1. CURRICULUM VITAE
OTHMAN BIN SULAIMAN
Permanent Address : No 921 kampung wakaf beruas
20050 kuala Terengganu,
TERENGGANU DARUL IMAN
Telephone No : 019-6412347 / 012 3829334
PERSONAL PARTICULARS
I /C No : 760912-11-5217
Age : 38
Date of Birth : 12th September 1976
Sex : Male
Marital status : Single
Religion : Islam
Health : Excellent
Languages spoken : Bahasa Malaysia / English
Languages written : Bahasa Malaysia / English
Email address : man76_nff@yahoo.com
: manganu76@gmail.com
TECHNICAL TRAINING & SEMINAR ATTENDENCE
Welding Technology : Mara Vocational Institute
Certified as Malaysian Skills Certificate in
Welding Technology Level 2
Institute Radiography Coarse conducted by
Malaysia Institute of Nuclear Technology Research(MINT)
TWI Training and Certification (S.E.Asia) sungai buloh
: API RP 580 RBI METHODLOGY & APPLICATION FOR
PRESURE VESSEL & BOILER (ATTENDENCE COURSE)
: CSWIP 3.4 RADIOGRAPHIC INTERPRETATION
: AWS WELDING INSPECTOR (ATTENDENCE COURSE)
: CSWIP 3.1 WELDING INSPECTOR (ATTENDENCE COURSE)
2. PERSONAL RECOGNITION
BEST PMT SUPERVISOR FOR THE FABRICATION AND ERECTION OF FPS
GUMUSUT KAKAP PROJECT,
PERSONAL ATTRIBUTES
: Personally quality-driven
: Systematic and conscientious
: Results-oriented
: Analytical
: Strong team-working skill
: Highly committed
: Excellent at process skills
WORKING EXPERIENCE
JUNE 2013 – JULY 2014
Position : Construction Superintendent
Company : ALGOTECH ( M ) SDN BHD
Project : HA MBD PROJECT ( SAFRAN ) Messier Bugatti Dowty
Client : TECHNIP CONSULTANT (M) SDN BHD
Job / Task
· Coordinates all site construction activities and supervises all field personnel
as required to successfully complete project.
· Fully monitor and coordinates with subcontractor for quality plan ,mechanical
equipment installation ,piping installation and insulation ,civil construction
work included steel structural roof cladding and painting work
· Order material and schedule inspection as necessary throughout the process
· Maintain relationship with customer, contractor ,supplies and employees
· Prepares schedules and supervises completion of work and punch list
· Promotes job site safety ,encourages safe work practices and rectifies job site
hazards immediately
· Ensure that as built drawing are prepared on an ongoing basic by all trades
during the construction period
· Ensure efficient management to archive target on quality productivity.
3. · Ensure all activities carried out in accordance project specifications,
inspection test plan and project quality plan.
MAY 2007 – APRIL 2013
Position : Structural Superintendent / Lead Supervisor
Company : MALAYSIA MARINE HEAVY ENGINEERING ( MMHE )
Project : Gumusut Kakap Semi FPS (Hull)
Client : SABAH SHELL PETROLEUM CO LTD
· Monitoring daily Fabrication, Installation and NDT work progress done as per standards
and client specification
· Ensure all personnel involved welded and fitters are qualified and competence to perform
the work
· To verify progress at site and summit to planners coordinator
· Ensure all consumable and facilities for fabrication in good condition
· Provide information and changed drawing to all contractors
· Coordinate with QA/QC personal regarding work inspection, NDT and acceptance
Achievement for ahead schedule during integration between hull structure n topside
40000 metric tonnes use super lift methods
Support Team for Piping
conduct n perform drift test external pipe and monitoring for installation for appurtenance
piping at external gumusut hull
monitoring installations n welding pipe support and bracket
: Seawater Caisson
: Umbilical Pull Tube
: Firewater Caisson
: ADCP Caisson
: Hazardous Open Drain Caisson
: Hazardous Open Drain Sump
: LHDI & Methanol Overboard Casing
Support Team For Mechanical
Conduct and perform
: Monitor for installation chain jack, deflector wheel ,HPU unit and messenger chain
: functional test
: Bolt tightening for chain jack n gantry
: Oil flashing of hydraulic mooring system
: Preservation of mooring equipment
4. June 2000 – April 2007
Company : Namfatt Fabricators Sdn. Bhd
Position : Site Coordinator .(Steel Structure)
Project : PD2 Tuanku Jaafar Power Station Phase 2 Port Dickson.
: Titan Butadiene & Propylene Project Pasir Gudang Johor.
Job/Task
· Coordinate with main contractor for schedule and work progress at
site.
· Planning work for subcontractor for make sure progress schedule.
· To verity the contractors are achieving the project specification and
requirement.
· Participate and ensure enforcement of Health, Safety and Environment
(HSE) regulation and program during fabrication and sits installation.
· Estimate consumable and facilities for fabrication and site installation.
Position : Site Supervisor cum Quality Control Inspector
Project : (Steel Structure)
· Malaysia Ethylene Oxide Glycol (MEOG) OPTIMAL PROJECT KERTIH
Terengganu.
· University Technology PETRONAS UTP Package 3A.Tronoh Perak
· University Technology PETRONAS UTP Package 3B 1 Tronoh Perak
· Project Gerbang Selatan Bersepadu CIQ Johor Bharu
· Project New Facilities And Factory Hle Kencana Dockyard Lumut, Perak
· Melut Basin Sudan. Factory Nam Fatt Fabricators S.Alam Selangor
· Sukhoi Hangar Bay MALAYSIA AIR FORCE Besut Terengganu
· Toyota Stamping Factory. Shah Alam Selangor
Job/Task :
· Type of Inspection;
· Monitoring erection work and procedure own as per Inspection and Test Plan
(ITP).
· Check rebar, framework and anchor bolt before concrete, concreting for stump
column roof canopy, infill concreting column roof canopy.
5. · Good inwards inspection
· Check for twist, bend, deformation and corrosion.
· Check paint condition.
· Inspection for structure steel erection
· Check elevation of shim/padding
· Check horizontality/crane hoist rail
· Check tightening of bolts (Anchor bolts)
· Structure steel installation tolerances
· Inspection of verticality.
· Welding
· Conducting Welding Procedure Specification (WPS) and Welder Qualification
Test (WQT).
· Visual inspection of Weldment.
· Request for NDE – as per specification requirement. MPI,DPI,RT
· Painting application
· Surface preparation prior to apply painting – as required.
· Painting application.
· Final inspection (punch list) – structure steel and painting
· Overall checking together with contractor and owner.
· Co-operate with supervisor regarding punch list clearance.
November 1999 – January 2000
Company : Fieldwork Engineering Sdn. Bhd. (workshop)
Position : Welding/Quality Control Inspector-Piping
Project : ASU 2 CUF KERTEH TERENGGANU
Job/Task :
i. Inspection of fit-up before welding.
ii. Monitoring welding activities as per welding procedures.
iii. Visual Inspection,
iv. Updating and compiling as all inspection report.
6. v. Monitoring post weld heat treatment.
August 1998 – November 1999
Company WI Weld Trade Inspection Sdn. Bhd.
Position NDT Technician
Job/Task
i. Visual Inspection of Weldment.
ii. Conducting Radiography and Magnetic Particle.
iii. Conducting Hardness Test and Dye Penetrate Test.
Project
- Huolon Corporation (M) Sdn. Bhd.
- Durian II Poyiv Project.
- Shutdown Poly C/D Plant III
Fieldwork Engineering Bhd.
- Nippon Electric Glass (NEG) Phase IV Project.
- Titan Aromatic Plant Project.
- Banting of Air Separating Plant Project.
Geahin Engineering Bhd.
- Zen Pasific Shui On JV – Hong Kong Airport Project
Vestech Engineering Sdn. Bhd.
- Boiler Vertical Air Receiver, Wash tank and
Variyoid Filter Sheel at Ulu Kinta.
Metacos Sdn. Bhd.
- Radiography Test on test specimen WQT
Iniaga Engineering Sdn. Bhd.
- Radiography Test on test specimen WQT
Summitan Engineering Sdn. Bhd.
- Structure steel for Putra LRT System, Phase 2
Sankyu (M) Sdn. Bhd.
- FCM Fertilizers Plant and Turnaround shutdown Penang
Position Coordinator Radiography
7. Radiography test coordinator for Project Power Plant Sta Rita
1000MWCCPS Batagas City Philippines
July 1997 – August 1998
Company: Tuck Sin Engineering and Construction
Position: Quality Control Inspector cum Site Supervisor
(Steel Structure)
Project:
i. Malaysia Mosaic Project, Kluang, Johor.
ii. Mid Valley City Phase 1 Megamall Centre Spire, Bangsar,
KL.
iii. Telekom Malaysia Headquarters, Bangsar, KL.
iv. Sepang Formula One Circuit – Grandstand.
v. Star LRT System 1 Phase 2, Kuala Lumpur.
Job/Task: Monitoring structure steel fabrication, site erection
inspection.
I. Conducting Welder Qualification Test (WQT).
II. Check fit-up before welding.
III. Visual Inspection after welding.
IV. Monitoring sand blasting activities.
V. Painting Inspection.
VI. Compiling and updating all report for final document