💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
2016.12 Social spaces
1. 2016 Spanish Royal Collections Museum, Madrid.
Collaboration from competition to developed design, 2002-3. FIRST PRIZE.
Architect: Mansilla + Tuñón. Client: Patrimonio Nacional.
Location: Palacio Real, Madrid, Spain.
Budget: 137,000,000 euros.
Competition 2002, Design project: 2003 -05. Currently under construction.
Built area: 33.000 m2.
Tapestries and painting level, exterior view.
2. 2012 Villa at Sifang Art Museum, China.
Collaboration from competition to developed design, 2003-4. FIRST PRIZE.
Architect: Mansilla + Tuñón. Client: China Internacional Practical Exhibition of
Architecture.
Location: Nanjing, China.
Budget: 700,000 euros.
Design project: 2003-04.
Built area: 470 m2.
Ground floor, and exterior view.
3. 2012 Jingdezhen Porcelain Culture Centre, shopping centre, Auditorium and 4D theatre.
Project for Crystal Architecture Design, based in China.
Architect: Oscar Fernández-Aguayo. Location: Jingdezhen, China.
Estimated budget: 220,000,000 Chinese yuan.
Design project: 2012.
Built area: 18.400 m2.
First, second and auditorium level. Image.
4. 2011 Regional Theatre-Auditorium.
Architecture competition, 2011.
Architect: Oscar Fernández-Aguayo. Location: Guadalajara, Spain.
Client: Regional Government of Castilla La Mancha.
Estimated budget: 9,300,000 euros.
Competition: 2011.
Built area: 6.200 m2.
Ground floor and image.
5. 2006 Museum of Cantabria, Santander.
Collaboration from competition to developed design, 2002-3. FIRST PRIZE.
Architect: Mansilla + Tuñón. Client: Regional Government of Cantabria.
Location: Santander, Cantabria, Spain.
Budget: 32,000,000 euros.
Competition: 2002. Design project: 2003-05.
Built area: 17.000 m2.
First floor and model.
6. 2004 Castilla and Leon Museum of Contemporary Art (MUSAC), León.
Collaboration from competition to technical design, 2000-01. FIRST PRIZE.
Architect: Mansilla + Tuñón. Client: Regional Government of Castilla y Leon.
Location: Avenida de los Reyes Leoneses, Leon, Spain.
Budget: 24,000,000 euros.
Design project: 2000-01. Work completion: 2004.
Built area: 11.000 m2.
Mies van der Rohe Award 2007 (European Union Prize for Contemporary Architecture).
Ground floor and exterior view.
7. 2003 Regional Government of Madrid Documentation Center in the Former El Aguila
Brewery, Madrid.
Collaboration from technical design (1998-99) to site supervision (2001-03).
Architect: Mansilla + Tuñón. Client: Regional Government of Madrid.
Location: Calle del General Lacy, Madrid, Spain.
Budget: 36,000,000 euros.
Competition: 1994. Design project: 1998-99. Work completion: 2003.
Built area: 27.000 m2.
Ground floor and exterior view.
8. 2003 Sanfermines Museum, Pamplona.
Collaboration from competition to developed design, 2001-03. FIRST PRIZE.
Architect: Mansilla + Tuñón. Client: Town Hall of Pamplona.
Location: Pamplona, Spain.
Estimated budget: 18,000,000 euros.
Competition: 2001. Design project: 2002-03.
Built area: 8.000 m2.
Site plan, and model.
9. 2003 Urban planning, Logroño.
Collaboration in architecture competition, 2003. FIRST PRIZE.
Architect: Mansilla + Tuñón. Client: Town Hall of Logroño.
Location: Valbuena, Logroño, Spain.
Estimated budget: 25,000,000 euros.
Competition: 2003.
Built area: 45.000 m2.
Site plan, and image.
10. 2003 History museum, La Coruña.
Collaboration in architecture competition, 2003.
Architect: Mansilla + Tuñón. Client: Town Hall of La Coruña.
Location: Castro Elvira, La Coruña, Spain.
Estimated budget: 18,500,000 euros.
Competition: 2003.
Built area: 10.000 m2.
Ground floor and model.
11. 2003 Visitor center of the National Park of Cabañeros, Ciudad Real.
Collaboration in architecture competition, 2003.
Architect: Mariano Bayón. Client: Parques Nacionales.
Location: Horcajo de los Montes, Ciudad Real, Spain.
Estimated budget: 4,100,000 euros.
Competition: 2003.
Built area: 4.300 m2.
Ground floor and section.
12. 2003 Office headquarters, commercial premises with garage, Madrid.
Collaboration in architecture competition, 2003.
Architect: Mansilla + Tuñón. Client: Fomento de Construcciones y Contratas (FCC).
Location: Las Tablas, Madrid, Spain.
Estimated budget: 36,000,000 euros.
Competition: 2003.
Built area: 30.000 m2.
Ground floor and image.
13. 2002 Regional Government of Madrid Regional Library in the Former El Aguila
Brewery, Madrid.
Collaboration in site supervision, 2001-02.
Architect: Mansilla + Tuñón. Client: Regional Government of Madrid.
Location: Calle del General Lacy, Madrid, Spain.
Budget: 12,000,000 euros.
Competition: 1994. Design project: 1995-96. Work completion: 2002.
Built area: 12.000 m2.
Ground floor and exterior view.
14. 2002 Madrid Tennis Stadium, Madrid.
Collaboration in architecture competition, 2002.
Architect: Mansilla + Tuñón. Client: Empresa Municipal del Suelo, Town
Hall of Madrid.
Location: Parque del Manzanares, Madrid, Spain.
Estimated budget: 70,000,000 euros.
Competition: 2002.
Built area: 70.000 m2.
Site plan and image.
15. 2002 Civic Centre, Sabadell.
Collaboration in architecture competition, 2002.
Architect: Mansilla + Tuñón. Client: Town Hall of Sabadell.
Location: Sabadell, Barcelona, Spain.
Estimated budget: 42,000,000 euros.
Competition: 2002.
Built area: 76.000 m2.
Podium level and image.
16. 2002 Four star Hotel in the former Santo Tomás School, Madrid.
Collaboration in architecture competition, 2002.
Architect: Mansilla + Tuñón. Client: Paradores de Turismo.
Location: Alcalá de Henares, Madrid, Spain.
Estimated budget: 24,000,000 euros.
Competition: 2002.
Built area: 35.000 m2.
First floor and image.
17. 2002 Parish Centre, Valencia.
Collaboration in architecture competition, 2002.
Architect: Mansilla + Tuñón. Client: Archdiocese of Valencia.
Location: Ademuz, Valencia, Spain.
Estimated budget: 4,000,000 euros.
Competition: 2002.
Built area: 3.300 m2.
First floor and image.
18. 2001 Railway station, shopping center, sports center and cultural center, Teruel.
Collaboration in architecture competition, 2001. SECOND PRIZE.
Architect: Mansilla + Tuñón. Client: Regional Government of Aragon.
Location: Teruel, Spain.
Estimated budget: 34,000,000 euros.
Competition: 2001.
Built area: 43.000 m2.
Site plan, and model.
19. 2001 Public Library, Jerez.
Collaboration in architecture competition, 2001.
Architect: Mansilla + Tuñón. Client: Town Hall of Jerez de la Frontera.
Location: Jerez de la Frontera, Cadiz, Spain.
Estimated budget: 4,300,000 euros.
Competition: 2001.
Built area: 3.500 m2.
Ground floor, model and image.
20. 2000 Castellón Museum of Fine Arts.
Collaboration in site supervision, 1999-2000.
Architect: Mansilla + Tuñón. Client: Castellón Cultural S.A.
Location: Avenida de los Hermanos Bou, Castellón, Spain.
Budget: 21,000,000 euros.
Competition: 1996. Design project: 1997. Work completion: 2000.
Built area: 12.000 m2.
Ground floor and cross view.
21. 2000 Brescia Centre for Contemporary Art.
Collaboration from competition (1999) to developed design (2000). FIRST PRIZE.
Architect: Mansilla + Tuñón. Client: Comune di Brescia.
Location: Crocera de San Luca, Brescia, Italy.
Budget: 6,000,000 euros.
Competition: 1999. Design project: 2000.
Built area: 4.000 m2.
Ground floor, model and image.
22. 2000 Conference Centre, Peñíscola.
Collaboration in architecture competition, 2000.
Architect: Mansilla + Tuñón. Client: Castellón Cultural S.A..
Location: Peñíscola, Castellón, Spain.
Estimated budget: 4,200,000 euros.
Competition: 2000.
Built area: 6.800 m2.
Ground floor and model.
23. 1999 Extension of “Centro de Arte Reina Sofia Museum”, Madrid.
Collaboration in architecture competition, 1999. Honorable mention.
Architect: Mansilla + Tuñón. Client: Museo Nacional Centro de Arte Reina Sofía
(MNCARS).
Location: Madrid, Spain.
Estimated budget: 42,000,000 euros.
Competition: 1999.
Built area: 21.000 m2.
Ground floor and model.
24. 1999 Extension of Thyssen-Bornemisza Museum, Madrid.
Collaboration in architecture competition, 1999.
Architect: Mansilla + Tuñón. Client: Fundación Thyssen-Bornemisza.
Location: Paseo del Prado, Madrid, Spain.
Estimated budget: 14,000,000 euros.
Competition: 1999.
Built area: 9.900 m2.
Detail plan and model.
25. 1999 Urban development, Sarriguren.
Collaboration in architecture competition, 1999.
Architect: Mansilla + Tuñón. Client: Government of Navarra.
Location: Sarriguren, Navarra, Spain.
Estimated budget: 21,000,000 euros.
Competition: 1999.
Built area: 12.780 m2.
Site plan, and image.