Understand the values of Project Managers and the art of delivery and process control, understand the tactics of how to be a good player sometimes in Chess, Puzzle and Domino.
Workshop outline:
-------------------------
- Adaptive is the only way for delivery!
- Management concepts: Planning, Controlling and Monitoring
- Why Agile methodologies is almost the Core delivery methodology
- Main Concepts of PMP methodologies
- Tools used that enhance process of delivery and ensure sustaining quality standards
1. The Art of Project
Management
Prepared By
Mona Reda
2. Agenda
• What is PROJECT
• Traditional Project Management
• Agile Project Management
• Agile Vs. Traditional
• Integration Between Agile & Traditional
10/1/2015 The Art of Project Management 2
11. Project Life Cycle
• Is a methodology that define what you need to do to deliver project
deliverables
• Traditional (Predictive)
• Adaptive (Agile)
10/1/2015 The Art of Project Management 12
15. Planning Process
Collect Requirements
Define Scope
Create a Work Breakdown Structure WBS
Define and Sequence the Activities
Define Resources
Define Project Duration
Create a Project Schedule
Determine Project Costs and Budget
The Art of Project Management 1710/1/2015
16. Planning Process (Cont’d)
Code Activity Sequenc
e
Resources Duration Date
From
Date
to
Cost
A Activity 1 - Man power, machines
B Sub Activity 1 A Man power, materials
C Activity 2 - Machine, materials
D Activity 3 -
E Sub Activity 3 D
F Sub Activity 3 E
G Activity 4 E, C
H Activity 5 G
I Activity 6 H The Art of Project Management 1810/1/2015
17. Planning Process (Cont’d)
Code Activity Cost
A Work package 1 4,000
C Work package 2 6,000
D Work package 3 10,000
G Work package 4 8,000
H Work package 5 5,000
I Work package 6 2,000
Total budget 35,000 EGP
The Art of Project Management 1910/1/2015
23. Agile Advantages
• Customer Satisfaction
• People interactions
• Customers, developers and testers interaction
• Rapid delivery
• Face-to-Face conversation
• Continuous attention to technical excellence and good design.
• Regular adaptation to changing circumstances.
• Even late changes in requirements are welcomed.
The Art of Project Management 2510/1/2015
34. Agile vs. Traditional
Traditional
• Plan Driven
• Scope ,Cost and Time are
constant
• A process starts after successful
completion of another.
• Failure is measured by
delivering project on time and
within Budget
Agile
• Change Driven
• Cost and time are constant with
changing scope.
• we plan all the time.
• Failure is measure against
customer satisfaction
The Art of Project Management 3610/1/2015