10 KWp SOLAR PV
                            ROOFTOP SYSTEM PROPOSAL




Ref: PEPL/10-11/PV/682


M/s Ace Controltech Services Ltd                                                                         Date: 21- February ‘11

Dear Sir,
Sub: Comprehensive Proposal for 10 KWp Roof top Solar PV System.

With reference to your query, we are pleased to submit herewith our comprehensive proposal of the Technical & Commercial
overview, for your kind perusal.

                                                         A. System Definition

Size
        10 kWp total DC capacity
        50 nos. 200-watt panels (To be procured globally from leading international vendors like
        Photon Energy, BP Solar, Solar Semiconductor etc.)

Energy Production

        Site location: New Delhi
        Site Co-ordinates: 28.40 N; 76.59 E
        Tilt Angle: South 30.3o
        Averaged radiation: 5.62 kW-hours/m2/day
        Number of full production days assumed per year: 330

        PVSyst Based Statistics:-
        Expected Annual production: 14.75 MW-hours (As per simulations)


Note: Energy production projections are reasonably accurate estimates based on site’s solar data and our experience with similar
systems. Exergy makes no guarantees as to actual production output from this system.

Grid/Load Interfacing

Solar system output shall be connected to a suitable load bus capable of taking the input. This input point shall be selected in field
in consultation with client’s Executive Engineer.




           Solar Photovoltaic Proposal                                                                               Page 1
B. System Components

Solar Panels                                                               Make: Solar Semiconductor/ Photon
                                                                           Energy/ Tata BP Solar
Note: Subject to availability at installation time, a different panel      Model: SSI-M6-200
from a leading vendor may be selected without affecting system size        Quantity: 50
and performance.
                                                                           Wattage: 200 W
                                                                           No. of Cells: 60
                                                                           Voc: 37.1 V
                                                                           Isc: 8.28 A
                                                                           Vmp: 29.6 V
                                                                           Imp: 7.6 A
                                                                           Dimensions: 1660X990X42 (mm)

                                                                           Weight: 20 kg
                                                                           Operating Conditions: -40 to +90 C
                                                                           Maximum System Voltage: 600 Vdc


Inverter                                                                   SMA Sunny Tripower 10000TL/ Delta Inverters
                                                                           Quantity: 1
Note: Subject to availability at installation time, a different inverter   AC maximum output: 10 KW
may be selected without affecting system size and performance.             MPP voltage range : 360 – 800 V
                                                                           Maximum current input DC/String : 33A
                                                                           Maximum efficiency : >98.1%
                                                                           Power connection : 3-phase

                                                                           We may take any other reputed make with efficiency > 95%.


Mounting Structures                                                        Panels shall be mounted on galvanized frames inclined at 30.3
                                                                           degrees to the south. The structure is designed in such a manner
                                                                           that module can be replaced easily and in line with site
                                                                           requirements and it is easy to install and service in future. The
                                                                           frames will be supported by angle legs of suitable lengths to
                                                                           provide the pre-determined inclination. All fasteners, nut and
                                                                           bolts are made of Stainless steel - SS 304 5.4.6 PCC. The structures
                                                                           shall be pre engineered to meet special requirements of placing the
                                                                           modules on the corrugated rooftops.

                                                                           FOUNDATION BASE: The legs of the structures made with
                                                                           GI angles are made of fixed and grouted in the PCC foundation
                                                                           columns made with 1:2:4 cement concrete.


Electrical Accessories                                                     Cables will conform to IS 694 and shall be of 650 V/ 1.1 kV
                                                                           grade. Interconnections, array to junction
                                                                           boxes, junction boxes to DCDB, DCDB
                                                                           to PCU etc will be selected to keep voltage
                                                                           drop and losses to the minimum. The
                                                                           bright annealed 99.97% pure bare copper
                                                                           conductors offer low conductor resistance,


             Solar Photovoltaic Proposal                                                                                    Page 2
result in lower heating thereby increasing cable life and efficiency..
                                        These wires are insulated with a special grade PVC compound
                                        formulated and manufactured in-house.

                                        Working voltage: up to 1100 V
                                        Temperature range: -15 deg C to +70 deg C
                                        Sizes: Suitable sizes
                                        Color codes: Red, Yellow, Black, Blue, Green

Battery                                 None

Energy Meter                            The Inverter shall have a built-in meter that tracks energy
                                        production and displays it on a small LED screen. The display
                                        can be used to determine real-time production, daily production,
                                        and yearly production. For more sophisticated analysis and visual
                                        data management, Solar Access modules can be included.

Remote Monitoring System                The Sunny Web Box continuously records and stores all available
                                        data of about 50 inverters in real time, in addition the inverter
                                        parameters can be requested and modified. It provides you with
                                        various modern data processing options for professional data
                                        management. These are saved in conventional CSV or XML file
                                        formats. The ability to exchange data by FTP allows you to easily
                                        transfer these values to your PC. You can just as easily use an SD
                                        card to save your data. Any such feature of remote monitoring
                                        shall be made available through additional costs.

Stringing Design                        5 strings of 10 panels each, however a detailed engineering might
                                        change the stringing design. In case Inverter configuration needs
                                        any modifications, based on its availability, the string layout may
                                        be modified accordingly.




          Solar Photovoltaic Proposal                                                      Page 3
C. Bill of Material

S.No     Component                        Type/Model No               Specifications             Quantity

1        PV Modules                       SSI-M6 200/ Solar                                      50
                                          Semiconductor

2        Grid Tie Inverter                SMA, Sunny Tripower                                    1
                                          10000TL; Solivia 10 TL
                                          Central/ String Inverters

3        Mounting Structure               Custom made                 MS hot dip galvanized      1Set
                                                                      steel

4        Field Junction Box               ABB Junction Boxes          IP65 standards             As per stringing
                                                                                                 design

5        Main Junction Box                ABB Junction Boxes          IP65 standards             As per stringing
                                                                                                 design

6        Earthing Kit                     Reputed make                                           1 set

7        Lightening Arrestors             Reputed make                                           1 set

8        AC & DC cables                   Conforming to BOS                                      As per site
                                                                                                 requirements

9        Ground Fault Protection System                               Included in the inverter   1

10       Remote Monitoring System         Sunny Web Box                                          NA




                                                     D. Solar PV Plot Plan




     Solar Photovoltaic Proposal                                                                                    Page 4
E. Installation Details


Area required:

The Total Area required for the System Installation shall be apx 1200 -1400 sq feet, without any shades, facing south.

Structural Anchoring:

Panels shall be mounted on galvanized frames inclined at 30.3 degrees to the south. The structure is designed in such a manner that
module can be replaced easily and in line with site requirements and it is easy to install and service in future. The frames will be
supported by angle legs of suitable lengths to provide the pre-determined inclination. All fasteners, nut and bolts are made of
Stainless steel - SS 304 5.4.6 PCC.

Foundation Base:

The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation columns made with 1:2:4
cement concrete. Actual frame and other structural dimensions will be determined during a more detailed site visit by specialists
during full design phase.




Inverter Installation

Based on the initial site visit, the inverters could possibly be installed on the terrace. This space provides ample accessibility and
good air circulation. The inverter is available in IP54 housing, however, an enclosed space has to be provided for the same. Actual
installation location and methods will be determined during full design phase.

Electrical

Proposed fire hose shaft will be used for running electrical cables down to the electrical panel room. A detailed electrical design
with single-line diagram and specifications will be prepared during full design phase after receiving the PO, for the client’s approval.


             Solar Photovoltaic Proposal                                                                             Page 5
F. Scope of Work

    1. We shall conduct a detailed site visit with specialists to take accurate measurements, photographs, and other site-specific
       information for full design.
    2. Prepare full system design to include civil, structural, electrical and mechanical components, with construction drawings
       and specifications.
    3. Procure equipment and materials and deliver to site.
    4. Perform complete system installation.
    5. Test all electrical components in accordance with manufacturer instructions.
    6. Commission the system to full operability.


                                                            G. Client Scope

Site-specific considerations will require assistance and cooperation from the client, as outlined below:

    1.   Provide access to work site for delivery of equipment and materials prior to and during project implementation.
    2.   Provide a suitable and secure space for storage of equipment and materials.
    3.   Facilitate access of work crew to the work site 7 days a week.
    4.   Facilitate interfacing with the client’s resident engineering staff for consultation as needed.
    5.   Separate electrical loads as discussed in Part A (Grid Interfacing) and connect solar output to building load system.
    6.   All the Statutory clearances, if any, required for the Project.

                                                 H. Delivery Schedule & Project Cost


Installation & Commissioning

All the Systems except Inverter, will be installed within 8-10weeks from the date of receipt of advance and approval of the “SLD”.

Warranty

The Solar modules are warranted by the solar panel manufacturer for a period of 25 years. The details are as below

    1. Panels:
       Manufacturing Warrantee for the System: 3 yrs after installation and commissioning.
       Performance Warrantee:
       a. 90% efficiency upto 12 yrs
       b. 80% efficiency upto 25 yrs
    2. Inverter: 3 yrs or 5 yrs depending on the make
    3. Balance of the Systems: Standard 12 months warrantee against manufacturing defects. We shall also ensure supply of
       Spares for the System for the required.




           Solar Photovoltaic Proposal                                                                              Page 6
Lumpsum Execution Cost: Rs. 208/Watt (Material Cost: Rs. 180/Watt, Installation Service Charges: Rs. 25/Watt)
Therefore, the total price will be :-
                                  10KWp system shall be INR 20,80,000.
                                  .
The final system size shall be finalized based on site visit and load conditions.

    •      Prices : Price quoted are FOR at site Delhi.
    •      Tentative Cost Breakup:
           a) Rs. 100/ Watt Solar Modules.
           b) Rs 35/ Watt Three Phase 10 KW Solar Inverter.
           c) Rs 15/ Watt Module Mounting Structures
           d) Rs 5/ Watt PVC Cabling Cost
           e) Rs 13/ Watt Civil Works including grouting etc
           f) Rs 15/ Watt Electrical Works, including lighting conductor, panel earthing, inverter installation
           g) Rs 25/ Watt Detailed Engineering & Service Cost.
    •      Freight & Insurance : Included in above
    •      System Installation: System will be supplied and same will be installed by us. Installation Charges included.
    •      Excise Duty/Service Tax: Currently, under present rules, Solar Photo Voltaic system is exempted from Excise Duty.
           However, rate prevalent at the time of dispatch will be applicable extra, at actual. Service Tax extra at Actual will be
           charged, Presently Applicable @10.32%.
    •      Octroi : Any Octroi/Entry tax, if any, will be payable will be extra
    •      Sales tax : CST@ 5% will be charged extra without Form-C OR CST@2%
    •      Delivery : Dispatch will be effected in 5-6 weeks from the date of acceptance of your Purchase order.(P.O) . System
           installation will be completed in 3 week’s time from date of receipt of materials at site, provided site is ready for installation.
    •      Payment Terms:
                         - INR 50,000 payable in advance for site visit and detailed load conditions study.
                         - 30% of the remaining amount payable as advance along with Formal PO for a specific Solar System size.
                         - 60% on supply of material (as indicated in BOM) at the site.
                         - Balance 10% on successful commissioning of the project.
    •      Validity : This offer is valid for 30 days from the date hereof


Name: Rajat Sethi

Designation: Head, Solar Infrastructure Services

Date: February 21, 2011
                                                                                                             _______________
Version: #1

Contact:
            D-32, Sector 7, Noida, INDIA.
            Pin Code: 201301
            E: rajat@exergy.in W: www.exergy.in
            M: 00-91-9999676750,
               00-91-9654436886.




             Solar Photovoltaic Proposal                                                                                  Page 7

Weitere ähnliche Inhalte

Was ist angesagt?

PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY
PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY
PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY Power System Operation
 
What Are Bifacial Solar Panels And How Is It Useful?
What Are Bifacial Solar Panels And How Is It Useful?What Are Bifacial Solar Panels And How Is It Useful?
What Are Bifacial Solar Panels And How Is It Useful?FrittSolar
 
Solar power system
Solar power systemSolar power system
Solar power systemAD Sarwar
 
Solar Photovoltaic-Thermal (PV/T) Technology and Development
Solar Photovoltaic-Thermal (PV/T) Technology and DevelopmentSolar Photovoltaic-Thermal (PV/T) Technology and Development
Solar Photovoltaic-Thermal (PV/T) Technology and DevelopmentIEEE UKM Student Beanch
 
Solar energy(Renewable source)
Solar energy(Renewable source)Solar energy(Renewable source)
Solar energy(Renewable source)bgoyani3
 
Solar Photovoltaic Technology
Solar Photovoltaic TechnologySolar Photovoltaic Technology
Solar Photovoltaic Technologyrelzaes
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravShubham Gaurav
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemShoeb Ali Khan
 
Proposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportProposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportAnkit Singh
 
Solar Energy Presentation
Solar Energy PresentationSolar Energy Presentation
Solar Energy PresentationKurt Kublbeck
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentationMalika Alix
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1Murugappa Group
 
Solar photovoltaic system design
Solar photovoltaic system designSolar photovoltaic system design
Solar photovoltaic system designJay Ranvir
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system worksHardik Parmar
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpointWilliam Wallace
 

Was ist angesagt? (20)

PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY
PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY
PHOTOVOLTAIC SYSTEMS AND SOLAR ENERGY
 
What Are Bifacial Solar Panels And How Is It Useful?
What Are Bifacial Solar Panels And How Is It Useful?What Are Bifacial Solar Panels And How Is It Useful?
What Are Bifacial Solar Panels And How Is It Useful?
 
SOLAR CELL AND APPLICATIONS
SOLAR CELL AND APPLICATIONSSOLAR CELL AND APPLICATIONS
SOLAR CELL AND APPLICATIONS
 
Solar power system
Solar power systemSolar power system
Solar power system
 
Solar Photovoltaic-Thermal (PV/T) Technology and Development
Solar Photovoltaic-Thermal (PV/T) Technology and DevelopmentSolar Photovoltaic-Thermal (PV/T) Technology and Development
Solar Photovoltaic-Thermal (PV/T) Technology and Development
 
Solar energy(Renewable source)
Solar energy(Renewable source)Solar energy(Renewable source)
Solar energy(Renewable source)
 
Solar Photovoltaic Technology
Solar Photovoltaic TechnologySolar Photovoltaic Technology
Solar Photovoltaic Technology
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham Gaurav
 
roof top solar
roof top solarroof top solar
roof top solar
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power system
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Proposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportProposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transport
 
Solar Energy Presentation
Solar Energy PresentationSolar Energy Presentation
Solar Energy Presentation
 
solar cells
solar cellssolar cells
solar cells
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentation
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
 
Solar photovoltaic system design
Solar photovoltaic system designSolar photovoltaic system design
Solar photovoltaic system design
 
Solar power.ppt
Solar power.pptSolar power.ppt
Solar power.ppt
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system works
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpoint
 

Ähnlich wie 10 kwp-solar-rooftop-system

Testing Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant CapabilityTesting Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant CapabilityTechnical Representatives, Inc.
 
25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIET25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIETsuraj chowdhury
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptxpramod719257
 
Enhanced DC to DC Converter using Photovoltaic Micro Inverter
Enhanced DC to DC Converter using Photovoltaic Micro InverterEnhanced DC to DC Converter using Photovoltaic Micro Inverter
Enhanced DC to DC Converter using Photovoltaic Micro InverterIRJET Journal
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolar Reference
 
Silicon Energy Cascade Series Photovoltaic Module Specification Sheet
Silicon Energy Cascade Series Photovoltaic Module Specification SheetSilicon Energy Cascade Series Photovoltaic Module Specification Sheet
Silicon Energy Cascade Series Photovoltaic Module Specification SheetSilicon Energy
 
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV SystemTransformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV SystemAnoop S
 
High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...
High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...
High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...Premier Publishers
 
17 mse009 connectors in solar photovoltaic system
17 mse009 connectors in solar photovoltaic system17 mse009 connectors in solar photovoltaic system
17 mse009 connectors in solar photovoltaic systempaneliya sagar
 
Small_Cabin_PV_Design
Small_Cabin_PV_DesignSmall_Cabin_PV_Design
Small_Cabin_PV_DesignJames Koehler
 
סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
 סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
סולאראדג' - תכנון מערכות סולאריות לתשואה מירביתTashtiot media
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemL'Obel Solar Power System
 

Ähnlich wie 10 kwp-solar-rooftop-system (20)

How to build a Inverters
How to build a InvertersHow to build a Inverters
How to build a Inverters
 
Testing Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant CapabilityTesting Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant Capability
 
25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIET25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIET
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 
Enhanced DC to DC Converter using Photovoltaic Micro Inverter
Enhanced DC to DC Converter using Photovoltaic Micro InverterEnhanced DC to DC Converter using Photovoltaic Micro Inverter
Enhanced DC to DC Converter using Photovoltaic Micro Inverter
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Solar pv plant and india
Solar pv plant and indiaSolar pv plant and india
Solar pv plant and india
 
Silicon Energy Cascade Series Photovoltaic Module Specification Sheet
Silicon Energy Cascade Series Photovoltaic Module Specification SheetSilicon Energy Cascade Series Photovoltaic Module Specification Sheet
Silicon Energy Cascade Series Photovoltaic Module Specification Sheet
 
Jmv presentation solar
Jmv  presentation solarJmv  presentation solar
Jmv presentation solar
 
Rooftop pro
Rooftop proRooftop pro
Rooftop pro
 
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV SystemTransformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
Transformer Less FPGA Controlled 2-Stage Isolated Grid Connected PV System
 
High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...
High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...
High Voltage Gain with low Current Stress Interleaved Boost Converter for Pho...
 
Quotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshjiQuotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshji
 
ISRO Funded IEEE Paper
ISRO Funded IEEE PaperISRO Funded IEEE Paper
ISRO Funded IEEE Paper
 
Gss herapura report
Gss herapura reportGss herapura report
Gss herapura report
 
17 mse009 connectors in solar photovoltaic system
17 mse009 connectors in solar photovoltaic system17 mse009 connectors in solar photovoltaic system
17 mse009 connectors in solar photovoltaic system
 
Small_Cabin_PV_Design
Small_Cabin_PV_DesignSmall_Cabin_PV_Design
Small_Cabin_PV_Design
 
Solar system design
Solar system designSolar system design
Solar system design
 
סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
 סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
 

10 kwp-solar-rooftop-system

  • 1. 10 KWp SOLAR PV ROOFTOP SYSTEM PROPOSAL Ref: PEPL/10-11/PV/682 M/s Ace Controltech Services Ltd Date: 21- February ‘11 Dear Sir, Sub: Comprehensive Proposal for 10 KWp Roof top Solar PV System. With reference to your query, we are pleased to submit herewith our comprehensive proposal of the Technical & Commercial overview, for your kind perusal. A. System Definition Size 10 kWp total DC capacity 50 nos. 200-watt panels (To be procured globally from leading international vendors like Photon Energy, BP Solar, Solar Semiconductor etc.) Energy Production Site location: New Delhi Site Co-ordinates: 28.40 N; 76.59 E Tilt Angle: South 30.3o Averaged radiation: 5.62 kW-hours/m2/day Number of full production days assumed per year: 330 PVSyst Based Statistics:- Expected Annual production: 14.75 MW-hours (As per simulations) Note: Energy production projections are reasonably accurate estimates based on site’s solar data and our experience with similar systems. Exergy makes no guarantees as to actual production output from this system. Grid/Load Interfacing Solar system output shall be connected to a suitable load bus capable of taking the input. This input point shall be selected in field in consultation with client’s Executive Engineer. Solar Photovoltaic Proposal Page 1
  • 2. B. System Components Solar Panels Make: Solar Semiconductor/ Photon Energy/ Tata BP Solar Note: Subject to availability at installation time, a different panel Model: SSI-M6-200 from a leading vendor may be selected without affecting system size Quantity: 50 and performance. Wattage: 200 W No. of Cells: 60 Voc: 37.1 V Isc: 8.28 A Vmp: 29.6 V Imp: 7.6 A Dimensions: 1660X990X42 (mm) Weight: 20 kg Operating Conditions: -40 to +90 C Maximum System Voltage: 600 Vdc Inverter SMA Sunny Tripower 10000TL/ Delta Inverters Quantity: 1 Note: Subject to availability at installation time, a different inverter AC maximum output: 10 KW may be selected without affecting system size and performance. MPP voltage range : 360 – 800 V Maximum current input DC/String : 33A Maximum efficiency : >98.1% Power connection : 3-phase We may take any other reputed make with efficiency > 95%. Mounting Structures Panels shall be mounted on galvanized frames inclined at 30.3 degrees to the south. The structure is designed in such a manner that module can be replaced easily and in line with site requirements and it is easy to install and service in future. The frames will be supported by angle legs of suitable lengths to provide the pre-determined inclination. All fasteners, nut and bolts are made of Stainless steel - SS 304 5.4.6 PCC. The structures shall be pre engineered to meet special requirements of placing the modules on the corrugated rooftops. FOUNDATION BASE: The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation columns made with 1:2:4 cement concrete. Electrical Accessories Cables will conform to IS 694 and shall be of 650 V/ 1.1 kV grade. Interconnections, array to junction boxes, junction boxes to DCDB, DCDB to PCU etc will be selected to keep voltage drop and losses to the minimum. The bright annealed 99.97% pure bare copper conductors offer low conductor resistance, Solar Photovoltaic Proposal Page 2
  • 3. result in lower heating thereby increasing cable life and efficiency.. These wires are insulated with a special grade PVC compound formulated and manufactured in-house. Working voltage: up to 1100 V Temperature range: -15 deg C to +70 deg C Sizes: Suitable sizes Color codes: Red, Yellow, Black, Blue, Green Battery None Energy Meter The Inverter shall have a built-in meter that tracks energy production and displays it on a small LED screen. The display can be used to determine real-time production, daily production, and yearly production. For more sophisticated analysis and visual data management, Solar Access modules can be included. Remote Monitoring System The Sunny Web Box continuously records and stores all available data of about 50 inverters in real time, in addition the inverter parameters can be requested and modified. It provides you with various modern data processing options for professional data management. These are saved in conventional CSV or XML file formats. The ability to exchange data by FTP allows you to easily transfer these values to your PC. You can just as easily use an SD card to save your data. Any such feature of remote monitoring shall be made available through additional costs. Stringing Design 5 strings of 10 panels each, however a detailed engineering might change the stringing design. In case Inverter configuration needs any modifications, based on its availability, the string layout may be modified accordingly. Solar Photovoltaic Proposal Page 3
  • 4. C. Bill of Material S.No Component Type/Model No Specifications Quantity 1 PV Modules SSI-M6 200/ Solar 50 Semiconductor 2 Grid Tie Inverter SMA, Sunny Tripower 1 10000TL; Solivia 10 TL Central/ String Inverters 3 Mounting Structure Custom made MS hot dip galvanized 1Set steel 4 Field Junction Box ABB Junction Boxes IP65 standards As per stringing design 5 Main Junction Box ABB Junction Boxes IP65 standards As per stringing design 6 Earthing Kit Reputed make 1 set 7 Lightening Arrestors Reputed make 1 set 8 AC & DC cables Conforming to BOS As per site requirements 9 Ground Fault Protection System Included in the inverter 1 10 Remote Monitoring System Sunny Web Box NA D. Solar PV Plot Plan Solar Photovoltaic Proposal Page 4
  • 5. E. Installation Details Area required: The Total Area required for the System Installation shall be apx 1200 -1400 sq feet, without any shades, facing south. Structural Anchoring: Panels shall be mounted on galvanized frames inclined at 30.3 degrees to the south. The structure is designed in such a manner that module can be replaced easily and in line with site requirements and it is easy to install and service in future. The frames will be supported by angle legs of suitable lengths to provide the pre-determined inclination. All fasteners, nut and bolts are made of Stainless steel - SS 304 5.4.6 PCC. Foundation Base: The legs of the structures made with GI angles are made of fixed and grouted in the PCC foundation columns made with 1:2:4 cement concrete. Actual frame and other structural dimensions will be determined during a more detailed site visit by specialists during full design phase. Inverter Installation Based on the initial site visit, the inverters could possibly be installed on the terrace. This space provides ample accessibility and good air circulation. The inverter is available in IP54 housing, however, an enclosed space has to be provided for the same. Actual installation location and methods will be determined during full design phase. Electrical Proposed fire hose shaft will be used for running electrical cables down to the electrical panel room. A detailed electrical design with single-line diagram and specifications will be prepared during full design phase after receiving the PO, for the client’s approval. Solar Photovoltaic Proposal Page 5
  • 6. F. Scope of Work 1. We shall conduct a detailed site visit with specialists to take accurate measurements, photographs, and other site-specific information for full design. 2. Prepare full system design to include civil, structural, electrical and mechanical components, with construction drawings and specifications. 3. Procure equipment and materials and deliver to site. 4. Perform complete system installation. 5. Test all electrical components in accordance with manufacturer instructions. 6. Commission the system to full operability. G. Client Scope Site-specific considerations will require assistance and cooperation from the client, as outlined below: 1. Provide access to work site for delivery of equipment and materials prior to and during project implementation. 2. Provide a suitable and secure space for storage of equipment and materials. 3. Facilitate access of work crew to the work site 7 days a week. 4. Facilitate interfacing with the client’s resident engineering staff for consultation as needed. 5. Separate electrical loads as discussed in Part A (Grid Interfacing) and connect solar output to building load system. 6. All the Statutory clearances, if any, required for the Project. H. Delivery Schedule & Project Cost Installation & Commissioning All the Systems except Inverter, will be installed within 8-10weeks from the date of receipt of advance and approval of the “SLD”. Warranty The Solar modules are warranted by the solar panel manufacturer for a period of 25 years. The details are as below 1. Panels: Manufacturing Warrantee for the System: 3 yrs after installation and commissioning. Performance Warrantee: a. 90% efficiency upto 12 yrs b. 80% efficiency upto 25 yrs 2. Inverter: 3 yrs or 5 yrs depending on the make 3. Balance of the Systems: Standard 12 months warrantee against manufacturing defects. We shall also ensure supply of Spares for the System for the required. Solar Photovoltaic Proposal Page 6
  • 7. Lumpsum Execution Cost: Rs. 208/Watt (Material Cost: Rs. 180/Watt, Installation Service Charges: Rs. 25/Watt) Therefore, the total price will be :- 10KWp system shall be INR 20,80,000. . The final system size shall be finalized based on site visit and load conditions. • Prices : Price quoted are FOR at site Delhi. • Tentative Cost Breakup: a) Rs. 100/ Watt Solar Modules. b) Rs 35/ Watt Three Phase 10 KW Solar Inverter. c) Rs 15/ Watt Module Mounting Structures d) Rs 5/ Watt PVC Cabling Cost e) Rs 13/ Watt Civil Works including grouting etc f) Rs 15/ Watt Electrical Works, including lighting conductor, panel earthing, inverter installation g) Rs 25/ Watt Detailed Engineering & Service Cost. • Freight & Insurance : Included in above • System Installation: System will be supplied and same will be installed by us. Installation Charges included. • Excise Duty/Service Tax: Currently, under present rules, Solar Photo Voltaic system is exempted from Excise Duty. However, rate prevalent at the time of dispatch will be applicable extra, at actual. Service Tax extra at Actual will be charged, Presently Applicable @10.32%. • Octroi : Any Octroi/Entry tax, if any, will be payable will be extra • Sales tax : CST@ 5% will be charged extra without Form-C OR CST@2% • Delivery : Dispatch will be effected in 5-6 weeks from the date of acceptance of your Purchase order.(P.O) . System installation will be completed in 3 week’s time from date of receipt of materials at site, provided site is ready for installation. • Payment Terms: - INR 50,000 payable in advance for site visit and detailed load conditions study. - 30% of the remaining amount payable as advance along with Formal PO for a specific Solar System size. - 60% on supply of material (as indicated in BOM) at the site. - Balance 10% on successful commissioning of the project. • Validity : This offer is valid for 30 days from the date hereof Name: Rajat Sethi Designation: Head, Solar Infrastructure Services Date: February 21, 2011 _______________ Version: #1 Contact: D-32, Sector 7, Noida, INDIA. Pin Code: 201301 E: rajat@exergy.in W: www.exergy.in M: 00-91-9999676750, 00-91-9654436886. Solar Photovoltaic Proposal Page 7