Deck Structural Design



                                OVERVIEW




Introduction

Now that you have the conceptual design for your deck, and you plan on doing this on your own, it is time to
develop the structural elements and material specifications. No matter if you complete the project yourself or
hire a contractor, this exercise will help you to get an understanding of the details of your deck. These
specifications will be a part of the Construction Document you will either take to the building department for a
permit, use to get bids on the project or use to build the deck yourself.


You might have already begun thinking about the construction details and possibly have a pretty good idea of
the components that make up a deck or have some good questions. And, unless you have special conditions, we
will answer most of those questions here. Special conditions include steep slopes, unstable soil and specific
building codes. If you are unsure where your project fits, check with a contractor or the building department.


After you complete this tutorial, you will have a better idea whether to do-it-yourself or hire a contractor. So,
grab your sketches and here we go.




   • Beginner - 3 to 4 hours
   • Intermediate - 2 to 3 hours
   • Advanced - 1 to 2 hours

                       Saving money by scrimping on materials or crowding the design tables will come back
   on you when the deck begins to age. Pay more now to save in the future.


                   If you put this project out to bid, the estimates will be more "apples-for-apples" if the
   contractors have a detailed plan to bid from. The Construction Document you are creating here will help
   make this possible.


                   Determine the direction the deck boards will run, this will influence the layout of the joists
   and girders. Most deck boards run parallel with the long dimension of the deck.


                    Print out the Deck Spec and Materials list, which you can fill out in the following steps.
STEPS
1. Create a list: Fill in the blanks on the Deck Specs form. This information
   will give you the basis for completing the materials list. You should get the
   measurements from the conceptual plan created in the previous tutorial.
   The following steps will help you fill in the quantities for each item. When
   this list is complete, you will be able to set a budget for your deck project by
   getting an estimate from the lumberyard or putting the project out to bid.
   Make your own copy of this list and let's begin.




2. Estimate the ledger: Measure from your plans how many feet of wall will
   support the deck and add 10% for waste. Note: Always add a "waste
   factor," use 10% as a minimum.




3. Estimate concrete: This project calls for concrete pads measuring 18
   inches by 18 inches by 12 inches deep. That equals 2.25 cubic feet per pad,
   times the number of pads to figure the total cubic feet. Verify the standard
   in your area, as many areas, especially in colder climates, require deeper
   pads. The goal is to have concrete pads that extend below the frost line,
   which could be as deep as 42". For each set of stairs add 2 cubic feet to
   support the bottom of the stairs. Don't forget to add the 10% to the total
   for waste; and, there are 27 cubic feet in a cubic yard.


   Our 30 foot by 20 foot deck will have three rows of concrete pads with five
   pads in each row--15 concrete pads times 2.25 cubic feet (c.f.) equals 33.75
   c.f. plus 2 c.f. for a total of 35.75 c.f. Don't forget the 10% waste factor. For
   this deck we will order 37.125 c.f. Be sure to round up to the nearest
   available quantity.
4. Estimate concrete piers: Simply count the number of concrete pads; you
   will need a concrete pier for each pad. It is not necessary to include a waste
   factor for piers.
5. Estimate posts: You will need posts if your deck is over 18 inches above
   the ground. Count the number of concrete pads and multiply that number
   by the average height of the deck above the ground. Take care that the
   individual post heights fall evenly into a common 4x4 lengths; 4x4's come in
   two foot increments starting at 8 feet--8'-10'-12' and so on.




6. Estimate girders: The girders are 4x6's on this deck and will "run" the
   same direction as the deck boards. This plan calls for girders spaced 6 feet 8
   inches apart and supported by piers every 6 feet (check applicable joist
   span tables). Girders should be supported on three piers where possible--
   this will make the minimum desirable length 12 feet, remember the piers
   are 6 feet apart. Therefore the best girder lengths are multiples of six, and
   the longest manageable length will be 18 feet. Also, the girders must be
   supported at the ends on piers.


   For our deck there will be three "rows" of girders, each 30 feet long, for a
   total of 90 linear feet of 4x6. For this estimate add 10 % for waste, be sure
   to check for availability of the required lengths.

7. Estimate joists: The joists are spaced 16 inch on center and will run
   perpendicular to the girders and deck boards. To figure the number of
   joists, convert the length of the deck to inches (a 30 foot deck is 30 x 12 =
   360 inches) and divide that by the 16-inch spacing (360 / 16 = 22.5) and
   round up (22.5 becomes 23.) Add 1 to that to figure the total number of
   joists. This deck will require 24 joists spaced at 16 inches on center. Multiply
   this number by the deck width (20 feet) to estimate the total linear feet of
   2x6 joists, 460 linear feet plus 10% (46) equals 510 (round up.)




8. Estimate deck boards: This deck will have 2 x 6 decking, a 2 x 6 is usually
   5 ½ inches instead of 6 as the name implies. So a standard 2 x 6 one foot
   long (a linear foot of 2x6) will cover .46 square feet.


   Our deck is 600 square feet (20 x 30) so there will be 600 / .46 = 1,304
   linear feet of deck boards.Be sure to include a 10% waste factor (134 feet)
   and the total is 1434 linear feet of 2 x 6.




9. Estimate stairs: This deck is 30 inches above the ground and has one set
   of stairs 36 inches wide. To figure the actual number of steps, divide 30
   inches by 6 inches--5 steps, the last one being the deck itself. Height of
   deck above ground divided by 6 equal the number of steps.


   To figure stringer length, multiply the number of steps by 16 inches for each
   stringer. Our deck has five steps times 16 inches--80 inches-6 feet 8 inches.
   Stairs up to 36 inches wide have two stringers, and stairs over 36 inches
   have three stringers up to 6 feet for the stringers. The steps (the steps are
   2x6 the same as the deck) have two 2x6's, times the width of the stairs. In
   this case, each step will have two 2x6's by 36 inches. Five steps will require
   10 x 36 inch 2x6's or 30 lineal feet of material. Add this to the deck material
   order.
10 Estimate railings: This deck has guard railings on two sides and hand
. railings on the stairs. Measure the open sides of the deck and add the stair
   rail. Get the stair rail length from the stair stringer length in step nine.


    Calculate one 8-foot 4x4 (post) for each 6 feet of rail, 2 feet of 2x4 (top and
    bottom rail) for each 1 foot of rail and 2.2 1x2 (baluster) for each foot of
    rail.


    There are three parts of the railing, the posts, the top and bottom rail and
    the balusters.



11 Hardware and fasteners: You will need galvanized nails, metal connectors
. and bolts to connect your deck parts. Figure one pound of 16d galvanized
   nails for each 10 square feet of deck, use the double hot dipped galvanized
   kind.


    Each joist will require two joist hangars. Each post should have a post cap
    to connect it to the girder it supports. Figure one pound of galvanized nails
    for each 10 metal connectors. The manufacturer will specify the size of nail
    for their product. Allow one bolt per foot of ledger, be sure to measure the
    length necessary to "run" the bolt through the wall framing and install a nut
    and washer on the other side.




Materials Needed
•   Your design from previous tutorial

•   Blank paper for lists


Tools Needed
•   Calculator

•   Span tables

•   Material selection information

Weitere ähnliche Inhalte

Ă„hnlich wie Deck structural design

Installing deck stairs
Installing deck stairsInstalling deck stairs
Installing deck stairsZulaiha Amaria
 
Woodworking: The Essentila "all Purpose" workbench
Woodworking: The Essentila "all Purpose" workbenchWoodworking: The Essentila "all Purpose" workbench
Woodworking: The Essentila "all Purpose" workbenchYadeaHerman
 
Installing the deck railing
Installing the deck railingInstalling the deck railing
Installing the deck railingZulaiha Amaria
 
9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shedicreatablesseo
 
2. How to build a shed floor?
2. How to build a shed floor?2. How to build a shed floor?
2. How to build a shed floor?icreatablesseo
 
4 classic roubo-style-workbench
4 classic roubo-style-workbench4 classic roubo-style-workbench
4 classic roubo-style-workbenchYadeaHerman
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1Keith Daggett
 
Easy small wood projects
Easy small wood projectsEasy small wood projects
Easy small wood projectsheatherbarnard5
 
I Year Diploma Presentation by Neha assudani B.Sc. Interior Design student
I Year Diploma Presentation by Neha assudani B.Sc. Interior Design studentI Year Diploma Presentation by Neha assudani B.Sc. Interior Design student
I Year Diploma Presentation by Neha assudani B.Sc. Interior Design studentdezyneecole
 
Maths A - Chapter 8
Maths A - Chapter 8Maths A - Chapter 8
Maths A - Chapter 8westy67968
 
Pvc and coroplast_class
Pvc and coroplast_classPvc and coroplast_class
Pvc and coroplast_classkjones9999
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line methodmalang1214
 
Installing deck posts
Installing deck postsInstalling deck posts
Installing deck postsZulaiha Amaria
 
Rachel Hughes Portfolio
Rachel Hughes PortfolioRachel Hughes Portfolio
Rachel Hughes PortfolioRachel Hughes
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof raftersicreatablesseo
 

Ă„hnlich wie Deck structural design (20)

Installing deck stairs
Installing deck stairsInstalling deck stairs
Installing deck stairs
 
Roof framing
Roof framingRoof framing
Roof framing
 
Woodworking: The Essentila "all Purpose" workbench
Woodworking: The Essentila "all Purpose" workbenchWoodworking: The Essentila "all Purpose" workbench
Woodworking: The Essentila "all Purpose" workbench
 
Installing the deck railing
Installing the deck railingInstalling the deck railing
Installing the deck railing
 
9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed
 
2. How to build a shed floor?
2. How to build a shed floor?2. How to build a shed floor?
2. How to build a shed floor?
 
4 classic roubo-style-workbench
4 classic roubo-style-workbench4 classic roubo-style-workbench
4 classic roubo-style-workbench
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1
 
Easy small wood projects
Easy small wood projectsEasy small wood projects
Easy small wood projects
 
How to build your dream 12x8 shed
 How to build your dream 12x8 shed  How to build your dream 12x8 shed
How to build your dream 12x8 shed
 
I Year Diploma Presentation by Neha assudani B.Sc. Interior Design student
I Year Diploma Presentation by Neha assudani B.Sc. Interior Design studentI Year Diploma Presentation by Neha assudani B.Sc. Interior Design student
I Year Diploma Presentation by Neha assudani B.Sc. Interior Design student
 
Coffee table @1
Coffee table @1Coffee table @1
Coffee table @1
 
Maths A - Chapter 8
Maths A - Chapter 8Maths A - Chapter 8
Maths A - Chapter 8
 
Pvc and coroplast_class
Pvc and coroplast_classPvc and coroplast_class
Pvc and coroplast_class
 
Timber decking
Timber deckingTimber decking
Timber decking
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
Planning a deck
Planning a deckPlanning a deck
Planning a deck
 
Installing deck posts
Installing deck postsInstalling deck posts
Installing deck posts
 
Rachel Hughes Portfolio
Rachel Hughes PortfolioRachel Hughes Portfolio
Rachel Hughes Portfolio
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof rafters
 

Mehr von Praveen Sudarsan

How to install pvc downpipes
How to install pvc downpipesHow to install pvc downpipes
How to install pvc downpipesPraveen Sudarsan
 
How to hang wallpaper
How to hang wallpaperHow to hang wallpaper
How to hang wallpaperPraveen Sudarsan
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pondPraveen Sudarsan
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal poolPraveen Sudarsan
 
How a lighting circuit works
How a lighting circuit worksHow a lighting circuit works
How a lighting circuit worksPraveen Sudarsan
 
How to avoid the cowboy builder
How to avoid the cowboy builderHow to avoid the cowboy builder
How to avoid the cowboy builderPraveen Sudarsan
 
General do it yourself safety comments
General do it yourself safety commentsGeneral do it yourself safety comments
General do it yourself safety commentsPraveen Sudarsan
 
Garage floor insulation
Garage floor insulationGarage floor insulation
Garage floor insulationPraveen Sudarsan
 
Foundations for light garden walls
Foundations for light garden wallsFoundations for light garden walls
Foundations for light garden wallsPraveen Sudarsan
 
Fixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsFixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsPraveen Sudarsan
 
Fixing to lathe & plaster
Fixing to lathe & plasterFixing to lathe & plaster
Fixing to lathe & plasterPraveen Sudarsan
 

Mehr von Praveen Sudarsan (20)

How to install pvc downpipes
How to install pvc downpipesHow to install pvc downpipes
How to install pvc downpipes
 
How to hang wallpaper
How to hang wallpaperHow to hang wallpaper
How to hang wallpaper
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal pool
 
How to build a deck
How to build a deckHow to build a deck
How to build a deck
 
How a lighting circuit works
How a lighting circuit worksHow a lighting circuit works
How a lighting circuit works
 
Home security
Home securityHome security
Home security
 
Heat guns
Heat gunsHeat guns
Heat guns
 
Hanging wallpaper
Hanging wallpaperHanging wallpaper
Hanging wallpaper
 
Hanging a door
Hanging a doorHanging a door
Hanging a door
 
Handrail anatomy
Handrail anatomyHandrail anatomy
Handrail anatomy
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Timber care
Timber careTimber care
Timber care
 
How to avoid the cowboy builder
How to avoid the cowboy builderHow to avoid the cowboy builder
How to avoid the cowboy builder
 
General do it yourself safety comments
General do it yourself safety commentsGeneral do it yourself safety comments
General do it yourself safety comments
 
Garage floor insulation
Garage floor insulationGarage floor insulation
Garage floor insulation
 
Foundations for light garden walls
Foundations for light garden wallsFoundations for light garden walls
Foundations for light garden walls
 
Fixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsFixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixings
 
Fixing to lathe & plaster
Fixing to lathe & plasterFixing to lathe & plaster
Fixing to lathe & plaster
 

KĂĽrzlich hochgeladen

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel AraĂşjo
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 

KĂĽrzlich hochgeladen (20)

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 

Deck structural design

  • 1. Deck Structural Design OVERVIEW Introduction Now that you have the conceptual design for your deck, and you plan on doing this on your own, it is time to develop the structural elements and material specifications. No matter if you complete the project yourself or hire a contractor, this exercise will help you to get an understanding of the details of your deck. These specifications will be a part of the Construction Document you will either take to the building department for a permit, use to get bids on the project or use to build the deck yourself. You might have already begun thinking about the construction details and possibly have a pretty good idea of the components that make up a deck or have some good questions. And, unless you have special conditions, we will answer most of those questions here. Special conditions include steep slopes, unstable soil and specific building codes. If you are unsure where your project fits, check with a contractor or the building department. After you complete this tutorial, you will have a better idea whether to do-it-yourself or hire a contractor. So, grab your sketches and here we go. • Beginner - 3 to 4 hours • Intermediate - 2 to 3 hours • Advanced - 1 to 2 hours Saving money by scrimping on materials or crowding the design tables will come back on you when the deck begins to age. Pay more now to save in the future. If you put this project out to bid, the estimates will be more "apples-for-apples" if the contractors have a detailed plan to bid from. The Construction Document you are creating here will help make this possible. Determine the direction the deck boards will run, this will influence the layout of the joists and girders. Most deck boards run parallel with the long dimension of the deck. Print out the Deck Spec and Materials list, which you can fill out in the following steps.
  • 2. STEPS 1. Create a list: Fill in the blanks on the Deck Specs form. This information will give you the basis for completing the materials list. You should get the measurements from the conceptual plan created in the previous tutorial. The following steps will help you fill in the quantities for each item. When this list is complete, you will be able to set a budget for your deck project by getting an estimate from the lumberyard or putting the project out to bid. Make your own copy of this list and let's begin. 2. Estimate the ledger: Measure from your plans how many feet of wall will support the deck and add 10% for waste. Note: Always add a "waste factor," use 10% as a minimum. 3. Estimate concrete: This project calls for concrete pads measuring 18 inches by 18 inches by 12 inches deep. That equals 2.25 cubic feet per pad, times the number of pads to figure the total cubic feet. Verify the standard in your area, as many areas, especially in colder climates, require deeper pads. The goal is to have concrete pads that extend below the frost line, which could be as deep as 42". For each set of stairs add 2 cubic feet to support the bottom of the stairs. Don't forget to add the 10% to the total for waste; and, there are 27 cubic feet in a cubic yard. Our 30 foot by 20 foot deck will have three rows of concrete pads with five pads in each row--15 concrete pads times 2.25 cubic feet (c.f.) equals 33.75 c.f. plus 2 c.f. for a total of 35.75 c.f. Don't forget the 10% waste factor. For this deck we will order 37.125 c.f. Be sure to round up to the nearest available quantity. 4. Estimate concrete piers: Simply count the number of concrete pads; you will need a concrete pier for each pad. It is not necessary to include a waste factor for piers.
  • 3. 5. Estimate posts: You will need posts if your deck is over 18 inches above the ground. Count the number of concrete pads and multiply that number by the average height of the deck above the ground. Take care that the individual post heights fall evenly into a common 4x4 lengths; 4x4's come in two foot increments starting at 8 feet--8'-10'-12' and so on. 6. Estimate girders: The girders are 4x6's on this deck and will "run" the same direction as the deck boards. This plan calls for girders spaced 6 feet 8 inches apart and supported by piers every 6 feet (check applicable joist span tables). Girders should be supported on three piers where possible-- this will make the minimum desirable length 12 feet, remember the piers are 6 feet apart. Therefore the best girder lengths are multiples of six, and the longest manageable length will be 18 feet. Also, the girders must be supported at the ends on piers. For our deck there will be three "rows" of girders, each 30 feet long, for a total of 90 linear feet of 4x6. For this estimate add 10 % for waste, be sure to check for availability of the required lengths. 7. Estimate joists: The joists are spaced 16 inch on center and will run perpendicular to the girders and deck boards. To figure the number of joists, convert the length of the deck to inches (a 30 foot deck is 30 x 12 = 360 inches) and divide that by the 16-inch spacing (360 / 16 = 22.5) and round up (22.5 becomes 23.) Add 1 to that to figure the total number of joists. This deck will require 24 joists spaced at 16 inches on center. Multiply this number by the deck width (20 feet) to estimate the total linear feet of 2x6 joists, 460 linear feet plus 10% (46) equals 510 (round up.) 8. Estimate deck boards: This deck will have 2 x 6 decking, a 2 x 6 is usually 5 ½ inches instead of 6 as the name implies. So a standard 2 x 6 one foot long (a linear foot of 2x6) will cover .46 square feet. Our deck is 600 square feet (20 x 30) so there will be 600 / .46 = 1,304 linear feet of deck boards.Be sure to include a 10% waste factor (134 feet) and the total is 1434 linear feet of 2 x 6. 9. Estimate stairs: This deck is 30 inches above the ground and has one set of stairs 36 inches wide. To figure the actual number of steps, divide 30 inches by 6 inches--5 steps, the last one being the deck itself. Height of deck above ground divided by 6 equal the number of steps. To figure stringer length, multiply the number of steps by 16 inches for each stringer. Our deck has five steps times 16 inches--80 inches-6 feet 8 inches. Stairs up to 36 inches wide have two stringers, and stairs over 36 inches have three stringers up to 6 feet for the stringers. The steps (the steps are 2x6 the same as the deck) have two 2x6's, times the width of the stairs. In this case, each step will have two 2x6's by 36 inches. Five steps will require 10 x 36 inch 2x6's or 30 lineal feet of material. Add this to the deck material order.
  • 4. 10 Estimate railings: This deck has guard railings on two sides and hand . railings on the stairs. Measure the open sides of the deck and add the stair rail. Get the stair rail length from the stair stringer length in step nine. Calculate one 8-foot 4x4 (post) for each 6 feet of rail, 2 feet of 2x4 (top and bottom rail) for each 1 foot of rail and 2.2 1x2 (baluster) for each foot of rail. There are three parts of the railing, the posts, the top and bottom rail and the balusters. 11 Hardware and fasteners: You will need galvanized nails, metal connectors . and bolts to connect your deck parts. Figure one pound of 16d galvanized nails for each 10 square feet of deck, use the double hot dipped galvanized kind. Each joist will require two joist hangars. Each post should have a post cap to connect it to the girder it supports. Figure one pound of galvanized nails for each 10 metal connectors. The manufacturer will specify the size of nail for their product. Allow one bolt per foot of ledger, be sure to measure the length necessary to "run" the bolt through the wall framing and install a nut and washer on the other side. Materials Needed • Your design from previous tutorial • Blank paper for lists Tools Needed • Calculator • Span tables • Material selection information