Delivered at PMI SCoP's 9th Annual Scheduling Conference, this presentation discusses the results from a recently conducted research project showing the correlation between the quality of a plan and overall project success, as well as a means of assessing schedule quality and forecasting accuracy using metric analysis.
6. // Acumen Schedule Metrics
Advanced Project Insight
Finish
Insufficient
Logic
Logic
Compliance™
Detail™
Density™
Hotspot™
• Accurate
• Ac>vity
V
• Measure
of
• Timely
start?
measure
of
project
dura>on
complexity/
performance
completeness
Milestone
Broad
Risk
Float
Ra>o™
Redundancy
Ra>o™
Range
• Degree
of
Index™
• Detail
V
• Check
for
flexibility
per
• Non-‐needed
repor>ng
erroneous
risk
day
of
work
logic
input
//
7. // Logic Density™
Planning Consistency
◦ Determine Logic Hotspots™ in schedule
◦ Indication of sufficient logic
◦ Excellent means of trending detail level
More
defini>on
needed
May 10, 2012
// 7
8. // Advanced Logic Analysis
Sound Basis of Schedule
◦ Use of FS, FF, SS, FS links
◦ Lags & Leads
◦ Lags hide schedule detail redundant
◦ Leads cause reverse dates A
◦ Circular logic between projects
◦ Out-of-Sequence updates B
◦ Open ends/missing logic C
◦ Open start/finish (hidden open ends)
◦ Logic Density
◦ Logic Hotspot
◦ Redundancy Index
//
10. // Baseline Compliance Index™
Examines
how
many
ac>vi>es
fell
within
the
expected
repor>ng
period
//
11. // Baseline Compliance™
Performance Analysis
◦ More than date comparison
◦ Measures period-compliance
◦ Included in Fuse® library
100%
50%
0%
May 10, 2012 // 11
17. // Claims Analysis
Insight into project variances
◦ Advanced forensics
◦ Fuse gives meaning to the
impact of changes
◦ Pinpoints changes to critical/
driving path
◦ Every single project attribute
can be checked
◦ Calendar definition changes
// May 10, 2012
19. // Case Study
Owner/contractor Alignment
• Houston-based oil/gas owner
• Objective:
• More on-time completion for projects over $250MM
• Encourage more mature contractor schedules
• Overcome “brain drain” in scheduling
• How achieved:
• Mandated contractor Fuse Schedule Index of 75+
• Gave contractor opportunity to self-assess
//