June 2015Part of the Nuclear Energy Solution
Disclaimers & Cautionary Statements
This presentation is and proprietary to GoviEx Uranium Inc., and may not be reproduced, disseminated or referred to, in whole or in part without
the prior consent of the company. The company assumes no responsibility for verification of the information in these materials, and no
representation or warranty is made as to the accuracy or completeness of such information. The company assumes no obligation to correct or
update these materials. These materials do not contain all information that may be required to evaluate, and do not constitute a
recommendation with respect to, any transaction or matter. Any recipient of these materials should conduct its own independent analysis of the
matters referred to herein.
This presentation includes certain “forward-looking statements”. All statements other than statements of historical facts, are forward looking
statements that involve various risks and uncertainties. Statements relating to “resources” are deemed to be forward-looking statements, as
they involve the implied assessment, based on certain estimates and assumptions, that the resources described can be profitably produced in
the future. There can be no assurances that such statements will prove accurate and actual results and future events could differ materially from
those anticipated in such statements. Such information contained herein represents management’s best judgment as of the date hereof based
on information currently available. The company can not guarantee future results, levels of activity, performance, or achievements. The
company does not assume the obligation to update any forward-looking statement.
Disclosure of a scientific or technical nature in this presentation relating to the companies mineral properties was prepared by, or under the
supervision of, Dr. Rob Bowell of SRK Consulting UK, a “qualified person” as defined in NI 43-101. Historical data disclosed herein has not been
verified by Dr. Bowell.
Complete disclosure with respect to (a) the key assumptions, parameters, and methods used to estimate the mineral resources and mineral
reserves described herein and (b) known risks that could materially affect the potential development of those mineral resources or mineral
reserves is set forth in the Company’s technical report titled “AN UPDATED INTEGRATED DEVELOPMENT PLAN FOR THE MADAOUELA PROJECT,
NIGER”, dated April 28, 2014, available at www.sedar.com.
United States investors are cautioned that the requirements and terminology of NI 43-101 and the CIM Standards on Mineral Resources and
Reserves – Definitions and Guideline (“CIM Standards”) differ significantly from the requirements and terminology of the United States Securities
and Exchange Commission (“SEC”) set forth in the SEC’s Industry Guide 7 (“SEC Industry Guide 7”). Accordingly, the Company’s disclosures
regarding mineralization may not be comparable to similar information disclosed by companies subject to SEC Industry Guide 7. Without limiting
the foregoing, while the terms “mineral resources”, “inferred mineral resources”, “indicated mineral resources” and “measured mineral
resources” are recognized and required by NI 43-101 and the CIM Standards, they are not recognized by the SEC and are not permitted to be
used in documents filed with the SEC by companies subject to SEC Industry Guide 7. In addition, the NI 43-101 and CIM Standards definition of
a “reserve” differs from the definition in SEC Industry Guide 7. This presentation and the disclosure contained herein does not constitute an offer
to sell or the solicitation of an offer to buy securities of GoviEx Uranium.
Air Pollution is the World’s Single Biggest
Environmental Health Risk – WHO
March 2014. The UN’s World Health Organization released new estimates of air pollution’s toll
on humanity, declaring risks to be far greater than previously thought.
• Air pollution accounts for one of every eight deaths around the world. It claimed 7 million
lives in 2012 – almost half caused by outdoor sources of pollution.
• “This finding more than doubles previous estimates and confirms that air pollution is now the
world’s largest single environmental health risk.”
• “Few risks have a greater impact on global health today than air pollution; the evidence
signals the need for concerted action to clean up the air we all breathe.”
— Dr. Maria Neira, WHO Director
54% of World’s Population Now Live in Cities
Sources: United Nations & Statista, July 2014
% of population living in urban areas
Urbanization: Cheap, Clean and Reliable Energy Generation is Key
to Solving World’s Air Pollution Problem
Nuclear is Part of the Green Solution
Sources: EIA & Sustainable Energy (D. Mackay, 2015)
Levelised cost of electricity (LCOE) $/MWh
CO2 Emission (g-CO2/kWh)
• Geothermal needs the right
geology.
• Hydro needs the right
geography.
• Solar and wind need space:
- Solar: 10 W/m2 (Europe)
- Wind: 2 W/m2
- Nuclear: 1,000 W/m2
• 3.2 GW Hinkley Reactor (UK)
would require an area:
• 2 x Brussels in solar panels
• London in wind turbines
• Solar and wind have limited
efficiency until energy storage
issues resolved.
The China Story Equals Uranium Demand
• In 2012, China had 15 nuclear power units with a total electric capacity
of 11 gigawatts, accounting for just 1.9% of the total electricity output.
• In 2013, this rose to 2% with 17 reactors, and 28 under construction.
By comparison, the USA is currently 20% and France 74%.
• China has the world’s most ambitious nuclear program with plans to provide 6% or 58 GW
of capacity by 2020, and a further increase to 16% or 200 GW by 2030.
• By 2030, China is expected to consume nearly half of global uranium production.
• With limited domestic reserves, and majority high-cost, it makes sense China looks to
purchase as much low-cost production it can over the next few years.
Sources: UXC Consulting & World Nuclear News
India’s Story Mirrors China
• 2014 Environmental Preference Index ranked India No. 174 out of 178 countries for air
quality (China is No. 176).
• WHO 2014 survey found 13 of 20 most polluted cities in the world were in India.
• Leading cause of premature death, with about 620,000 people dying every year
from pollution-related diseases.
• In 2013, India had 21 reactor with installed capacity of 5,780 MW consuming approx. 1580
TU per annum.
• Targeting installed capacity of 63,000 MW (equivalent to 25% total energy demand) by
2032.
Sources: Yale, World Nuclear News & WHO
Uranium Demand
• Uranium demand driven by nuclear build out.
• China forecast to grow from 21 reactors in 2014 to 132 reactors in 2030.
• Japan restarts slow to begin, but still targeting approx. 20% of long-term power mix.
• Indian and African reactor builds forecast to exceed reductions in Western Europe.
No.
reactors
Sources: UxC Consulting, OECD
Uranium Supply
Mlb U3O8
Cash / Incentive Cost US$/lb U3O8
• Declining production
partly offset by new
projects.
• Post-2020 supply deficit.
• Continued price weakness
increases risk of further
closures.
• Decline in quality of Reasonably
Assured Resources since 2011.
• US$18/lb resources equate to only
6 years global production.
• Majority production not profitable
at current spot price.
• Increase in incentive price for new
production with majority
>US$79/lb.
Tonnes U 000s
Source: UxC Consulting, OECD
Supply Gap
The Republic of Niger – Uranium Country
• World’s 4th largest uranium-producing nation (World Nuclear Association Report, 2012)
• 50 years of uninterrupted uranium exports on highway that crosses GoviEx tenements
• 2011 Presidential Election lauded by independent observers and the EU
• President Issoufou has a mining background and elected on platform of job creation
Cominak Mill & Somair Mine near Arlit, adjacent to GoviEx’s Madaouela Project
• Mining accounts for 50-70% of export revenues, national priority for job creation
• Mining Code encourages foreign direct investment and project development
• Well-established infrastructure
GoviEx Milestones
• 2007 – GoviEx commenced operations focused on building a Niger team
• 2008 – Signed Strategic Partnership with Cameco Corporation
• 2009 – Expanded exploration program at Madaouela
• 2010 – Completed NI 43-101 preliminary economic assessment (PEA)
• 2011 – Surpassed 400,000 metres of drilling and updated resource estimate
• 2012 – Signed Strategic Financing and off-take agreement with Toshiba
• 2013 – Completed NI 43-101 integrated development plan (IDP)
• 2014 – IPO and Toshiba A Bond Redemption
• 2015 – Expanded Marianne and Marilyn Uranium Mineral Resource
GoviEx Licences in Niger’s Mining Heart
Madaouela Historical Drilling
Licence Metres*
Mad 1 & Agal 525,000
Mad 2 10,900
Mad 3 16,700
Mad 4 & Era 25,300
Anou Melle 3,300
Total 581,200
*End 2013
• Resource extension drilling
targets still open on Mad 1
• Agal targets for resource
development and
extension
• Considerable “blue sky”
remains
GT = Thickness (m) x
U grade (kg/t)
• Renewed Madaouela 1, 2, 3, 4 and Anou Melle permits in November 2012; extended for a further 36 months
• Applied for Agal and Era licences in November 2012; awaiting approval
Madaouela Exploration Upside Potential
Main Targets:
1. Anou Melle
2. Brownfileds
3. Madaouela
Fault
4. Redox Extn.
1
2
4
3
Summary of the mineral resources classified in accordance with CIM guidelines
for Madaouela Project using cut-off: 0.4 kg/t eU*
*See Appendix A for notes on tonnes and grade associated with Madaouela Mineral Resources
as at April 20, 2015
Madaouela Mineral Resources, April 2015
Conceptual Integrated Mine Development Plan
TAILINGS STORAGE FACILITY
M&M PORTAL LOCATION
PROCESSING PLANT
HIGH VOLUME & MINE LINK ROAD CONVEYOR
EXPLOSIVES MAGAZINE
MSNE-MARYVONNE INFRASTRUCTURE AREA
MSNE-MARYVONNE
PORTAL LOCATION
WELLFIELD
LOCATION
MARIANNE-MARILYN
UNDERGROUND MINE
M&M INFRASTRUCTURE AREA
SITE ACCESS ROAD FROM N25 MSNE-
MARYVONNE
MINE
HIGH VOLUME & MINE LINK ROAD
MIRIAM OPEN PIT
MIRIAM WASTE DUMP 3
MIRIAM WASTE DUMP 2
MIRIAM WASTE DUMP 1
MIRIAM INFRASTRUCTURE AREA
Probable Mineral Reserves
ROM Uranium Oxide
Deposit
Cut-Off
Grade
eU (kg/t)
Tonnes
(Mt)
Grade
U3O8 (kg/t)
Contained
U3O8 (t)
Miriam OP 0.41 6.4 1.07 6,800
Marianne-Marilyn U/G 0.60 11.1 1.00 11,100
MSNE-Maryvonne U/G 0.48 7.8 0.89 7,000
Probable Mineral Reserves 25.3 0.98 24,900
CIM mineral reserve statement (June 7th, 2013) for the Madaouela deposit *
• Probable mineral reserves are 54.88 Mlb U3O8 at 0.098% U3O8.
• Reported on 100% basis.
• Total Uranium Recovery forecast at 83%.
• Accounts for dilution, mining losses and stope design losses.
• Based on June 2013 IDP cash costs, still to be revised for lower Sept IDP costs.
*See Appendix B for notes on Madaouela Probable Mineral Reserves as at June 7, 2013
Integrated Development Plan (IDP) Summary Table,
September 2013
Parameter Units
IDP
Base Case
Sales U3O8 (Mlb) 45,59
Prices U3O8 (USD/lb) 70
Cash Operating Costs (USD/lb U3O8) 26.39
Total Operating Costs (incld Rylty) (USD/lb U3O8) 33.10
Startup Capital Expenditure (USDm) 340
Total LOM Capital Expenditure (USDm) 646
Capital Costs (USD/lb U3O8) 14.16
Total Costs (USD/lb U3O8) 40.55
NPV @ 8.00% (USDm) 251.14
IRR (%) 21.9%
Break even price (NPV=0 @ 8%) (USD/lb U3O8) 50.5
NPV IRR
NPV at 10% (USD70/lb U3O8) (USDm) 185 21.9%
NPV at 8% (USD70/lb U3O8) (USDm) 251 21.9%
NPV at 8% (USD65/lb U3O8) (USDm) 184 18.5%
NPV at 8% (USD75/lb U3O8) (USDm) 317 25.2%
NPV reported post all taxes and royalties, and for 100% of the Madaouela Project
Project Milestones
 Completed IDP in 2013
 IPO completed in 2014
 ESIA completed March 2015
• Mining Permit Application June 2015
• Mining Permit Grant in 2015/16
• Pre-mine development in 2016/17
• Attain full production in 2018/2019
Source: Dundee Capital Markets Uranium Sector Weekly, May 19, 2015
Note: Priced as of May 26, 2015
(1) M&I is inclusive of reserves. GoviEx M+I Resources = 110 Mlb; Inferred Resources = 28 Mlb.
(2) Consensus pricing based on Bloomberg estimates as of May 2015.
Uranium Sector EV/Resource (C$/lb)Total U3O8 Reserves & Resources (Mlb) (1)
$35.00
$43.00
$51.50
$69.37 $70.00
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
2014 2015 2016 2017 LT
(US$/lb)
Consensus Uranium Prices(2)
Uranium Developers EV (C$m)
Significant Value in GoviEx Relative to Peers
Average = 97Mlb
Average = 0.68x
Reserves
Resources
GoviEx Inferred Resources
GoviEx M&I Resources
Investment Strategy in Niger
Sustainable Success Through Local Investment
• Over US$110 million invested in Niger since 2007.
• 100% in-country leadership positions occupied by
locals.
• Substantial investment in training programs.
• Top foreign direct investor (non Sovereign, ex
France / China).
• $1+5 million donation for local social relief.
• Investments to improve educational facilities and
livelihoods.
• Focus on water delivery that serve 2,000 locals.
GoviEx Core Team
Executive Management Board of Directors
• Govind Friedland, Exec. Chairman, GE,
Colorado School of Mines
• Daniel Major, CEO, Mining Engineer,
Camborne School of Mines
• Lei Wang, Interim CFO
• Rodrigo Romo, Corporate Secretary
• Aminou Boukari, Niger Country Manager
• Jerome Randabel, Chief Geologist
• Dr. Henri Sanguinetti, 35 years experience in uranium
exploration and mining, 25+ years with COGEMA and AREVA
• Dr. Rob Bowell, SRK Project Manager for Madaouela PFS
• Assane Adamou, Legini Niger, geotechnical/environmental (EIA)
• Matthew Lechtzier, Lead Director
• Govind Friedland, Exec Chairman
• Daniel Major, CEO & Exec Director
• Robert Hanson, HRCC Chair
• Rachid Benyakhlef, TC Chair
• William Assini, Audit Chair
• David Marsh, Director
• Benoit LaSalle, Director
• SRK Consulting, Madaouela Project
Consultants
• Tenova Bateman Engineering (EPCM)
• Deloitte & Touche LLP, Auditors
External Advisors
Niger Management/Consultants
As at As at
December 31, 2014 May 31, 2015
All figures in Millions except for per share items
Common Shares Outstanding 146.22 146.22
Options 4.65 7.87
Fully Diluted 150.86 154.09
Capital Structure
Registered Shareholders Percentage
Govind Friedland 21.36%
Toshiba Corporation 19.42%
Cameco Global Exploration Ltd. 8.55%
THL Resources Investment Limited 6.84%
Semafo Inc. 6.70%
Current Shareholding as at April 30, 2015
GoviEx Strength is the Sum of it Parts
• Advanced stage uranium project
• Pre-feasibility completed
• Environmental and Social Impact Assessment completed
• Mine permit application in process
• Large NI 43-101 Mineral Resource
• 108 Mlb in Measured & Indicated and 28 Mlb in Inferred
• Exploration upside
• Exploration to date covered less that 10% of the surface area
• Moving to near mine brownfields exploration
• Good reserve grade combined with upgrade technology
• Compared to 0.03% at Rossing, Langer 0.05%, Imouraren 0.07% and Husab 0.04%
• Upgrading technology results in leach-feed grade of 0.5%
• Strong stable shareholder base
• Govind Friedland, Toshiba Corporation, Cameco
• Large project with robust economics
• Mine life in excess of 18 years at 2.5 Mlb U3O8 per annum at C1 cash cost of $26/lb
• Potential to reduce opex through optimization
• Niger open for business in uranium mining
• Long history of mining
• Strong development-focused mining code
Questions?
Appendix A
On November 22, 2012, GoviEx submitted to the Niger authorities a licence application covering certain portions of
the original Madaouela I and IV licences surface areas that were excluded from the renewed licences granted on
November 2, 2012. GoviEx has been advised that the two applications for the excluded areas of Madaouela I and IV
will be approved, but is awaited at the time of writing its applications, and hence has not adjusted its resources to
account for any potential changes. However, it should be noted that resources associated with MSEE, and La Banane
would be materially affected, and to a limited extent Miriam’s resources would be affected should GoviEx not be
successful in its application.
The company’s mineral resources as at April 20, 2015 are classified in accordance with the Canadian Institute of
Mining, Metallurgy and Petroleum’s “CIM Definition Standards - For Mineral Resources and Mineral Reserves" in
accordance with the requirements of National Instrument 43-101 “Standards of Disclosure for Mineral Projects" (the
Instrument). Mineral reserve and mineral resource estimates reflect the company's reasonable expectation that all
necessary permits and approvals will be obtained and maintained. (1kg/t eU3O8=0.1% eU3O8). The “e” symbol
denotes that resource estimation is based on spectrometer data obtained in the field and confirmed by a smaller
number of samples by laboratory chemical analysis.
Mineral resources that are not mineral reserves do not have to demonstrate economic viability. Mineral resources are
subject to infill drilling, permitting, mine planning, mining dilution and recovery losses, among other things, to be
converted into mineral reserves. Due to the uncertainty associated with inferred mineral resources, it cannot be
assumed that all or any part of an inferred mineral resource will ever be upgraded to indicated or measured mineral
resources, including as a result of continued exploration.
The Mineral Resource Statement was prepared by John Arthur, FGS, CGeol (CP) and Peter Gleeson FAusIMM (CP) of
SRK Consulting (UK) Ltd, both are Qualified Persons as defined by the CIM Code.
Notes on tonnes and grade associated with Madaouela Mineral Resources
as at April 20, 2015
Appendix B
Notes on Madaouela Probable Mineral Reserves as at June 7, 2013
Open Pit Mineral Reserves for Miriam are reported within a designed pit shell at a cut-off grade of 0.41 kg/t eU. Cut-off grades are
based on a price of USD 70 per pound of U3O8 (USD 154 /kg U3O8) and uranium recoveries of 84.4 %, without considering
revenues from other metals. Note Mineral Reserves are based on both Measured and Indicated Resources.
Underground Mineral Reserves for MSNE-Maryvonne are reported at a cut-off grade of 0.48 kg/t eU for MSNE-Maryvonne. Cut-off
grades are based on a price of USD 70 per pound of U3O8 (USD 154 /kg U3O8) and uranium recoveries of 84.4 %, without
considering revenues from other metals. Note Mineral Reserves are based on both Measured and Indicated Resources.
Underground Mineral Reserves for Marianne Marilyn are reported at a cut-off grade of 0.60 kg/t eU for Marianne Marilyn, higher
than the estimated cut-off grade 0.48 kg/t eU.
On November 22, 2012, GoviEx submitted to the Niger authorities an application covering certain portions of the original
Madaouela I and IV licences surface areas that were excluded from the renewed licences granted on November 2, 2012. GoviEx
has been advised that the two applications for the excluded areas of Madaouela I and IV will be approved, but is awaited at the
time of writing its applications, and hence has not adjusted its reserves to account for any changes. However, it should be noted
that to a limited extent Miriam’s resources and hence reserves would be impacted should GoviEx not be successful in its
application.
The Company’s mineral reserves as at June 7, 2013 are classified in accordance with the Canadian Institute of Mining, Metallurgy
and Petroleum’s “CIM Definition Standards - For Mineral Resources and Mineral Reserves" in accordance with the requirements of
National Instrument 43-101 “Standards of Disclosure for Mineral Projects" (the Instrument). Mineral reserve and mineral resource
estimates reflect the Company's reasonable expectation that all necessary permits and approvals will be obtained and maintained.
The Mineral Reserve Statement was prepared by and under the direction of Rick Skelton, MSc, CEns, MIMMM MSAIMM, ARSM and
Ryan Freeman MAusIMM (CP) of SRK Ltd, who are Qualified Persons as defined by the CIM Code.

Weitere ähnliche Inhalte

Was ist angesagt?

New base 05 december 2017 energy news issue 1109 by khaled al awadi-compre...
New base 05 december 2017 energy news issue   1109  by khaled al awadi-compre...New base 05 december 2017 energy news issue   1109  by khaled al awadi-compre...
New base 05 december 2017 energy news issue 1109 by khaled al awadi-compre...Khaled Al Awadi
 
Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Doris Capurro
 
Opportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in IndiaOpportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in India Devesh Gautam
 
IRENA GPCA presentation 2015 1012
IRENA GPCA presentation 2015 1012IRENA GPCA presentation 2015 1012
IRENA GPCA presentation 2015 1012IRENAslides
 
India's Wind Energy Market Potential
India's Wind Energy Market PotentialIndia's Wind Energy Market Potential
India's Wind Energy Market PotentialAklanta Kalita
 
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy  an overview by mohammed mostafa el khayat- nrea_egyptWind energy  an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy an overview by mohammed mostafa el khayat- nrea_egyptRCREEE
 
RCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE
 
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...WEC Italia
 
Non-fossil fuel treaty report: Fossil Fuel Exit Strategy
Non-fossil fuel treaty report: Fossil Fuel Exit StrategyNon-fossil fuel treaty report: Fossil Fuel Exit Strategy
Non-fossil fuel treaty report: Fossil Fuel Exit StrategyEnergy for One World
 
Emerging renewable energy implementation in gcc
Emerging renewable energy implementation in gccEmerging renewable energy implementation in gcc
Emerging renewable energy implementation in gccRajesh Sarma
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysisAnkur Agarwal
 
2010 deep research report on china pv power station
2010 deep research report on china pv power station2010 deep research report on china pv power station
2010 deep research report on china pv power stationqyresearch
 
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...Victor Popolitov
 
Solar News from around the world for week 2 of June 2021
Solar News from around the world for week 2 of June 2021Solar News from around the world for week 2 of June 2021
Solar News from around the world for week 2 of June 2021Rohit Arora
 

Was ist angesagt? (18)

New base 05 december 2017 energy news issue 1109 by khaled al awadi-compre...
New base 05 december 2017 energy news issue   1109  by khaled al awadi-compre...New base 05 december 2017 energy news issue   1109  by khaled al awadi-compre...
New base 05 december 2017 energy news issue 1109 by khaled al awadi-compre...
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Renewables and World Bank Guarantees
Renewables and World Bank Guarantees
 
Opportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in IndiaOpportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in India
 
Energy Transition(s): where are we?
Energy Transition(s): where are we?Energy Transition(s): where are we?
Energy Transition(s): where are we?
 
IRENA GPCA presentation 2015 1012
IRENA GPCA presentation 2015 1012IRENA GPCA presentation 2015 1012
IRENA GPCA presentation 2015 1012
 
Solar in egypt guide
Solar in egypt guideSolar in egypt guide
Solar in egypt guide
 
India's Wind Energy Market Potential
India's Wind Energy Market PotentialIndia's Wind Energy Market Potential
India's Wind Energy Market Potential
 
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy  an overview by mohammed mostafa el khayat- nrea_egyptWind energy  an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
 
RCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programs
 
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
 
Non-fossil fuel treaty report: Fossil Fuel Exit Strategy
Non-fossil fuel treaty report: Fossil Fuel Exit StrategyNon-fossil fuel treaty report: Fossil Fuel Exit Strategy
Non-fossil fuel treaty report: Fossil Fuel Exit Strategy
 
Emerging renewable energy implementation in gcc
Emerging renewable energy implementation in gccEmerging renewable energy implementation in gcc
Emerging renewable energy implementation in gcc
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysis
 
2010 deep research report on china pv power station
2010 deep research report on china pv power station2010 deep research report on china pv power station
2010 deep research report on china pv power station
 
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
IPP for CUC CNMI/USA Modern Independent Energy Plant in the CNMI, an Overseas...
 
Solar for-students
Solar for-studentsSolar for-students
Solar for-students
 
Solar News from around the world for week 2 of June 2021
Solar News from around the world for week 2 of June 2021Solar News from around the world for week 2 of June 2021
Solar News from around the world for week 2 of June 2021
 

Andere mochten auch (7)

Ngualla Project: A large new rare earth discovery
Ngualla Project: A large new rare earth discoveryNgualla Project: A large new rare earth discovery
Ngualla Project: A large new rare earth discovery
 
CanAlaska Uranium
CanAlaska UraniumCanAlaska Uranium
CanAlaska Uranium
 
Organto Presentation - November 2016
Organto Presentation - November 2016Organto Presentation - November 2016
Organto Presentation - November 2016
 
Order disorder transformation( the kinetics behind)
Order disorder transformation( the kinetics behind)Order disorder transformation( the kinetics behind)
Order disorder transformation( the kinetics behind)
 
Next-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based ProppantsNext-Generation Fly-Ash Based Proppants
Next-Generation Fly-Ash Based Proppants
 
The Global Proppants Industry
The Global Proppants IndustryThe Global Proppants Industry
The Global Proppants Industry
 
The next generation in proppants
The next generation in proppantsThe next generation in proppants
The next generation in proppants
 

Ähnlich wie Goviex (20)

Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
NexGen Arrow Presentation
NexGen Arrow PresentationNexGen Arrow Presentation
NexGen Arrow Presentation
 
Nxe presentation april 2015 (nyc bos)
Nxe presentation april 2015 (nyc bos)Nxe presentation april 2015 (nyc bos)
Nxe presentation april 2015 (nyc bos)
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Nxe presentation august 11 2015
Nxe presentation august 11 2015Nxe presentation august 11 2015
Nxe presentation august 11 2015
 
Corporate Presentation - August 2015
Corporate Presentation - August 2015Corporate Presentation - August 2015
Corporate Presentation - August 2015
 
Presentation
PresentationPresentation
Presentation
 
Nxe presentation june 1 2015
Nxe presentation june 1 2015Nxe presentation june 1 2015
Nxe presentation june 1 2015
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015
 
Nxe presentation
Nxe presentationNxe presentation
Nxe presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
IRENA Critical Materials - IRENA Technical Paper
IRENA Critical Materials - IRENA Technical PaperIRENA Critical Materials - IRENA Technical Paper
IRENA Critical Materials - IRENA Technical Paper
 
Diggers & Dealers Presentation Aug 2018
Diggers & Dealers Presentation Aug 2018Diggers & Dealers Presentation Aug 2018
Diggers & Dealers Presentation Aug 2018
 
Macusani Yellowcake Inc (TSX-V) Investor Presentation
Macusani Yellowcake Inc (TSX-V) Investor PresentationMacusani Yellowcake Inc (TSX-V) Investor Presentation
Macusani Yellowcake Inc (TSX-V) Investor Presentation
 
Ure corporate presentation 20140709 (final)
Ure corporate presentation 20140709 (final)Ure corporate presentation 20140709 (final)
Ure corporate presentation 20140709 (final)
 

Mehr von Objective Capital Conferences

Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017 Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017 Objective Capital Conferences
 
Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013Objective Capital Conferences
 
African mining: a macroeconomic and political analysis
African mining: a macroeconomic and political analysisAfrican mining: a macroeconomic and political analysis
African mining: a macroeconomic and political analysisObjective Capital Conferences
 

Mehr von Objective Capital Conferences (20)

Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017 Skin Elements Corporate Presentation - London, Dec 2017
Skin Elements Corporate Presentation - London, Dec 2017
 
KBL Mining Corporate Presentation - June 2015
KBL Mining Corporate Presentation - June 2015KBL Mining Corporate Presentation - June 2015
KBL Mining Corporate Presentation - June 2015
 
Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013Century Iron Mines Corporate Presentation - November 2013
Century Iron Mines Corporate Presentation - November 2013
 
Canoel International Energy - October 2013
Canoel International Energy - October 2013Canoel International Energy - October 2013
Canoel International Energy - October 2013
 
Century Iron Corporate Presentation - May 2013
Century Iron Corporate Presentation - May 2013Century Iron Corporate Presentation - May 2013
Century Iron Corporate Presentation - May 2013
 
Century Iron Mines Corporation
Century Iron Mines CorporationCentury Iron Mines Corporation
Century Iron Mines Corporation
 
Building the next Saskatchewan potash giant
Building the next Saskatchewan potash giantBuilding the next Saskatchewan potash giant
Building the next Saskatchewan potash giant
 
Building the Italian antimony industry
Building the Italian antimony industryBuilding the Italian antimony industry
Building the Italian antimony industry
 
'In the elevator'
'In the elevator''In the elevator'
'In the elevator'
 
Developing Gold Projects in Tanzania and Namibia
Developing Gold Projects in Tanzania and NamibiaDeveloping Gold Projects in Tanzania and Namibia
Developing Gold Projects in Tanzania and Namibia
 
Building the next gold giant
Building the next gold giantBuilding the next gold giant
Building the next gold giant
 
What is the future of the Rare Earths sector?
What is the future of the Rare Earths sector?What is the future of the Rare Earths sector?
What is the future of the Rare Earths sector?
 
Gold exploration in the Volta Region
Gold exploration in the Volta RegionGold exploration in the Volta Region
Gold exploration in the Volta Region
 
Gold and base metals exploration in Eritrea
Gold and base metals exploration in EritreaGold and base metals exploration in Eritrea
Gold and base metals exploration in Eritrea
 
Copper exploration in Oman and Turkey
Copper exploration in Oman and TurkeyCopper exploration in Oman and Turkey
Copper exploration in Oman and Turkey
 
Developing an integrated approach in Tanzania
Developing an integrated approach in TanzaniaDeveloping an integrated approach in Tanzania
Developing an integrated approach in Tanzania
 
African mining: a macroeconomic and political analysis
African mining: a macroeconomic and political analysisAfrican mining: a macroeconomic and political analysis
African mining: a macroeconomic and political analysis
 
Ngualla Project: Discovery to Development
Ngualla Project: Discovery to DevelopmentNgualla Project: Discovery to Development
Ngualla Project: Discovery to Development
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Exploration in Tanzania
Exploration in TanzaniaExploration in Tanzania
Exploration in Tanzania
 

Kürzlich hochgeladen

一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样dyuozua
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样sovco
 
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样dyuozua
 
一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样
一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样
一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样dyuozua
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfProbe Gold
 
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call GirlsPremium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girlsmeghakumariji156
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationLeonardo
 
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样dyuozua
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Ltd
 
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样dyuozua
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Klinik kandungan
 
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样dyuozua
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024Kweku Zurek
 
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样dyuozua
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCAMILRI
 
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样dyuozua
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCAMILRI
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证xzxvi5zp
 

Kürzlich hochgeladen (20)

一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
一比一原版(Galway毕业证书)爱尔兰高威大学毕业证成绩单原件一模一样
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
 
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
一比一原版(Otago毕业证书)奥塔哥大学毕业证成绩单原件一模一样
 
一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样
一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样
一比一原版(UC毕业证书)坎特伯雷大学毕业证成绩单原件一模一样
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call GirlsPremium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
 
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
一比一原版(UoA毕业证书)奥克兰大学毕业证成绩单原件一模一样
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
一比一原版(AUT毕业证书)奥克兰理工大学毕业证成绩单原件一模一样
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 

Goviex

  • 1. June 2015Part of the Nuclear Energy Solution
  • 2. Disclaimers & Cautionary Statements This presentation is and proprietary to GoviEx Uranium Inc., and may not be reproduced, disseminated or referred to, in whole or in part without the prior consent of the company. The company assumes no responsibility for verification of the information in these materials, and no representation or warranty is made as to the accuracy or completeness of such information. The company assumes no obligation to correct or update these materials. These materials do not contain all information that may be required to evaluate, and do not constitute a recommendation with respect to, any transaction or matter. Any recipient of these materials should conduct its own independent analysis of the matters referred to herein. This presentation includes certain “forward-looking statements”. All statements other than statements of historical facts, are forward looking statements that involve various risks and uncertainties. Statements relating to “resources” are deemed to be forward-looking statements, as they involve the implied assessment, based on certain estimates and assumptions, that the resources described can be profitably produced in the future. There can be no assurances that such statements will prove accurate and actual results and future events could differ materially from those anticipated in such statements. Such information contained herein represents management’s best judgment as of the date hereof based on information currently available. The company can not guarantee future results, levels of activity, performance, or achievements. The company does not assume the obligation to update any forward-looking statement. Disclosure of a scientific or technical nature in this presentation relating to the companies mineral properties was prepared by, or under the supervision of, Dr. Rob Bowell of SRK Consulting UK, a “qualified person” as defined in NI 43-101. Historical data disclosed herein has not been verified by Dr. Bowell. Complete disclosure with respect to (a) the key assumptions, parameters, and methods used to estimate the mineral resources and mineral reserves described herein and (b) known risks that could materially affect the potential development of those mineral resources or mineral reserves is set forth in the Company’s technical report titled “AN UPDATED INTEGRATED DEVELOPMENT PLAN FOR THE MADAOUELA PROJECT, NIGER”, dated April 28, 2014, available at www.sedar.com. United States investors are cautioned that the requirements and terminology of NI 43-101 and the CIM Standards on Mineral Resources and Reserves – Definitions and Guideline (“CIM Standards”) differ significantly from the requirements and terminology of the United States Securities and Exchange Commission (“SEC”) set forth in the SEC’s Industry Guide 7 (“SEC Industry Guide 7”). Accordingly, the Company’s disclosures regarding mineralization may not be comparable to similar information disclosed by companies subject to SEC Industry Guide 7. Without limiting the foregoing, while the terms “mineral resources”, “inferred mineral resources”, “indicated mineral resources” and “measured mineral resources” are recognized and required by NI 43-101 and the CIM Standards, they are not recognized by the SEC and are not permitted to be used in documents filed with the SEC by companies subject to SEC Industry Guide 7. In addition, the NI 43-101 and CIM Standards definition of a “reserve” differs from the definition in SEC Industry Guide 7. This presentation and the disclosure contained herein does not constitute an offer to sell or the solicitation of an offer to buy securities of GoviEx Uranium.
  • 3. Air Pollution is the World’s Single Biggest Environmental Health Risk – WHO March 2014. The UN’s World Health Organization released new estimates of air pollution’s toll on humanity, declaring risks to be far greater than previously thought. • Air pollution accounts for one of every eight deaths around the world. It claimed 7 million lives in 2012 – almost half caused by outdoor sources of pollution. • “This finding more than doubles previous estimates and confirms that air pollution is now the world’s largest single environmental health risk.” • “Few risks have a greater impact on global health today than air pollution; the evidence signals the need for concerted action to clean up the air we all breathe.” — Dr. Maria Neira, WHO Director
  • 4. 54% of World’s Population Now Live in Cities Sources: United Nations & Statista, July 2014 % of population living in urban areas Urbanization: Cheap, Clean and Reliable Energy Generation is Key to Solving World’s Air Pollution Problem
  • 5. Nuclear is Part of the Green Solution Sources: EIA & Sustainable Energy (D. Mackay, 2015) Levelised cost of electricity (LCOE) $/MWh CO2 Emission (g-CO2/kWh) • Geothermal needs the right geology. • Hydro needs the right geography. • Solar and wind need space: - Solar: 10 W/m2 (Europe) - Wind: 2 W/m2 - Nuclear: 1,000 W/m2 • 3.2 GW Hinkley Reactor (UK) would require an area: • 2 x Brussels in solar panels • London in wind turbines • Solar and wind have limited efficiency until energy storage issues resolved.
  • 6. The China Story Equals Uranium Demand • In 2012, China had 15 nuclear power units with a total electric capacity of 11 gigawatts, accounting for just 1.9% of the total electricity output. • In 2013, this rose to 2% with 17 reactors, and 28 under construction. By comparison, the USA is currently 20% and France 74%. • China has the world’s most ambitious nuclear program with plans to provide 6% or 58 GW of capacity by 2020, and a further increase to 16% or 200 GW by 2030. • By 2030, China is expected to consume nearly half of global uranium production. • With limited domestic reserves, and majority high-cost, it makes sense China looks to purchase as much low-cost production it can over the next few years. Sources: UXC Consulting & World Nuclear News
  • 7. India’s Story Mirrors China • 2014 Environmental Preference Index ranked India No. 174 out of 178 countries for air quality (China is No. 176). • WHO 2014 survey found 13 of 20 most polluted cities in the world were in India. • Leading cause of premature death, with about 620,000 people dying every year from pollution-related diseases. • In 2013, India had 21 reactor with installed capacity of 5,780 MW consuming approx. 1580 TU per annum. • Targeting installed capacity of 63,000 MW (equivalent to 25% total energy demand) by 2032. Sources: Yale, World Nuclear News & WHO
  • 8. Uranium Demand • Uranium demand driven by nuclear build out. • China forecast to grow from 21 reactors in 2014 to 132 reactors in 2030. • Japan restarts slow to begin, but still targeting approx. 20% of long-term power mix. • Indian and African reactor builds forecast to exceed reductions in Western Europe. No. reactors Sources: UxC Consulting, OECD
  • 9. Uranium Supply Mlb U3O8 Cash / Incentive Cost US$/lb U3O8 • Declining production partly offset by new projects. • Post-2020 supply deficit. • Continued price weakness increases risk of further closures. • Decline in quality of Reasonably Assured Resources since 2011. • US$18/lb resources equate to only 6 years global production. • Majority production not profitable at current spot price. • Increase in incentive price for new production with majority >US$79/lb. Tonnes U 000s Source: UxC Consulting, OECD Supply Gap
  • 10. The Republic of Niger – Uranium Country • World’s 4th largest uranium-producing nation (World Nuclear Association Report, 2012) • 50 years of uninterrupted uranium exports on highway that crosses GoviEx tenements • 2011 Presidential Election lauded by independent observers and the EU • President Issoufou has a mining background and elected on platform of job creation Cominak Mill & Somair Mine near Arlit, adjacent to GoviEx’s Madaouela Project • Mining accounts for 50-70% of export revenues, national priority for job creation • Mining Code encourages foreign direct investment and project development • Well-established infrastructure
  • 11. GoviEx Milestones • 2007 – GoviEx commenced operations focused on building a Niger team • 2008 – Signed Strategic Partnership with Cameco Corporation • 2009 – Expanded exploration program at Madaouela • 2010 – Completed NI 43-101 preliminary economic assessment (PEA) • 2011 – Surpassed 400,000 metres of drilling and updated resource estimate • 2012 – Signed Strategic Financing and off-take agreement with Toshiba • 2013 – Completed NI 43-101 integrated development plan (IDP) • 2014 – IPO and Toshiba A Bond Redemption • 2015 – Expanded Marianne and Marilyn Uranium Mineral Resource
  • 12. GoviEx Licences in Niger’s Mining Heart
  • 13. Madaouela Historical Drilling Licence Metres* Mad 1 & Agal 525,000 Mad 2 10,900 Mad 3 16,700 Mad 4 & Era 25,300 Anou Melle 3,300 Total 581,200 *End 2013 • Resource extension drilling targets still open on Mad 1 • Agal targets for resource development and extension • Considerable “blue sky” remains GT = Thickness (m) x U grade (kg/t) • Renewed Madaouela 1, 2, 3, 4 and Anou Melle permits in November 2012; extended for a further 36 months • Applied for Agal and Era licences in November 2012; awaiting approval
  • 14. Madaouela Exploration Upside Potential Main Targets: 1. Anou Melle 2. Brownfileds 3. Madaouela Fault 4. Redox Extn. 1 2 4 3
  • 15. Summary of the mineral resources classified in accordance with CIM guidelines for Madaouela Project using cut-off: 0.4 kg/t eU* *See Appendix A for notes on tonnes and grade associated with Madaouela Mineral Resources as at April 20, 2015 Madaouela Mineral Resources, April 2015
  • 16. Conceptual Integrated Mine Development Plan TAILINGS STORAGE FACILITY M&M PORTAL LOCATION PROCESSING PLANT HIGH VOLUME & MINE LINK ROAD CONVEYOR EXPLOSIVES MAGAZINE MSNE-MARYVONNE INFRASTRUCTURE AREA MSNE-MARYVONNE PORTAL LOCATION WELLFIELD LOCATION MARIANNE-MARILYN UNDERGROUND MINE M&M INFRASTRUCTURE AREA SITE ACCESS ROAD FROM N25 MSNE- MARYVONNE MINE HIGH VOLUME & MINE LINK ROAD MIRIAM OPEN PIT MIRIAM WASTE DUMP 3 MIRIAM WASTE DUMP 2 MIRIAM WASTE DUMP 1 MIRIAM INFRASTRUCTURE AREA
  • 17. Probable Mineral Reserves ROM Uranium Oxide Deposit Cut-Off Grade eU (kg/t) Tonnes (Mt) Grade U3O8 (kg/t) Contained U3O8 (t) Miriam OP 0.41 6.4 1.07 6,800 Marianne-Marilyn U/G 0.60 11.1 1.00 11,100 MSNE-Maryvonne U/G 0.48 7.8 0.89 7,000 Probable Mineral Reserves 25.3 0.98 24,900 CIM mineral reserve statement (June 7th, 2013) for the Madaouela deposit * • Probable mineral reserves are 54.88 Mlb U3O8 at 0.098% U3O8. • Reported on 100% basis. • Total Uranium Recovery forecast at 83%. • Accounts for dilution, mining losses and stope design losses. • Based on June 2013 IDP cash costs, still to be revised for lower Sept IDP costs. *See Appendix B for notes on Madaouela Probable Mineral Reserves as at June 7, 2013
  • 18. Integrated Development Plan (IDP) Summary Table, September 2013 Parameter Units IDP Base Case Sales U3O8 (Mlb) 45,59 Prices U3O8 (USD/lb) 70 Cash Operating Costs (USD/lb U3O8) 26.39 Total Operating Costs (incld Rylty) (USD/lb U3O8) 33.10 Startup Capital Expenditure (USDm) 340 Total LOM Capital Expenditure (USDm) 646 Capital Costs (USD/lb U3O8) 14.16 Total Costs (USD/lb U3O8) 40.55 NPV @ 8.00% (USDm) 251.14 IRR (%) 21.9% Break even price (NPV=0 @ 8%) (USD/lb U3O8) 50.5 NPV IRR NPV at 10% (USD70/lb U3O8) (USDm) 185 21.9% NPV at 8% (USD70/lb U3O8) (USDm) 251 21.9% NPV at 8% (USD65/lb U3O8) (USDm) 184 18.5% NPV at 8% (USD75/lb U3O8) (USDm) 317 25.2% NPV reported post all taxes and royalties, and for 100% of the Madaouela Project
  • 19. Project Milestones  Completed IDP in 2013  IPO completed in 2014  ESIA completed March 2015 • Mining Permit Application June 2015 • Mining Permit Grant in 2015/16 • Pre-mine development in 2016/17 • Attain full production in 2018/2019
  • 20. Source: Dundee Capital Markets Uranium Sector Weekly, May 19, 2015 Note: Priced as of May 26, 2015 (1) M&I is inclusive of reserves. GoviEx M+I Resources = 110 Mlb; Inferred Resources = 28 Mlb. (2) Consensus pricing based on Bloomberg estimates as of May 2015. Uranium Sector EV/Resource (C$/lb)Total U3O8 Reserves & Resources (Mlb) (1) $35.00 $43.00 $51.50 $69.37 $70.00 $0.00 $10.00 $20.00 $30.00 $40.00 $50.00 $60.00 $70.00 $80.00 2014 2015 2016 2017 LT (US$/lb) Consensus Uranium Prices(2) Uranium Developers EV (C$m) Significant Value in GoviEx Relative to Peers Average = 97Mlb Average = 0.68x Reserves Resources GoviEx Inferred Resources GoviEx M&I Resources
  • 21. Investment Strategy in Niger Sustainable Success Through Local Investment • Over US$110 million invested in Niger since 2007. • 100% in-country leadership positions occupied by locals. • Substantial investment in training programs. • Top foreign direct investor (non Sovereign, ex France / China). • $1+5 million donation for local social relief. • Investments to improve educational facilities and livelihoods. • Focus on water delivery that serve 2,000 locals.
  • 22. GoviEx Core Team Executive Management Board of Directors • Govind Friedland, Exec. Chairman, GE, Colorado School of Mines • Daniel Major, CEO, Mining Engineer, Camborne School of Mines • Lei Wang, Interim CFO • Rodrigo Romo, Corporate Secretary • Aminou Boukari, Niger Country Manager • Jerome Randabel, Chief Geologist • Dr. Henri Sanguinetti, 35 years experience in uranium exploration and mining, 25+ years with COGEMA and AREVA • Dr. Rob Bowell, SRK Project Manager for Madaouela PFS • Assane Adamou, Legini Niger, geotechnical/environmental (EIA) • Matthew Lechtzier, Lead Director • Govind Friedland, Exec Chairman • Daniel Major, CEO & Exec Director • Robert Hanson, HRCC Chair • Rachid Benyakhlef, TC Chair • William Assini, Audit Chair • David Marsh, Director • Benoit LaSalle, Director • SRK Consulting, Madaouela Project Consultants • Tenova Bateman Engineering (EPCM) • Deloitte & Touche LLP, Auditors External Advisors Niger Management/Consultants
  • 23. As at As at December 31, 2014 May 31, 2015 All figures in Millions except for per share items Common Shares Outstanding 146.22 146.22 Options 4.65 7.87 Fully Diluted 150.86 154.09 Capital Structure Registered Shareholders Percentage Govind Friedland 21.36% Toshiba Corporation 19.42% Cameco Global Exploration Ltd. 8.55% THL Resources Investment Limited 6.84% Semafo Inc. 6.70% Current Shareholding as at April 30, 2015
  • 24. GoviEx Strength is the Sum of it Parts • Advanced stage uranium project • Pre-feasibility completed • Environmental and Social Impact Assessment completed • Mine permit application in process • Large NI 43-101 Mineral Resource • 108 Mlb in Measured & Indicated and 28 Mlb in Inferred • Exploration upside • Exploration to date covered less that 10% of the surface area • Moving to near mine brownfields exploration • Good reserve grade combined with upgrade technology • Compared to 0.03% at Rossing, Langer 0.05%, Imouraren 0.07% and Husab 0.04% • Upgrading technology results in leach-feed grade of 0.5% • Strong stable shareholder base • Govind Friedland, Toshiba Corporation, Cameco • Large project with robust economics • Mine life in excess of 18 years at 2.5 Mlb U3O8 per annum at C1 cash cost of $26/lb • Potential to reduce opex through optimization • Niger open for business in uranium mining • Long history of mining • Strong development-focused mining code
  • 26. Appendix A On November 22, 2012, GoviEx submitted to the Niger authorities a licence application covering certain portions of the original Madaouela I and IV licences surface areas that were excluded from the renewed licences granted on November 2, 2012. GoviEx has been advised that the two applications for the excluded areas of Madaouela I and IV will be approved, but is awaited at the time of writing its applications, and hence has not adjusted its resources to account for any potential changes. However, it should be noted that resources associated with MSEE, and La Banane would be materially affected, and to a limited extent Miriam’s resources would be affected should GoviEx not be successful in its application. The company’s mineral resources as at April 20, 2015 are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum’s “CIM Definition Standards - For Mineral Resources and Mineral Reserves" in accordance with the requirements of National Instrument 43-101 “Standards of Disclosure for Mineral Projects" (the Instrument). Mineral reserve and mineral resource estimates reflect the company's reasonable expectation that all necessary permits and approvals will be obtained and maintained. (1kg/t eU3O8=0.1% eU3O8). The “e” symbol denotes that resource estimation is based on spectrometer data obtained in the field and confirmed by a smaller number of samples by laboratory chemical analysis. Mineral resources that are not mineral reserves do not have to demonstrate economic viability. Mineral resources are subject to infill drilling, permitting, mine planning, mining dilution and recovery losses, among other things, to be converted into mineral reserves. Due to the uncertainty associated with inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to indicated or measured mineral resources, including as a result of continued exploration. The Mineral Resource Statement was prepared by John Arthur, FGS, CGeol (CP) and Peter Gleeson FAusIMM (CP) of SRK Consulting (UK) Ltd, both are Qualified Persons as defined by the CIM Code. Notes on tonnes and grade associated with Madaouela Mineral Resources as at April 20, 2015
  • 27. Appendix B Notes on Madaouela Probable Mineral Reserves as at June 7, 2013 Open Pit Mineral Reserves for Miriam are reported within a designed pit shell at a cut-off grade of 0.41 kg/t eU. Cut-off grades are based on a price of USD 70 per pound of U3O8 (USD 154 /kg U3O8) and uranium recoveries of 84.4 %, without considering revenues from other metals. Note Mineral Reserves are based on both Measured and Indicated Resources. Underground Mineral Reserves for MSNE-Maryvonne are reported at a cut-off grade of 0.48 kg/t eU for MSNE-Maryvonne. Cut-off grades are based on a price of USD 70 per pound of U3O8 (USD 154 /kg U3O8) and uranium recoveries of 84.4 %, without considering revenues from other metals. Note Mineral Reserves are based on both Measured and Indicated Resources. Underground Mineral Reserves for Marianne Marilyn are reported at a cut-off grade of 0.60 kg/t eU for Marianne Marilyn, higher than the estimated cut-off grade 0.48 kg/t eU. On November 22, 2012, GoviEx submitted to the Niger authorities an application covering certain portions of the original Madaouela I and IV licences surface areas that were excluded from the renewed licences granted on November 2, 2012. GoviEx has been advised that the two applications for the excluded areas of Madaouela I and IV will be approved, but is awaited at the time of writing its applications, and hence has not adjusted its reserves to account for any changes. However, it should be noted that to a limited extent Miriam’s resources and hence reserves would be impacted should GoviEx not be successful in its application. The Company’s mineral reserves as at June 7, 2013 are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum’s “CIM Definition Standards - For Mineral Resources and Mineral Reserves" in accordance with the requirements of National Instrument 43-101 “Standards of Disclosure for Mineral Projects" (the Instrument). Mineral reserve and mineral resource estimates reflect the Company's reasonable expectation that all necessary permits and approvals will be obtained and maintained. The Mineral Reserve Statement was prepared by and under the direction of Rick Skelton, MSc, CEns, MIMMM MSAIMM, ARSM and Ryan Freeman MAusIMM (CP) of SRK Ltd, who are Qualified Persons as defined by the CIM Code.