SlideShare ist ein Scribd-Unternehmen logo
1 von 7
CURRICULUM VITAE 
OTHMAN BIN SULAIMAN 
Permanent Address : No 921 kampung wakaf beruas 
20050 kuala Terengganu, 
TERENGGANU DARUL IMAN 
Telephone No : 019-6412347 / 012 3829334 
PERSONAL PARTICULARS 
I /C No : 760912-11-5217 
Age : 38 
Date of Birth : 12th September 1976 
Sex : Male 
Marital status : Single 
Religion : Islam 
Health : Excellent 
Languages spoken : Bahasa Malaysia / English 
Languages written : Bahasa Malaysia / English 
Email address : man76_nff@yahoo.com 
: manganu76@gmail.com 
TECHNICAL TRAINING & SEMINAR ATTENDENCE 
Welding Technology : Mara Vocational Institute 
Certified as Malaysian Skills Certificate in 
Welding Technology Level 2 
Institute Radiography Coarse conducted by 
Malaysia Institute of Nuclear Technology Research(MINT) 
TWI Training and Certification (S.E.Asia) sungai buloh 
: API RP 580 RBI METHODLOGY & APPLICATION FOR 
PRESURE VESSEL & BOILER (ATTENDENCE COURSE) 
: CSWIP 3.4 RADIOGRAPHIC INTERPRETATION 
: AWS WELDING INSPECTOR (ATTENDENCE COURSE) 
: CSWIP 3.1 WELDING INSPECTOR (ATTENDENCE COURSE)
PERSONAL RECOGNITION 
BEST PMT SUPERVISOR FOR THE FABRICATION AND ERECTION OF FPS 
GUMUSUT KAKAP PROJECT, 
PERSONAL ATTRIBUTES 
: Personally quality-driven 
: Systematic and conscientious 
: Results-oriented 
: Analytical 
: Strong team-working skill 
: Highly committed 
: Excellent at process skills 
WORKING EXPERIENCE 
JUNE 2013 – JULY 2014 
Position : Construction Superintendent 
Company : ALGOTECH ( M ) SDN BHD 
Project : HA MBD PROJECT ( SAFRAN ) Messier Bugatti Dowty 
Client : TECHNIP CONSULTANT (M) SDN BHD 
Job / Task 
· Coordinates all site construction activities and supervises all field personnel 
as required to successfully complete project. 
· Fully monitor and coordinates with subcontractor for quality plan ,mechanical 
equipment installation ,piping installation and insulation ,civil construction 
work included steel structural roof cladding and painting work 
· Order material and schedule inspection as necessary throughout the process 
· Maintain relationship with customer, contractor ,supplies and employees 
· Prepares schedules and supervises completion of work and punch list 
· Promotes job site safety ,encourages safe work practices and rectifies job site 
hazards immediately 
· Ensure that as built drawing are prepared on an ongoing basic by all trades 
during the construction period 
· Ensure efficient management to archive target on quality productivity.
· Ensure all activities carried out in accordance project specifications, 
inspection test plan and project quality plan. 
MAY 2007 – APRIL 2013 
Position : Structural Superintendent / Lead Supervisor 
Company : MALAYSIA MARINE HEAVY ENGINEERING ( MMHE ) 
Project : Gumusut Kakap Semi FPS (Hull) 
Client : SABAH SHELL PETROLEUM CO LTD 
· Monitoring daily Fabrication, Installation and NDT work progress done as per standards 
and client specification 
· Ensure all personnel involved welded and fitters are qualified and competence to perform 
the work 
· To verify progress at site and summit to planners coordinator 
· Ensure all consumable and facilities for fabrication in good condition 
· Provide information and changed drawing to all contractors 
· Coordinate with QA/QC personal regarding work inspection, NDT and acceptance 
Achievement for ahead schedule during integration between hull structure n topside 
40000 metric tonnes use super lift methods 
Support Team for Piping 
conduct n perform drift test external pipe and monitoring for installation for appurtenance 
piping at external gumusut hull 
monitoring installations n welding pipe support and bracket 
: Seawater Caisson 
: Umbilical Pull Tube 
: Firewater Caisson 
: ADCP Caisson 
: Hazardous Open Drain Caisson 
: Hazardous Open Drain Sump 
: LHDI & Methanol Overboard Casing 
Support Team For Mechanical 
Conduct and perform 
: Monitor for installation chain jack, deflector wheel ,HPU unit and messenger chain 
: functional test 
: Bolt tightening for chain jack n gantry 
: Oil flashing of hydraulic mooring system 
: Preservation of mooring equipment
June 2000 – April 2007 
Company : Namfatt Fabricators Sdn. Bhd 
Position : Site Coordinator .(Steel Structure) 
Project : PD2 Tuanku Jaafar Power Station Phase 2 Port Dickson. 
: Titan Butadiene & Propylene Project Pasir Gudang Johor. 
Job/Task 
· Coordinate with main contractor for schedule and work progress at 
site. 
· Planning work for subcontractor for make sure progress schedule. 
· To verity the contractors are achieving the project specification and 
requirement. 
· Participate and ensure enforcement of Health, Safety and Environment 
(HSE) regulation and program during fabrication and sits installation. 
· Estimate consumable and facilities for fabrication and site installation. 
Position : Site Supervisor cum Quality Control Inspector 
Project : (Steel Structure) 
· Malaysia Ethylene Oxide Glycol (MEOG) OPTIMAL PROJECT KERTIH 
Terengganu. 
· University Technology PETRONAS UTP Package 3A.Tronoh Perak 
· University Technology PETRONAS UTP Package 3B 1 Tronoh Perak 
· Project Gerbang Selatan Bersepadu CIQ Johor Bharu 
· Project New Facilities And Factory Hle Kencana Dockyard Lumut, Perak 
· Melut Basin Sudan. Factory Nam Fatt Fabricators S.Alam Selangor 
· Sukhoi Hangar Bay MALAYSIA AIR FORCE Besut Terengganu 
· Toyota Stamping Factory. Shah Alam Selangor 
Job/Task : 
· Type of Inspection; 
· Monitoring erection work and procedure own as per Inspection and Test Plan 
(ITP). 
· Check rebar, framework and anchor bolt before concrete, concreting for stump 
column roof canopy, infill concreting column roof canopy.
· Good inwards inspection 
· Check for twist, bend, deformation and corrosion. 
· Check paint condition. 
· Inspection for structure steel erection 
· Check elevation of shim/padding 
· Check horizontality/crane hoist rail 
· Check tightening of bolts (Anchor bolts) 
· Structure steel installation tolerances 
· Inspection of verticality. 
· Welding 
· Conducting Welding Procedure Specification (WPS) and Welder Qualification 
Test (WQT). 
· Visual inspection of Weldment. 
· Request for NDE – as per specification requirement. MPI,DPI,RT 
· Painting application 
· Surface preparation prior to apply painting – as required. 
· Painting application. 
· Final inspection (punch list) – structure steel and painting 
· Overall checking together with contractor and owner. 
· Co-operate with supervisor regarding punch list clearance. 
November 1999 – January 2000 
Company : Fieldwork Engineering Sdn. Bhd. (workshop) 
Position : Welding/Quality Control Inspector-Piping 
Project : ASU 2 CUF KERTEH TERENGGANU 
Job/Task : 
i. Inspection of fit-up before welding. 
ii. Monitoring welding activities as per welding procedures. 
iii. Visual Inspection, 
iv. Updating and compiling as all inspection report.
v. Monitoring post weld heat treatment. 
August 1998 – November 1999 
Company WI Weld Trade Inspection Sdn. Bhd. 
Position NDT Technician 
Job/Task 
i. Visual Inspection of Weldment. 
ii. Conducting Radiography and Magnetic Particle. 
iii. Conducting Hardness Test and Dye Penetrate Test. 
Project 
- Huolon Corporation (M) Sdn. Bhd. 
- Durian II Poyiv Project. 
- Shutdown Poly C/D Plant III 
Fieldwork Engineering Bhd. 
- Nippon Electric Glass (NEG) Phase IV Project. 
- Titan Aromatic Plant Project. 
- Banting of Air Separating Plant Project. 
Geahin Engineering Bhd. 
- Zen Pasific Shui On JV – Hong Kong Airport Project 
Vestech Engineering Sdn. Bhd. 
- Boiler Vertical Air Receiver, Wash tank and 
Variyoid Filter Sheel at Ulu Kinta. 
Metacos Sdn. Bhd. 
- Radiography Test on test specimen WQT 
Iniaga Engineering Sdn. Bhd. 
- Radiography Test on test specimen WQT 
Summitan Engineering Sdn. Bhd. 
- Structure steel for Putra LRT System, Phase 2 
Sankyu (M) Sdn. Bhd. 
- FCM Fertilizers Plant and Turnaround shutdown Penang 
Position Coordinator Radiography
Radiography test coordinator for Project Power Plant Sta Rita 
1000MWCCPS Batagas City Philippines 
July 1997 – August 1998 
Company: Tuck Sin Engineering and Construction 
Position: Quality Control Inspector cum Site Supervisor 
(Steel Structure) 
Project: 
i. Malaysia Mosaic Project, Kluang, Johor. 
ii. Mid Valley City Phase 1 Megamall Centre Spire, Bangsar, 
KL. 
iii. Telekom Malaysia Headquarters, Bangsar, KL. 
iv. Sepang Formula One Circuit – Grandstand. 
v. Star LRT System 1 Phase 2, Kuala Lumpur. 
Job/Task: Monitoring structure steel fabrication, site erection 
inspection. 
I. Conducting Welder Qualification Test (WQT). 
II. Check fit-up before welding. 
III. Visual Inspection after welding. 
IV. Monitoring sand blasting activities. 
V. Painting Inspection. 
VI. Compiling and updating all report for final document

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Mani cv
Mani   cvMani   cv
Mani cv
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 
Resume NMN 5b _3_
Resume NMN 5b _3_Resume NMN 5b _3_
Resume NMN 5b _3_
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
Resume MAR
Resume MARResume MAR
Resume MAR
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Suneesh-QAQC Inspector-CV
Suneesh-QAQC Inspector-CVSuneesh-QAQC Inspector-CV
Suneesh-QAQC Inspector-CV
 
Mech
MechMech
Mech
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Jijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )doc
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 

Ähnlich wie Resume othman sulaiman

Ähnlich wie Resume othman sulaiman (20)

Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
Prakesh Welding Foreman CV
Prakesh Welding Foreman CVPrakesh Welding Foreman CV
Prakesh Welding Foreman CV
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
RESUME UPDATED 2015
RESUME UPDATED 2015RESUME UPDATED 2015
RESUME UPDATED 2015
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 

Resume othman sulaiman

  • 1. CURRICULUM VITAE OTHMAN BIN SULAIMAN Permanent Address : No 921 kampung wakaf beruas 20050 kuala Terengganu, TERENGGANU DARUL IMAN Telephone No : 019-6412347 / 012 3829334 PERSONAL PARTICULARS I /C No : 760912-11-5217 Age : 38 Date of Birth : 12th September 1976 Sex : Male Marital status : Single Religion : Islam Health : Excellent Languages spoken : Bahasa Malaysia / English Languages written : Bahasa Malaysia / English Email address : man76_nff@yahoo.com : manganu76@gmail.com TECHNICAL TRAINING & SEMINAR ATTENDENCE Welding Technology : Mara Vocational Institute Certified as Malaysian Skills Certificate in Welding Technology Level 2 Institute Radiography Coarse conducted by Malaysia Institute of Nuclear Technology Research(MINT) TWI Training and Certification (S.E.Asia) sungai buloh : API RP 580 RBI METHODLOGY & APPLICATION FOR PRESURE VESSEL & BOILER (ATTENDENCE COURSE) : CSWIP 3.4 RADIOGRAPHIC INTERPRETATION : AWS WELDING INSPECTOR (ATTENDENCE COURSE) : CSWIP 3.1 WELDING INSPECTOR (ATTENDENCE COURSE)
  • 2. PERSONAL RECOGNITION BEST PMT SUPERVISOR FOR THE FABRICATION AND ERECTION OF FPS GUMUSUT KAKAP PROJECT, PERSONAL ATTRIBUTES : Personally quality-driven : Systematic and conscientious : Results-oriented : Analytical : Strong team-working skill : Highly committed : Excellent at process skills WORKING EXPERIENCE JUNE 2013 – JULY 2014 Position : Construction Superintendent Company : ALGOTECH ( M ) SDN BHD Project : HA MBD PROJECT ( SAFRAN ) Messier Bugatti Dowty Client : TECHNIP CONSULTANT (M) SDN BHD Job / Task · Coordinates all site construction activities and supervises all field personnel as required to successfully complete project. · Fully monitor and coordinates with subcontractor for quality plan ,mechanical equipment installation ,piping installation and insulation ,civil construction work included steel structural roof cladding and painting work · Order material and schedule inspection as necessary throughout the process · Maintain relationship with customer, contractor ,supplies and employees · Prepares schedules and supervises completion of work and punch list · Promotes job site safety ,encourages safe work practices and rectifies job site hazards immediately · Ensure that as built drawing are prepared on an ongoing basic by all trades during the construction period · Ensure efficient management to archive target on quality productivity.
  • 3. · Ensure all activities carried out in accordance project specifications, inspection test plan and project quality plan. MAY 2007 – APRIL 2013 Position : Structural Superintendent / Lead Supervisor Company : MALAYSIA MARINE HEAVY ENGINEERING ( MMHE ) Project : Gumusut Kakap Semi FPS (Hull) Client : SABAH SHELL PETROLEUM CO LTD · Monitoring daily Fabrication, Installation and NDT work progress done as per standards and client specification · Ensure all personnel involved welded and fitters are qualified and competence to perform the work · To verify progress at site and summit to planners coordinator · Ensure all consumable and facilities for fabrication in good condition · Provide information and changed drawing to all contractors · Coordinate with QA/QC personal regarding work inspection, NDT and acceptance Achievement for ahead schedule during integration between hull structure n topside 40000 metric tonnes use super lift methods Support Team for Piping conduct n perform drift test external pipe and monitoring for installation for appurtenance piping at external gumusut hull monitoring installations n welding pipe support and bracket : Seawater Caisson : Umbilical Pull Tube : Firewater Caisson : ADCP Caisson : Hazardous Open Drain Caisson : Hazardous Open Drain Sump : LHDI & Methanol Overboard Casing Support Team For Mechanical Conduct and perform : Monitor for installation chain jack, deflector wheel ,HPU unit and messenger chain : functional test : Bolt tightening for chain jack n gantry : Oil flashing of hydraulic mooring system : Preservation of mooring equipment
  • 4. June 2000 – April 2007 Company : Namfatt Fabricators Sdn. Bhd Position : Site Coordinator .(Steel Structure) Project : PD2 Tuanku Jaafar Power Station Phase 2 Port Dickson. : Titan Butadiene & Propylene Project Pasir Gudang Johor. Job/Task · Coordinate with main contractor for schedule and work progress at site. · Planning work for subcontractor for make sure progress schedule. · To verity the contractors are achieving the project specification and requirement. · Participate and ensure enforcement of Health, Safety and Environment (HSE) regulation and program during fabrication and sits installation. · Estimate consumable and facilities for fabrication and site installation. Position : Site Supervisor cum Quality Control Inspector Project : (Steel Structure) · Malaysia Ethylene Oxide Glycol (MEOG) OPTIMAL PROJECT KERTIH Terengganu. · University Technology PETRONAS UTP Package 3A.Tronoh Perak · University Technology PETRONAS UTP Package 3B 1 Tronoh Perak · Project Gerbang Selatan Bersepadu CIQ Johor Bharu · Project New Facilities And Factory Hle Kencana Dockyard Lumut, Perak · Melut Basin Sudan. Factory Nam Fatt Fabricators S.Alam Selangor · Sukhoi Hangar Bay MALAYSIA AIR FORCE Besut Terengganu · Toyota Stamping Factory. Shah Alam Selangor Job/Task : · Type of Inspection; · Monitoring erection work and procedure own as per Inspection and Test Plan (ITP). · Check rebar, framework and anchor bolt before concrete, concreting for stump column roof canopy, infill concreting column roof canopy.
  • 5. · Good inwards inspection · Check for twist, bend, deformation and corrosion. · Check paint condition. · Inspection for structure steel erection · Check elevation of shim/padding · Check horizontality/crane hoist rail · Check tightening of bolts (Anchor bolts) · Structure steel installation tolerances · Inspection of verticality. · Welding · Conducting Welding Procedure Specification (WPS) and Welder Qualification Test (WQT). · Visual inspection of Weldment. · Request for NDE – as per specification requirement. MPI,DPI,RT · Painting application · Surface preparation prior to apply painting – as required. · Painting application. · Final inspection (punch list) – structure steel and painting · Overall checking together with contractor and owner. · Co-operate with supervisor regarding punch list clearance. November 1999 – January 2000 Company : Fieldwork Engineering Sdn. Bhd. (workshop) Position : Welding/Quality Control Inspector-Piping Project : ASU 2 CUF KERTEH TERENGGANU Job/Task : i. Inspection of fit-up before welding. ii. Monitoring welding activities as per welding procedures. iii. Visual Inspection, iv. Updating and compiling as all inspection report.
  • 6. v. Monitoring post weld heat treatment. August 1998 – November 1999 Company WI Weld Trade Inspection Sdn. Bhd. Position NDT Technician Job/Task i. Visual Inspection of Weldment. ii. Conducting Radiography and Magnetic Particle. iii. Conducting Hardness Test and Dye Penetrate Test. Project - Huolon Corporation (M) Sdn. Bhd. - Durian II Poyiv Project. - Shutdown Poly C/D Plant III Fieldwork Engineering Bhd. - Nippon Electric Glass (NEG) Phase IV Project. - Titan Aromatic Plant Project. - Banting of Air Separating Plant Project. Geahin Engineering Bhd. - Zen Pasific Shui On JV – Hong Kong Airport Project Vestech Engineering Sdn. Bhd. - Boiler Vertical Air Receiver, Wash tank and Variyoid Filter Sheel at Ulu Kinta. Metacos Sdn. Bhd. - Radiography Test on test specimen WQT Iniaga Engineering Sdn. Bhd. - Radiography Test on test specimen WQT Summitan Engineering Sdn. Bhd. - Structure steel for Putra LRT System, Phase 2 Sankyu (M) Sdn. Bhd. - FCM Fertilizers Plant and Turnaround shutdown Penang Position Coordinator Radiography
  • 7. Radiography test coordinator for Project Power Plant Sta Rita 1000MWCCPS Batagas City Philippines July 1997 – August 1998 Company: Tuck Sin Engineering and Construction Position: Quality Control Inspector cum Site Supervisor (Steel Structure) Project: i. Malaysia Mosaic Project, Kluang, Johor. ii. Mid Valley City Phase 1 Megamall Centre Spire, Bangsar, KL. iii. Telekom Malaysia Headquarters, Bangsar, KL. iv. Sepang Formula One Circuit – Grandstand. v. Star LRT System 1 Phase 2, Kuala Lumpur. Job/Task: Monitoring structure steel fabrication, site erection inspection. I. Conducting Welder Qualification Test (WQT). II. Check fit-up before welding. III. Visual Inspection after welding. IV. Monitoring sand blasting activities. V. Painting Inspection. VI. Compiling and updating all report for final document