Energy Ltd Posted 3 Apr 2010 from Singareni Collieries, Western Coalfields Ltd. and Mahanadi Coalfields Ltd and station output is about 10 TWh/yr, up to 40% of the state’s electricity requirement. Unit-4 was financed by Japan’s ODA. Photograph courtesy of Gammon India Ltd Posted 15 Nov 2008 Wardha Warora Location: Maharashtra Operator: KSK Energy Ventures Pvt Ltd Configuration: 4 X 135 MW Operation: 2010-2011 Fuel: lignite Boiler supplier: Dongfang T/G supplier: Dongfang, Harbin EPC: Sichuan Electric Power Designing & Consulting Co Ltd Quick facts: In May 2007, KSK closed on the first phase of its Wardha Warora project in Chandrapur district. The foundation stone was laid shortly thereafter. Steel maker Viraj Profiles has a 25yr PPA for the entire 270 MW for captive use. KSK has a coal supply agreement with the Gujarat Mining Development Corp, which will supply coal from a captive coal block in Chhattisgarh. The Rs 2,416cr plant began commissioning in Q1 2010. Photograph courtesy of KSK Energy Ventures Pvt Ltd industcards.com/st-coal-india-kar-ma… 2/3
  • 3. 06-10-2010 st-coal-india-kar-mah Posted 24 Apr 2010 Abbreviations Data: industcards, Platts UDI World Electric Power Plants Data Base Updated 04/24/10 Home industcards.com/st-coal-india-kar-ma… 3/3