Workers Evacuated After Gas Levels Rise
Metropolitan Colliery – 21st March 2019
• 6:00pm the issue began with the longwall face stopped on high CO2 in return.
• 7:15pm withdrawal of all underground persons begins. Withdrawal TARP activated
rising CH4 levels.
• 8:45pm all persons underground withdrawn to the surface and accounted for.
• LW return recorded CH4 to 16.1%, CO2 to 15.9% and O2 to 13.5% in 43m3/s.
• Main upcast shaft recorded CH4 to 3.01%, CO2 to 4.16% in 280m3/s.
• Workforce out of the mine for seven days.
• 2.9 million cubic metres of gas released in 6 days. 38% CH4 and 62% CO2.
Facts
Gas trends – LW return tube bundle
Gas trends – LW return real time
Gas trends – Upcast shaft tube bundle
Gas trends – Ellicott diagram LW return
Gas trends – Ellicott diagram upcast shaft
Where did the gas come from?
Where did the gas come from?
• Most likely source appears to be from surrounding strata below the working seam.
• Limited data available for the mining area.
• Gas assumed to be released by a combination of factors
• Fracture profile around the LW
• Change in depth of cover
• Mining through a syncline
• Loading event on the supports
• No identified geological structure in the immediate area
• No cross measure drainage holes due to lack of identified geological structure
• Tube bundle gas monitoring continued to function
• Real time gas monitoring very limited
Findings
1. Managing the gas reservoirs around extraction panels:
a. Ensure there is enough reliable exploration data available to determine the
geotechnical risks and gas reservoir affected by the proposed mining method.
b. Include a means to determine which reservoir the gas is released from to
confirm design and modelling assumptions.
c. Include lithology above as well as below the intended working seam.
d. Consider significant gas capture with the gas drainage process and have
minimal contamination of accessible mine airways.
Recommendations – focusing on
2. Withdrawal trigger action response plans (TARPs):
a. Design TARPs to reflect realistic triggers and actions that are simple to
follow.
b. Develop a process to ensure the workforce are aware and understand the
TARPs in use at the mine.
3. Use of self-contained self-rescuers:
a. Consider expanding the training on self-rescuers to include use during times
where low oxygen environments are encountered and excessive levels of
carbon-dioxide gas.
b. Develop TARPs in relation to the circumstances when self-rescuers are
expected to be used.
Recommendations – focusing on
4. Post incident monitoring:
a. Mines should conduct a risk assessment to determine atmospheric
monitoring requirements post incident (explosion, fire, gas event, etc.). This
should include both real time and tube bundle.
b. The selection of post incident monitoring arrangements should consider the
post incident survivability of the system and system elements.
c. Post incident monitoring arrangements should operate effectively when
power is removed from all or parts of the mine.
d. Post incident monitoring points should be installed in optimal locations such
as intake airways, return airways and escape routes.
e. Monitoring for gases relevant to the incident should form part of the post
incident monitoring arrangements. This should ensure the concentration range
of the gases being monitored are appropriate.
f. Implement a program of testing the effectiveness of the post incident
monitoring arrangements.
Recommendations – focusing on
5. Re-entry procedures:
a. Mines should conduct a risk assessment to determine re-entry conditions
appropriate for the various risks identified.
b. Develop TARPs to reflect acceptable and unacceptable conditions.
6. Workers’ access to return airways during extraction activities:
a. Mines should conduct a risk assessment to determine the controls necessary for
workers to safely access return airways.
b. Develop a procedure to reflect those controls identified.
c. Consider the timing of access, barometric change effects, production activities,
whether working alone is appropriate, remote workings, communications and gas
detection.
d. Review requirements for appropriate gas monitoring, communications and
emergency escape for those workers accessing return airways in the event a
withdrawal is required.
Recommendations – focusing on
7. The determination of acceptable methane levels passing through the ventilation
fans:
a. Mines should conduct a risk assessment to determine the maximum levels
of methane that will be allowed to pass through the main ventilation fans.
b. Develop TARPs to guide workers at the mine in the decision-making
process when excessive quantities of various gases are being exhausted from
the mine.
c. Explore options to be able to conduct simple ventilation changes remotely
from the surface to manage unexpected gas issues underground.
d. Explore options to be able to remotely limit the volumes of methane gas
levels that pass through the fan infrastructure.
Recommendations – focusing on
8. Management of ventilation fan exhaust gases around surface infrastructure:
a. Mines should conduct plume modelling in relation to the main surface
ventilation fans.
b. Conduct hazardous area assessments to include relevant infrastructure that
may be affected by these exhaust gases.
9. Review site emergency management and withdrawal procedures:
a. Include accurate monitoring of the locations of workers and man transport
vehicles to facilitate timely and efficient withdrawal.
b. Include the availability of man transports in work areas.
Recommendations – focusing on
David Gordon
david.gordon@planning.nsw.gov.au
Thank you.
Questions?

Weitere ähnliche Inhalte

Was ist angesagt?

Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)
Obi-Ugbo Alex
 

Was ist angesagt? (7)

2017 Safety Professional
2017 Safety Professional2017 Safety Professional
2017 Safety Professional
 
The management of geotechnical risk on major infrastructure projects
The management of geotechnical risk on major infrastructure projectsThe management of geotechnical risk on major infrastructure projects
The management of geotechnical risk on major infrastructure projects
 
Texas city 10 years mar 2015 rev. 1.2 (ops)
Texas city 10 years mar 2015 rev. 1.2 (ops)Texas city 10 years mar 2015 rev. 1.2 (ops)
Texas city 10 years mar 2015 rev. 1.2 (ops)
 
Application of high energy micro-mist technology - Jon Roberts
Application of high energy micro-mist technology - Jon RobertsApplication of high energy micro-mist technology - Jon Roberts
Application of high energy micro-mist technology - Jon Roberts
 
Natural Gas Roundtable - ET Environmental Presentation
Natural Gas Roundtable - ET Environmental PresentationNatural Gas Roundtable - ET Environmental Presentation
Natural Gas Roundtable - ET Environmental Presentation
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)
 
Mechanical Update - Jeremy U'Brien
Mechanical Update - Jeremy U'BrienMechanical Update - Jeremy U'Brien
Mechanical Update - Jeremy U'Brien
 

Ähnlich wie Metropolitan colliery gas (Dave Gordon)

Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
Chad Colton
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
irvan septyan mulyana
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdf
Jalal Neshat
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtp
medongonu
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtp
medongonu
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
hydrologyproject001
 

Ähnlich wie Metropolitan colliery gas (Dave Gordon) (20)

Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
Tube bundle gas monitoring system
Tube bundle gas monitoring systemTube bundle gas monitoring system
Tube bundle gas monitoring system
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
 
510 tunneling safety 2016
510 tunneling safety 2016510 tunneling safety 2016
510 tunneling safety 2016
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdf
 
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
 
Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 
part 1 .pdf.pdf
part 1 .pdf.pdfpart 1 .pdf.pdf
part 1 .pdf.pdf
 
PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale DrillingPA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTING
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtp
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtp
 
CCS Risk analysis, Neil Wildgust, Global CCS Institute
CCS Risk analysis, Neil Wildgust, Global CCS InstituteCCS Risk analysis, Neil Wildgust, Global CCS Institute
CCS Risk analysis, Neil Wildgust, Global CCS Institute
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
Center for Sustainable Shale Development 15 Performance Standards
Center for Sustainable Shale Development 15 Performance StandardsCenter for Sustainable Shale Development 15 Performance Standards
Center for Sustainable Shale Development 15 Performance Standards
 
Mech CE6461 FMM lab_manual
Mech CE6461 FMM lab_manualMech CE6461 FMM lab_manual
Mech CE6461 FMM lab_manual
 

Mehr von NSW Environment and Planning

Mehr von NSW Environment and Planning (20)

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
The culture of hydraulic safety - Kyle Probert
The culture of hydraulic safety - Kyle ProbertThe culture of hydraulic safety - Kyle Probert
The culture of hydraulic safety - Kyle Probert
 
Demolition of a former mine site - Luke Egan and David Wood
Demolition of a former mine site - Luke Egan and David WoodDemolition of a former mine site - Luke Egan and David Wood
Demolition of a former mine site - Luke Egan and David Wood
 
Equipment failure - a liability or an asset? - Roger Costanzi
Equipment failure - a liability or an asset? - Roger CostanziEquipment failure - a liability or an asset? - Roger Costanzi
Equipment failure - a liability or an asset? - Roger Costanzi
 
Critical risk and control frameworks - James Ritchie
Critical risk and control frameworks - James RitchieCritical risk and control frameworks - James Ritchie
Critical risk and control frameworks - James Ritchie
 

Kürzlich hochgeladen

Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 

Metropolitan colliery gas (Dave Gordon)

  • 1. David Gordon – Inspector of Mines Coal Safety and Health Representatives Seminar September 2019 Workers Evacuated After Gas Levels Rise Metropolitan Colliery – 21st March 2019
  • 2.
  • 3. • 6:00pm the issue began with the longwall face stopped on high CO2 in return. • 7:15pm withdrawal of all underground persons begins. Withdrawal TARP activated rising CH4 levels. • 8:45pm all persons underground withdrawn to the surface and accounted for. • LW return recorded CH4 to 16.1%, CO2 to 15.9% and O2 to 13.5% in 43m3/s. • Main upcast shaft recorded CH4 to 3.01%, CO2 to 4.16% in 280m3/s. • Workforce out of the mine for seven days. • 2.9 million cubic metres of gas released in 6 days. 38% CH4 and 62% CO2. Facts
  • 4. Gas trends – LW return tube bundle
  • 5. Gas trends – LW return real time
  • 6. Gas trends – Upcast shaft tube bundle
  • 7. Gas trends – Ellicott diagram LW return
  • 8. Gas trends – Ellicott diagram upcast shaft
  • 9. Where did the gas come from?
  • 10. Where did the gas come from?
  • 11. • Most likely source appears to be from surrounding strata below the working seam. • Limited data available for the mining area. • Gas assumed to be released by a combination of factors • Fracture profile around the LW • Change in depth of cover • Mining through a syncline • Loading event on the supports • No identified geological structure in the immediate area • No cross measure drainage holes due to lack of identified geological structure • Tube bundle gas monitoring continued to function • Real time gas monitoring very limited Findings
  • 12. 1. Managing the gas reservoirs around extraction panels: a. Ensure there is enough reliable exploration data available to determine the geotechnical risks and gas reservoir affected by the proposed mining method. b. Include a means to determine which reservoir the gas is released from to confirm design and modelling assumptions. c. Include lithology above as well as below the intended working seam. d. Consider significant gas capture with the gas drainage process and have minimal contamination of accessible mine airways. Recommendations – focusing on
  • 13. 2. Withdrawal trigger action response plans (TARPs): a. Design TARPs to reflect realistic triggers and actions that are simple to follow. b. Develop a process to ensure the workforce are aware and understand the TARPs in use at the mine. 3. Use of self-contained self-rescuers: a. Consider expanding the training on self-rescuers to include use during times where low oxygen environments are encountered and excessive levels of carbon-dioxide gas. b. Develop TARPs in relation to the circumstances when self-rescuers are expected to be used. Recommendations – focusing on
  • 14. 4. Post incident monitoring: a. Mines should conduct a risk assessment to determine atmospheric monitoring requirements post incident (explosion, fire, gas event, etc.). This should include both real time and tube bundle. b. The selection of post incident monitoring arrangements should consider the post incident survivability of the system and system elements. c. Post incident monitoring arrangements should operate effectively when power is removed from all or parts of the mine. d. Post incident monitoring points should be installed in optimal locations such as intake airways, return airways and escape routes. e. Monitoring for gases relevant to the incident should form part of the post incident monitoring arrangements. This should ensure the concentration range of the gases being monitored are appropriate. f. Implement a program of testing the effectiveness of the post incident monitoring arrangements. Recommendations – focusing on
  • 15. 5. Re-entry procedures: a. Mines should conduct a risk assessment to determine re-entry conditions appropriate for the various risks identified. b. Develop TARPs to reflect acceptable and unacceptable conditions. 6. Workers’ access to return airways during extraction activities: a. Mines should conduct a risk assessment to determine the controls necessary for workers to safely access return airways. b. Develop a procedure to reflect those controls identified. c. Consider the timing of access, barometric change effects, production activities, whether working alone is appropriate, remote workings, communications and gas detection. d. Review requirements for appropriate gas monitoring, communications and emergency escape for those workers accessing return airways in the event a withdrawal is required. Recommendations – focusing on
  • 16. 7. The determination of acceptable methane levels passing through the ventilation fans: a. Mines should conduct a risk assessment to determine the maximum levels of methane that will be allowed to pass through the main ventilation fans. b. Develop TARPs to guide workers at the mine in the decision-making process when excessive quantities of various gases are being exhausted from the mine. c. Explore options to be able to conduct simple ventilation changes remotely from the surface to manage unexpected gas issues underground. d. Explore options to be able to remotely limit the volumes of methane gas levels that pass through the fan infrastructure. Recommendations – focusing on
  • 17. 8. Management of ventilation fan exhaust gases around surface infrastructure: a. Mines should conduct plume modelling in relation to the main surface ventilation fans. b. Conduct hazardous area assessments to include relevant infrastructure that may be affected by these exhaust gases. 9. Review site emergency management and withdrawal procedures: a. Include accurate monitoring of the locations of workers and man transport vehicles to facilitate timely and efficient withdrawal. b. Include the availability of man transports in work areas. Recommendations – focusing on