SlideShare ist ein Scribd-Unternehmen logo
1 von 9
Downloaden Sie, um offline zu lesen
OPERATIONAL ANALYSIS REVIEW
                  Template for Federal IT Capital Investments
                                                         January 2010




                                P2C2 Group, Inc.                                                              (301) 942-7985
                                4101 Denfeld Avenue                                                      info@p2c2group.com
                                Kensington, MD 20895                                                     www.p2c2group.com




This template is © 2010 by the P2C2 Group, Inc. Federal agencies are granted permission to reproduce and use this template
provided that (1) P2C2 Group’s copyright notice is identified on each page and (2) there is no substantive change in the template
structure. The P2C2 Group also provides consulting support for capital investment planning, operational analysis reviews,
alternatives and cost benefits analysis, acquisition reviews, program outcome evaluations, and integrated baseline reviews.

For information about obtaining the free template in Word format, contact info@p2c2group.com.
METHODOLOGY
The P2C2 Group, Inc. has applied the methodology outlined in the Office of
Management and Budget (OMB) Capital Programming Guide, a supplement to Circular
A-11, Part 7. The methodology is applicable to major capital investments, including
information technology.

Operational Analysis Reviews are an important tool for the strategic management of IT
systems, alignment with Enterprise Architecture (EA), and successful execution of the
Capital Planning and Investment Control (CPIC) process. Such reviews compare the
performance of an IT asset or system to an established baseline. It measures ongoing
performance of Management-In-Use (Operations & Maintenance) investments against
established cost, schedule, and performance goals. It should also include a review of
related enterprise management issues such as risk, information security, harmonization
with the EA transition strategy, and any updates to the agency’s strategic
plans/objectives.

Note that the review is conducted against a baseline, which should be consistent with
the investment’s system planning and OMB Exhibit 300 documents. In addition, any
weaknesses identified in the Operational Analysis Review should be considered when
making future decisions about the investment. For example, the results of the review
may indicated that certain enhancements are needed to meet user requirements.
Findings may also suggest the need to pursue an alternatives analysis about how to
resolve major issues identified.

In conducting the Operational Analysis Review, the P2C2 Group has collected CPIC
and other related documentation, compared costs to historic budgets, and has
considered system performance, user satisfaction, and other operational data. The
review reports the following:

   •   Identification of System
   •   Lifecycle Summary for this Investment
   •   Summary of Recommended Actions
   •   Description of the System
   •   Summary of Review Findings
   •   OMB Dashboard Indicators
   •   Customer Assessment
   •   Operational Cost Analysis
   •   Stakeholder Input
   •   Operational Assessment (by IPT)
   •   Investment Evaluation




             Operational Analysis Review Template © 2010 www.p2c2group.com
Operational Analysis Review
                                                                                                        FORM


       OPERATIONAL ANALYSIS REVIEW
              For IT Systems and Applications in Steady State or Management-In-Use Phase
                                        Template © 2010 www.p2c2group.com


The Operational Analysis Review should compare the performance of an IT asset or system to the
established baseline. The review measures ongoing performance of Management-In-Use (Steady State)
investments against established cost and performance goals. It should also include a review of related
enterprise management issues such as risk, information security, harmonization with the EA transition
strategy, and any updates to the agency’s business processes or strategic plans.

Identification of System

Name of System or Application

Agency

Program/Business Function
Supported by this Investment

Time Period Covered by Review

Number of Users

Business Owner

Project Manager

Key Personnel Participating in this
Review (IPT – Stakeholders)

Date of Review

Signature/Title



Lifecycle Summary for this Investment

The total lifecycle for this investment (all phases) is from FY      through FY
The total lifecycle cost is $       Million

The Operations & Maintenance Phase for this investment is from FY_____ through FY____


Summary Recommended Actions
   Attach Plan of Action & Milestones if appropriate – See Below




                  Operational Analysis Review Template © 2010 www.p2c2group.com                            1
Operational Analysis Review
                                                                                                      FORM

Description of System or Investment
Use brief project description from the Exhibit 300 (2500 characters or less)




Summary of Review Findings




                Operational Analysis Review Template © 2010 www.p2c2group.com                            2
Operational Analysis Review
                                                                                                       FORM

OMB Dashboard Indicators

Performance


  Use same measures as in Exhibit 300 and Dashboard Reporting
  Fiscal     Strategic   Measurement   Measurem Measurem      Measurement        Baseline   Target   Actual
  Year       Goal(s)     Area          ent      ent           Indicator                              Results
             Supported                 Category Grouping




 Customer Assessment (date)

 Summarize the level of end-user satisfaction with the system. For example, address indicators
 such as effectiveness, productivity, availability, and reliability:



 Based upon the results of the survey, are there planned changes to the investment?



 Next Customer Assessment:




DME Cost Analysis – List all cost, schedule, or performance variances that are 10% or greater:
  Attach a complete analysis of each, or provide an overall Gap Analysis.

For further details refer to document: (file)

FY2009:
Cost variance of -??.??% for open DME
Cost variance of -??.??% for all DME
No schedule or performance variances

The variance for all DME milestones is attributed to the following reasons:




Is this investment consistent with EA and EA Transition Plan?




                 Operational Analysis Review Template © 2010 www.p2c2group.com                                 3
Operational Analysis Review
                                                                                                                         FORM

Operational Cost Analysis

Compare planned and actual Operations & Maintenance costs for the most appropriate comparison
period (either cumulative cost through current or just-completed fiscal year, or for a single fiscal year
(current or just-completed).

          [ ] Current Fiscal Year:
          [ ] Period of Review, (date range)


Description of   Milestone   Current    Current     BAC        Planned   BCWS      Actual     Actual     Actual %   BCWP      ACWP
Milestone        Type        Start      End Date    (Planned   % Comp              Start      End Date   Comp                 (Actual
                             Date                   Costs)                         Date                                       Costs)



Source: IT Dashboard, FY_____


Description of   Milestone   Cost        Cost          CV %         CV %        Schedule      Schedule   SV %        SV %
Milestone        Type        Variance    Variance                   Health      Variance (#   Variance               Health
                             Current-    (CV)                                   of days)      (SV)
                             Actual      BCWP-
                                         ACWP


Source: IT Dashboard, FY____


 Open Milestones:
 This fiscal year
 through Sept, _____
                               Planned     Planned         Budgeted Cost                        Budgeted Cost
                                Costs         %            Work Scheduled       Actual %        Work Planned         Actual Cost Work
                                (BAC)      Complete           (BCWS)            Complete           (BCWP)            Planned (ACWP)




     FY09 Steady State
Source: FY ____ Details –




                      Operational Analysis Review Template © 2010 www.p2c2group.com                                                     4
Operational Analysis Review
                                                                                                                           FORM

Stakeholder Input
Conduct one or more meetings with representatives of users and other stakeholder groups to obtain their
recommendations and assessment of the system/investment. Summarize their feedback below.




Operational Assessment

Assessment Factor                                       Rating                            √        Brief Description   Estimated
                                                                                      Correction      of Potential        Cost of


                                     Excellent

                                                 Good

                                                         Fair

                                                                Poor

                                                                       Unacceptable
                                                                                      Desirable?   Correction Action   Correction




This investment supports:

Functional Requirements for
which it was planned
The agency's mission and
programs
"Green Lights" on OMB
Scorecards
User and stakeholder
satisfaction with the as-is
investment
Applicable legal and regulatory
requirements
Performance goals and metrics
(such as those in Exhibit 300)
Cost efficiency in government
operations and business
functions
Reliable and available
information processing, storage
and retrieval
Productivity for system/
application users
Maintainability for the system
owner and administrator
Information security and privacy

Risk Mitigation and
Management
Continuity of Government and
Disaster Recovery
Enterprise Architecture
(Transition Plan and Target EA)




                 Operational Analysis Review Template © 2010 www.p2c2group.com                                                      5
Operational Analysis Review
                                                                                                      FORM

Investment Evaluation (Questionnaire)


A. Describe how well this investment meets current and future business needs of the agency.


B. Are the functions performed by this system/investment still a priority for the agency?


C. Can business processes be simplified?


D. Can this system/investment be eliminated or consolidated with other systems or assets?


E. How can this system/asset be maintained/managed with fewer Federal or contractor FTEs?


F, Are new technologies available that could perform this function of this investment better and/or at a
lower cost?


G. Could spending more on this investment close any identified gaps and/or achieve improved results?


H, Are alternatives available that would lead to greater customer service and satisfaction, and should
they be considered as a replacement to the current investment?


I. Could the functions be performed better or cheaper through partnerships with other agencies and/or
the private sector?


J. Discuss Options for Desirable Corrections, Improvements, Alternatives, and Changes.


K. Summarize Proposed Decisions about Agency's Response to Desirable Corrections, Improvements,
Alternatives and Changes.




                Operational Analysis Review Template © 2010 www.p2c2group.com                              6
Operational Analysis Review
                                                                                                     FORM

APPENDICES

Provide key documents referenced in the Operational Review. Lengthy documents may be incorporated
by reference and location of availability.




               Operational Analysis Review Template © 2010 www.p2c2group.com                            7

Weitere ähnliche Inhalte

Andere mochten auch

Example of Business Operations Analysis
Example of Business Operations AnalysisExample of Business Operations Analysis
Example of Business Operations AnalysisBojan Mitrovic, M.A.
 
Systems theory ppt
Systems theory pptSystems theory ppt
Systems theory pptroxcine
 
Sample contents of a completed feasibility study
Sample contents of a completed feasibility studySample contents of a completed feasibility study
Sample contents of a completed feasibility studynazcats
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementshart sood
 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectLena Argosino
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 

Andere mochten auch (9)

Example of Business Operations Analysis
Example of Business Operations AnalysisExample of Business Operations Analysis
Example of Business Operations Analysis
 
Systems theory ppt
Systems theory pptSystems theory ppt
Systems theory ppt
 
Sample contents of a completed feasibility study
Sample contents of a completed feasibility studySample contents of a completed feasibility study
Sample contents of a completed feasibility study
 
Feasibility Study
Feasibility StudyFeasibility Study
Feasibility Study
 
operations management
operations managementoperations management
operations management
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management Aspect
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 

Ähnlich wie Operational analysis review_jan2010_p2c2

Earned value
Earned valueEarned value
Earned valueOliver
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementStork
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementStork
 
Template Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviçosTemplate Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviçosFernando Palma
 
SAE2 Application Modernization Process
SAE2 Application Modernization ProcessSAE2 Application Modernization Process
SAE2 Application Modernization ProcessLawrence Wilkes
 
2012 connectionpoint pcammisa_hpcm
2012 connectionpoint pcammisa_hpcm2012 connectionpoint pcammisa_hpcm
2012 connectionpoint pcammisa_hpcmInnovusPartners
 
Draft CE-74 v03 for MAIN review
Draft CE-74 v03 for MAIN reviewDraft CE-74 v03 for MAIN review
Draft CE-74 v03 for MAIN reviewNesma
 
IRJET - Hardware Benchmarking Application
IRJET - Hardware Benchmarking ApplicationIRJET - Hardware Benchmarking Application
IRJET - Hardware Benchmarking ApplicationIRJET Journal
 
Measuring the ROI of choosing Flex for Enterprise RIAs
Measuring the ROI of choosing Flex for Enterprise RIAsMeasuring the ROI of choosing Flex for Enterprise RIAs
Measuring the ROI of choosing Flex for Enterprise RIAsRaffaele Mannella
 
Basic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdfBasic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdfElyes ELEBRI
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)Mark Carlson
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdfAmrishTyagi8
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxSudipBalLama
 
WBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project ManagementWBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project ManagementAnjali Rao
 

Ähnlich wie Operational analysis review_jan2010_p2c2 (20)

Earned value
Earned valueEarned value
Earned value
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
 
Template Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviçosTemplate Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviços
 
SAE2 Application Modernization Process
SAE2 Application Modernization ProcessSAE2 Application Modernization Process
SAE2 Application Modernization Process
 
2012 connectionpoint pcammisa_hpcm
2012 connectionpoint pcammisa_hpcm2012 connectionpoint pcammisa_hpcm
2012 connectionpoint pcammisa_hpcm
 
Draft CE-74 v03 for MAIN review
Draft CE-74 v03 for MAIN reviewDraft CE-74 v03 for MAIN review
Draft CE-74 v03 for MAIN review
 
IRJET - Hardware Benchmarking Application
IRJET - Hardware Benchmarking ApplicationIRJET - Hardware Benchmarking Application
IRJET - Hardware Benchmarking Application
 
Measuring the ROI of choosing Flex for Enterprise RIAs
Measuring the ROI of choosing Flex for Enterprise RIAsMeasuring the ROI of choosing Flex for Enterprise RIAs
Measuring the ROI of choosing Flex for Enterprise RIAs
 
Basic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdfBasic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdf
 
Free Up Your Time For Strategic, Value-Added Activity
Free Up Your Time For Strategic, Value-Added ActivityFree Up Your Time For Strategic, Value-Added Activity
Free Up Your Time For Strategic, Value-Added Activity
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)
 
Automated legacy portfolio assessment
Automated legacy portfolio assessmentAutomated legacy portfolio assessment
Automated legacy portfolio assessment
 
DPPM1
DPPM1DPPM1
DPPM1
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdf
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptx
 
WBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project ManagementWBS Structure –Essential Element In Project Management
WBS Structure –Essential Element In Project Management
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
 
Project management case analysis
Project management case analysisProject management case analysis
Project management case analysis
 

Mehr von Jim Kendrick

PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickJim Kendrick
 
P2C2 Group, Inc. - Qualifications
P2C2 Group, Inc. - QualificationsP2C2 Group, Inc. - Qualifications
P2C2 Group, Inc. - QualificationsJim Kendrick
 
P2C2 Group's Quick Tasks for IT Enterprise Management
P2C2 Group's Quick Tasks for IT Enterprise ManagementP2C2 Group's Quick Tasks for IT Enterprise Management
P2C2 Group's Quick Tasks for IT Enterprise ManagementJim Kendrick
 
Quick Tasks for CIOs, PMOs, CPIC
Quick Tasks for CIOs, PMOs, CPICQuick Tasks for CIOs, PMOs, CPIC
Quick Tasks for CIOs, PMOs, CPICJim Kendrick
 
Evms Presentation (July2006)Repro
Evms Presentation (July2006)ReproEvms Presentation (July2006)Repro
Evms Presentation (July2006)ReproJim Kendrick
 

Mehr von Jim Kendrick (7)

PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
P2C2 Group, Inc. - Qualifications
P2C2 Group, Inc. - QualificationsP2C2 Group, Inc. - Qualifications
P2C2 Group, Inc. - Qualifications
 
P2C2 Group's Quick Tasks for IT Enterprise Management
P2C2 Group's Quick Tasks for IT Enterprise ManagementP2C2 Group's Quick Tasks for IT Enterprise Management
P2C2 Group's Quick Tasks for IT Enterprise Management
 
Quick Tasks for CIOs, PMOs, CPIC
Quick Tasks for CIOs, PMOs, CPICQuick Tasks for CIOs, PMOs, CPIC
Quick Tasks for CIOs, PMOs, CPIC
 
CPIC Quick Tasks
CPIC Quick TasksCPIC Quick Tasks
CPIC Quick Tasks
 
Evms Presentation (July2006)Repro
Evms Presentation (July2006)ReproEvms Presentation (July2006)Repro
Evms Presentation (July2006)Repro
 
Smarter CPIC
Smarter CPICSmarter CPIC
Smarter CPIC
 

Kürzlich hochgeladen

The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 

Kürzlich hochgeladen (20)

The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 

Operational analysis review_jan2010_p2c2

  • 1. OPERATIONAL ANALYSIS REVIEW Template for Federal IT Capital Investments January 2010 P2C2 Group, Inc. (301) 942-7985 4101 Denfeld Avenue info@p2c2group.com Kensington, MD 20895 www.p2c2group.com This template is © 2010 by the P2C2 Group, Inc. Federal agencies are granted permission to reproduce and use this template provided that (1) P2C2 Group’s copyright notice is identified on each page and (2) there is no substantive change in the template structure. The P2C2 Group also provides consulting support for capital investment planning, operational analysis reviews, alternatives and cost benefits analysis, acquisition reviews, program outcome evaluations, and integrated baseline reviews. For information about obtaining the free template in Word format, contact info@p2c2group.com.
  • 2. METHODOLOGY The P2C2 Group, Inc. has applied the methodology outlined in the Office of Management and Budget (OMB) Capital Programming Guide, a supplement to Circular A-11, Part 7. The methodology is applicable to major capital investments, including information technology. Operational Analysis Reviews are an important tool for the strategic management of IT systems, alignment with Enterprise Architecture (EA), and successful execution of the Capital Planning and Investment Control (CPIC) process. Such reviews compare the performance of an IT asset or system to an established baseline. It measures ongoing performance of Management-In-Use (Operations & Maintenance) investments against established cost, schedule, and performance goals. It should also include a review of related enterprise management issues such as risk, information security, harmonization with the EA transition strategy, and any updates to the agency’s strategic plans/objectives. Note that the review is conducted against a baseline, which should be consistent with the investment’s system planning and OMB Exhibit 300 documents. In addition, any weaknesses identified in the Operational Analysis Review should be considered when making future decisions about the investment. For example, the results of the review may indicated that certain enhancements are needed to meet user requirements. Findings may also suggest the need to pursue an alternatives analysis about how to resolve major issues identified. In conducting the Operational Analysis Review, the P2C2 Group has collected CPIC and other related documentation, compared costs to historic budgets, and has considered system performance, user satisfaction, and other operational data. The review reports the following: • Identification of System • Lifecycle Summary for this Investment • Summary of Recommended Actions • Description of the System • Summary of Review Findings • OMB Dashboard Indicators • Customer Assessment • Operational Cost Analysis • Stakeholder Input • Operational Assessment (by IPT) • Investment Evaluation Operational Analysis Review Template © 2010 www.p2c2group.com
  • 3. Operational Analysis Review FORM OPERATIONAL ANALYSIS REVIEW For IT Systems and Applications in Steady State or Management-In-Use Phase Template © 2010 www.p2c2group.com The Operational Analysis Review should compare the performance of an IT asset or system to the established baseline. The review measures ongoing performance of Management-In-Use (Steady State) investments against established cost and performance goals. It should also include a review of related enterprise management issues such as risk, information security, harmonization with the EA transition strategy, and any updates to the agency’s business processes or strategic plans. Identification of System Name of System or Application Agency Program/Business Function Supported by this Investment Time Period Covered by Review Number of Users Business Owner Project Manager Key Personnel Participating in this Review (IPT – Stakeholders) Date of Review Signature/Title Lifecycle Summary for this Investment The total lifecycle for this investment (all phases) is from FY through FY The total lifecycle cost is $ Million The Operations & Maintenance Phase for this investment is from FY_____ through FY____ Summary Recommended Actions Attach Plan of Action & Milestones if appropriate – See Below Operational Analysis Review Template © 2010 www.p2c2group.com 1
  • 4. Operational Analysis Review FORM Description of System or Investment Use brief project description from the Exhibit 300 (2500 characters or less) Summary of Review Findings Operational Analysis Review Template © 2010 www.p2c2group.com 2
  • 5. Operational Analysis Review FORM OMB Dashboard Indicators Performance Use same measures as in Exhibit 300 and Dashboard Reporting Fiscal Strategic Measurement Measurem Measurem Measurement Baseline Target Actual Year Goal(s) Area ent ent Indicator Results Supported Category Grouping Customer Assessment (date) Summarize the level of end-user satisfaction with the system. For example, address indicators such as effectiveness, productivity, availability, and reliability: Based upon the results of the survey, are there planned changes to the investment? Next Customer Assessment: DME Cost Analysis – List all cost, schedule, or performance variances that are 10% or greater: Attach a complete analysis of each, or provide an overall Gap Analysis. For further details refer to document: (file) FY2009: Cost variance of -??.??% for open DME Cost variance of -??.??% for all DME No schedule or performance variances The variance for all DME milestones is attributed to the following reasons: Is this investment consistent with EA and EA Transition Plan? Operational Analysis Review Template © 2010 www.p2c2group.com 3
  • 6. Operational Analysis Review FORM Operational Cost Analysis Compare planned and actual Operations & Maintenance costs for the most appropriate comparison period (either cumulative cost through current or just-completed fiscal year, or for a single fiscal year (current or just-completed). [ ] Current Fiscal Year: [ ] Period of Review, (date range) Description of Milestone Current Current BAC Planned BCWS Actual Actual Actual % BCWP ACWP Milestone Type Start End Date (Planned % Comp Start End Date Comp (Actual Date Costs) Date Costs) Source: IT Dashboard, FY_____ Description of Milestone Cost Cost CV % CV % Schedule Schedule SV % SV % Milestone Type Variance Variance Health Variance (# Variance Health Current- (CV) of days) (SV) Actual BCWP- ACWP Source: IT Dashboard, FY____ Open Milestones: This fiscal year through Sept, _____ Planned Planned Budgeted Cost Budgeted Cost Costs % Work Scheduled Actual % Work Planned Actual Cost Work (BAC) Complete (BCWS) Complete (BCWP) Planned (ACWP) FY09 Steady State Source: FY ____ Details – Operational Analysis Review Template © 2010 www.p2c2group.com 4
  • 7. Operational Analysis Review FORM Stakeholder Input Conduct one or more meetings with representatives of users and other stakeholder groups to obtain their recommendations and assessment of the system/investment. Summarize their feedback below. Operational Assessment Assessment Factor Rating √ Brief Description Estimated Correction of Potential Cost of Excellent Good Fair Poor Unacceptable Desirable? Correction Action Correction This investment supports: Functional Requirements for which it was planned The agency's mission and programs "Green Lights" on OMB Scorecards User and stakeholder satisfaction with the as-is investment Applicable legal and regulatory requirements Performance goals and metrics (such as those in Exhibit 300) Cost efficiency in government operations and business functions Reliable and available information processing, storage and retrieval Productivity for system/ application users Maintainability for the system owner and administrator Information security and privacy Risk Mitigation and Management Continuity of Government and Disaster Recovery Enterprise Architecture (Transition Plan and Target EA) Operational Analysis Review Template © 2010 www.p2c2group.com 5
  • 8. Operational Analysis Review FORM Investment Evaluation (Questionnaire) A. Describe how well this investment meets current and future business needs of the agency. B. Are the functions performed by this system/investment still a priority for the agency? C. Can business processes be simplified? D. Can this system/investment be eliminated or consolidated with other systems or assets? E. How can this system/asset be maintained/managed with fewer Federal or contractor FTEs? F, Are new technologies available that could perform this function of this investment better and/or at a lower cost? G. Could spending more on this investment close any identified gaps and/or achieve improved results? H, Are alternatives available that would lead to greater customer service and satisfaction, and should they be considered as a replacement to the current investment? I. Could the functions be performed better or cheaper through partnerships with other agencies and/or the private sector? J. Discuss Options for Desirable Corrections, Improvements, Alternatives, and Changes. K. Summarize Proposed Decisions about Agency's Response to Desirable Corrections, Improvements, Alternatives and Changes. Operational Analysis Review Template © 2010 www.p2c2group.com 6
  • 9. Operational Analysis Review FORM APPENDICES Provide key documents referenced in the Operational Review. Lengthy documents may be incorporated by reference and location of availability. Operational Analysis Review Template © 2010 www.p2c2group.com 7