SlideShare ist ein Scribd-Unternehmen logo
1 von 41
Cost of Quality Current Perspectives © Omnex  All rights reserved
Speaker Biography ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
History of Cost of Quality 12 3 6 9 1951 Cost of Quality Concept – Dr. J.M. Juran 1950’s COQ in GE – AV Feigenbaum  1964 – Q100 Report IBM 1979 – Quality is Free – Philip Crosby 1980’s – Cost of Quality is Popularized Late 80’s to 90’s – COQ loses favor 1998 – COPQ Reappears in QS-9000 2002 – COPQ present in ISO/TS 16949:2002 1990’s – COQ reappears with Six Sigma
Cost of Quality  Classic Typology  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Maturity of Quality Management System and reduction in COQ
Problems with Traditional COQ Models ,[object Object],[object Object],[object Object],[object Object]
Problems with Traditional COQ Models ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],COQ systems fail due to “poor management planning, implementation, and follow-up.”
COPQ is “The Hidden Factory”  Quality audits • Warranty claims • Maintenance and service • Warranty claims • Maintenance and service As is Could be • Scrap/rejects • Rework • Longer cycle times and excess inventory • Scrap/rejects • Rework • Longer cycle times and excess inventory 5 % 2 0 - 2 5 % 6 5 - 7 0 % ? As is Could be Cost of failure in the field Cost of failure in the field Internal failure costs Internal failure costs Cost appraisal and inspection Cost appraisal and inspection Cost to improve and prevent poor quality Cost to improve and prevent poor quality Opportunity lost • Avoided capital cost • Opportunity cost of additional volume if Sales > capacity • Lost customer loyalty • Time spent expediting • Cost to the customer • • Opportunity cost of additional volume if Sales > capacity • Lost customer loyalty • Time spent expediting • Cost to the customer • Improvement program costs • Process control • Quality engineering and admin • Improvement program costs • Process control • Quality engineering and admin • Inspection/test (materials, equipment, labor) • Vendor control • Quality audits • Inspection/test (materials, equipment, labor) • Vendor control •
Cost of Poor Quality (COPQ)  the Tip of the Iceberg Quality engineering and administration Inspection/test (materials, equipment, labor) Expediting Scrap Rework Rejects Warranty claims Maintenance and service Cost to customer  Excess inventory Additional labor hours Longer cycle times Quality audits Vendor control Lost customer loyalty Improvement program costs Process control Opportunity cost if sales greater than plant capacity
Cost of Poor  Design  Quality 1 10 100 1000+ X Millions A change while still in design In manufacturing At customer location Recall Litigation Internal to Fab In shipping Customer incoming Customer mfg Field Cost of Poor  Manufacturing  Quality-Semiconductor Example 5 50 500 5-50K 10K - X Millions
COQ Methods Traditional Costing Approach Six Sigma Approach Measurables Approach
Traditional Cost Method  % Method ,[object Object],[object Object],[object Object],[object Object],[object Object]
Traditional Cost Method  % Method
Traditional Cost Method Unit Cost Method ,[object Object],[object Object],[object Object],[object Object],[object Object],1 2 3 4 5 6 7
Traditional Cost Method  Unit Cost Method
Traditional Cost Method ,[object Object],[object Object],[object Object],[object Object],[object Object],$
Activity-Based Costing ,[object Object],[object Object],[object Object],[object Object]
Activity-Based Costing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Six Sigma Approach
Cost of Poor Quality  & Industry Average PPM’s COPQ   Sigma   PPM 30-40% of Sales   2.0   308,537  Non Competitive  20-30% of Sales   3.0   66,807  15-20% of Sales   4.0 6,210  Industry Average 10-15% of Sales   5.0  233 <10% of Sales   6.0  3.4  World Class
COPQ & Sigma/Yield Relationship Industry Averages COPQ Sigma   Yield 30-40% of Sales   2.0  5%  Non Competitive  20-30% of Sales  3.0  93%  15-20% of Sales   4.0  99.4%  Industry Average 10-15% of Sales   5.0  99.976% <10% of Sales   6.0  99.999655%  World Class
Using the Six Sigma Approach ,[object Object],[object Object],[object Object],[object Object]
Measurables Approach
Measurables Approach - COPQ ,[object Object],[object Object],[object Object]
Measurables Approach - COPQ ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Cost Of Quality New Directions
Cost of Quality  Expanded Typology ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
COPQ is “The Hidden Factory”  “ Soft” Quality Lost
COQ – Doing it Right the First Time ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],This is the greatest opportunity for COQ….
COQ – Upstream and Doing it Right the First Time ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
COQ – Process Approach ,[object Object],[object Object]
Opportunities for COQ Semiconductor Design and Manufacturing
Criteria for First Pass Success in Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
First Pass Success in Design ,[object Object],[object Object],[object Object],[object Object],[object Object],Cost of Quality – $6.5 Million using the development budget. Some will argue that it should be calculated based on the entire Business line (i.e. COQ = $32.5 Million)
Internal Failure Costs Yield, Rework, and Failure ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Chute yield – 74% to 93%  depending on complexity and maturity
Opportunities in Wafer Fab ,[object Object],[object Object]
Transaction Costs for Quality Problems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Total of  13 to 27 person days at $1000 per day  –  minimum of $11,000 for analysis only.  And now we have to stop the bleeding and fix the problem
Implementing COQ
Implementing COQ  – Current Perspectives – ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Implementing COQ  Integration into the Strategic Model Customer Expectations Competitive Benchmarks Mission, Vision & Values Results Measurement Key Processes Process Measurement Improvement Projects COQ provides direction on selecting Improvement Actions  and track effectiveness Six Sigma/ Varification Lean/Value Stream Mapping COQ Measurements Value Engineering Project Prioritization Method Strategic Objectives
Implementing COQ  – If COQ Is Not a Driver – ,[object Object],[object Object],[object Object]
Summary:  What is COQ? ,[object Object],[object Object],[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

The Global 8D Problem Solving Process
The Global 8D Problem Solving ProcessThe Global 8D Problem Solving Process
The Global 8D Problem Solving Process
Flevy.com Best Practices
 
Basic quality concepts(3)
Basic quality concepts(3)Basic quality concepts(3)
Basic quality concepts(3)
ngiyari
 
Cost of poor quality presentation5
Cost of poor quality presentation5Cost of poor quality presentation5
Cost of poor quality presentation5
Imran Jamil
 
Cost of Poor Quality - Lean Conference 2016
Cost of Poor Quality - Lean Conference 2016Cost of Poor Quality - Lean Conference 2016
Cost of Poor Quality - Lean Conference 2016
Senapu
 

Was ist angesagt? (20)

FMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysisFMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysis
 
Fmea
FmeaFmea
Fmea
 
Cost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteCost of-poor-quality - juran institute
Cost of-poor-quality - juran institute
 
Process fmea
Process fmea Process fmea
Process fmea
 
cost of quality
cost of qualitycost of quality
cost of quality
 
FMEA
FMEAFMEA
FMEA
 
Cost of poor quality
Cost of  poor qualityCost of  poor quality
Cost of poor quality
 
Quality & Quality tools
Quality & Quality toolsQuality & Quality tools
Quality & Quality tools
 
Productivity & Total Quality Management
Productivity & Total Quality ManagementProductivity & Total Quality Management
Productivity & Total Quality Management
 
Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)Summarized presentation VDA 6.3 2016 (development)
Summarized presentation VDA 6.3 2016 (development)
 
The Global 8D Problem Solving Process
The Global 8D Problem Solving ProcessThe Global 8D Problem Solving Process
The Global 8D Problem Solving Process
 
Basic quality concepts(3)
Basic quality concepts(3)Basic quality concepts(3)
Basic quality concepts(3)
 
Presentation On G8D
Presentation On G8DPresentation On G8D
Presentation On G8D
 
Cost of poor quality presentation5
Cost of poor quality presentation5Cost of poor quality presentation5
Cost of poor quality presentation5
 
Presentation_Final_1
Presentation_Final_1Presentation_Final_1
Presentation_Final_1
 
Quality principles and concepts
Quality principles and conceptsQuality principles and concepts
Quality principles and concepts
 
PPAP Awareness training.pptx
PPAP Awareness training.pptxPPAP Awareness training.pptx
PPAP Awareness training.pptx
 
Cost of Poor Quality - Lean Conference 2016
Cost of Poor Quality - Lean Conference 2016Cost of Poor Quality - Lean Conference 2016
Cost of Poor Quality - Lean Conference 2016
 
ISO 9001 2015 Quality Management System (Implementation)
ISO 9001 2015 Quality Management System (Implementation)ISO 9001 2015 Quality Management System (Implementation)
ISO 9001 2015 Quality Management System (Implementation)
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 

Ähnlich wie Costof quality

Quality is a cost
Quality is a costQuality is a cost
Quality is a cost
batch18
 
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptCost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
ssuser5f2474
 
Marty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.docMarty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.doc
Marty Howard
 
Lean Six Sigma for Jewellery
Lean Six Sigma for JewelleryLean Six Sigma for Jewellery
Lean Six Sigma for Jewellery
Prem Anand
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
Omnex Inc.
 
Hi Performance Manufacturing
Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance Manufacturing
Alex Diong
 

Ähnlich wie Costof quality (20)

Training Prog :: Vendor quality Management system-Vendor development
Training Prog :: Vendor quality Management system-Vendor developmentTraining Prog :: Vendor quality Management system-Vendor development
Training Prog :: Vendor quality Management system-Vendor development
 
Cost Reduction using QMS-1
Cost Reduction using QMS-1Cost Reduction using QMS-1
Cost Reduction using QMS-1
 
Zero defect zero excursions
Zero defect zero excursionsZero defect zero excursions
Zero defect zero excursions
 
Costofquality
Costofquality Costofquality
Costofquality
 
Quality is a cost
Quality is a costQuality is a cost
Quality is a cost
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Managing quality ppt @ bec doms
Managing quality ppt @ bec domsManaging quality ppt @ bec doms
Managing quality ppt @ bec doms
 
Understanding Enterprise Quality Management Systems (EQMS)
Understanding Enterprise Quality Management Systems (EQMS)Understanding Enterprise Quality Management Systems (EQMS)
Understanding Enterprise Quality Management Systems (EQMS)
 
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.pptCost_of_Poor_Quality_Lecture_2017_June_p.ppt
Cost_of_Poor_Quality_Lecture_2017_June_p.ppt
 
C12 quality
C12 qualityC12 quality
C12 quality
 
C12 quality
C12 qualityC12 quality
C12 quality
 
Marty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.docMarty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.doc
 
olivier_a.pdf
olivier_a.pdfolivier_a.pdf
olivier_a.pdf
 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1
 
Lean Six Sigma for Jewellery
Lean Six Sigma for JewelleryLean Six Sigma for Jewellery
Lean Six Sigma for Jewellery
 
Modern businessenvironmentandmanagementaccounting
Modern businessenvironmentandmanagementaccountingModern businessenvironmentandmanagementaccounting
Modern businessenvironmentandmanagementaccounting
 
Supplier quality management
Supplier quality managementSupplier quality management
Supplier quality management
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
 
Hi Performance Manufacturing
Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance Manufacturing
 

Mehr von Omnex Inc.

Semiconductor newsletter8 01
Semiconductor newsletter8 01Semiconductor newsletter8 01
Semiconductor newsletter8 01
Omnex Inc.
 
Omnex semiconductor1 may_2000
Omnex semiconductor1  may_2000Omnex semiconductor1  may_2000
Omnex semiconductor1 may_2000
Omnex Inc.
 
Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006
Omnex Inc.
 
Omnexsystem spresentation
Omnexsystem spresentationOmnexsystem spresentation
Omnexsystem spresentation
Omnex Inc.
 
Omnex semiconductor2 sac_board_may2000
Omnex semiconductor2 sac_board_may2000Omnex semiconductor2 sac_board_may2000
Omnex semiconductor2 sac_board_may2000
Omnex Inc.
 
Omnex sac may01
Omnex sac may01Omnex sac may01
Omnex sac may01
Omnex Inc.
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
Omnex Inc.
 
Key changes ts169492002
Key changes ts169492002Key changes ts169492002
Key changes ts169492002
Omnex Inc.
 
Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05
Omnex Inc.
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtime
Omnex Inc.
 
Integrating lssiso9ts
Integrating lssiso9tsIntegrating lssiso9ts
Integrating lssiso9ts
Omnex Inc.
 
Implementing ts strategic-choices_5_2003
Implementing ts strategic-choices_5_2003Implementing ts strategic-choices_5_2003
Implementing ts strategic-choices_5_2003
Omnex Inc.
 
Hitachi case study(22 11)
Hitachi case study(22 11)Hitachi case study(22 11)
Hitachi case study(22 11)
Omnex Inc.
 
Ew qms asq_kitchner
Ew qms asq_kitchnerEw qms asq_kitchner
Ew qms asq_kitchner
Omnex Inc.
 
Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000
Omnex Inc.
 

Mehr von Omnex Inc. (20)

Omnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex 2019 Newsletter Navigator
Omnex 2019 Newsletter Navigator
 
Omnex 2018 Navigator Newsletter
Omnex 2018 Navigator NewsletterOmnex 2018 Navigator Newsletter
Omnex 2018 Navigator Newsletter
 
Semiconductor newsletter8 01
Semiconductor newsletter8 01Semiconductor newsletter8 01
Semiconductor newsletter8 01
 
Rollout
RolloutRollout
Rollout
 
Omnex semiconductor1 may_2000
Omnex semiconductor1  may_2000Omnex semiconductor1  may_2000
Omnex semiconductor1 may_2000
 
Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006
 
New ts16949
New ts16949New ts16949
New ts16949
 
Omnexsystem spresentation
Omnexsystem spresentationOmnexsystem spresentation
Omnexsystem spresentation
 
Omnex semiconductor2 sac_board_may2000
Omnex semiconductor2 sac_board_may2000Omnex semiconductor2 sac_board_may2000
Omnex semiconductor2 sac_board_may2000
 
Omne xsales
Omne xsalesOmne xsales
Omne xsales
 
Omnex sac may01
Omnex sac may01Omnex sac may01
Omnex sac may01
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
 
Key changes ts169492002
Key changes ts169492002Key changes ts169492002
Key changes ts169492002
 
Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05Iso ts-implementation-webinar5-17-05
Iso ts-implementation-webinar5-17-05
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtime
 
Integrating lssiso9ts
Integrating lssiso9tsIntegrating lssiso9ts
Integrating lssiso9ts
 
Implementing ts strategic-choices_5_2003
Implementing ts strategic-choices_5_2003Implementing ts strategic-choices_5_2003
Implementing ts strategic-choices_5_2003
 
Hitachi case study(22 11)
Hitachi case study(22 11)Hitachi case study(22 11)
Hitachi case study(22 11)
 
Ew qms asq_kitchner
Ew qms asq_kitchnerEw qms asq_kitchner
Ew qms asq_kitchner
 
Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000Comparison ts16949 2002_qs9000
Comparison ts16949 2002_qs9000
 

Costof quality

  • 1. Cost of Quality Current Perspectives © Omnex All rights reserved
  • 2.
  • 3. History of Cost of Quality 12 3 6 9 1951 Cost of Quality Concept – Dr. J.M. Juran 1950’s COQ in GE – AV Feigenbaum 1964 – Q100 Report IBM 1979 – Quality is Free – Philip Crosby 1980’s – Cost of Quality is Popularized Late 80’s to 90’s – COQ loses favor 1998 – COPQ Reappears in QS-9000 2002 – COPQ present in ISO/TS 16949:2002 1990’s – COQ reappears with Six Sigma
  • 4.
  • 5.
  • 6.
  • 7. COPQ is “The Hidden Factory” Quality audits • Warranty claims • Maintenance and service • Warranty claims • Maintenance and service As is Could be • Scrap/rejects • Rework • Longer cycle times and excess inventory • Scrap/rejects • Rework • Longer cycle times and excess inventory 5 % 2 0 - 2 5 % 6 5 - 7 0 % ? As is Could be Cost of failure in the field Cost of failure in the field Internal failure costs Internal failure costs Cost appraisal and inspection Cost appraisal and inspection Cost to improve and prevent poor quality Cost to improve and prevent poor quality Opportunity lost • Avoided capital cost • Opportunity cost of additional volume if Sales > capacity • Lost customer loyalty • Time spent expediting • Cost to the customer • • Opportunity cost of additional volume if Sales > capacity • Lost customer loyalty • Time spent expediting • Cost to the customer • Improvement program costs • Process control • Quality engineering and admin • Improvement program costs • Process control • Quality engineering and admin • Inspection/test (materials, equipment, labor) • Vendor control • Quality audits • Inspection/test (materials, equipment, labor) • Vendor control •
  • 8. Cost of Poor Quality (COPQ) the Tip of the Iceberg Quality engineering and administration Inspection/test (materials, equipment, labor) Expediting Scrap Rework Rejects Warranty claims Maintenance and service Cost to customer Excess inventory Additional labor hours Longer cycle times Quality audits Vendor control Lost customer loyalty Improvement program costs Process control Opportunity cost if sales greater than plant capacity
  • 9. Cost of Poor Design Quality 1 10 100 1000+ X Millions A change while still in design In manufacturing At customer location Recall Litigation Internal to Fab In shipping Customer incoming Customer mfg Field Cost of Poor Manufacturing Quality-Semiconductor Example 5 50 500 5-50K 10K - X Millions
  • 10. COQ Methods Traditional Costing Approach Six Sigma Approach Measurables Approach
  • 11.
  • 13.
  • 14. Traditional Cost Method Unit Cost Method
  • 15.
  • 16.
  • 17.
  • 19. Cost of Poor Quality & Industry Average PPM’s COPQ Sigma PPM 30-40% of Sales 2.0 308,537 Non Competitive 20-30% of Sales 3.0 66,807 15-20% of Sales 4.0 6,210 Industry Average 10-15% of Sales 5.0 233 <10% of Sales 6.0 3.4 World Class
  • 20. COPQ & Sigma/Yield Relationship Industry Averages COPQ Sigma Yield 30-40% of Sales 2.0 5% Non Competitive 20-30% of Sales 3.0 93% 15-20% of Sales 4.0 99.4% Industry Average 10-15% of Sales 5.0 99.976% <10% of Sales 6.0 99.999655% World Class
  • 21.
  • 23.
  • 24.
  • 25. Cost Of Quality New Directions
  • 26.
  • 27. COPQ is “The Hidden Factory” “ Soft” Quality Lost
  • 28.
  • 29.
  • 30.
  • 31. Opportunities for COQ Semiconductor Design and Manufacturing
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 38.
  • 39. Implementing COQ Integration into the Strategic Model Customer Expectations Competitive Benchmarks Mission, Vision & Values Results Measurement Key Processes Process Measurement Improvement Projects COQ provides direction on selecting Improvement Actions and track effectiveness Six Sigma/ Varification Lean/Value Stream Mapping COQ Measurements Value Engineering Project Prioritization Method Strategic Objectives
  • 40.
  • 41.

Hinweis der Redaktion

  1. When Saab&apos;s R&amp;D organization looked at its Quality Costs, it was amazed to find that 78 percent of its R&amp;D budget was classified as Quality Cost. Likewise, in a marketing and sales organization, the Quality Cost is often more than 100% of the marketing and sales budget when lost-opportunity costs are considered