OPERATIONS MANAGEMENT 1 OPERATIONS MANAGEMENT
Mr. GHULAM MUSTAFA PRESENTED TO OPERATIONS MANAGEMENT 2
PROJECT TEAM HAFIZ WAQAS AHMAD ANSARI MOHSIN AKBAR BBA-VI PCIT MULTAN 3 OPERATIONS MANAGEMENT
PRESENTATION OBJECTIVES Product Design Quality Management Process & capacity design Location Layout Design Human Resource & Job Design Supply Chain Management Inventory, MRP, JIT Intermediate & Short-term Scheduling Maintenance  4 OPERATIONS MANAGEMENT
PROGRESSIVE STEEL INDUSTRY (pVT) limited LAHORE OPERATIONS MANAGEMENT 5
COMPANY PROFILE One of the oldest and largest manufacturers, exporter and importer of Gardar, T.R, CC bullet and steel profiles Serving the nation for over two and half decades Initially established in 1980 In the beginning, the mills mainly deal in the production of mill steel Many new products in the products line like medium steel wire and wire rod OPERATIONS MANAGEMENT 6
GROUP INFORMATION The Details of PSI other units is follows:  Progressive Steel Industries (Pvt) Ltd.   Punjab Concast (Pvt) Ltd.  Safco Steel  Kamran Steel Rolling Mills (Pvt) Ltd.  T. A Corporation  (Pvt) Ltd. OPERATIONS MANAGEMENT 7
MANAGEMENT OPERATIONS MANAGEMENT 8 MIAN M. ASHRAF (CEO) MIAN M. ARSHAD IQBAL (DIRECTOR MARKETING) MIAN ABDUL SAMI (DIRECTOR FINANCE) Mr. TABASSUM (DIRECTOR OPERATIONS) RANA SHAHID ANWAR (MARKETING MANAGER) Mr. SALEEM SHAH (ACCOUNTS MANAGER) RANA ZAHIDANWAR (OPERATIONS MANAGER) OTHER MANAGEMENT STAFF
OPERATION CYCLE OPERATIONS MANAGEMENT 9 PROCESS INPUTS OUTPUTS
STEEL PRODUCTION CYCLE OPERATIONS MANAGEMENT 10 SCRAP BILLET BEAM T-IRON BARS
PRODUCT DESIGN Garder T-R  Bar  CC Billet  Wire Rod  Steel Wire OPERATIONS MANAGEMENT 11
GARDAR SIZE OPERATIONS MANAGEMENT 12
T-IRON SIZE OPERATIONS MANAGEMENT 13
QUALITY MANAGEMENT Defining the quality customer satisfaction employee involvement continuous improvement ISO 9001: 2000 certified OPERATIONS MANAGEMENT 14
QUALITY POLICY OF PSI “AT EVERY STAGE OF PRODUCTION WE HAVE ONLY FOCUS POINT AND THAT IS OUR CLIENT AND THEIR NEEDS.” OPERATIONS MANAGEMENT 15
QUALITY STANDARDS Waistage 4 – 5 % OPERATIONS MANAGEMENT 16 G-1030           GarderGrade G-1024           GarderGrade G-1035           T-Iron G-1040           T-Iron
PROCESS & CAPACITY DESIGN Mass production produces large volumes of a standard product for a mass market ATTRIBUTES OF MASS PRODUCTION OPERATIONS MANAGEMENT 17
PROCESS – I  Scrap to Billet Melting (1700ºC) Chemical mixing manganese silicon chromium nickel Carbon Molding Cooling   OPERATIONS MANAGEMENT 18
RAW MATERIAL (SCRAP) Shredded Scrap  Bundle scrap Rolling scrap Miss-roll scrap Head & tails OPERATIONS MANAGEMENT 19
Shredded Scrap OPERATIONS MANAGEMENT 20
Head & tails, miss-rolled OPERATIONS MANAGEMENT 21
MELTING Furnace (capacity 5 ton) OPERATIONS MANAGEMENT 22
MELTING OPERATIONS MANAGEMENT 23
MOLDING OPERATIONS MANAGEMENT 24
MOLDING OPERATIONS MANAGEMENT 25
COOLING OPERATIONS MANAGEMENT 26
OUTPUT T-IRON BILLET OPERATIONS MANAGEMENT 27
OUTPUT GARDAR BILLET OPERATIONS MANAGEMENT 28
PROCESS – II (A) BILLET to T-Iron Cutting  Melting at 1250ºC Rolling  stamping Cooling Cutting  OPERATIONS MANAGEMENT 29
INPUT Cut piece of billet OPERATIONS MANAGEMENT 30
process Melting, rolling & stamping OPERATIONS MANAGEMENT 31
PROCESS Head and tail cutting OPERATIONS MANAGEMENT 32
OUTPUT OPERATIONS MANAGEMENT 33
PROCESS – II (B) BILLET to Gardar Cutting  Melting at 1700ºC Rolling  stamping Cooling Cutting  OPERATIONS MANAGEMENT 34
INPUT OPERATIONS MANAGEMENT 35
PROCESS OPERATIONS MANAGEMENT 36
PROCESS Rolling, stamping OPERATIONS MANAGEMENT 37
PROCESS OPERATIONS MANAGEMENT 38
PROCESS Cooling  OPERATIONS MANAGEMENT 39
OUTPUT OPERATIONS MANAGEMENT 40
OUTPUT OPERATIONS MANAGEMENT 41
CUTTING OPERATIONS MANAGEMENT 42
output Ready to sale out OPERATIONS MANAGEMENT 43
CAPACITY Raw material  Minimum 1000 ton weekly Maximum capacity Gardar – 500 ton daily T-Iron – 100 ton daily Output  Gardar – 150 to 200 ton daily T-Iron – 70 to 80 ton daily OPERATIONS MANAGEMENT 44
LOCATION 1.5 Km Kala KhataiRoad Shahdra Lahore The selection of city of Lahore Labor climate  Proximity to market Quality of life Proximity to sale depot & other production units Utilities and real-estate cost OPERATIONS MANAGEMENT 45
LAYOUT DESIGN Product layouts arrange activities in line according to  sequence of operations for a particular product or service OPERATIONS MANAGEMENT 46
LAYOUT DESIGN PROCESS – I Scrap to Billet OPERATIONS MANAGEMENT 47
LAYOUT DESIGN OPERATIONS MANAGEMENT 48 ,[object Object]
Billet to T-Iron,[object Object]
HR & JOB DESIGN Hiring Job training Job rotation Empowerment Work schedules Health & Safety  OPERATIONS MANAGEMENT 50
SUPPLY CHAIN MANAGEMENT SUPPLIERS UK, USA, BAHREN, UAE Make or Buy Decisions Cost Capacity Quality  Speed Reliability Expertise OPERATIONS MANAGEMENT 51
INVENTORY, MRP & JIT Raw material - Minimum 1000 ton weekly Godown storage capacity – 500 ton Sale point godown storage capacity – 2000 ton Actual output – 200 ton daily OPERATIONS MANAGEMENT 52
RE-ORDER Raw material is purchased on weekly bases and usually order lot size is 1000 ton OPERATIONS MANAGEMENT 53
INTERMEDIATE AND SHORT-TERM SCHEDULING Non-seasonal Usually permanent employees at middle level Weekly base workers at low level usually no slowdown  OPERATIONS MANAGEMENT 54
MAINTENANCE Own maintenance department On daily bases Supervisors and maintenance dept is responsible  OPERATIONS MANAGEMENT 55
THANKS… OPERATIONS MANAGEMENT 56

Weitere ähnliche Inhalte

Was ist angesagt? (9)

Tega Corporate Presentation
Tega Corporate PresentationTega Corporate Presentation
Tega Corporate Presentation
 
Tega Industries - Losugen
Tega Industries - LosugenTega Industries - Losugen
Tega Industries - Losugen
 
گورینگ
گورینگگورینگ
گورینگ
 
ISO 9000
ISO 9000ISO 9000
ISO 9000
 
Durosa, MX
Durosa, MXDurosa, MX
Durosa, MX
 
Grupo Zapata
Grupo ZapataGrupo Zapata
Grupo Zapata
 
Aditya flexipack
Aditya flexipack Aditya flexipack
Aditya flexipack
 
ISO INTERNATIONAL ORGANIZATION FOR STANDARDIZATION
ISO INTERNATIONAL ORGANIZATION FOR STANDARDIZATIONISO INTERNATIONAL ORGANIZATION FOR STANDARDIZATION
ISO INTERNATIONAL ORGANIZATION FOR STANDARDIZATION
 
GGAG Corporate Presentation FY 2020-21
GGAG Corporate Presentation FY 2020-21GGAG Corporate Presentation FY 2020-21
GGAG Corporate Presentation FY 2020-21
 

Ähnlich wie Progressive Steel Industries (Op. Mngt)

Mba 513 final carpenter
Mba 513 final carpenterMba 513 final carpenter
Mba 513 final carpenter
guest7ce8cf
 
Prince Industries Inc
Prince Industries IncPrince Industries Inc
Prince Industries Inc
Rick
 
Company Profile - 15 Dec 2014
Company Profile - 15 Dec 2014Company Profile - 15 Dec 2014
Company Profile - 15 Dec 2014
Mak Chew Ming
 
H&T_Company Profile
H&T_Company ProfileH&T_Company Profile
H&T_Company Profile
Gary Wang
 

Ähnlich wie Progressive Steel Industries (Op. Mngt) (20)

Mba 513 final carpenter
Mba 513 final carpenterMba 513 final carpenter
Mba 513 final carpenter
 
2019 dressta corporate presentation eng
2019 dressta corporate presentation eng2019 dressta corporate presentation eng
2019 dressta corporate presentation eng
 
Project Management
Project ManagementProject Management
Project Management
 
Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)
 
JBS Engineering, Howrah, Babbitt Metal Bearing
JBS Engineering, Howrah, Babbitt Metal BearingJBS Engineering, Howrah, Babbitt Metal Bearing
JBS Engineering, Howrah, Babbitt Metal Bearing
 
All-Weld Sales Presentation Show
All-Weld Sales Presentation ShowAll-Weld Sales Presentation Show
All-Weld Sales Presentation Show
 
Sai engineering company profile j 355
Sai engineering company profile j 355Sai engineering company profile j 355
Sai engineering company profile j 355
 
Prince Industries Inc
Prince Industries IncPrince Industries Inc
Prince Industries Inc
 
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering) Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
Tutamen Injection Molding and CNC Company Presentation (Medical, Engineering)
 
Pg Corp Brochure07 08
Pg Corp Brochure07 08Pg Corp Brochure07 08
Pg Corp Brochure07 08
 
Company Profile - 15 Dec 2014
Company Profile - 15 Dec 2014Company Profile - 15 Dec 2014
Company Profile - 15 Dec 2014
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
 
Sahil Sharma(12-ME-124)
Sahil Sharma(12-ME-124)Sahil Sharma(12-ME-124)
Sahil Sharma(12-ME-124)
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
 
Minova UK Presentation
Minova UK PresentationMinova UK Presentation
Minova UK Presentation
 
Resume -S DAS -F
Resume -S DAS -FResume -S DAS -F
Resume -S DAS -F
 
Introduction to the study
Introduction to the studyIntroduction to the study
Introduction to the study
 
Automobile components
Automobile componentsAutomobile components
Automobile components
 
ATA Tool 2015 catalog
ATA Tool 2015 catalogATA Tool 2015 catalog
ATA Tool 2015 catalog
 
H&T_Company Profile
H&T_Company ProfileH&T_Company Profile
H&T_Company Profile
 

Progressive Steel Industries (Op. Mngt)