SEMINAR REPORT ON:

SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS.
At

NTPC-SAIL Power Company Private Limited, Rourkela.

Submitted By:

PARTHA SARATHI PARIDA
REG NO. 10010133
7TH SEMESTER
ELECTRICAL ENGINEERING

VEER SURENDRA SAI UNIVERSITY OF TECHNOLOGY, BURLA, ODISHA.
DEPARTMENT OF ELECTRICAL ENGINEERING
NSPCL, ROURKELA CAPTIVE POWER PLANT
NTPC Ltd formed joint venture with SAIL on 50:50 basis in March 2001 in the name
of NTPC-SAIL Power Company Private Limited (NSPCL). NSPCL took over captive
power plant-II located at Rourkela Steel Plant (2X60 MW) from SAIL.

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

2
AN OVERVIEW OF CPP :-

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

3
MAJOR EQUIPMENT IN CPP :• 2 GENERATORS
• 2 GENERATOR TRANSFORMERS
• 2 UNIT AUXILIARY TRANSFORMERS
• STATION TRANSFORMERS

• FEEDERS

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

4
TECHNICAL DATA OF GENERATOR UNIT 1 AND 2:
• Generator Type :

THRI 86/35

• Year of manufacture :

1985

• Stator No. :

1134 & 1135

• Rotor No. :

1134 & 1135

• Exciter type :

Static

• Apparent power :

75 MVA

• Active power :

60 MW

• Current :

3.766 KA

• Voltage :

11.5 KV +5%

• Speed :

3000 Rpm

• Frequency :

50 Hz

• Power Factor :

0.8

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

5
TECHNICAL DATA OF GEN. TRANSFORMER UNIT
1 AND 2:
• Make :

Crompton Greaves Ltd

• Rating :

16.5/33/82.5/ MVA

• Type of cooling :

ONAN/ONAF/OFAF

• No load voltage :

HV : 138KV , LV : 11.5KV

• Winding :

HV : STAR , LV : DELTA

• Phases :

3/3

• Frequency :

50 Hz

• Vector group :

Ynd 11

• Rated current :

HV : 345.20Amps ,LV 4141.90
Amps

• Total oil qty :

24,470 Lts

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

6
TECHNICAL DATA OF UNIT AUX. TRANSFORMER
UNIT 1 AND 2:
• Make :

Crompton Greaves Ltd

• Rating :

12.5 MVA

• Type of cooling :

ONAN

• Voltage :

HV : 11.5 KV , LV : 6.9 KV

• Phases :

3/3

• Frequency :

50 Hz

• Vector group :

DYN 1

• Rated current :

HV : 627.5 Amps ,
LV:1045.9 Amps

• Total oil qty. :

9,000 Lts

• Percentage impedance voltage :

7%

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

7
TECHNICAL DATA OF STATION AUXILIARY
TRANSFORMER:
• Make :

Crompton Graeves Ltd

• Rating :

20/25 MVA

• Cooling :

ONAN/ONAF

• No Load voltage :

132/6.9/3.3 KV (UNLOADED )

• Current:

HV 109.3 Amps LV 2091.8 Amps

• Frequency :

50 Hz

• Vector Group :

YNY nd 011

• quantity of oil :

17500Lts

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

8
SWITCHYARD:
SALIENT FEATURES OF 132KV SWITCHTYARD:•
•
•
•
•
•
•
•
•

20 OPERATING BAYS
02 GENERATORS
04 GRIDCO FEEDERS
06 SMELTER FEEDERS
BUS COUPLER
BUS TIE CUM BUS COUPLER
STATION TRANSFORMERS
01 BT BAY
ISOLATION TRANSFORMERS

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

9
IMPORTANT COMPONENTS OF THE SWITCH YARD:
1. BUSBARS:
TYPES OF BUSBAR ARRANGEMENTS:
1. Single Bus-bar Arrangement.
2. Single Bus-bar System with Sectionalization
3. Ring Bus-bar system
4. Double Main and Transfer Bus-bar Arrangement
5. Duplicate Bus-bars System

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

10
1. SINGLE BUS-BAR ARRANGEMENT
In this arrangement a set of bus-bars is used for complete power station and
to this bus-bar are connected all generators, transformers and feeders
through circuit breakers and isolating switches.

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

11
2. SINGLE BUS-BAR SYSTEM WITH SECTIONALIZATION
With increased number of generators and outgoing feeders connected to
the bus-bars, it becomes essential to provide arrangement for
sectionalizing the bus-bars so that a fault on any one section of the busbars may not cause a complete shutdown. This is achieved by providing
a circuit breaker and isolating switches between the section.

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

12
3. RING BUS-BAR SYSTEM
In this arrangement each feeder is supplied from two paths, so that in
case of failure of a section, supply is not interrupted.

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

13
4. DOUBLE MAIN AND TRANSFER BUS-BAR
ARRANGEMENT
This arrangement incorporates all advantages of the double bus as well as
transfer bus scheme. This scheme needs a bus-coupler for the on load transfer of
circuits from one main bus to the other and a transfer coupler for taking out
circuit breaker of various circuits for maintenance.

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

14
2. BUS COUPLER:
• Two different bus sections of two different power transformers are
connected by means of a bus coupler.
• The bus coupler becomes useful when one of the power transformers
fails or a fault occurs in either of the bus sections.

3. INSULATORS:
• The overhead line conductors should be supported on the poles or
towers in such a way that currents from conductors do not flow to
earth through supports i.e., line conductors must be properly insulated
from supports. This is achieved by securing line conductors to supports
with the help of INSULATORS.
• The insulators provide necessary insulation between line conductors
and supports and thus prevent any leakage current from conductors to
earth.

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

15
TYPES OF INSULATORS:

1.PIN TYPE:

3. STRAIN
INSULATORS:
03-Nov-2013

2. SUSPENSION
TYPE:

4. SHACKEL
INSULATORS:

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

16
4. CIRCUIT BREAKER & RELAYS:
• A circuit breaker is an automatically operated electrical switch designed
to protect an electrical current from damage caused by overload or
short circuit.
• Its basic function is to detect a fault condition and, by interrupting
continuity, to immediately discontinue electrical flow.
• The circuit breaker works along with the relays which give a tripping
signal in case of any irregularity or the faults.

• The circuit breaker then opens to open the circuit such that other
instruments of the system can be protected.

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

17
5. ISOLATORS: (GOD)- GROUP OPERATED DISCONNECTOR:
• It is used to make sure that an electrical circuit can be completely deenergised for service or maintenance.

• It allows isolation of apparatus such as circuit breakers and
transformers, and transmission lines, for maintenance.
• GOD’s are provided to facilitate isolation of breakers supplying power to
various feeders. In 220kv Switchyard, they are designed as 29A, 29B,
29C & 29E as follows





03-Nov-2013

29 A – main bus side GOD.
29 B - Equipment side GOD.
29 C - Transfer bus side GOD.
29 E - Earth GOD.

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

18
6. Current and voltage transformers
• Current or voltage instrument transformers are necessary for isolating
the protection, control and measurement equipment from the high
voltages of a power system, and for supplying the equipment with the
appropriate values of current and voltage - generally these are 1A or 5Α
for the current coils, and 120 V for the voltage coils.

CURRENT TRANSFORMER
03-Nov-2013

VOLTAGE TRANSFORMER

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

19
8. LIGHTNING ARRESTER:
• A lightning arrester is a device used on electrical power systems
and telecommunication systems to protect the insulation and
conductors of the system from the damaging effects of lightning.
• The typical lightning arrester has a high-voltage terminal and a ground
terminal.
• When a lightning surge (or switching surge, which is very similar) travels
along the power line to the arrester, the current from the surge is
diverted through the arrestor, in most cases to earth.

LIGHTNING ARRESTER
03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

20
TRANSFORMER YARD:
• Transformer yard consists of following types of transformers

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

21
CONCLUSION :• Switchyard is most essential part of the power system.
• It is the protective part of the whole power system.
• Switch yard is also most essential part for transmission, distribution, and
collection.

BIBILIOGRAPHY :1. http://wikipedia.com
2. http://google.co.in
3. http://www.engineersedge.com
4. http://www.scribd.com
5. http://electricals4u.com
6. Power system Engineering by O P KOTHARI and I J NAGRATH
7. Power System By J B GUPTA

03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

22
03-Nov-2013

DEPARTMENT OF ELECTRICAL ENGINEERING,
V.S.S.U.T,BURLA

23

Weitere ähnliche Inhalte

Was ist angesagt?

PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Substations
SubstationsSubstations
Substationsitfakash
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design) SayanSarkar55
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protectionmichaeljmack
 
132 kv substation
132 kv substation132 kv substation
132 kv substationWipro
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ramGRBabu Naidu
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scadaHemendra Kumar Rajput
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1Md Irshad Ahmad
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 

Was ist angesagt? (20)

Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Substations
SubstationsSubstations
Substations
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
132 kv substation
132 kv substation132 kv substation
132 kv substation
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 

Andere mochten auch

distribution system fault mangement
distribution system fault mangementdistribution system fault mangement
distribution system fault mangementManjunath Ds
 
Practical Electrical Wiring Standards - National Rules for Electrical Install...
Practical Electrical Wiring Standards - National Rules for Electrical Install...Practical Electrical Wiring Standards - National Rules for Electrical Install...
Practical Electrical Wiring Standards - National Rules for Electrical Install...Living Online
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysiskirkusawi
 
Practical HV and LV Switching Operations and Safety Rules
Practical HV and LV Switching Operations and Safety RulesPractical HV and LV Switching Operations and Safety Rules
Practical HV and LV Switching Operations and Safety RulesLiving Online
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2R.K. Mathuria
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...Vikram Rawani
 
Power system fault analysis ppt
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis pptkarikalan123
 
Electrical grounding and earthing
Electrical grounding and earthingElectrical grounding and earthing
Electrical grounding and earthingNitesh Dash
 
Earthing Concepts
Earthing ConceptsEarthing Concepts
Earthing Conceptsmvrkprasad
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systemsBiswajit Pratihari
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthingDenuka
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 
Electrical Safety
Electrical  Safety Electrical  Safety
Electrical Safety Reliance
 
Top 10 rules for electric safety
Top 10 rules for electric safetyTop 10 rules for electric safety
Top 10 rules for electric safetyRock Wood
 

Andere mochten auch (19)

distribution system fault mangement
distribution system fault mangementdistribution system fault mangement
distribution system fault mangement
 
Practical Electrical Wiring Standards - National Rules for Electrical Install...
Practical Electrical Wiring Standards - National Rules for Electrical Install...Practical Electrical Wiring Standards - National Rules for Electrical Install...
Practical Electrical Wiring Standards - National Rules for Electrical Install...
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysis
 
Practical HV and LV Switching Operations and Safety Rules
Practical HV and LV Switching Operations and Safety RulesPractical HV and LV Switching Operations and Safety Rules
Practical HV and LV Switching Operations and Safety Rules
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2
 
Earthing system
Earthing systemEarthing system
Earthing system
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
 
Power system fault analysis ppt
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis ppt
 
Electrical grounding and earthing
Electrical grounding and earthingElectrical grounding and earthing
Electrical grounding and earthing
 
Earthing Concepts
Earthing ConceptsEarthing Concepts
Earthing Concepts
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthing
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
Importance of industrial safety
Importance of industrial safetyImportance of industrial safety
Importance of industrial safety
 
Electrical Safety
Electrical  Safety Electrical  Safety
Electrical Safety
 
Top 10 rules for electric safety
Top 10 rules for electric safetyTop 10 rules for electric safety
Top 10 rules for electric safety
 
Electrical safety new
Electrical safety newElectrical safety new
Electrical safety new
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
Substation overview
Substation overviewSubstation overview
Substation overview
 

Ähnlich wie SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS

pptpdf-131117235616-phpapp02.pdf
pptpdf-131117235616-phpapp02.pdfpptpdf-131117235616-phpapp02.pdf
pptpdf-131117235616-phpapp02.pdfThien Phan Bản
 
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptxINTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptxSrujan99
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Gangwal
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Mohit Kothari
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Mohit Kothari
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Mohit Kothari
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmissionprasantakcs
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFjang041
 
Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Sachin Airan
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Md Hasan
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
DPL Transmission And Distribution
DPL Transmission And DistributionDPL Transmission And Distribution
DPL Transmission And DistributionSubhojeet Sinha ☁
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxSNEHAKANWAR1
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptxAsif682330
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...rohit nadella
 

Ähnlich wie SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS (20)

pptpdf-131117235616-phpapp02.pdf
pptpdf-131117235616-phpapp02.pdfpptpdf-131117235616-phpapp02.pdf
pptpdf-131117235616-phpapp02.pdf
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptxINTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
Design of substation
Design of substationDesign of substation
Design of substation
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmission
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7
 
Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02Amanppt 140826070457-phpapp02
Amanppt 140826070457-phpapp02
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
DPL Transmission And Distribution
DPL Transmission And DistributionDPL Transmission And Distribution
DPL Transmission And Distribution
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
 

Kürzlich hochgeladen

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 

Kürzlich hochgeladen (20)

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 

SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS

  • 1. SEMINAR REPORT ON: SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS. At NTPC-SAIL Power Company Private Limited, Rourkela. Submitted By: PARTHA SARATHI PARIDA REG NO. 10010133 7TH SEMESTER ELECTRICAL ENGINEERING VEER SURENDRA SAI UNIVERSITY OF TECHNOLOGY, BURLA, ODISHA. DEPARTMENT OF ELECTRICAL ENGINEERING
  • 2. NSPCL, ROURKELA CAPTIVE POWER PLANT NTPC Ltd formed joint venture with SAIL on 50:50 basis in March 2001 in the name of NTPC-SAIL Power Company Private Limited (NSPCL). NSPCL took over captive power plant-II located at Rourkela Steel Plant (2X60 MW) from SAIL. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 2
  • 3. AN OVERVIEW OF CPP :- 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 3
  • 4. MAJOR EQUIPMENT IN CPP :• 2 GENERATORS • 2 GENERATOR TRANSFORMERS • 2 UNIT AUXILIARY TRANSFORMERS • STATION TRANSFORMERS • FEEDERS 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 4
  • 5. TECHNICAL DATA OF GENERATOR UNIT 1 AND 2: • Generator Type : THRI 86/35 • Year of manufacture : 1985 • Stator No. : 1134 & 1135 • Rotor No. : 1134 & 1135 • Exciter type : Static • Apparent power : 75 MVA • Active power : 60 MW • Current : 3.766 KA • Voltage : 11.5 KV +5% • Speed : 3000 Rpm • Frequency : 50 Hz • Power Factor : 0.8 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 5
  • 6. TECHNICAL DATA OF GEN. TRANSFORMER UNIT 1 AND 2: • Make : Crompton Greaves Ltd • Rating : 16.5/33/82.5/ MVA • Type of cooling : ONAN/ONAF/OFAF • No load voltage : HV : 138KV , LV : 11.5KV • Winding : HV : STAR , LV : DELTA • Phases : 3/3 • Frequency : 50 Hz • Vector group : Ynd 11 • Rated current : HV : 345.20Amps ,LV 4141.90 Amps • Total oil qty : 24,470 Lts 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 6
  • 7. TECHNICAL DATA OF UNIT AUX. TRANSFORMER UNIT 1 AND 2: • Make : Crompton Greaves Ltd • Rating : 12.5 MVA • Type of cooling : ONAN • Voltage : HV : 11.5 KV , LV : 6.9 KV • Phases : 3/3 • Frequency : 50 Hz • Vector group : DYN 1 • Rated current : HV : 627.5 Amps , LV:1045.9 Amps • Total oil qty. : 9,000 Lts • Percentage impedance voltage : 7% 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 7
  • 8. TECHNICAL DATA OF STATION AUXILIARY TRANSFORMER: • Make : Crompton Graeves Ltd • Rating : 20/25 MVA • Cooling : ONAN/ONAF • No Load voltage : 132/6.9/3.3 KV (UNLOADED ) • Current: HV 109.3 Amps LV 2091.8 Amps • Frequency : 50 Hz • Vector Group : YNY nd 011 • quantity of oil : 17500Lts 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 8
  • 9. SWITCHYARD: SALIENT FEATURES OF 132KV SWITCHTYARD:• • • • • • • • • 20 OPERATING BAYS 02 GENERATORS 04 GRIDCO FEEDERS 06 SMELTER FEEDERS BUS COUPLER BUS TIE CUM BUS COUPLER STATION TRANSFORMERS 01 BT BAY ISOLATION TRANSFORMERS 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 9
  • 10. IMPORTANT COMPONENTS OF THE SWITCH YARD: 1. BUSBARS: TYPES OF BUSBAR ARRANGEMENTS: 1. Single Bus-bar Arrangement. 2. Single Bus-bar System with Sectionalization 3. Ring Bus-bar system 4. Double Main and Transfer Bus-bar Arrangement 5. Duplicate Bus-bars System 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 10
  • 11. 1. SINGLE BUS-BAR ARRANGEMENT In this arrangement a set of bus-bars is used for complete power station and to this bus-bar are connected all generators, transformers and feeders through circuit breakers and isolating switches. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 11
  • 12. 2. SINGLE BUS-BAR SYSTEM WITH SECTIONALIZATION With increased number of generators and outgoing feeders connected to the bus-bars, it becomes essential to provide arrangement for sectionalizing the bus-bars so that a fault on any one section of the busbars may not cause a complete shutdown. This is achieved by providing a circuit breaker and isolating switches between the section. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 12
  • 13. 3. RING BUS-BAR SYSTEM In this arrangement each feeder is supplied from two paths, so that in case of failure of a section, supply is not interrupted. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 13
  • 14. 4. DOUBLE MAIN AND TRANSFER BUS-BAR ARRANGEMENT This arrangement incorporates all advantages of the double bus as well as transfer bus scheme. This scheme needs a bus-coupler for the on load transfer of circuits from one main bus to the other and a transfer coupler for taking out circuit breaker of various circuits for maintenance. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 14
  • 15. 2. BUS COUPLER: • Two different bus sections of two different power transformers are connected by means of a bus coupler. • The bus coupler becomes useful when one of the power transformers fails or a fault occurs in either of the bus sections. 3. INSULATORS: • The overhead line conductors should be supported on the poles or towers in such a way that currents from conductors do not flow to earth through supports i.e., line conductors must be properly insulated from supports. This is achieved by securing line conductors to supports with the help of INSULATORS. • The insulators provide necessary insulation between line conductors and supports and thus prevent any leakage current from conductors to earth. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 15
  • 16. TYPES OF INSULATORS: 1.PIN TYPE: 3. STRAIN INSULATORS: 03-Nov-2013 2. SUSPENSION TYPE: 4. SHACKEL INSULATORS: DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 16
  • 17. 4. CIRCUIT BREAKER & RELAYS: • A circuit breaker is an automatically operated electrical switch designed to protect an electrical current from damage caused by overload or short circuit. • Its basic function is to detect a fault condition and, by interrupting continuity, to immediately discontinue electrical flow. • The circuit breaker works along with the relays which give a tripping signal in case of any irregularity or the faults. • The circuit breaker then opens to open the circuit such that other instruments of the system can be protected. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 17
  • 18. 5. ISOLATORS: (GOD)- GROUP OPERATED DISCONNECTOR: • It is used to make sure that an electrical circuit can be completely deenergised for service or maintenance. • It allows isolation of apparatus such as circuit breakers and transformers, and transmission lines, for maintenance. • GOD’s are provided to facilitate isolation of breakers supplying power to various feeders. In 220kv Switchyard, they are designed as 29A, 29B, 29C & 29E as follows     03-Nov-2013 29 A – main bus side GOD. 29 B - Equipment side GOD. 29 C - Transfer bus side GOD. 29 E - Earth GOD. DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 18
  • 19. 6. Current and voltage transformers • Current or voltage instrument transformers are necessary for isolating the protection, control and measurement equipment from the high voltages of a power system, and for supplying the equipment with the appropriate values of current and voltage - generally these are 1A or 5Α for the current coils, and 120 V for the voltage coils. CURRENT TRANSFORMER 03-Nov-2013 VOLTAGE TRANSFORMER DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 19
  • 20. 8. LIGHTNING ARRESTER: • A lightning arrester is a device used on electrical power systems and telecommunication systems to protect the insulation and conductors of the system from the damaging effects of lightning. • The typical lightning arrester has a high-voltage terminal and a ground terminal. • When a lightning surge (or switching surge, which is very similar) travels along the power line to the arrester, the current from the surge is diverted through the arrestor, in most cases to earth. LIGHTNING ARRESTER 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 20
  • 21. TRANSFORMER YARD: • Transformer yard consists of following types of transformers 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 21
  • 22. CONCLUSION :• Switchyard is most essential part of the power system. • It is the protective part of the whole power system. • Switch yard is also most essential part for transmission, distribution, and collection. BIBILIOGRAPHY :1. http://wikipedia.com 2. http://google.co.in 3. http://www.engineersedge.com 4. http://www.scribd.com 5. http://electricals4u.com 6. Power system Engineering by O P KOTHARI and I J NAGRATH 7. Power System By J B GUPTA 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 22
  • 23. 03-Nov-2013 DEPARTMENT OF ELECTRICAL ENGINEERING, V.S.S.U.T,BURLA 23