1. FCI Works TM Knowledge-based Facility Condition Assessment For Building Portfolio Owners in Education, Healthcare, Government, and Commercial Sectors.
2.
3.
4. Reference Cost Databases Capital Planning & Budgeting Renovate vs. Replace Physical & Functional Needs Analyses/Metrics Budgetary Reporting Support Models Unit Prices Assemblies Assemblies Unit Prices Project Estimating Cost Validation Prioritization Time Estimation Assemblies Building Cost Models New Construction & Built Capital Renewal Preventive & Routine Maintenance Energy Janitorial System Cost Models* Unit Pricing** Uniformat II* Masterformat04**
5.
6. $$$$ Cost $ Data Accuracy / Granularity 50% 80% 100% FCI Works On-site Assessments (overview) On-site Assessments (detailed) FCI WORKS Model & RS Means Traditional Parametric Peer to Peer Benchmarking
7. Building Systems Creation Default component breakdowns, Expected Useful Life, and Construction Year data Building Data Input Demographics (Location), Building Sector, Building Type, Construction Data, Major Restoration Data, Replacement Value Capital Costing Repair needs and associated FCI calculated using established, calibrated deterioration curves Component Breakdown, Expected Useful Life and Construction/ Renovation dates can be individually adjusted following document review and interviews. No walkthroughs are required. Deterioration curve that has been calibrated against 10,500 buildings is used to calculate where each system is in it’s lifecycle and produces a high-level repair need cost.
13. Scroll right to view and edit “EUL” data Pull-down list for standard building templates If available, the Last Major Renovation Date can be entered, which over-rides the “Original Construction date” Clicking “Reset All” populates “Cost”, “ EUL” and “Age” data fields.
17. Calculate repair needs & measure overall conditions using FCIWORKS, for a fraction of the cost of sending highly-trained teams to visually-assess every facility of a large organization. techsupport@fciworks.com www.fciworks.com
Hinweis der Redaktion
Medical 2 billion “on the boards” and 236 projects Education 7 billion on the boards and 1200 projects Community 1 billion on the boards and 328 projects
Quantitative Decision Metrics Leverage “All the Best Data”