2. Disclosure
This presentation has been prepared by Platinum Group Metals Ltd. (âPlatinum Groupâ or the âCompanyâ). Information included in this presentation regarding
the Companyâs mineral properties has been compiled by R. Michael Jones, P.Eng, the President and Chief Executive Officer of the Company, and a nonindependent Qualified Person for purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects (âNI 43-101â), based on the
independent technical reports, and Other Information filed by the Company with the Canadian securities regulators and the U.S. Securities and Exchange
Commission (âSECâ). The authors of the technical reports have reviewed and consented to the use of the material from their reports in the Disclosure Record..
For more detailed information regarding the Company and its mineral properties, you should refer to the Companyâs independent technical reports and other
filings with the Canadian securities regulators and the SEC, which are available at www.sedar.com and www.sec.gov, respectively. Scientific or Technical
information contained herein is derived from the Companyâs technical reports, including the âUpdated Technical Report (Updated Feasibility Study Western
Bushveld Joint Venture Project 1 (Elandsfontein and Frischgewaagd)â dated November 20, 2009 with an effective date of October 8, 2009 (the â2009 UFSâ)
prepared by Gordon I. Cunningham, Charles J. Muller, Timothy V. Spindler and Byron Stewart, which include more detailed information with respect to the
Companyâs properties, including the dates of such reports and the estimates included therein, details of quality and grade of each resource, details of the key
assumptions, methods and parameters used in the resource estimates and the 2009 UFS and a general discussion of the extent to which the resource
estimates and the other estimates and projections included in the reports may be materially affected by any known environmental, permitting, legal, taxation,
socio-political, marketing, or other relevant issues. Scientific or technical information contained herein related to the Waterberg Project is derived from the
Companyâs technical reports including the âRevised and Updated Mineral Resource Estimate for the Waterberg Platinum Projectâ dated September 3, 2011
prepared by Ken Lomberg which includes more detailed information.
CAUTIONARY NOTE TO UNITED STATES INVESTORS
As a Canadian issuer that is eligible to use the U.S./Canada Multijurisdictional Disclosure System (MJDS), the Company is permitted to prepare a prospectus
and this presentation in accordance with Canadian securities laws, which differ in certain respects from U.S. securities laws. In particular, this presentation
uses the terms âmineral resourceâ, âmeasured mineral resourceâ, âindicated mineral resourceâ and âinferred mineral resourceâ. While these terms are
recognized and required by Canadian securities laws, they are not recognized by the SEC. In addition, âreservesâ reported by the Company under Canadian
standards may not qualify as reserves under SEC standards. U.S. investors are cautioned not to assume that any part of a âmeasured mineral resourceâ or an
âindicated mineral resourceâ will ever be converted into a âreserve.â Under U.S. standards, mineralization may not be classified as a âreserveâ unless the
mineralization can be economically and legally produced or extracted at the time the reserve determination is made. âInferred mineral resourcesâ have a great
amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an
inferred mineral resource will ever be upgraded to a higher category. U.S. investors are urged to read the statement in the filed prospectus under the heading
âCautionary Note to United States Investorsâ for further information. Historical results or feasibility models presented herein are not guarantees or expectations
of future performance.
Information included in this presentation, the Companyâs independent technical reports and the Companyâs other public statements related to its mineral
properties has been prepared in accordance with securities laws in effect in Canada, which differ from U.S. securities laws. The SEC permits U.S. mining
companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. The
Company uses certain terms in this presentation, such as âresources,â that the SECâs guidelines strictly prohibit U.S. registered companies from including in
their filings with the SEC. You are urged to consider closely the disclosure in our Form 40-F annual report, which may be secured from us, or from the SECâs
website at www.sec.gov.
This presentation also contains information about adjacent properties on which the Company has no right to explore or mine. The Company advises you that
the SECâs mining guidelines strictly prohibit information of this type in documents filed with the SEC. Investors are cautioned that mineral deposits on adjacent
properties are not indicative of mineral deposits on the Companies properties
This presentation is not an offer to sell, or a solicitation to buy, any securities in any jurisdiction. The Toronto Stock Exchange and the NYSE.MKT LLC have
not reviewed and do not accept responsibility for the accuracy or adequacy of this presentation, which has been prepared by the Company.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
1
3. Forward Looking Statements
Certain of the statements made herein, including statements regarding the timing of future activities and achievements by the Company, future anticipated
exploration and development programs of the Companyâs WBJV and Waterberg projects, business plans, funding models for the WBJV Project 1 platinum
mine, statements regarding the project finance loan and other financing, potential required equity contributions and cost overrun accounts, potential mining
scenarios and timing of production at the WBJV Project 1 platinum mine, the possibility of qualified empowerment partners investing in the WBJV Project 1
Platinum Mine and the outcome of further developments with regard to Wesizwe, business trends and future operating factors, price estimates and anticipated
platinum supply and deficits are forward-looking and subject to important risk factors and uncertainties, many of which are beyond the Companyâs ability to
control or predict. In addition, resource estimates and feasibility study results constitute forward-looking statements to the extent that they represent,
respectively, estimates of mineralization that may be encountered upon additional exploration and estimates of the capital and operating expenses, metals and
currency prices and other operating conditions that may be encountered in the future.
Forward-Looking Statements are subject to a number of risks and uncertainties that may cause the actual events or results to differ materially from those
discussed in the Forward-Looking Statements, and even if events or results discussed in the Forward-Looking Statements are realized or substantially realized,
there can be no assurance that they will have the expected consequences to, or effects on, the Company. Factors that could cause actual results or events to
differ materially from current expectations include, among other things: additional financing requirements; the Companyâs history of losses and ability to
continue as a going concern; the fact that most of the Companyâs properties contain no known mineral reserves; delays in, or inability to achieve, planned
commercial production at the Companyâs properties; discrepancies between actual and estimated mineral reserves and mineral resources, between actual and
estimated development and operating costs, between actual and estimated metallurgical recoveries and between estimated and actual production; fluctuations
in the relative values of the Canadian dollar as compared to the South African Rand and the United States dollar; metal price volatility; a default under the
proposed project loan facility, if consummated, including as a result of delays in the start-up of the WBJV Project 1 platinum mine; the ability of the Company to
retain its key management employees or procure the services of skilled and experienced personnel; conflicts of interest among the Companyâs directors and
executive officers as a result of their involvement with other mineral resource companies; any disputes or disagreements with the Companyâs joint venture
partners or any failure of the Company or such joint venture partners to fund their obligations under applicable joint venture agreements; exploration,
development and mining risks and the inherently dangerous nature of the mining industry, including environmental hazards, industrial accidents, unusual or
unexpected formations, safety stoppages (whether voluntary or regulatory), pressures, mine collapses, cave ins or flooding and the risk of inadequate
insurance or inability to obtain insurance to cover these risks and other risks and uncertainties; property and mineral title risks, including defective title to
mineral claims or property; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in
Canada, South Africa or other countries in which the Company does or may carry out business in the future; equipment shortages and the ability of the
Company to acquire the necessary access rights and infrastructure for its mineral properties; environmental regulations and the ability of the Company to
obtain and maintain necessary permits, including environmental authorizations; competition in the mineral exploration industry; and risks of doing business in
South Africa, including but not limited to, labour, economic and political instability as well as the factors described or referred to in the section entitled âRisk
Factorsâ in the Companyâs Annual Information Form for the year ended August 31, which is available on SEDAR at www.sedar.com , and is included as part of
the Companyâs Form 40-F annual report filed with the SEC at www.sec.gov and in the Companyâs prospectus dated December 21, 2012. You are advised to
review these risk factors, and not to place undue reliance on Forward-Looking Statements.
The Company undertakes no obligation to update publicly or release any revisions to Forward-Looking Statements to reflect events or circumstances after the
date of this presentation or to reflect the occurrence of unanticipated events except as required by law.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
2
4. Investment Highlights
Advanced Mine
Construction
Financial Strength
Strategic
Discovery
⢠$355M in equity raised
during 2013 to fund
project development
and exploration.
⢠Waterberg - a thick
mechanized target,
growing, open and
near surface.
⢠Large scale, high
grade, shallow
development.
⢠Major shareholders
include Blackrock,
Liberty Mutual, Fidelity,
T.Rowe Price and
Wellington.
⢠Current resource 17.5
million ounces (3E)
inferred (September
2013).
⢠Steady state
production projected at
275K ounces 4E/year
with a 20+ year mine
life.
⢠A mandate for a USD
$195M senior loan
facility announced on
November 11th, 2013.
⢠Platinum Group Metals
Ltd. is in construction
on the 74% owned
WBJV Project 1
Platinum Mine.
⢠First production
scheduled for 2015.
⢠Mandated banks
include Barclays,
ABSA, Caterpillar
Financial and Societe
Generale.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
⢠Preliminary Economic
Assessment (PEA) on
Waterberg JV
scheduled for Q1 2014.
⢠Extension drilling
underway on 87%
owned ground
expanding deposit
scale.
3
5. Share Structure and Capital Markets
Share Structure
as at January 2014
Stock Symbols:
PTM:Â TSX;Â PLG:NYSEÂ MKT
Market Capitalization:
C$Â 700M
Share Price:
C$Â 1.30
52 Week High/Low:
$1.70/$0.74
Shares Outstanding:
551,271,542
Options:
20,189,500
Fully Diluted:
571,461,042
Cash:
C$ 230M
2013 TSX MINING FINANCINGS EX-BARRICK
200,000,000
180,000,000
160,000,000
140,000,000
120,000,000
100,000,000
80,000,000
60,000,000
40,000,000
20,000,000
Platinum Detour Gold Platinum
Allied
Guyana
Paladin
Kirkland
Banro
Group
Corporation
Group
Nevada
Goldfields Energy Ltd. Lake Gold Corporation
Metals Ltd.
Metals Ltd. Gold Corp.
Inc.
Inc.
MAJOR SHAREHOLDERS
RESEARCH COVERAGE
Blackrock Inc.
Goldman Sachs
Genesis Investment Management
RBCÂ Capital Markets
Franklin Resources
GMPÂ Securities
JP Morgan Asset Management
Raymond James
T. Rowe Price
MBAC
Fertilizer
Corp
BMO Capital Markets
Liberty Metals and Mining
Polymet
Mining
Corp.
CIBC World Markets
ONE YEAR STOCK CHART (PTM:TSX)
Fidelity International
Index Membership: Russell Global, S&P/TSX Global Mining,
S&P/TSX Small Cap.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
4
7. Platinum Supply
SOUTH AFRICAN SUPPLY VS. TOTAL SUPPLY
8,000
MILLIONS OF OUNCES
7,000
6,000
5,000
4,000
3,000
2,000
1,000
0
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Source: Johnson Matthey
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
6
8. Platinum Demand
$2,500
PGM PRICES (USD)
DEMAND BY SECTOR
Pt
$2,000
Pd
Petroleum
2%
Medical &
$1,500
Biomedical
3%
$1,000
$500
$0
Jan-99
2,500
Jan-02
Jan-05
Jan-08
Jan-14
CHINESE JEWELRY DEMAND VS. EUROPEAN
AUTO DEMAND
European Autocatalyst Demand
MILLIONS OF OUNCES
Jan-11
Other
5%
Autocatalyst
37%
Chinese Jewelry Demand
2,000
Jewelry
33%
1,500
Chemical
6%
1,000
Investment
9%
Electrical
Glass
2%
3%
500
0
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Source: Johnson Matthey
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
7
9. Platinum Cost Curve: Targeting the Lowest Quartile
Major African PGM Mines: Cash Cost + Maintenance Capital
WBJV is adjacent to the operating BRPM mine:
shallow, high grade Merensky reef
Waterberg has similar traits to Anglo Platinum Mogalakwena and Impala Zimplats:
large scale, thick, near surface, with a mechanized approach
Source: JP Morgan and Platinum Group Metals Ltd. - September 2013.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
8
11. WBJV Project 1 â Shallow and High Grade
Wesizwe
Bakubung Mine
Highlights
Highlights
RBP/Anglo Platinum
Styldrift Expansion
⢠A mining license was
granted in 2012.
Platinum Group Metals
WBJV Project 1
Impala Platinum
#20 Shaft
⢠Anglo Platinum has
exercised a first right of
refusal for a life of mine
concentrate off-take.
⢠Construction started in
2011 with over $260M
invested to date.
N
2Â Kms
⢠Platinum Group has a
74% interest in the WBJV
Project 1 Platinum Mine.
RBP/Anglo Platinum
BRPM Mine
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
10
13. WBJV Project 1: Key Developments
Mill Foundations
Eskom SubstationÂ
Ventilation ShaftÂ
Underground DevelopmentÂ
Current workforce: Over 1000
people on site with 25% from local
communities.
North Mine: Decline development
advanced 1200m+ on twin
headings. Mining underway with
ore being stockpiled.
South Mine: Decline development
has advanced 300m+ with good
ground conditions.
Processing: Earthworks and
laydown areas completed. Major
mill components ordered.
Power: 10MVA installation
complete with additional 10MVA in
2014. Full 40MVA scheduled for
steady state.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
12
14. WBJV Project 1 â Quick Facts
Shallow, high grade, in the main platinum mining and smelting
area, adjoining mines in production and construction.
Resources (2.8M Measured/5.4M Indicated)
Reserves (1.8M Proven. 2.9M Probable)
4.7M ounces 4E Proven and Probable
Projected Steady State Production
275K ounces/year 4E
Metal Split
64% Pt, 27% Pd, 5% Rh, 4% Au
Mine Life
20+ years
Capital Invested To Date
$260M
Projected Operating Cost (8R/$) 1
$655 USD/4E oz (R650/tonne milled)
Projected Peak Funding (8R/$) 1
â˘
â˘
â˘
â˘
â˘
â˘
8.2M ounces 4E Measured and Indicated
$506M USD
See 2009 UFS, www.sedar.com, including Risk Factors, Metal Prices and Differences in Reporting under SEC Guidelines
Resources may never become reserves, figures may change during project implementation in progress.
Figures based on 100% Project
US$ Metal Price Assumptions: Pt: $1,343, Pd: $322, Rh: $4,951, Au: $807 (2009 UFS)
See Appendix for tonnes and grade associated with reserves and resources and associated Qualified Persons
(1) Updated Guidance, April 16, 2012 â pending project finance completion and updated project Financial Model â See Press Release Nov. 11, 2013
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
13
16. Waterberg Projects, North Limb
A New PGM District
⢠A new discovery of a
previously unmapped part
of the Bushveld Complex.
⢠Waterberg JV Project: A
Joint Venture with Japan
Oil, Gas and Metals
National Corporation
(JOGMEC).
⢠Waterberg Extension: 87%
owned by Platinum Group.
⢠A Preliminary Economic
Assessment (PEA) is in
process on the JV with
expected completion in
early 2014.
⢠Large system with multiple
thick layers, near surface
with mechanized potential.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
15
17. Waterberg Joint Venture â Strategic Partner
Japanese Partnership
⢠State agency with
mandate to explore for
strategic minerals.
⢠Partner since 2010 on
Waterberg JV with 37%
interest.
⢠Tender process underway
to sell stake to a qualified
Japanese industrial firm or
trading house.
⢠Process scheduled to
complete in H1 2014 with
a new partner going
forward.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
16
18. Waterberg Joint Venture - Resource
Total Resource: 17.52M ozs 3E Inferred
SEPTEMBER 2012: 6.2M ozs (3E) inferred
FEBRUARY 2013: 10.1M ozs (3E) inferred
SEPTEMBER 2013: 17.52M ozs (3E) inferred
Inferred Mineral Resource, Ken Lomberg, Coffey Mining, Independent Qualified Person. See press release September 3, 2013. Mineral resources which are not mineral reserves
do not have demonstrated economic viability. The estimate of mineral resources may be materially affected be environmental, permitting, legal marketing or other relevant issues.
The quantity and grade of reported inferred mineral resources in this estimate are conceptual in nature. There is no guarantee that all or any part of the mineral resource will be
converted to a mineral reserve.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
17
19. Waterberg Joint Venture - Resource
Inferred Resource
167 Mt, 3.26g/t Pt, Pd, Au
Super âFâ Zone
5.5
Kms
N
Inferred Mineral Resource, September 3, 2013, Ken Lomberg,
Coffey Mining, Independent Qualified Person
See press release September 3, 2013. Mineral resources which are
not mineral reserves do not have demonstrated economic viability.
The estimate of mineral resources may be materially affected be
environmental, permitting, legal marketing or other relevant issues.
The quantity and grade of reported inferred mineral resources in this
estimate are conceptual in nature. There is no guarantee that all or
any part of the mineral resource will be converted to a mineral
reserve.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
18
20. Waterberg Extension - A District Scale Discovery
District Scale
⢠Initial round of drilling in late
2013 has extended the deposit
an additional 5 kms.
⢠A 14 drill rig program is
currently underway with a $15M
budget for 2014.
⢠An inferred resource for the
Waterberg Extension is
expected in mid 2014.
⢠Hole WE-008 announced in
December 2013: 53.22m @
5.26 g/t 3E.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
19
21. Waterberg: Shallow and Mechanized Potential
Highlights
LONG HOLE STOPING â POTENTIAL âSUPER Fâ DESIGN
⢠A Preliminary Economic Assessment
(PEA) by WorleyParsonsTWP for the
Waterberg JV deposit is scheduled
for early 2014.
⢠Based on reef thicknesses a
mechanized mining approach will be
employed.
⢠Mechanization has several
advantages:
Mining method assessment completed, cost estimation in
progress. (See press release Nov. 11th, 2013)
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
ďź
ďź
ďź
ďź
ďź
ďź
Less off-reef development
Lower cost
Faster production
Smaller workforce
Higher skilled jobs
Safer environment
⢠The deposit will likely be accessed
via multiple declines from surface.
20
22. Corporate Objectives
ď§ Continue with construction at WBJV Project 1 platinum mine.
ď§ Complete WBJV Project 1 overall project finance.
ď§ Expand the Waterberg discovery.
ď§ Complete PEA and mine design on the Waterberg Joint
Venture.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
21
24. WBJV: Merensky Reserves
Tonnes (000)
4E
Content 4E
t
g/t
tonne
Moz
5.61
37.478
1.21
5.44
61.677
1.98
99.155
3.19
Merensky Proven
6,678
Merensky Probable
11,333
Total Merensky Mineral Reserves
18,011
5.51
QP Charles Muller of Minxcon Resources, See details Press Release and 43-101 reports on www.sedar.com.
Includes mining dilution and flow of ore factors, QPs Tim Spindler and Gordon Cunningham Mining Factors and Updated
Feasibility Study October 2009
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
23
25. WBJV: UG2 Reserves
Tonnes (000)
4E
Content 4E
t
g/t
tonne
Moz
3.37
17.126
0.55
3.41
28.831
0.93
3.40
45.957
1.48
UG2 Proven
5,086
UG2 Probable
8,449
Total UG2 Mineral Reserves
13,535
QP Charles Muller of Minxcon Resources, See details Press Release and 43-101 reports on www.sedar.com,
Tim Spindler and Gordon Cunningham Mining Factors and Updated Feasibility Study Report October 2009
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
24
28. 27
Waterberg: Building Near Surface Ounces
SEPTEMBER 2012: 6.2M ozs (3E) inferred
FEBRUARY 2013: 10.1M ozs (3E) inferred
SEPTEMBER 2013: 17.52M ozs (3E) inferred
Thickness
(m)
Tonnes
(Mt)
Pt
(g/t)
Pd
(g/t)
Au
(g/t)
2PGE+Au
(g/t)
Pt:Pd:Au
2 PGE+Au
(koz)
Cu
(%)
Ni
(%)
Cu
(t)
Ni
(t)
T1
2.30
8.50
1.04
1.55
0.47
3.06
34:51:15
842
0.17
0.10
14,500
8,400
T2
3.77
39.16
1.16
2.04
0.84
4.04
29:50:21
5,107
0.18
0.10
69,400
37,600
T Total
3.38
47.66
1.14
1.95
0.77
3.86
30:50:20
5,948
0.18
0.10
83,900
46,000
F Total
3.0 to 30.0
119.05
0.91
1.98
0.13
3.02
30:65:5
11,575
0.07
0.17
78,800
202,200
166.71
0.98
1.97
0.32
3.26
30:60:10
17,523
0.10
0.15
162,700
248,200
Total
Inferred Mineral Resource, September 3, 2013, Ken Lomberg, Coffey Mining, Independent Qualified Person
See press release September 3, 2013. Mineral resources which are not mineral reserves do not have demonstrated economic
viability. The estimate of mineral resources may be materially affected be environmental, permitting, legal marketing or other
relevant issues. The quantity and grade of reported inferred mineral resources in this estimate are conceptual in nature. There
is no guarantee that all or any part of the mineral resource will be converted to a mineral reserve.
PLG:Â NYSEÂ MKTÂ PTM:Â TSX
27