How to Right-size Your Portfolio Implementation




How to Right-Size Your Portfolio
 Management Implementation



                                             By Tim Washington
                                             Project World 2011
                                             November 15-16th
How to Right-size Your Portfolio Implementation



                  Agenda

•   Overview of Portfolio Management
•   Portfolio Magnitude and Project Criticality
•   Accountability Framework
•   Examples
•   Q&R
How to Right-size Your Portfolio Implementation




             What is
“Project Portfolio Management”?

            (and why does it matter?)
How to Right-size Your Portfolio Implementation

Project portfolio management is a combination of various
management disciplines:

             Business management


             General management


             Project and program management



                      %Management Disciplines
How to Right-size Your Portfolio Implementation



Project portfolio management (PPM) is a

management discipline that drives

strategic execution and maximizes
organizational value through the
selection, optimization, and oversight of
project investments which align to business
goals and strategies.




                             PMI Quote
How to Right-size Your Portfolio Implementation




     “Portfolio management is the strategy-based, prioritized set

     of all projects and programs in an organization reconciled

     to the resources available to accomplish them.”




Stanford Advanced Project Management    Stanford Quote
How to Right-size Your Portfolio Implementation


     “Managing [the] composite groups of

     projects with the same rigor,
     balance, executive leadership, and

     decision-making involvement as the

     company’s financial portfolio.
     Portfolio Management is an ongoing
     process that includes decision-
     making, prioritization, review,
     realignment, and reprioritization.”

-Renee Sommer                   Financial Portfolio Quote
How to Right-size Your Portfolio Implementation


The Purpose of Portfolio Management

    • Execute Strategy

    • Maximize Organizational Value

    • Enhance Decision Making

    • Manage Organizational Change
How to Right-size Your Portfolio Implementation

    Portfolio Management Benefits:

• Higher return on project investments
• Lower organizational risk
• Greater confidence of meeting customer
  commitments
• Balanced project portfolio workload
• Shorter project cycle times
• Increased project throughput

                        PPM Goals
How to Right-size Your Portfolio Implementation
   At the highest level, Project Portfolio Management has four basic components:

                                       Select the Right
                                           Projects
                                   Selected projects must align
                                  with the business strategy and
                                  meet other important criteria.


         Mature the                                                       Optimize the
    Portfolio Processes                                                    Portfolio
                                         The Goal:
   Higher portfolio maturity        Maximize Value to the             All the steps necessary to
   translates into a greater            Organization               construct an optimal portfolio
 realization of the benefits of                                     given current limitations and
project portfolio management.                                                 constraints.

                                         Protect the
                                       Portfolio’s Value

                                     Project benefits must be
                                   protected in order to deliver
                                    maximum portfolio value.
How to Right-size Your Portfolio Implementation

A good governance structure is central to making PPM work.

                       PORTFOLIO GOVERNANCE
                          (Strategic Direction)


                           Select the Right
                               Projects


                       “Portfolio management
      Mature the       without governance is an   Optimize the
 Portfolio Processes       empty concept.”         Portfolio




                             Protect the
                           Portfolio’s Value
How to Right-size Your Portfolio Implementation



                    Agenda

•   Overview of Portfolio Management
•   Project Criticality and Portfolio Magnitude
•   Accountability Framework
•   Examples
•   Q&R
How to Right-size Your Portfolio Implementation


Project Criticality: Project importance
(Examples: degree of increasing revenue, importance
of strategic execution, risk of failure, risk of not doing
the project, financial ramifications, critical
dependencies.)


Portfolio Magnitude: Portfolio breadth
(Examples: factors such as budget, total human
resources, breadth of organization/portfolio [local,
regional, national, international, business units]).
How to Right-size Your Portfolio Implementation

How Much Value Do You Need To Deliver?




   This will drive the scope of your implementation
How to Right-size Your Portfolio Implementation
        Large
       Portfolio


Portfolio Magnitude                                                 Level 5




                            Manual PPM Process/Tool




                      Level 1       Level 2               Level 3     Level 4     Very
                                                                                Critical
                                          Project Criticality                   Projects
How to Right-size Your Portfolio Implementation

         What is Driving Your PPM Implementation?

Improve Demand Management?                Project Selection


Improve Strategic Alignment?              Prioritization

                                          Capacity Management
Improve Project Execution?
                                          Project Sequencing

Improve Decision Making?                  Efficient Governance


Balance Investments?                      Portfolio Balancing


Maximize Organizational Value?            Portfolio Optimization
How to Right-size Your Portfolio Implementation



PPM Components           Level 1   Level 2   Level 3   Level 4   Level 5

Project Selection

Prioritization

Portfolio Balancing

Efficient Governance

Capacity Management

Portfolio Optimization




    Implementation objectives will help determine maturity targets
How to Right-size Your Portfolio Implementation

At What Caliber Does Your Organization Need to Perform?


       Level 1—Ad hoc, “Street Ball”

       Level 2—Developing, “High School Level”

       Level 3—Defined, “Collegiate Level”

       Level 4—Managed, “Professional Level”

       Level 5—Optimized, “Championship Level”
How to Right-size Your Portfolio Implementation



                  Agenda

•   Overview of Portfolio Management
•   Portfolio Magnitude and Project Criticality
•   Accountability Framework
•   Examples
•   Q&R
How to Right-size Your Portfolio Implementation

          Critical Components of Accountability


                        Leadership
                         to Drive
                       Accountability




Governance as                             A Shared Vision
the Framework                            With Strategic Goals
Which Enables                             to Demonstrate
 Accountability                             Accountability
How to Right-size Your Portfolio Implementation

  What Kind of Governance Do You Need?




PPM is only bureaucratic if you have the wrong infrastructure
How to Right-size Your Portfolio Implementation

               What Kind of Direction Do You Need?




“Informed Intuition”       Strategic Goals        Strategic Roadmap
                                                     with Metrics
How to Right-size Your Portfolio Implementation

  What Quality of Leadership Do You Have?




   Disengaged                                  Very Engaged
  Short-sighted                                  Proactive
Weak Communicator                          Strong Communicator


          Leadership Quality Will Drive PPM Quality
How to Right-size Your Portfolio Implementation



Strategic leadership requires:


1) Active engagement

2) Being proactive

3) Balancing long-term and short-term needs

4) Communicating a consistent message
How to Right-size Your Portfolio Implementation

          Critical Components of Accountability


                        Leadership
                         to Drive
                       Accountability




Governance as                             A Shared Vision
the Framework                            With Strategic Goals
Which Enables                             to Demonstrate
 Accountability                             Accountability
How to Right-size Your Portfolio Implementation



                  Agenda

•   Overview of Portfolio Management
•   Portfolio Magnitude and Project Criticality
•   Accountability Framework
•   Examples
•   Q&R
How to Right-size Your Portfolio Implementation
                  Example #1 Hewlett-Packard
                           Fortune 500 Rank: #10
           $114.5 Billion revenue, $7.66 Billion in profit in 2010

4/3/2010                      4/28/2010                              9/30/2010




                       HP Bought Palm for $1.2
                                                           Léo Apotheker Named CEO
                              Billion                         and President of HP
                   •   “Palm’s innovative operating        "Léo is a strategic thinker
                       system provides an ideal            with a passion for
                       platform to expand HP’s             technology, wide-reaching
                       mobility strategy…”                 global experience and
                   •   “Advances in mobility are           proven operational discipline
                       offering significant                - exactly what we were
                       opportunities, and HP intends       looking for in a CEO."
                       to be a leader in this
                       market.”
How to Right-size Your Portfolio Implementation
           Example #1 Hewlett-Packard
                    Fortune 500 Rank: #10
    $114.5 Billion revenue, $7.66 Billion in profit in 2010




    8/18/2011                                        9/22/2011

                     Léo Apotheker Fired

         • "We are at a critical moment and we
           need renewed leadership to
           successfully implement our strategy…”
         • “The problem with Apotheker wasn't
           lack of vision as much as a lack of
           execution and communication”
How to Right-size Your Portfolio Implementation
                 Example #2 City of Bellevue
                 Ranked 4th Best City of Live In (2010)
                        Population: 124,000
                     $1 Billion Bi-annual budget


• Local initiatives cut tax revenue down to 1% annually

• The Bellevue city council proactively made plans to address
  the recession by developing a new budgeting process called
  “Budget One”

• Open and frank communication—“Our traditional way of
  developing a budget—department by department—must make
  way for a process that targets spending with specific
  community needs”

• Budget One was a ‘fundamental reset’: Instead of asking the
  traditional question of “what are we going to cut?”, the new
  question was “what are we buying?”
How to Right-size Your Portfolio Implementation
How to Right-size Your Portfolio Implementation
How to Right-size Your Portfolio Implementation


                            Summary

• Consider project criticality and portfolio magnitude
• Understand what the ‘end state’ of your portfolio process should be
   based on organizational needs
• Understand the level of caliber needed to be successful
• Enable accountability with solid governance
• Demonstrate accountability with well thought-out goals and
   roadmaps
• Drive accountability with good leadership
How to Right-size Your Portfolio Implementation




Questions?
How to Right-size Your Portfolio Implementation




   Thank You for
 listening and for
providing feedback
How to Right-size Your Portfolio Implementation


       Contact Information

Name: Tim Washington
Email: twashin@costco.com
Web: www.ppmexecution.com

      @ppmexecution

      http://www.linkedin.com/in/timawashington

Weitere ähnliche Inhalte

Was ist angesagt?

PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickJim Kendrick
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmocrmackenzie
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMOSyed Raashid
 
Tips on Implementing a PMO
Tips on Implementing a PMOTips on Implementing a PMO
Tips on Implementing a PMOrmac39
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesErin Jones
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off PresentationEbru Seiwert
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 
ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiAli Kaabi
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plantigcap
 
Journey to Maturity Building a PMO
Journey to Maturity Building a PMOJourney to Maturity Building a PMO
Journey to Maturity Building a PMOJames Brown
 
P3O - a standard for PMO modelling
P3O - a standard for PMO modellingP3O - a standard for PMO modelling
P3O - a standard for PMO modellingProfeo
 

Was ist angesagt? (20)

PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmo
 
PMO 101
PMO 101PMO 101
PMO 101
 
PMO Mandate
PMO MandatePMO Mandate
PMO Mandate
 
Pmo
PmoPmo
Pmo
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMO
 
Tips on Implementing a PMO
Tips on Implementing a PMOTips on Implementing a PMO
Tips on Implementing a PMO
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off Presentation
 
What is a PMO
What is a PMOWhat is a PMO
What is a PMO
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali Kaabi
 
PMO-Framework
PMO-FrameworkPMO-Framework
PMO-Framework
 
AXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
AXELOS - P3O® - Portfolio, Programme and Project Offices - FoundationAXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
AXELOS - P3O® - Portfolio, Programme and Project Offices - Foundation
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plan
 
Journey to Maturity Building a PMO
Journey to Maturity Building a PMOJourney to Maturity Building a PMO
Journey to Maturity Building a PMO
 
AXELOS - PRINCE2® Foundation
AXELOS - PRINCE2® FoundationAXELOS - PRINCE2® Foundation
AXELOS - PRINCE2® Foundation
 
PgMP 02 - Program Performance Domainv1
PgMP 02 - Program Performance Domainv1PgMP 02 - Program Performance Domainv1
PgMP 02 - Program Performance Domainv1
 
P3O - a standard for PMO modelling
P3O - a standard for PMO modellingP3O - a standard for PMO modelling
P3O - a standard for PMO modelling
 

Andere mochten auch

Budget reductions and accountability final
Budget reductions and accountability finalBudget reductions and accountability final
Budget reductions and accountability finalTim Washington
 
How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...
How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...
How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...Tim Washington
 
Portfolio optimization overview
Portfolio optimization overviewPortfolio optimization overview
Portfolio optimization overviewTim Washington
 
Bond portfolio management strategies
Bond portfolio management strategiesBond portfolio management strategies
Bond portfolio management strategiesVishal Narvekar
 
A Capability Maturity Model for Corporate Performance Management, an Empirica...
A Capability Maturity Model for Corporate Performance Management, an Empirica...A Capability Maturity Model for Corporate Performance Management, an Empirica...
A Capability Maturity Model for Corporate Performance Management, an Empirica...Mika Aho
 
Organizational maturity model pcmm
Organizational maturity model pcmmOrganizational maturity model pcmm
Organizational maturity model pcmmDaniel Oskooei
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful ProjectsTrevor Roberts
 
The Project Management Process - Week 2
The Project Management Process - Week 2The Project Management Process - Week 2
The Project Management Process - Week 2Craig Brown
 
Bond management strategies
Bond management strategiesBond management strategies
Bond management strategiesAmanpreet Singh
 

Andere mochten auch (10)

Budget reductions and accountability final
Budget reductions and accountability finalBudget reductions and accountability final
Budget reductions and accountability final
 
How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...
How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...
How Project Portfolio Management Ties Leadership, Strategic IQ, and Organizat...
 
Portfolio optimization overview
Portfolio optimization overviewPortfolio optimization overview
Portfolio optimization overview
 
Bond portfolio management
Bond portfolio managementBond portfolio management
Bond portfolio management
 
Bond portfolio management strategies
Bond portfolio management strategiesBond portfolio management strategies
Bond portfolio management strategies
 
A Capability Maturity Model for Corporate Performance Management, an Empirica...
A Capability Maturity Model for Corporate Performance Management, an Empirica...A Capability Maturity Model for Corporate Performance Management, an Empirica...
A Capability Maturity Model for Corporate Performance Management, an Empirica...
 
Organizational maturity model pcmm
Organizational maturity model pcmmOrganizational maturity model pcmm
Organizational maturity model pcmm
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful Projects
 
The Project Management Process - Week 2
The Project Management Process - Week 2The Project Management Process - Week 2
The Project Management Process - Week 2
 
Bond management strategies
Bond management strategiesBond management strategies
Bond management strategies
 

Ähnlich wie Right-sizing Project Portfolio Management

Soutenance These Gianluca Costanzi
Soutenance These Gianluca CostanziSoutenance These Gianluca Costanzi
Soutenance These Gianluca CostanziGianluca Costanzi
 
Pmi ppm 100514 keynote
 Pmi ppm 100514 keynote Pmi ppm 100514 keynote
Pmi ppm 100514 keynoteRobert Twiddy
 
Project Ranking
Project RankingProject Ranking
Project RankingUW Madison
 
Latihan keusahawanan kaedah baru
Latihan keusahawanan   kaedah baruLatihan keusahawanan   kaedah baru
Latihan keusahawanan kaedah baruHj Arriffin Mansor
 
Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)Kimmy Chen
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)Innovate Vancouver
 
Effective portfolio management
Effective portfolio managementEffective portfolio management
Effective portfolio managementDave Angelow
 
UMT360Webinar_Project and portfolio financial controls for microsoft project ...
UMT360Webinar_Project and portfolio financial controls for microsoft project ...UMT360Webinar_Project and portfolio financial controls for microsoft project ...
UMT360Webinar_Project and portfolio financial controls for microsoft project ...UMT360
 
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...Thomas Walenta, PMI Fellow
 
Strategic program management
Strategic program managementStrategic program management
Strategic program managementEdwin Provencal
 
Strategic program management
Strategic program managementStrategic program management
Strategic program managementEdwin Provencal
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change AgentSoftServe
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPSoftServe
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
Project Management -Strategic Competency, & Trends
Project Management -Strategic Competency, & TrendsProject Management -Strategic Competency, & Trends
Project Management -Strategic Competency, & TrendsSoftServe
 
Vijay Prasad - Project Management - part 1 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 1 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 1 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 1 (Ukrainian PM Community)mandrew182
 

Ähnlich wie Right-sizing Project Portfolio Management (20)

Soutenance These Gianluca Costanzi
Soutenance These Gianluca CostanziSoutenance These Gianluca Costanzi
Soutenance These Gianluca Costanzi
 
Pmi ppm 100514 keynote
 Pmi ppm 100514 keynote Pmi ppm 100514 keynote
Pmi ppm 100514 keynote
 
Project Ranking
Project RankingProject Ranking
Project Ranking
 
Latihan keusahawanan kaedah baru
Latihan keusahawanan   kaedah baruLatihan keusahawanan   kaedah baru
Latihan keusahawanan kaedah baru
 
Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)
 
Effective portfolio management
Effective portfolio managementEffective portfolio management
Effective portfolio management
 
UMT360Webinar_Project and portfolio financial controls for microsoft project ...
UMT360Webinar_Project and portfolio financial controls for microsoft project ...UMT360Webinar_Project and portfolio financial controls for microsoft project ...
UMT360Webinar_Project and portfolio financial controls for microsoft project ...
 
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
 
Strategic program management
Strategic program managementStrategic program management
Strategic program management
 
Strategic program management
Strategic program managementStrategic program management
Strategic program management
 
Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change Agent
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
 
Project management office value
Project management office valueProject management office value
Project management office value
 
Project Management -Strategic Competency, & Trends
Project Management -Strategic Competency, & TrendsProject Management -Strategic Competency, & Trends
Project Management -Strategic Competency, & Trends
 
Vijay Prasad - Project Management - part 1 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 1 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 1 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 1 (Ukrainian PM Community)
 
1 project management framework
1  project management framework1  project management framework
1 project management framework
 

Right-sizing Project Portfolio Management

  • 1. How to Right-size Your Portfolio Implementation How to Right-Size Your Portfolio Management Implementation By Tim Washington Project World 2011 November 15-16th
  • 2. How to Right-size Your Portfolio Implementation Agenda • Overview of Portfolio Management • Portfolio Magnitude and Project Criticality • Accountability Framework • Examples • Q&R
  • 3. How to Right-size Your Portfolio Implementation What is “Project Portfolio Management”? (and why does it matter?)
  • 4. How to Right-size Your Portfolio Implementation Project portfolio management is a combination of various management disciplines: Business management General management Project and program management %Management Disciplines
  • 5. How to Right-size Your Portfolio Implementation Project portfolio management (PPM) is a management discipline that drives strategic execution and maximizes organizational value through the selection, optimization, and oversight of project investments which align to business goals and strategies. PMI Quote
  • 6. How to Right-size Your Portfolio Implementation “Portfolio management is the strategy-based, prioritized set of all projects and programs in an organization reconciled to the resources available to accomplish them.” Stanford Advanced Project Management Stanford Quote
  • 7. How to Right-size Your Portfolio Implementation “Managing [the] composite groups of projects with the same rigor, balance, executive leadership, and decision-making involvement as the company’s financial portfolio. Portfolio Management is an ongoing process that includes decision- making, prioritization, review, realignment, and reprioritization.” -Renee Sommer Financial Portfolio Quote
  • 8. How to Right-size Your Portfolio Implementation The Purpose of Portfolio Management • Execute Strategy • Maximize Organizational Value • Enhance Decision Making • Manage Organizational Change
  • 9. How to Right-size Your Portfolio Implementation Portfolio Management Benefits: • Higher return on project investments • Lower organizational risk • Greater confidence of meeting customer commitments • Balanced project portfolio workload • Shorter project cycle times • Increased project throughput PPM Goals
  • 10. How to Right-size Your Portfolio Implementation At the highest level, Project Portfolio Management has four basic components: Select the Right Projects Selected projects must align with the business strategy and meet other important criteria. Mature the Optimize the Portfolio Processes Portfolio The Goal: Higher portfolio maturity Maximize Value to the All the steps necessary to translates into a greater Organization construct an optimal portfolio realization of the benefits of given current limitations and project portfolio management. constraints. Protect the Portfolio’s Value Project benefits must be protected in order to deliver maximum portfolio value.
  • 11. How to Right-size Your Portfolio Implementation A good governance structure is central to making PPM work. PORTFOLIO GOVERNANCE (Strategic Direction) Select the Right Projects “Portfolio management Mature the without governance is an Optimize the Portfolio Processes empty concept.” Portfolio Protect the Portfolio’s Value
  • 12. How to Right-size Your Portfolio Implementation Agenda • Overview of Portfolio Management • Project Criticality and Portfolio Magnitude • Accountability Framework • Examples • Q&R
  • 13. How to Right-size Your Portfolio Implementation Project Criticality: Project importance (Examples: degree of increasing revenue, importance of strategic execution, risk of failure, risk of not doing the project, financial ramifications, critical dependencies.) Portfolio Magnitude: Portfolio breadth (Examples: factors such as budget, total human resources, breadth of organization/portfolio [local, regional, national, international, business units]).
  • 14. How to Right-size Your Portfolio Implementation How Much Value Do You Need To Deliver? This will drive the scope of your implementation
  • 15. How to Right-size Your Portfolio Implementation Large Portfolio Portfolio Magnitude Level 5 Manual PPM Process/Tool Level 1 Level 2 Level 3 Level 4 Very Critical Project Criticality Projects
  • 16. How to Right-size Your Portfolio Implementation What is Driving Your PPM Implementation? Improve Demand Management? Project Selection Improve Strategic Alignment? Prioritization Capacity Management Improve Project Execution? Project Sequencing Improve Decision Making? Efficient Governance Balance Investments? Portfolio Balancing Maximize Organizational Value? Portfolio Optimization
  • 17. How to Right-size Your Portfolio Implementation PPM Components Level 1 Level 2 Level 3 Level 4 Level 5 Project Selection Prioritization Portfolio Balancing Efficient Governance Capacity Management Portfolio Optimization Implementation objectives will help determine maturity targets
  • 18. How to Right-size Your Portfolio Implementation At What Caliber Does Your Organization Need to Perform? Level 1—Ad hoc, “Street Ball” Level 2—Developing, “High School Level” Level 3—Defined, “Collegiate Level” Level 4—Managed, “Professional Level” Level 5—Optimized, “Championship Level”
  • 19. How to Right-size Your Portfolio Implementation Agenda • Overview of Portfolio Management • Portfolio Magnitude and Project Criticality • Accountability Framework • Examples • Q&R
  • 20. How to Right-size Your Portfolio Implementation Critical Components of Accountability Leadership to Drive Accountability Governance as A Shared Vision the Framework With Strategic Goals Which Enables to Demonstrate Accountability Accountability
  • 21. How to Right-size Your Portfolio Implementation What Kind of Governance Do You Need? PPM is only bureaucratic if you have the wrong infrastructure
  • 22. How to Right-size Your Portfolio Implementation What Kind of Direction Do You Need? “Informed Intuition” Strategic Goals Strategic Roadmap with Metrics
  • 23. How to Right-size Your Portfolio Implementation What Quality of Leadership Do You Have? Disengaged Very Engaged Short-sighted Proactive Weak Communicator Strong Communicator Leadership Quality Will Drive PPM Quality
  • 24. How to Right-size Your Portfolio Implementation Strategic leadership requires: 1) Active engagement 2) Being proactive 3) Balancing long-term and short-term needs 4) Communicating a consistent message
  • 25. How to Right-size Your Portfolio Implementation Critical Components of Accountability Leadership to Drive Accountability Governance as A Shared Vision the Framework With Strategic Goals Which Enables to Demonstrate Accountability Accountability
  • 26. How to Right-size Your Portfolio Implementation Agenda • Overview of Portfolio Management • Portfolio Magnitude and Project Criticality • Accountability Framework • Examples • Q&R
  • 27. How to Right-size Your Portfolio Implementation Example #1 Hewlett-Packard Fortune 500 Rank: #10 $114.5 Billion revenue, $7.66 Billion in profit in 2010 4/3/2010 4/28/2010 9/30/2010 HP Bought Palm for $1.2 Léo Apotheker Named CEO Billion and President of HP • “Palm’s innovative operating "Léo is a strategic thinker system provides an ideal with a passion for platform to expand HP’s technology, wide-reaching mobility strategy…” global experience and • “Advances in mobility are proven operational discipline offering significant - exactly what we were opportunities, and HP intends looking for in a CEO." to be a leader in this market.”
  • 28. How to Right-size Your Portfolio Implementation Example #1 Hewlett-Packard Fortune 500 Rank: #10 $114.5 Billion revenue, $7.66 Billion in profit in 2010 8/18/2011 9/22/2011 Léo Apotheker Fired • "We are at a critical moment and we need renewed leadership to successfully implement our strategy…” • “The problem with Apotheker wasn't lack of vision as much as a lack of execution and communication”
  • 29. How to Right-size Your Portfolio Implementation Example #2 City of Bellevue Ranked 4th Best City of Live In (2010) Population: 124,000 $1 Billion Bi-annual budget • Local initiatives cut tax revenue down to 1% annually • The Bellevue city council proactively made plans to address the recession by developing a new budgeting process called “Budget One” • Open and frank communication—“Our traditional way of developing a budget—department by department—must make way for a process that targets spending with specific community needs” • Budget One was a ‘fundamental reset’: Instead of asking the traditional question of “what are we going to cut?”, the new question was “what are we buying?”
  • 30. How to Right-size Your Portfolio Implementation
  • 31. How to Right-size Your Portfolio Implementation
  • 32. How to Right-size Your Portfolio Implementation Summary • Consider project criticality and portfolio magnitude • Understand what the ‘end state’ of your portfolio process should be based on organizational needs • Understand the level of caliber needed to be successful • Enable accountability with solid governance • Demonstrate accountability with well thought-out goals and roadmaps • Drive accountability with good leadership
  • 33. How to Right-size Your Portfolio Implementation Questions?
  • 34. How to Right-size Your Portfolio Implementation Thank You for listening and for providing feedback
  • 35. How to Right-size Your Portfolio Implementation Contact Information Name: Tim Washington Email: twashin@costco.com Web: www.ppmexecution.com @ppmexecution http://www.linkedin.com/in/timawashington