A
SEMINAR
ON
PRESENTED BY:
SHRUTI RANJAN PARIDA
1101348076
MECHANICAL
ABOUT JSPL
Jindal Steel and Power Limited has set up India's first mega power project in the private sector – the 1000
MW thermal power plant at Raigarh, Chhattisgarh. The Company has invested approximately Rs. 4338
crore for setting up a 1000 MW power plant.
The Company has constructed a 258 km, 400 KV Double Circuit transmission line from the plant to the
PGCIL sub-station at Raipur through which power can be sold anywhere in India. For meeting the plant's
consumptive water requirement, an 18 m high dam over the Kelo River has been built, 25 km away from
the project site.
The Company is expanding its capacity at Tamnar by setting up a 2400 MW thermal power plant at an
estimated cost of Rs 13,410 crore. The Company has already placed order on Bharat Heavy Electricals
Limited (BHEL) for supply of a 4X600 MW Boiler Turbine Generation (BTG) package.
MAIN PARTS OF THE PLANT ARE :-
i. COAL HANDLING PLANT
ii. PRE TREATMENT and DM PLANT
iii. COOLING TOWER
iv. BOILER and its Components
v. ASH HANDLING PLANT
vi. TURBINE GENERATOR
vii. TRANSFORMERS
viii. SWITCH YARD
ix. CONCLUSION
1. Here Sub-bituminous
type ‘F’ grade coal is
used in the boiler.
2. The size of the coal is
0.6 mm.
3. It is very low quality
coal which contain
50-60% ash.
1. CRUSHER
2. VIBRATING SCREEN
3. CONVEYER
4. MAGNETIC SEPARATOR
5. VIBRO FEEDER
IMPACT CRUSHER
DOUBLE ROLL CRUSHER
VIBRATING SCREEN
MAGNETIC SAPARATOR
VIBRO FEEDER
RESERVOIR (Mahanadi, Kelo)
STEALING CHAMBER (Cl2 dozing)
PARSELL FLUME (5% Polly Alluminium Chloride dozing)
INNER CELL CLEARIFIER (Removes sludges)
OUTER CELL CLEARIFIER
RGF (Rapid Gravity Filter)
FWS (Filtered Water Storage)
The main aim of DM Plant is to de-mineralised the raw water coming from a water source by
chemical dosing which may be harmful to the pipeline and boilers.
ACF (Activated Carbon Filter) – contain charcoal to absorb chlorine.
LBC (Layer Bed Cation) – contain resin to remove +ve minerals
DEGASSER TOWER – removes CO2.
WBA (Weak Base Anion) – contain resin to remove –ve minerals.
SBA (Strong Base Anion) – it also contain resin to remove remaining charged minerals.
MB (Mixed Bed) - having both WBA and SBA to remove silica.
1. THE WARM WATER IS TAKEN FROM THE CONDENSER
TUBES TO THE COOLING TOWER.
2. THIS BREAKS THE WATER UP INTO A VERY FINE SPRAY
INCREASING THE SURFACE AREA OF THE WATER
DROPLETS MAKING IT EASEIR TO COOL.
3. THE COOL WATER IS COLLECTED IN POND AT THE
BOTTOM OF THE COOLING TOWER.
4. FROM HERE IT PUMPED BACK TO CONDENSER.
1. TO PRODUCE STEAM BOILER CONVERTS ENERGY, IN THE
FORM OF COAL, INTO STEAM.
2. THE BIOLER IS LINED WITH STEEL TUBING IN WHICH PURE
WATER IS TURNED TO STEAM BY THE HEAT CREATED FROM
THE BURNING OF COAL.
3. THE PLANT MAINLY OF TWO TYPES:-
i. AFBC (Air Fluidise Bed Combustion)
ii. WHRC ( Waste Heat Recovory Boiler)
4. BOILER CAPACITY– 165 TPH (ton per hour)
5. STEAM PRESSURE– 90 kg/cm2
6. STEAM TEMPERATURE– 540 oc
BOILER COMPONENTS
FORCED DRAFT (FD) FAN
THIS FAN FORCES THE ATMOSPHERIC AIR THROUGH THE BOILER FURNACE AND PUSHES OUT THE
HOT GASES FROM THE FURNACE THROUGH SUPERHEATER, ECONOMIZER, AND AIR HEATER TO
STACKS.
INDUCED DRAFT (ID) FAN
1. THIS FAN IS PROVIDED AT THE OUTLET OF THE BOILER, THAT IS JUST BEFORE THE STACK.
2. THIS FAN SUCKS HOT GASES FROM THE FURNACE THROUGH THE SUPERHEATERS, ECONOMIZER
AND DISCHARGES GAS INTO THE STACK.
PRIMARY AIR (PA) FAN
THIS FAN ARE HIGH PRESSURE FANS USED TO SUPPLY THE AIR FOR THE TRANSPORTATION OF
COAL DIRECTLY TO FURNACE.
FD FAN
ID FAN
PA FAN
ECONOMIZER
1. FLUE GAS COMING OUT OF THE BOILER CARRIES LOTS OF HEAT.
2. THE ECONOMIZER EXTRACTS A PART OF HEAT FROM THE FLUE GASES AND USES FOR HEATING THE
FEED WATER. THUS IMPROVES THE EFFICIENCY OF PLANT.
SUPERHEATER
1. SUPER HEATER IS USED TO REMOVE MOISTURE CONTENT FROM THE STEAM.
2. SUPER HEATER RAISES THE TEMPERATURE OF STEAM ABOVE 540 oc.
3. ADVANTAGES OF SUPER HEATER :-
i. INCREASE EFFICIENCY.
ii. REDUCES CORROSION OF TURBINE BLADES.
AIR PREHEATER (APH)
1. IT IS USED TO PREHEAT THE AIR BEFORE ENTERING INTO FURNACE.
2. IT IS A HEAT EXCHANGER IN WHICH SOME FURTHER HEAT IS EXTRACTED FROM THE FLUE GASES
AND USE TO HEAT THE COMING AIR FROM COMBUSTION.
Superheater
ELECTROSTATIC PRECIPITATOR
1. IT IS DESIGNED TO TRAP AND REMOVE DUST PARTICLES FROM AND EXHAUST GAS STREAM OF AN
INDUSTRIAL PROCESS.
2. THE PRECIPITATION PROCESS INVOLVES 3 MAIN FUNCTIONS:-
i. PARTICLE CHARGING
ii. PARTICLE COLLECTION
iii. REMOVAL OF PARTICLES
DEAERATOR
A DEAERATOR IS A DEVICE THAT IS WIDELY USED FOR THE REMOVAL OF OXYGEN AND OTHER
DISSOLVED GASES FROM THE FEEDWATER. IN PARTICULAR,DISSOLVED OXYGEN IN BOILER
FEEDWATERS WILL CAUSE SERIOUS CORROSION DAMAGE IN STEAM SYSTEMS BY ATTACHING TO THE
WALLS OF METAL PIPING AND OTHER METALLIC EQUIPMENT AND FORMING OXIDES (RUST).
CONDENSER
1. HERE THE STEAM IS CONDENSED BACK INTO WATER AND PUMPED BACK TO THE BOILER.
2. THIS HAPPENS VIA A SERIES OF LOW AND HIGH PRESSURE HEATERS.
CONDENSATE EXTRACTION PUMP
THE CONSENSATE WATER IS DRAWN FROM THE CONDENSER BY EXTRACTION PUMP AND SEND IT TO
LOW PRESSURE FEED HEATER.
LOW PRESSURE FEED HEATER (LP HEATER)
1. FEED WATER FROM THE CONDENSATE EXTRACTION PUMPS PASS THROUGH LOW PRESSURE HEATER.
2. STEAM IS USED TO HEAT THE FEED WATER.
HIGH PRESSURE HEATER
WITH SIMILAR PURPOSE, THE HIGH PRESSURE FEED HEATERS ARE THE LAST STAGE OF FEED WATER
HEATING BEFORE THE FEED WATER ENTERS THE BIOLER SYSTEM AT THE ECONOMIZER.
CONDENSER
CEP
LPH HPH
BOILER FEED PUMP
1. THE BOILER FEED PUMP PUMPS THE WATER INTO THE BOILER, OVERCOMING PRESSURE OF
150 Kg/cm².
2. THE PUMP IS DRIVEN BY AN ELECTRIC MOTOR.
3. THE PUMP RUN IN 4130 RPM AND THE MOTOR RUNS IN 1490 RPM.
CIRCULATING WATER PUMPS
THE CIRCULATING WATER PUMPS ARE USED TO CIRCULATE THE WATER FROM COOLING TOWER TO
THE CONDENSER AND BACK AGAIN.
COMPRESSOR HOUSE
1. THE MAIN PURPOSE OF THE COMPRESSOR HOUSE IS TO PROVIDE OR SUPPLY THE HIGH PRESSURE
AIR TO THE DIFFERENT COMPONENTS IN PLANT.
2. THERE ARE 2 TYPES OF COMPRESSED AIR:-
i. SERVICE AIR WHICH CONTAINS MOISTURE AND IS SUPPLY TO ASH HANDLING PLANT AND OTHER
SERVICES WHERE MOISTURE NOT DAMAGE ANY EQUIPMENT.
ii. INSTRUMENT AIR WHICH CONTAIN NO MOISTURE IN AIR AND THIS AIR IS USED IN NUMETIC
VALVES.
BFP
CIRCULATING PUMP COMPRESSOR HOUSE
DRY ASH SYSTEM
FLY ASH IS CONSIDERED TO BE COLLECTED IN ESP HOPPERS. FLY ASH FROM ESP HOPPERS EXTRACTED
BY VACUUM PUMPS UP TO INTERMEDIATE SURGE HOPPER CUM BAG FILTER FOR FURTHER DRY
CONVEYING TO FLY ASH SILO.
WET ASH SYSTEM
BOTTOM ASH SLURRY AND FLY ASH SLURRY SHALL BE PUMPED FROM THE COMMON ASH SLURRY
SUMP UP TO THE DYKE AREA WHICH IS LOCATED AT A DISTANCE FROM SLURRY PUMP HOUSE.
AFTER THE COAL IS BURN THE ASH OF THE COAL REMAINS IN THE ESP SYSTEM SO TO REMOVE THAT
ASH FROM THE PLANT THERE IS AN ASH HANDLING PLANT JUST NEAR THE BOILER. THE WET ASH IS
DUMPED IN DUMPING AREA AND THE DRY ASH IS USED IN BRICK AND CEMENT MAKING.
DRY ASHWET ASH
SILO
1. A STEAM TURBINE GENERATOR IS A DEVICE THAT USES STEAM TO ROTATE A TURBINE GENERATOR
TO PRODUC ELECTRICITY.
2. STEAM TURBINES USE WATER THAT IS HEATED TO EXTREMELY HIGH TEMPERATURES AND CONVERTED
INTO STEAM TO ROTATE THE BLADES OF A TURBINE, IN ORDER TO CREATE MECHANICAL OR
ROTATIONAL ENERGY. THIS ROTATIONAL ENERGY CAUSED BY THE HIGH PRESSURED STEAM
TURBINE IS USED TO GENERATE ELECTRICITY IN AN ATTACHED GENERATOR.
3. MAIN COMPONENTS OF TYPICAL TURBOGENERATOR CONSISTS OF :-
i. PERMANENT MAGNET GENERATOR (PMG)
ii. AUTOMATIC VOLTAGE REGULATOR (AVR)
iii. EXCITER
iv. GEAR BOX
v. ALTERNATOR
vi. TURBINE
1. TRANSFORMER IS THE MOST CONVENIENT DEVICE FOR TRANSFORMER OF POWER FROM ONE
VOLTAGE TO ANOTHER VOLTAGE AT THE SAME FREQUENCY.
2. IT WORKS IN THE PRINCIPLE OF ELECTROMAGNETIC INDUCTION.
3. TRANSFORMERS ARE OF TWO TYPES :-
i. STEP-UP TRANSFORMER
ii. STEP-DOWN TRANSFORMER
ELECTRICAL SWITCHYARDS ARE USUALLLY PART OF SUBSTATION WHERE ELECTRICITY IS
TRANSFORMED FROM ONE VOLTAGE TO ANOTHER FOR THE TRANSMISSION , DISTRIBUTION.
EVERY PART OF THE PLANT IS PLAYS AN IMPORTANT ROLE FOR THE PLANT. WITHOUT THIS
COMPONENTS THE PLANT OR BOILER CANT EVEN RUN AND IF RUNS ALSO THEN THERE IS A100%
CHANCE OF A TRIPPING OF PLANT AND BECAUSE OF WHICH VERY HUGE AMOUNT OF LOSSES IN
MAN, MONEY AND TIME OCCURES.
THANK YOU TO
ALL…

Weitere ähnliche Inhalte

Was ist angesagt?

Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
Rashmi Nimje
 

Was ist angesagt? (20)

STEAM POWER PLANT
STEAM POWER PLANTSTEAM POWER PLANT
STEAM POWER PLANT
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
 
Chapter 4 Gas Turbine
Chapter 4 Gas TurbineChapter 4 Gas Turbine
Chapter 4 Gas Turbine
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Rankine cycle
Rankine cycleRankine cycle
Rankine cycle
 
Candu reactor ppt
Candu reactor pptCandu reactor ppt
Candu reactor ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)
 
Economic analysis of power plant
Economic analysis of power plantEconomic analysis of power plant
Economic analysis of power plant
 
Power Plant Engineering: Pressurised Water Reactor
Power Plant Engineering: Pressurised Water ReactorPower Plant Engineering: Pressurised Water Reactor
Power Plant Engineering: Pressurised Water Reactor
 
power point presentation over thermal power plant
power point presentation over thermal power plantpower point presentation over thermal power plant
power point presentation over thermal power plant
 
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERINGCOAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
 
Gas turbine plant
Gas turbine plantGas turbine plant
Gas turbine plant
 
Thermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeThermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to Knowledge
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
Binary cycle & co generation power plants
Binary cycle & co generation power plantsBinary cycle & co generation power plants
Binary cycle & co generation power plants
 

Ähnlich wie Power plant Engineering ppt

Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892
cit-cit
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
arvind singh rathore
 

Ähnlich wie Power plant Engineering ppt (20)

Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892
 
Overview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVCOverview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVC
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Pintu raj
Pintu rajPintu raj
Pintu raj
 
National thermal power corporation
National thermal power corporationNational thermal power corporation
National thermal power corporation
 
boiler and cogeneration training material
boiler and cogeneration training materialboiler and cogeneration training material
boiler and cogeneration training material
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Power Plant Engg.pdf
Power Plant Engg.pdfPower Plant Engg.pdf
Power Plant Engg.pdf
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)
 
hindalco power
hindalco powerhindalco power
hindalco power
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
Coal Base Thermal Power Plant
Coal Base Thermal Power PlantCoal Base Thermal Power Plant
Coal Base Thermal Power Plant
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Kürzlich hochgeladen

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 

Kürzlich hochgeladen (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 

Power plant Engineering ppt

  • 1. A SEMINAR ON PRESENTED BY: SHRUTI RANJAN PARIDA 1101348076 MECHANICAL
  • 2. ABOUT JSPL Jindal Steel and Power Limited has set up India's first mega power project in the private sector – the 1000 MW thermal power plant at Raigarh, Chhattisgarh. The Company has invested approximately Rs. 4338 crore for setting up a 1000 MW power plant. The Company has constructed a 258 km, 400 KV Double Circuit transmission line from the plant to the PGCIL sub-station at Raipur through which power can be sold anywhere in India. For meeting the plant's consumptive water requirement, an 18 m high dam over the Kelo River has been built, 25 km away from the project site. The Company is expanding its capacity at Tamnar by setting up a 2400 MW thermal power plant at an estimated cost of Rs 13,410 crore. The Company has already placed order on Bharat Heavy Electricals Limited (BHEL) for supply of a 4X600 MW Boiler Turbine Generation (BTG) package.
  • 3.
  • 4. MAIN PARTS OF THE PLANT ARE :- i. COAL HANDLING PLANT ii. PRE TREATMENT and DM PLANT iii. COOLING TOWER iv. BOILER and its Components v. ASH HANDLING PLANT vi. TURBINE GENERATOR vii. TRANSFORMERS viii. SWITCH YARD ix. CONCLUSION
  • 5.
  • 6. 1. Here Sub-bituminous type ‘F’ grade coal is used in the boiler. 2. The size of the coal is 0.6 mm. 3. It is very low quality coal which contain 50-60% ash.
  • 7. 1. CRUSHER 2. VIBRATING SCREEN 3. CONVEYER 4. MAGNETIC SEPARATOR 5. VIBRO FEEDER
  • 13.
  • 14. RESERVOIR (Mahanadi, Kelo) STEALING CHAMBER (Cl2 dozing) PARSELL FLUME (5% Polly Alluminium Chloride dozing) INNER CELL CLEARIFIER (Removes sludges) OUTER CELL CLEARIFIER RGF (Rapid Gravity Filter) FWS (Filtered Water Storage)
  • 15. The main aim of DM Plant is to de-mineralised the raw water coming from a water source by chemical dosing which may be harmful to the pipeline and boilers. ACF (Activated Carbon Filter) – contain charcoal to absorb chlorine. LBC (Layer Bed Cation) – contain resin to remove +ve minerals DEGASSER TOWER – removes CO2. WBA (Weak Base Anion) – contain resin to remove –ve minerals. SBA (Strong Base Anion) – it also contain resin to remove remaining charged minerals. MB (Mixed Bed) - having both WBA and SBA to remove silica.
  • 16.
  • 17. 1. THE WARM WATER IS TAKEN FROM THE CONDENSER TUBES TO THE COOLING TOWER. 2. THIS BREAKS THE WATER UP INTO A VERY FINE SPRAY INCREASING THE SURFACE AREA OF THE WATER DROPLETS MAKING IT EASEIR TO COOL. 3. THE COOL WATER IS COLLECTED IN POND AT THE BOTTOM OF THE COOLING TOWER. 4. FROM HERE IT PUMPED BACK TO CONDENSER.
  • 18.
  • 19. 1. TO PRODUCE STEAM BOILER CONVERTS ENERGY, IN THE FORM OF COAL, INTO STEAM. 2. THE BIOLER IS LINED WITH STEEL TUBING IN WHICH PURE WATER IS TURNED TO STEAM BY THE HEAT CREATED FROM THE BURNING OF COAL. 3. THE PLANT MAINLY OF TWO TYPES:- i. AFBC (Air Fluidise Bed Combustion) ii. WHRC ( Waste Heat Recovory Boiler) 4. BOILER CAPACITY– 165 TPH (ton per hour) 5. STEAM PRESSURE– 90 kg/cm2 6. STEAM TEMPERATURE– 540 oc
  • 20.
  • 21. BOILER COMPONENTS FORCED DRAFT (FD) FAN THIS FAN FORCES THE ATMOSPHERIC AIR THROUGH THE BOILER FURNACE AND PUSHES OUT THE HOT GASES FROM THE FURNACE THROUGH SUPERHEATER, ECONOMIZER, AND AIR HEATER TO STACKS. INDUCED DRAFT (ID) FAN 1. THIS FAN IS PROVIDED AT THE OUTLET OF THE BOILER, THAT IS JUST BEFORE THE STACK. 2. THIS FAN SUCKS HOT GASES FROM THE FURNACE THROUGH THE SUPERHEATERS, ECONOMIZER AND DISCHARGES GAS INTO THE STACK. PRIMARY AIR (PA) FAN THIS FAN ARE HIGH PRESSURE FANS USED TO SUPPLY THE AIR FOR THE TRANSPORTATION OF COAL DIRECTLY TO FURNACE.
  • 23. ECONOMIZER 1. FLUE GAS COMING OUT OF THE BOILER CARRIES LOTS OF HEAT. 2. THE ECONOMIZER EXTRACTS A PART OF HEAT FROM THE FLUE GASES AND USES FOR HEATING THE FEED WATER. THUS IMPROVES THE EFFICIENCY OF PLANT. SUPERHEATER 1. SUPER HEATER IS USED TO REMOVE MOISTURE CONTENT FROM THE STEAM. 2. SUPER HEATER RAISES THE TEMPERATURE OF STEAM ABOVE 540 oc. 3. ADVANTAGES OF SUPER HEATER :- i. INCREASE EFFICIENCY. ii. REDUCES CORROSION OF TURBINE BLADES. AIR PREHEATER (APH) 1. IT IS USED TO PREHEAT THE AIR BEFORE ENTERING INTO FURNACE. 2. IT IS A HEAT EXCHANGER IN WHICH SOME FURTHER HEAT IS EXTRACTED FROM THE FLUE GASES AND USE TO HEAT THE COMING AIR FROM COMBUSTION.
  • 25. ELECTROSTATIC PRECIPITATOR 1. IT IS DESIGNED TO TRAP AND REMOVE DUST PARTICLES FROM AND EXHAUST GAS STREAM OF AN INDUSTRIAL PROCESS. 2. THE PRECIPITATION PROCESS INVOLVES 3 MAIN FUNCTIONS:- i. PARTICLE CHARGING ii. PARTICLE COLLECTION iii. REMOVAL OF PARTICLES
  • 26. DEAERATOR A DEAERATOR IS A DEVICE THAT IS WIDELY USED FOR THE REMOVAL OF OXYGEN AND OTHER DISSOLVED GASES FROM THE FEEDWATER. IN PARTICULAR,DISSOLVED OXYGEN IN BOILER FEEDWATERS WILL CAUSE SERIOUS CORROSION DAMAGE IN STEAM SYSTEMS BY ATTACHING TO THE WALLS OF METAL PIPING AND OTHER METALLIC EQUIPMENT AND FORMING OXIDES (RUST).
  • 27. CONDENSER 1. HERE THE STEAM IS CONDENSED BACK INTO WATER AND PUMPED BACK TO THE BOILER. 2. THIS HAPPENS VIA A SERIES OF LOW AND HIGH PRESSURE HEATERS. CONDENSATE EXTRACTION PUMP THE CONSENSATE WATER IS DRAWN FROM THE CONDENSER BY EXTRACTION PUMP AND SEND IT TO LOW PRESSURE FEED HEATER. LOW PRESSURE FEED HEATER (LP HEATER) 1. FEED WATER FROM THE CONDENSATE EXTRACTION PUMPS PASS THROUGH LOW PRESSURE HEATER. 2. STEAM IS USED TO HEAT THE FEED WATER. HIGH PRESSURE HEATER WITH SIMILAR PURPOSE, THE HIGH PRESSURE FEED HEATERS ARE THE LAST STAGE OF FEED WATER HEATING BEFORE THE FEED WATER ENTERS THE BIOLER SYSTEM AT THE ECONOMIZER.
  • 29. BOILER FEED PUMP 1. THE BOILER FEED PUMP PUMPS THE WATER INTO THE BOILER, OVERCOMING PRESSURE OF 150 Kg/cm². 2. THE PUMP IS DRIVEN BY AN ELECTRIC MOTOR. 3. THE PUMP RUN IN 4130 RPM AND THE MOTOR RUNS IN 1490 RPM. CIRCULATING WATER PUMPS THE CIRCULATING WATER PUMPS ARE USED TO CIRCULATE THE WATER FROM COOLING TOWER TO THE CONDENSER AND BACK AGAIN. COMPRESSOR HOUSE 1. THE MAIN PURPOSE OF THE COMPRESSOR HOUSE IS TO PROVIDE OR SUPPLY THE HIGH PRESSURE AIR TO THE DIFFERENT COMPONENTS IN PLANT. 2. THERE ARE 2 TYPES OF COMPRESSED AIR:- i. SERVICE AIR WHICH CONTAINS MOISTURE AND IS SUPPLY TO ASH HANDLING PLANT AND OTHER SERVICES WHERE MOISTURE NOT DAMAGE ANY EQUIPMENT. ii. INSTRUMENT AIR WHICH CONTAIN NO MOISTURE IN AIR AND THIS AIR IS USED IN NUMETIC VALVES.
  • 31.
  • 32. DRY ASH SYSTEM FLY ASH IS CONSIDERED TO BE COLLECTED IN ESP HOPPERS. FLY ASH FROM ESP HOPPERS EXTRACTED BY VACUUM PUMPS UP TO INTERMEDIATE SURGE HOPPER CUM BAG FILTER FOR FURTHER DRY CONVEYING TO FLY ASH SILO. WET ASH SYSTEM BOTTOM ASH SLURRY AND FLY ASH SLURRY SHALL BE PUMPED FROM THE COMMON ASH SLURRY SUMP UP TO THE DYKE AREA WHICH IS LOCATED AT A DISTANCE FROM SLURRY PUMP HOUSE. AFTER THE COAL IS BURN THE ASH OF THE COAL REMAINS IN THE ESP SYSTEM SO TO REMOVE THAT ASH FROM THE PLANT THERE IS AN ASH HANDLING PLANT JUST NEAR THE BOILER. THE WET ASH IS DUMPED IN DUMPING AREA AND THE DRY ASH IS USED IN BRICK AND CEMENT MAKING.
  • 34.
  • 35. 1. A STEAM TURBINE GENERATOR IS A DEVICE THAT USES STEAM TO ROTATE A TURBINE GENERATOR TO PRODUC ELECTRICITY. 2. STEAM TURBINES USE WATER THAT IS HEATED TO EXTREMELY HIGH TEMPERATURES AND CONVERTED INTO STEAM TO ROTATE THE BLADES OF A TURBINE, IN ORDER TO CREATE MECHANICAL OR ROTATIONAL ENERGY. THIS ROTATIONAL ENERGY CAUSED BY THE HIGH PRESSURED STEAM TURBINE IS USED TO GENERATE ELECTRICITY IN AN ATTACHED GENERATOR. 3. MAIN COMPONENTS OF TYPICAL TURBOGENERATOR CONSISTS OF :- i. PERMANENT MAGNET GENERATOR (PMG) ii. AUTOMATIC VOLTAGE REGULATOR (AVR) iii. EXCITER iv. GEAR BOX v. ALTERNATOR vi. TURBINE
  • 36.
  • 37.
  • 38. 1. TRANSFORMER IS THE MOST CONVENIENT DEVICE FOR TRANSFORMER OF POWER FROM ONE VOLTAGE TO ANOTHER VOLTAGE AT THE SAME FREQUENCY. 2. IT WORKS IN THE PRINCIPLE OF ELECTROMAGNETIC INDUCTION. 3. TRANSFORMERS ARE OF TWO TYPES :- i. STEP-UP TRANSFORMER ii. STEP-DOWN TRANSFORMER
  • 39.
  • 40. ELECTRICAL SWITCHYARDS ARE USUALLLY PART OF SUBSTATION WHERE ELECTRICITY IS TRANSFORMED FROM ONE VOLTAGE TO ANOTHER FOR THE TRANSMISSION , DISTRIBUTION.
  • 41. EVERY PART OF THE PLANT IS PLAYS AN IMPORTANT ROLE FOR THE PLANT. WITHOUT THIS COMPONENTS THE PLANT OR BOILER CANT EVEN RUN AND IF RUNS ALSO THEN THERE IS A100% CHANCE OF A TRIPPING OF PLANT AND BECAUSE OF WHICH VERY HUGE AMOUNT OF LOSSES IN MAN, MONEY AND TIME OCCURES.
  • 42.