SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Downloaden Sie, um offline zu lesen
Pressman Evaluation Report
Department: Press
Emp Name: ___________________________________________ Emp Code : __________________
Dept: _____________________ Joining Date: ____/____/________ Date of Last Increase: _____/_____/________
GENERAL Excellent Good Average Poor N/A
1. Attendance on press 10 min. before shift start
2. Looks for learning opportunities
3. Knowledge of paper used on jobs
4. Helping on other Process
5. Follows safety rules
6. Follows company policies
7. Works with others
8. Response to assignments
9. Ability to supervise crew
10. Works on own without supervision
11. Application of standard operating procedures
12. Efficient use of down time
13. Ability to train crew members
14. Attendance on monthly cleaning
CLEANING Excellent Good Average Poor N/A
1. Runner
2. Fountain tray
3. Water circulation tank
4. Blanket
5. Dampening roller
6. Plate removing
7. Plate cylinder
8. Reprint Plate cleaning and gumming
SET UPS Excellent Good Average Poor N/A
1. Shaft fixing to reel
2. Reel loading and unloading
3. Paper feeding
ATTENDANCE RECORD Excellent
Number of days absents this Period ________ Unauthorized Days ________ Good
Number of days absent last Period ________ Unauthorized Days ________ Average
Number of days late this Period __________ Number of days late last Period ______ Poor
Date of this evaluation ____/____/______ Date of previous evaluation ____/____/________ 6 Mos 12 Mos
Reason for evaluation: General Performance Salary Increase Promotion
4. Water circulation tank and tray filling
5. Ink tray filling
6. Plate folding
7. Knowledge of folder set ups
8. Plan ahead for next job
RUN Excellent Good Average Poor N/A
1. Paper jogging
2. Plate Insert
3. Ink feeding
4. Ink & Water Balance
5. Multi web capabilities
6. Color matching on process (speed & accuracy)
7. Registration (speed & accuracy)
8. Alert to press problems- fold off, scum,
dry ups, wash out, ink spitting, etc.
9. Identify why certain problems occur (scum, web break)
10. Waste generated
11. Training of press crew
12. Keeps press & surrounding areas clean
13. Organization of finished product
MAINTENANCE Excellent Good Average Poor N/A
1. Preventive maintenance
2. Roller setting
3. Identify and repair minor mechanical problems
PERSONEL PERFORMANCE Excellent Good Average Poor N/A
1. Quality of work
2. Sense of urgency
3. Keeps work area clean
4. Follows instructions
5. Cooperation
6. Attitude
7. Initiative
8. Work habits
Comments:_______________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
OVERALL EVALUATION Positive Negative
Overall comparison to previous evaluation improved No Change Poorer
REVIEWER COMMENTS:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
EMPLOYEE’S EFFICIENCY ON
Excellent Good Poor
 Unit
 3 C Stack
 3 C
 4 Hi Stack
 4 Hi
 Folder
 Is the Employee has previous experience in the Printing Industry? ______________________
 If Yes, How much? (Mention the Organization) _____________________________________________________________
EMPLOYEE COMMENTS:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
DATE: ____/____/_________ EMPLOYEE SIGNATURE: _____________________________________________________
DATE: ____/____/_________ EVALUATED BY: ____________________________________________________________
DATE: ____/____/_________ MANAGEMENT REVIEW BY: __________________________________________________
RATE CHANGES FROM: Rs__________________ TO Rs_____________________ NO CHANGES
Salary Increase Recommended Not Recommended
Shift in Charge Production Manager General Manager

Weitere ähnliche Inhalte

Ähnlich wie Performance Evaluation Form for Printing Press

Analysis Template BookTable of ContentsTable of Contents.docx
Analysis Template BookTable of ContentsTable of Contents.docxAnalysis Template BookTable of ContentsTable of Contents.docx
Analysis Template BookTable of ContentsTable of Contents.docx
nettletondevon
 
Chapter 8 group assignment
Chapter 8 group assignmentChapter 8 group assignment
Chapter 8 group assignment
jandrewsxu
 
5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODN5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODN
Ed Aliño
 
Essam Saber Anees Ambarak
Essam Saber Anees AmbarakEssam Saber Anees Ambarak
Essam Saber Anees Ambarak
Essam Saber
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
營松 林
 
5 Single Shift CI Projects (1)
5 Single Shift CI Projects (1)5 Single Shift CI Projects (1)
5 Single Shift CI Projects (1)
Jaime Alboim
 
Testing resume maxim albuquerque
Testing resume maxim albuquerqueTesting resume maxim albuquerque
Testing resume maxim albuquerque
Maxim Albuquerque
 
Senior Project Manager
Senior Project ManagerSenior Project Manager
Senior Project Manager
Chad Stryker
 

Ähnlich wie Performance Evaluation Form for Printing Press (20)

Work Based Project
Work Based ProjectWork Based Project
Work Based Project
 
Analysis Template BookTable of ContentsTable of Contents.docx
Analysis Template BookTable of ContentsTable of Contents.docxAnalysis Template BookTable of ContentsTable of Contents.docx
Analysis Template BookTable of ContentsTable of Contents.docx
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Process Mapping and Process Improvement for the Small Business Owner
Process Mapping and Process Improvement  for the Small Business OwnerProcess Mapping and Process Improvement  for the Small Business Owner
Process Mapping and Process Improvement for the Small Business Owner
 
smalBiz
smalBizsmalBiz
smalBiz
 
Chapter 8 group assignment
Chapter 8 group assignmentChapter 8 group assignment
Chapter 8 group assignment
 
Real Estate Management System in Vb.Net
Real Estate Management System in Vb.NetReal Estate Management System in Vb.Net
Real Estate Management System in Vb.Net
 
Work study manual
Work study manualWork study manual
Work study manual
 
Process Discovery Mapping
Process Discovery MappingProcess Discovery Mapping
Process Discovery Mapping
 
5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODN5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODN
 
Essam Saber Anees Ambarak
Essam Saber Anees AmbarakEssam Saber Anees Ambarak
Essam Saber Anees Ambarak
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
 
5 Single Shift CI Projects (1)
5 Single Shift CI Projects (1)5 Single Shift CI Projects (1)
5 Single Shift CI Projects (1)
 
Kaizen
KaizenKaizen
Kaizen
 
Testing resume maxim albuquerque
Testing resume maxim albuquerqueTesting resume maxim albuquerque
Testing resume maxim albuquerque
 
Resume 1
Resume 1Resume 1
Resume 1
 
Developing SOPs
Developing SOPsDeveloping SOPs
Developing SOPs
 
Senior Project Manager
Senior Project ManagerSenior Project Manager
Senior Project Manager
 
Performance Appraisal HRM
Performance Appraisal HRMPerformance Appraisal HRM
Performance Appraisal HRM
 

Kürzlich hochgeladen

100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
hyt3577
 

Kürzlich hochgeladen (6)

RecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplaceRecruZone - Your Recruiting Bounty marketplace
RecruZone - Your Recruiting Bounty marketplace
 
2k Shots ≽ 9205541914 ≼ Call Girls In Ganesh Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Ganesh Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Ganesh Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Ganesh Nagar (Delhi)
 
Webinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislationWebinar - How to set pay ranges in the context of pay transparency legislation
Webinar - How to set pay ranges in the context of pay transparency legislation
 
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
Will Robots Steal Your Jobs? Will Robots Steal Your Jobs? 10 Eye-Opening Work...
 
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Vinod Nagar East (Delhi)
 
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
100%Safe delivery(+971558539980)Abortion pills for sale..dubai sharjah, abu d...
 

Performance Evaluation Form for Printing Press

  • 1. Pressman Evaluation Report Department: Press Emp Name: ___________________________________________ Emp Code : __________________ Dept: _____________________ Joining Date: ____/____/________ Date of Last Increase: _____/_____/________ GENERAL Excellent Good Average Poor N/A 1. Attendance on press 10 min. before shift start 2. Looks for learning opportunities 3. Knowledge of paper used on jobs 4. Helping on other Process 5. Follows safety rules 6. Follows company policies 7. Works with others 8. Response to assignments 9. Ability to supervise crew 10. Works on own without supervision 11. Application of standard operating procedures 12. Efficient use of down time 13. Ability to train crew members 14. Attendance on monthly cleaning CLEANING Excellent Good Average Poor N/A 1. Runner 2. Fountain tray 3. Water circulation tank 4. Blanket 5. Dampening roller 6. Plate removing 7. Plate cylinder 8. Reprint Plate cleaning and gumming SET UPS Excellent Good Average Poor N/A 1. Shaft fixing to reel 2. Reel loading and unloading 3. Paper feeding ATTENDANCE RECORD Excellent Number of days absents this Period ________ Unauthorized Days ________ Good Number of days absent last Period ________ Unauthorized Days ________ Average Number of days late this Period __________ Number of days late last Period ______ Poor Date of this evaluation ____/____/______ Date of previous evaluation ____/____/________ 6 Mos 12 Mos Reason for evaluation: General Performance Salary Increase Promotion
  • 2. 4. Water circulation tank and tray filling 5. Ink tray filling 6. Plate folding 7. Knowledge of folder set ups 8. Plan ahead for next job RUN Excellent Good Average Poor N/A 1. Paper jogging 2. Plate Insert 3. Ink feeding 4. Ink & Water Balance 5. Multi web capabilities 6. Color matching on process (speed & accuracy) 7. Registration (speed & accuracy) 8. Alert to press problems- fold off, scum, dry ups, wash out, ink spitting, etc. 9. Identify why certain problems occur (scum, web break) 10. Waste generated 11. Training of press crew 12. Keeps press & surrounding areas clean 13. Organization of finished product MAINTENANCE Excellent Good Average Poor N/A 1. Preventive maintenance 2. Roller setting 3. Identify and repair minor mechanical problems PERSONEL PERFORMANCE Excellent Good Average Poor N/A 1. Quality of work 2. Sense of urgency 3. Keeps work area clean 4. Follows instructions 5. Cooperation 6. Attitude 7. Initiative 8. Work habits Comments:_______________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________
  • 3. OVERALL EVALUATION Positive Negative Overall comparison to previous evaluation improved No Change Poorer REVIEWER COMMENTS: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ EMPLOYEE’S EFFICIENCY ON Excellent Good Poor  Unit  3 C Stack  3 C  4 Hi Stack  4 Hi  Folder  Is the Employee has previous experience in the Printing Industry? ______________________  If Yes, How much? (Mention the Organization) _____________________________________________________________ EMPLOYEE COMMENTS: _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ DATE: ____/____/_________ EMPLOYEE SIGNATURE: _____________________________________________________ DATE: ____/____/_________ EVALUATED BY: ____________________________________________________________ DATE: ____/____/_________ MANAGEMENT REVIEW BY: __________________________________________________ RATE CHANGES FROM: Rs__________________ TO Rs_____________________ NO CHANGES Salary Increase Recommended Not Recommended Shift in Charge Production Manager General Manager