e-mail: valandi2006@yahoo.com CURRICULUM
VITAE
OPRITESCU Valentin page 1 of 5
OPRITESCU Valentin
BIRTH DATE: 16/8/1955
NATIONALITY: Romanian
CIVIL STATUS: widower
EDUCATION
1974 - 1982 Polytechnic University of Bucharest, Nuclear Power Engineering Specialty
COMPUTER ABILITIES
PRIMAVERA Project Management P6; Microsoft Project; Miles; Excel; Word; Power Points,
Full Monte Monte Carlo Risk Analysis for MS-Project Decision tree analysis
LANGUAGE ABILITIES
English (Good), French,Italian
WORK EXPERIENCE
Period: (April 2009 – March 2010)
COMPANY: VOLTAS Ltd. Engineering Solutions Company for a Spectrum of Industries in
areas, such as heating, ventilation and air conditioning (HVAC), refrigeration, electro-
mechanical projects, textile machinery, machine tools, mining and construction equipment,
materials handling, water management, building management systems, indoor air quality and
chemicals
LOCATION: QATAR
PROJECT: Sidra Project, Barwa City Project
POSITION: Project Manager
Reviewing the Contract documents for each Construction Package and advising the
Engineering/Construction Manager related to any abnormal situation that may occur.
Reviewing Contractors proposed site organization and report to the Engineering/Construction Manager.
Reviewing and approving / comments on the Design schedules as submitted by the Contractor and
ensuring the Design Schedule is in compliance with the overall project schedule.
Reviewing and approving / comment on the procurement schedules as submitted by the Contractor and
ensure the procurement schedules are in compliance and coordinated with current construction
schedules.
Reviewing and continuously monitoring, against approved schedules, the Contractor's major
construction progress and ensuring equipment and manpower are adequate or in case of any shortage
report to Engineering/Construction Manager.
Reviewing in detail the recovery schedules as submitted by the Contractors and ensuring manpower and
site supervision staffs are increased properly.
Performing periodically site visits in order to check if the progress of work on site is in compliance with
approved schedules, major milestones have been met and report deficiencies to Construction Manager.
Reviewing all daily, weekly and monthly reports as submitted by Contractor and report to Construction
Manager any deficiency or non-compliance.
Reviewing any claim involving time impact as submitted by Contractor and reports his assessment to
Construction Manager.
Reviewing field design changes and Trend Notices and assessing time impact, if any.
Advising the Construction Manager of any foreseen slippage of progress and corrective actions to be
taken.
Attending weekly progress meeting and monthly Executive meetings and participate in preparing the
agenda.
Assisting the Engineer/Construction Managers during preparation of Monthly Progress reports and
Monthly Executive Presentations.
Tel., +40 728442296
e-mail: valandi2006@yahoo.com CURRICULUM
VITAE
OPRITESCU Valentin page 2 of 5
Reviewing the commissioning plans as submitted by Contractor and ensuring its compliance with the
approved construction schedule.
Close collaboration with PMC staff in reviewing the Close out Reports as submitted by Contractors.
Providing Cost Analysis of the Commissioning discipline and Contractors monthly and other periodic
cost and invoicing data. Reviewing, analyzing and correcting submitted valuation costs prior to
authorization. Check and approving various invoices.
Solving any discrepancy in Valuations. Preparing Cost Report for Commissioning Activities to include all
the above and review with Commissioning Manager, Superintendents, Commissioning Services
Coordinator and Contract Holder. Assisting Commissioning Services Coordinator to compile all the
above into the Monthly Cost Report. Supporting Project and Commissioning Engineers in developing
estimates and contracts cost control. Assisting Commissioning Services Coordinator to ensure all
contractors invoices are verified before submission for payment and are fully in compliance with
administrative contractual requirements. Assisting Commissioning Services Coordinator to prepare
Annual and Bi-annual Project forecast and Work Plan and Budget costs and phasing.
Period: (March 2003 - April 2009)
COMPANY: VALANDI Trading SRL (Company for Planning Consultancy, Management and
Recruitment)
LOCATION: ROMANIA
POSITION: General Manager
Preparing contractual requirements related to planning/ scheduling, progress measuring and reporting.
Providing Cost Analysis of the Commissioning discipline and Contractors monthly and other periodic
cost and invoicing data. Reviewing, analyzing and correcting submitted valuation costs prior to
authorization. Check and approving various invoices.
Solving any discrepancy in Valuations. Preparing Cost Report for Commissioning Activities to include all
the above and review with Commissioning Manager, Superintendents, Commissioning Services
Coordinator and Contract Holder. Assisting Commissioning Services Coordinator to compile all the
above into the Monthly Cost Report. Supporting Project and Commissioning Engineers in developing
estimates and contracts cost control. Assisting Commissioning Services Coordinator to ensure all
contractors invoices are verified before submission for payment and are fully in compliance with
administrative contractual requirements. Providing technical assistance for Commissioning Services
Coordinator to prepare Annual and Bi-annual Project forecast and Work Plan and Budget costs and
phasing.
Period: (August 1999 - March 2003)
COMPANY: SC HANNAH STEEL CON Dutch Company- Steel Construction Company
LOCATION: ROMANIA
POSITION: Project Manager
- Developing Project Plan.
- Direct project resources.
- Monitoring and managing the project schedule.
- Monitoring and managing the project budget.
- Monitoring and managing the project risk.
- Dealing with operational issues.
- Organizing steering committee meetings, including ensuring that minutes will be taken.
- Reporting to the steering committee, raising strategic issues.
- Preparing Project Status Reports and Project Change Requests for the steering committee.
- Ensuring project meets requirements and objectives.
- Managing project team members.
- Negotiating and solving issues as they arise across areas of the project and where they impact on other
activities, systems and projects.
Tel., +40 728442296
e-mail: valandi2006@yahoo.com CURRICULUM
VITAE
OPRITESCU Valentin page 3 of 5
- Look after the interests of the project team.
- Organizing and chair project reference group meetings, as appropriate.
- Communicating project status to project sponsor, all team members and other relevant and involved
parties.
- Maintaining project documentation.
Preparing contractual requirements related to planning/ scheduling, progress measuring and reporting.
Providing project management with the assessment of risks and uncertainties within project schedules
using probabilistic scheduling - range estimates and simulation - Pertmaster risk assessment tool.
Also preparing TIA's (Time Impact Analyses), mitigation schedules, and created 'what if scenarios'
Establishing project controls system by integrating data from PRIMAVERA level 4 scheduling,
procurement, risk assessment schedules into a detailed progress measuring, progress reporting tool.
Period: (May 1999 - June 1999)
COMPANY: INCAT (Consulting, Design, Engineering, Helpdesk, Training and Systems
Support services, as well as Technology Solutions)
LOCATION: EQUATORIAL GUINEEA
PROJECT: Malabo Methanol Plant
POSITION: Planning Engineer
Computing some material resources for the underground pipe lines adjacent to the Methanol Plant.
Developing PRIMAVERA level 4 construction schedules over existing level 3 schedules for the
erection of two oil tanks monitoring and updating them, analyzing any deviation form the schedule.
Progress reporting on weekly bases, creating a data base in Excel and collect, input in this the data of
construction physical achievement, creating the project schedule in PRIMAVERA, updating the
terms.Optimizing material resources for underground pipeline network.Cross referencing of our level 2
Consrtruction schedules with the level 2 construction schedules provided by E.O.I.
Period: (June 1998 - September 1998)
COMPANY: ABB Lummus
LOCATION: MONGOLIA, Ulan Bataar
POSITION: Project Controller
- Developing Project Plan.
- Direct project resources.
- Monitoring and managing the project schedule.
- Monitoring and managing the project budget.
- Monitoring and managing the project risk.
- Dealing with operational issues.
- Organizing steering committee meetings, including ensuring that minutes will be taken.
- Reporting to the steering committee, raising strategic issues.
- Preparing Project Status Reports and Project Change Requests for the steering committee.
- Ensuring project meets requirements and objectives.
- Managing project team members.
- Negotiating and solving issues as they arise across areas of the project and where they impact on other
activities, systems and projects.
- Look after the interests of the project team.
- Organizing and chair project reference group meetings, as appropriate.
- Communicating project status to project sponsor, all team members and other relevant and involved
parties.
- Maintaining project documentation.
Building up schedules and working plan for the rehabilitation of 200 M We power plant. Creating, using
PRIMAVERA software and partially Microsoft project a Level 3 detailed prefabrication and erection
integrated schedule, multidiscipline (civil, steel structure, mechanical, electrical, instrument), for
contractor for installation off 5 diesel electrical generator units installation, in accordance with owner
Tel., +40 728442296
e-mail: valandi2006@yahoo.com CURRICULUM
VITAE
OPRITESCU Valentin page 4 of 5
project milestones. Creating a data base system using Excel and soft's and collecting in it the production
data achievements for production progress monitoring and for schedule updating; progress reporting, on
weekly base and monthly base, using graphic and tabular reports from Primavera schedule, Histograms-
curve graphics, Scheduling criticality analysisfor track keeping of project milestone and terms. Following
and Data collecting for material acquisition. Cost control coordination.
Period: (December 1997 - February 1998)
COMPANY: IMPREGILLO SpA Italy
LOCATION: TANZANIA
PROJECT: Kihansi Site
POSITION: Planning Engineer
Building up PRIMAVERA level 3 schedules for the construction of the dam and also monitoring the
progress of the work using 3-weeks window schedule. Elaborating level 2 Coordination and Control
schedules for the power plant. Computing material resources such as: concrete, formwork, reinforcing
and allocating manpower. Monitoring and updating the progress. Preparing progress reports.Drawing
control and technical remarks,optimizing material resources for the blockouts of the dam.
Period: (December 1996 - July 1997)
COMPANY: ANSALDO ENERGIA Spag
LOCATION: LEBANON
PROJECT: ZahraniSite
POSITION: Planning Engineer
Preparing PRIMAVERA level 2 and level 3 commissioning and construction schedules for the Gas
Turbine of 450 MWe power plant. Performing resource leveling and what if analysis. Create, using
PRIMAVERA soft a Level 3 detailed prefabrication and erection integrated schedule, multidiscipline
(civil, steel structure, mechanical, electrical, instrumentation) for MLNG Project -gas truncklines and
compression plant, for contractor Fochi in accordance with owner level 2 coordination schedule and
project milestones;.
Creating a data base system, using Excel and Access soft's, and collectin.g / inputting in it the
production data achievements for production progress monitoring and for schedule updating;
Organizing the monthly base progress reporting using graphic and tabular reports from Primavera
schedule, Histograms, S-curve graphics
Scheduling criticality analysisfor track keeping of project milestone and terms.Progress reports,and Time
impact analysis .Reviewing the organization of the archive checking status of the engineering packages
Elaborating commisionig procedures for dirty oil drainage system.Prioritizing turnovers from
construction to commissioning.
Period: (June 1995 - April 1996)
COMPANY: ABB Lummus
LOCATION: UAE
PROJECT: Taweelah Site- Water Desalination Plant
POSITION: Assistant Planning Manager
Preparing PRIMAVERA level 2 and level 3 construction and commissioning schedules ,updating
progress, performing critical path analysis , estimating delays .Preparing also level 4 production
schedules. Elaborating using Primavera soft, a Level 3 detailed prefabrication and erection integrated
schedule, multidiscipline (civil, str. steel, mechanical, electrical, instrumentation)for installation off 6
unitsx150Mw power plants and 6 desalination plants, for contractor, in accordance with owner level 2
coordination schedule and project milestones; Create a data base system , using Excel and Access soft's,
collecting in it the production data achievements for production progress monitoring and for schedule
Tel., +40 728442296
e-mail: valandi2006@yahoo.com CURRICULUM
VITAE
OPRITESCU Valentin page 5 of 5
updating; on the weekly base and monthly base progress reporting ,using company special soft (CMS
and PCIS), graphic and tabular reports from Primavera schedule, Histograms, S-curve graphics; Schedule
criticality analysis for track keeping of project milestone and terms; Following and Data collecting for
equipment material acquisition (piping, electrical, instrumentation), coordination of material taking of to
site for erection; cost control coordination.Productivity analysis reports creating some buffers in the
durations according to critical event chain methodology.
Period: (March 1992 - May 1994)
COMPANY: SC NIMB (Installation and Construction. Steel Structure Installation, Civil and
Industrial Erection)
LOCATION: ROMANIA
PROJECT: Cernavoda Nuclear Power Plant
POSITION: Planning Engineer
Preparing PRIMAVERA level 3, 4, 5 schedules for steel structure erection and HVAC systems
installation. Highlighting critical path activities and using also PERT method.
Period: (September 1982 - December 1991)
COMPANY: CNE CERNAVODA Nuclear Power Plant
LOCATION: ROMANIA
PROJECT: Cernavoda Nuclear Power Plant
POSITION: Planning Engineer/Planning Manager
Preparing PRIMAVERA level 1 to level 5 schedules and daily working plans. Updating plans,
monitoring progress, preparing progress reports, planning and scheduling procedures. Preparing level 2
coordination and control schedules using both Precedence Diagramming Method and I-J Diagramming
Method for the construction and commissioning of Cernavoda Unit 1. Coordinating the consortium
planning team staff to elaborate a Baseline Schedules for Level I (contractual) and Level 2 (correlated
with Level 1) as a coordination schedule for installation of U1 CNE Cernavoda Nuclear Power Plant,
covering Engineering, Procurement, Construction, Pre-commissioning Phases for all discipline (civil,
mechanical, piping, electrical, instrumentation). Coordinating the consortium planning team staff for
creating a data base and collecting, inputting in it off the construction achievement data, updating the
schedules and progress reporting on weekly basis; the schedules criticality analyzing and acting to keep
the terms of schedule for all construction and pre-commissioning phases of investition. Coordinating the
contractors planning specialists in their Level 3 schedule duties (scheduling, updating, criticality)
Signature, 19 August 2010

Weitere ähnliche Inhalte

Was ist angesagt?

EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
Mohamad Khalid Nawawi
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
Peter White
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
juwes
 
DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17 DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17
Deborah Hines
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
Essam Harby
 
CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016
Marjorie Anne Abulon
 
Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209
Alan Millett
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
Venkatesh -
 

Was ist angesagt? (19)

EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 
Primavera trainer
Primavera trainerPrimavera trainer
Primavera trainer
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17 DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
 
Omargul CV 2
Omargul  CV 2 Omargul  CV 2
Omargul CV 2
 
Resume
ResumeResume
Resume
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016
 
Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209
 
JJC-CV - April-2016
JJC-CV - April-2016JJC-CV - April-2016
JJC-CV - April-2016
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
A.Sanchez_The rising cost and risks of large scale capital projects
A.Sanchez_The rising cost and risks of large scale capital projectsA.Sanchez_The rising cost and risks of large scale capital projects
A.Sanchez_The rising cost and risks of large scale capital projects
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 

Ähnlich wie OPRITESCU ValentinCV (2)

Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
 
CURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDFCURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDF
ASIIMWE INNOCENT
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
L Douglas Sargent Jr
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Abd~el Hakim mohamed izran
 
CV-Fabiani Duca -2016
CV-Fabiani Duca -2016CV-Fabiani Duca -2016
CV-Fabiani Duca -2016
Fabiani Duca
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
Mohamed Hablas
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
Nermeen gerges
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
mahmood mansor
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Islam Elshoura
 

Ähnlich wie OPRITESCU ValentinCV (2) (20)

Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
C.V
C.VC.V
C.V
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
CURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDFCURRICULUM_VITAE_recent.PDF
CURRICULUM_VITAE_recent.PDF
 
Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
CV_Mahmoud_Reda
CV_Mahmoud_RedaCV_Mahmoud_Reda
CV_Mahmoud_Reda
 
Shahzad Sikandaruk
Shahzad SikandarukShahzad Sikandaruk
Shahzad Sikandaruk
 
Resume - R1.Docx
Resume - R1.DocxResume - R1.Docx
Resume - R1.Docx
 
CV
CVCV
CV
 
Bill resume
Bill resumeBill resume
Bill resume
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
CV-Fabiani Duca -2016
CV-Fabiani Duca -2016CV-Fabiani Duca -2016
CV-Fabiani Duca -2016
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
012741
012741012741
012741
 
Valerio Fatatis Curriculum Vitae
Valerio Fatatis Curriculum VitaeValerio Fatatis Curriculum Vitae
Valerio Fatatis Curriculum Vitae
 

OPRITESCU ValentinCV (2)

  • 1. Tel., +40 728442296 e-mail: valandi2006@yahoo.com CURRICULUM VITAE OPRITESCU Valentin page 1 of 5 OPRITESCU Valentin BIRTH DATE: 16/8/1955 NATIONALITY: Romanian CIVIL STATUS: widower EDUCATION 1974 - 1982 Polytechnic University of Bucharest, Nuclear Power Engineering Specialty COMPUTER ABILITIES PRIMAVERA Project Management P6; Microsoft Project; Miles; Excel; Word; Power Points, Full Monte Monte Carlo Risk Analysis for MS-Project Decision tree analysis LANGUAGE ABILITIES English (Good), French,Italian WORK EXPERIENCE Period: (April 2009 – March 2010) COMPANY: VOLTAS Ltd. Engineering Solutions Company for a Spectrum of Industries in areas, such as heating, ventilation and air conditioning (HVAC), refrigeration, electro- mechanical projects, textile machinery, machine tools, mining and construction equipment, materials handling, water management, building management systems, indoor air quality and chemicals LOCATION: QATAR PROJECT: Sidra Project, Barwa City Project POSITION: Project Manager Reviewing the Contract documents for each Construction Package and advising the Engineering/Construction Manager related to any abnormal situation that may occur. Reviewing Contractors proposed site organization and report to the Engineering/Construction Manager. Reviewing and approving / comments on the Design schedules as submitted by the Contractor and ensuring the Design Schedule is in compliance with the overall project schedule. Reviewing and approving / comment on the procurement schedules as submitted by the Contractor and ensure the procurement schedules are in compliance and coordinated with current construction schedules. Reviewing and continuously monitoring, against approved schedules, the Contractor's major construction progress and ensuring equipment and manpower are adequate or in case of any shortage report to Engineering/Construction Manager. Reviewing in detail the recovery schedules as submitted by the Contractors and ensuring manpower and site supervision staffs are increased properly. Performing periodically site visits in order to check if the progress of work on site is in compliance with approved schedules, major milestones have been met and report deficiencies to Construction Manager. Reviewing all daily, weekly and monthly reports as submitted by Contractor and report to Construction Manager any deficiency or non-compliance. Reviewing any claim involving time impact as submitted by Contractor and reports his assessment to Construction Manager. Reviewing field design changes and Trend Notices and assessing time impact, if any. Advising the Construction Manager of any foreseen slippage of progress and corrective actions to be taken. Attending weekly progress meeting and monthly Executive meetings and participate in preparing the agenda. Assisting the Engineer/Construction Managers during preparation of Monthly Progress reports and Monthly Executive Presentations.
  • 2. Tel., +40 728442296 e-mail: valandi2006@yahoo.com CURRICULUM VITAE OPRITESCU Valentin page 2 of 5 Reviewing the commissioning plans as submitted by Contractor and ensuring its compliance with the approved construction schedule. Close collaboration with PMC staff in reviewing the Close out Reports as submitted by Contractors. Providing Cost Analysis of the Commissioning discipline and Contractors monthly and other periodic cost and invoicing data. Reviewing, analyzing and correcting submitted valuation costs prior to authorization. Check and approving various invoices. Solving any discrepancy in Valuations. Preparing Cost Report for Commissioning Activities to include all the above and review with Commissioning Manager, Superintendents, Commissioning Services Coordinator and Contract Holder. Assisting Commissioning Services Coordinator to compile all the above into the Monthly Cost Report. Supporting Project and Commissioning Engineers in developing estimates and contracts cost control. Assisting Commissioning Services Coordinator to ensure all contractors invoices are verified before submission for payment and are fully in compliance with administrative contractual requirements. Assisting Commissioning Services Coordinator to prepare Annual and Bi-annual Project forecast and Work Plan and Budget costs and phasing. Period: (March 2003 - April 2009) COMPANY: VALANDI Trading SRL (Company for Planning Consultancy, Management and Recruitment) LOCATION: ROMANIA POSITION: General Manager Preparing contractual requirements related to planning/ scheduling, progress measuring and reporting. Providing Cost Analysis of the Commissioning discipline and Contractors monthly and other periodic cost and invoicing data. Reviewing, analyzing and correcting submitted valuation costs prior to authorization. Check and approving various invoices. Solving any discrepancy in Valuations. Preparing Cost Report for Commissioning Activities to include all the above and review with Commissioning Manager, Superintendents, Commissioning Services Coordinator and Contract Holder. Assisting Commissioning Services Coordinator to compile all the above into the Monthly Cost Report. Supporting Project and Commissioning Engineers in developing estimates and contracts cost control. Assisting Commissioning Services Coordinator to ensure all contractors invoices are verified before submission for payment and are fully in compliance with administrative contractual requirements. Providing technical assistance for Commissioning Services Coordinator to prepare Annual and Bi-annual Project forecast and Work Plan and Budget costs and phasing. Period: (August 1999 - March 2003) COMPANY: SC HANNAH STEEL CON Dutch Company- Steel Construction Company LOCATION: ROMANIA POSITION: Project Manager - Developing Project Plan. - Direct project resources. - Monitoring and managing the project schedule. - Monitoring and managing the project budget. - Monitoring and managing the project risk. - Dealing with operational issues. - Organizing steering committee meetings, including ensuring that minutes will be taken. - Reporting to the steering committee, raising strategic issues. - Preparing Project Status Reports and Project Change Requests for the steering committee. - Ensuring project meets requirements and objectives. - Managing project team members. - Negotiating and solving issues as they arise across areas of the project and where they impact on other activities, systems and projects.
  • 3. Tel., +40 728442296 e-mail: valandi2006@yahoo.com CURRICULUM VITAE OPRITESCU Valentin page 3 of 5 - Look after the interests of the project team. - Organizing and chair project reference group meetings, as appropriate. - Communicating project status to project sponsor, all team members and other relevant and involved parties. - Maintaining project documentation. Preparing contractual requirements related to planning/ scheduling, progress measuring and reporting. Providing project management with the assessment of risks and uncertainties within project schedules using probabilistic scheduling - range estimates and simulation - Pertmaster risk assessment tool. Also preparing TIA's (Time Impact Analyses), mitigation schedules, and created 'what if scenarios' Establishing project controls system by integrating data from PRIMAVERA level 4 scheduling, procurement, risk assessment schedules into a detailed progress measuring, progress reporting tool. Period: (May 1999 - June 1999) COMPANY: INCAT (Consulting, Design, Engineering, Helpdesk, Training and Systems Support services, as well as Technology Solutions) LOCATION: EQUATORIAL GUINEEA PROJECT: Malabo Methanol Plant POSITION: Planning Engineer Computing some material resources for the underground pipe lines adjacent to the Methanol Plant. Developing PRIMAVERA level 4 construction schedules over existing level 3 schedules for the erection of two oil tanks monitoring and updating them, analyzing any deviation form the schedule. Progress reporting on weekly bases, creating a data base in Excel and collect, input in this the data of construction physical achievement, creating the project schedule in PRIMAVERA, updating the terms.Optimizing material resources for underground pipeline network.Cross referencing of our level 2 Consrtruction schedules with the level 2 construction schedules provided by E.O.I. Period: (June 1998 - September 1998) COMPANY: ABB Lummus LOCATION: MONGOLIA, Ulan Bataar POSITION: Project Controller - Developing Project Plan. - Direct project resources. - Monitoring and managing the project schedule. - Monitoring and managing the project budget. - Monitoring and managing the project risk. - Dealing with operational issues. - Organizing steering committee meetings, including ensuring that minutes will be taken. - Reporting to the steering committee, raising strategic issues. - Preparing Project Status Reports and Project Change Requests for the steering committee. - Ensuring project meets requirements and objectives. - Managing project team members. - Negotiating and solving issues as they arise across areas of the project and where they impact on other activities, systems and projects. - Look after the interests of the project team. - Organizing and chair project reference group meetings, as appropriate. - Communicating project status to project sponsor, all team members and other relevant and involved parties. - Maintaining project documentation. Building up schedules and working plan for the rehabilitation of 200 M We power plant. Creating, using PRIMAVERA software and partially Microsoft project a Level 3 detailed prefabrication and erection integrated schedule, multidiscipline (civil, steel structure, mechanical, electrical, instrument), for contractor for installation off 5 diesel electrical generator units installation, in accordance with owner
  • 4. Tel., +40 728442296 e-mail: valandi2006@yahoo.com CURRICULUM VITAE OPRITESCU Valentin page 4 of 5 project milestones. Creating a data base system using Excel and soft's and collecting in it the production data achievements for production progress monitoring and for schedule updating; progress reporting, on weekly base and monthly base, using graphic and tabular reports from Primavera schedule, Histograms- curve graphics, Scheduling criticality analysisfor track keeping of project milestone and terms. Following and Data collecting for material acquisition. Cost control coordination. Period: (December 1997 - February 1998) COMPANY: IMPREGILLO SpA Italy LOCATION: TANZANIA PROJECT: Kihansi Site POSITION: Planning Engineer Building up PRIMAVERA level 3 schedules for the construction of the dam and also monitoring the progress of the work using 3-weeks window schedule. Elaborating level 2 Coordination and Control schedules for the power plant. Computing material resources such as: concrete, formwork, reinforcing and allocating manpower. Monitoring and updating the progress. Preparing progress reports.Drawing control and technical remarks,optimizing material resources for the blockouts of the dam. Period: (December 1996 - July 1997) COMPANY: ANSALDO ENERGIA Spag LOCATION: LEBANON PROJECT: ZahraniSite POSITION: Planning Engineer Preparing PRIMAVERA level 2 and level 3 commissioning and construction schedules for the Gas Turbine of 450 MWe power plant. Performing resource leveling and what if analysis. Create, using PRIMAVERA soft a Level 3 detailed prefabrication and erection integrated schedule, multidiscipline (civil, steel structure, mechanical, electrical, instrumentation) for MLNG Project -gas truncklines and compression plant, for contractor Fochi in accordance with owner level 2 coordination schedule and project milestones;. Creating a data base system, using Excel and Access soft's, and collectin.g / inputting in it the production data achievements for production progress monitoring and for schedule updating; Organizing the monthly base progress reporting using graphic and tabular reports from Primavera schedule, Histograms, S-curve graphics Scheduling criticality analysisfor track keeping of project milestone and terms.Progress reports,and Time impact analysis .Reviewing the organization of the archive checking status of the engineering packages Elaborating commisionig procedures for dirty oil drainage system.Prioritizing turnovers from construction to commissioning. Period: (June 1995 - April 1996) COMPANY: ABB Lummus LOCATION: UAE PROJECT: Taweelah Site- Water Desalination Plant POSITION: Assistant Planning Manager Preparing PRIMAVERA level 2 and level 3 construction and commissioning schedules ,updating progress, performing critical path analysis , estimating delays .Preparing also level 4 production schedules. Elaborating using Primavera soft, a Level 3 detailed prefabrication and erection integrated schedule, multidiscipline (civil, str. steel, mechanical, electrical, instrumentation)for installation off 6 unitsx150Mw power plants and 6 desalination plants, for contractor, in accordance with owner level 2 coordination schedule and project milestones; Create a data base system , using Excel and Access soft's, collecting in it the production data achievements for production progress monitoring and for schedule
  • 5. Tel., +40 728442296 e-mail: valandi2006@yahoo.com CURRICULUM VITAE OPRITESCU Valentin page 5 of 5 updating; on the weekly base and monthly base progress reporting ,using company special soft (CMS and PCIS), graphic and tabular reports from Primavera schedule, Histograms, S-curve graphics; Schedule criticality analysis for track keeping of project milestone and terms; Following and Data collecting for equipment material acquisition (piping, electrical, instrumentation), coordination of material taking of to site for erection; cost control coordination.Productivity analysis reports creating some buffers in the durations according to critical event chain methodology. Period: (March 1992 - May 1994) COMPANY: SC NIMB (Installation and Construction. Steel Structure Installation, Civil and Industrial Erection) LOCATION: ROMANIA PROJECT: Cernavoda Nuclear Power Plant POSITION: Planning Engineer Preparing PRIMAVERA level 3, 4, 5 schedules for steel structure erection and HVAC systems installation. Highlighting critical path activities and using also PERT method. Period: (September 1982 - December 1991) COMPANY: CNE CERNAVODA Nuclear Power Plant LOCATION: ROMANIA PROJECT: Cernavoda Nuclear Power Plant POSITION: Planning Engineer/Planning Manager Preparing PRIMAVERA level 1 to level 5 schedules and daily working plans. Updating plans, monitoring progress, preparing progress reports, planning and scheduling procedures. Preparing level 2 coordination and control schedules using both Precedence Diagramming Method and I-J Diagramming Method for the construction and commissioning of Cernavoda Unit 1. Coordinating the consortium planning team staff to elaborate a Baseline Schedules for Level I (contractual) and Level 2 (correlated with Level 1) as a coordination schedule for installation of U1 CNE Cernavoda Nuclear Power Plant, covering Engineering, Procurement, Construction, Pre-commissioning Phases for all discipline (civil, mechanical, piping, electrical, instrumentation). Coordinating the consortium planning team staff for creating a data base and collecting, inputting in it off the construction achievement data, updating the schedules and progress reporting on weekly basis; the schedules criticality analyzing and acting to keep the terms of schedule for all construction and pre-commissioning phases of investition. Coordinating the contractors planning specialists in their Level 3 schedule duties (scheduling, updating, criticality) Signature, 19 August 2010