Power Plants in Karnataka Maharastra - - For Sealing Compounds for Power Stations Call +91-891-2564393
1. 06-10-2010 st-coal-india-kar-mah
Coal-Fired Plants in India -
Karnataka & Maharashtra
Chandrapur
Location: Maharashtra
Operator: Maharashtra State Power Generation Co
Ltd
Configuration: 4 X 210 MW, 3 X 500 MW
Bellary Operation: 1983-1997
Location: Karnataka Bhusawal Fuel: bituminous coal
Operator: Karnataka Power Corp Ltd Location: Maharashtra Boiler supplier: ACC Vickers Babcock Ltd,
Configuration: 1 X 500 MW Operator: Maharashtra State Power Generation Co Combustion Engineering, BHEL
Operation: 2008 Ltd T/G supplier: BHEL, Siemens
Fuel: coal Configuration: 1 X 55 MW, 2 X 210 MW EPC: Development Consultants Pvt Ltd
Boiler supplier: BHEL Operation: 1968-1982 Quick facts: This mine-mouth power station is 6km
T/G supplier: BHEL Fuel: bituminous coal from Chandrapur Town in far western Maharashtra.
EPC: BHEL Boiler supplier: Cekop, BHEL The foundation stone for the first phase was laid on
Quick facts: The first 500-MW unit of BTPS cost Rs T/G supplier: Siemens, BHEL 16 Jan 1977 and Unit-1 was commissioned in Aug
2,120 crore and was commissioned on 3 Nov 2008 Quick facts: This power station is 8km from 1983, followed by Unit-2 in Jul 1984. The station
at the site near Kudatini Village, 22km from Bellary. Bhusawal City and 450km from Mumbai. Unit-1 was was dedicated to the nation on 8 Oct 1984 by PM
The unit zero date was 29 Dec 2003. Estimated derated to 55 MW from 62.5 MW in Apr 2007.Two Indira Gandhi. The plant is the terminus of a 400kV
cost of power is Rs 2.20/kWh and annual generation more 500-MW sets are under construction for double-circuit line from NTPC’s Korba STPS and
is expected by be about 3,500 GWh. The unit service in 2010/11. Cooling water is from the Tapi originally the Chandrapur station had 3 X 400kV
connects to the 400kV grid at Davangere River. circuits delivering up to 1,200 MW of power to
Substation. The stack is 275m tall. Fuel is from a Mumbai. ABB and BHEL subsequently built a
captive block of Western Coal Fields Ltd. Photograph courtesy of Maharashtra State Power Generation Co 1,500-MW, 500kV HVDC line on the route
Ltd
Posted 3 Feb 2010
Chandrapur-Padghe. The 753km link was
Photograph courtesy of Karnataka Power Corp Ltd commissioned in 1999 thereby allowing more
Posted 8 Nov 2008
efficient utilization of Chandrapur and facilitating the
development of two more 500-MW sets now in
planning.
Photograph courtesy of maharashtra.bsnl.co.in
Posted 10 Jan 2009
Khaperkheda-I Phase 2 Khaperkheda-I Phase 2
Dahanu Location: Maharashtra Location: Maharashtra
Location: Maharashtra Operator: Maharashtra State Electricity Board Operator: Maharashtra State Power Generation Co
Operator: Reliance Energy Configuration: 3 X 30 MW Ltd
Configuration: 2 X 250 MW Operation: 1960-1964 Configuration: 4 X 210 MW
Operation: 1996 Fuel: bituminous coal Operation: 1989-2001
Fuel: coal Boiler supplier: B&W Fuel: bituminous coal, oil
Boiler supplier: BHEL T/G supplier: Siemens Boiler supplier: Combustion Engineering, BHEL
T/G supplier: BHEL Quick facts: This was one of the first-large-scale T/G supplier: BHEL
EPC: Development Consultants Pvt Ltd, BHEL power plants in the state with 3 X 10 MW sets EPCr: BHEL
Quick facts: These were the first 250-MW BHEL commissioned and handed over to the nation by Quick facts: The first unit of the new Khaperkhed
sets in India. The 275m stack was the tallest in India's first President Dr. Rajendra Prasad on 27 plant was commissioned on 26 Mar 1989. The plant
India at completion. Two 600-MW units are in Dec 1950. The small units were scrapped in 1976. has been putting out about 6 TWH/yr. A 500-MW
industcards.com/st-coal-india-kar-ma… 1/3
2. 06-10-2010 st-coal-india-kar-mah pp p g y
planning for the site The 30-MW units were retired in Jun 1991. unit is in construction.
Photograph courtesy of Reliance Energy Photograph courtesy of Maharashtra State Power Generation Co Photograph courtesy of Maharashtra State Power Generation Co
Posted 19 May 2004 Ltd Ltd
Posted 3 Feb 2010 Posted 3 Feb 2010
Raichur
Location: Karnataka
Operator: Karnataka Power Corp Ltd
Configuration: 7 X 210 MW
Operation: 1985-2003
Fuel: coal
Boiler supplier: BHEL Ratnagiri
T/G supplier: Shanghai, BHEL, Siemens Location: Karnataka Trombay
EPC: TCE Consulting Engineers, Mysore Operator: JSW Energy Ltd Location: Maharashtra
Construction, Gammon India Configuration: 4 X 300 MW Operator: Tata Electric
Quick facts: Raichur was developed per a 1978 Operation: 2010 Configuration: 1 X 150 MW, 2 X 500 MW, 1 X 180
MOU with TCE Consulting Engineers who were Fuel: coal MW CC
consultants for the first two stages. The 300ha site Boiler supplier: Shanghai Operation: 1965-1993
is on the Krishna River in Raichur Dist about 500km T/G supplier: Shanghai Fuel: coal, natural gas, oil
from Bangalore. Unit-1 was completed in Mar 1985 EPC: EDAC Engineering, SEW Constructions, Boiler supplier: CE, BHEL
and Unit-2 a year later. Construction of Unit-3 was Sunil HiTech Engineers T/G supplier: BHEL, GE, Siemens
started in 1986 and completed in Mar 1991 while Quick facts: In Aug 2007, JSW Energy closed on Quick facts: Trombay has India's first 500-MW
Unit-4 was started in 1989 and completed in Sep Ratnagiri Phase-I in Ratnagiri district. This generating unit and the country's first FGD system.
1994 These four units cost about Rs 13,860mn. In Rs4,500cr project will burn about 4.1mn tpy of
1996, three more units were started and these cost imported coal. Power evacuation will be via two Photograph courtesy of Tata Electric
Rs 15,450mn. Unit-7 was completed in a then- 400kV lines to Koyna and two more to Karad. Posted 23 Mar 2002
record 25mos at the end of 2002. An eighth 250- MOEF clearance was received in Nov 2007.
MW set is under construction and two 500-MW
units are planned. About 7mn tpy of coal is delivered Photograph courtesy of JSW Energy Ltd
Posted 3 Apr 2010
from Singareni Collieries, Western Coalfields Ltd.
and Mahanadi Coalfields Ltd and station output is
about 10 TWh/yr, up to 40% of the state’s electricity
requirement. Unit-4 was financed by Japan’s ODA.
Photograph courtesy of Gammon India Ltd
Posted 15 Nov 2008
Wardha Warora
Location: Maharashtra
Operator: KSK Energy Ventures Pvt Ltd
Configuration: 4 X 135 MW
Operation: 2010-2011
Fuel: lignite
Boiler supplier: Dongfang
T/G supplier: Dongfang, Harbin
EPC: Sichuan Electric Power Designing &
Consulting Co Ltd
Quick facts: In May 2007, KSK closed on the first
phase of its Wardha Warora project in Chandrapur
district. The foundation stone was laid shortly
thereafter. Steel maker Viraj Profiles has a 25yr
PPA for the entire 270 MW for captive use. KSK
has a coal supply agreement with the Gujarat
Mining Development Corp, which will supply coal
from a captive coal block in Chhattisgarh. The Rs
2,416cr plant began commissioning in Q1 2010.
Photograph courtesy of KSK Energy Ventures Pvt Ltd
industcards.com/st-coal-india-kar-ma… 2/3
3. 06-10-2010 st-coal-india-kar-mah
Posted 24 Apr 2010
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 04/24/10