PRE-MIGRATION ACTIVITY
Copyright © 2016 C-DOT. All Rights Reserved
10-08-2022
1
Pre-Retrofit Activity
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
2
Pre-Retrofit Activity
Site Survey of Exchange
Total number of Co-located Line BMs
Total number of Trunk BMs
Total number of RSUs working
Connectivity available at RSUs
Total number of V5.2 AI links working
Total number of PRI Links working
Total number of BRI lines working
Connectivity available for MPLS
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
3
Pre-Deployment Activity
 Filling the exchange Survey Sheet for Site-wise BOM preparation.
 Total number of Co-located Line BMs and compaction of BMs as
per corporate guidelines. BM Compression.ppt
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
4
BM Compression
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
5
 As per the PAN-India data most of the exchanges / BMs are working
with only 30% to 40% loading.
 In present Scenario the working ports of LCC Cards are distributed in
a random fashion.
Present Scenario
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
6
Faulty Ports Working ports Spare Ports
Present Working of Ports
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
7
 We need to shift Terminal equipments in such a manner, so that
the working subscriber should be moved to Base Module rack and
then Line Module-01 and Line Module-02 rack.
 In this manner subscribers are organized properly among the
various racks.
Action Item
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
8
After Relocation - I
Faulty Ports Working ports Spare Ports
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
9
After Relocation - II
Faulty Ports Working ports Spare Ports
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
10
Final Result
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
11
The Final Working Rack
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
12
Main Advantage
 This is applicable to Co-located BMs and Remote BMs.
 This will lead to power saving.
 It will generate inventory of Control cards of ATU (i.e.
TIC/ISP/TUI) and Power Supply Cards.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
13
Activity for MBM Sites
10-08-2022
14
Copyright © 2016 C-DOT. All Rights Reserved
MBM Exchange
 The same strategy can be implemented in the MBM exchange.
 The equipment planning for MAX-NG has been done after
considering the BM compression activity.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
15
]
BM8
BM7
BM6
BM5
BM1
2
BM1
1
BM1
0
BM9
BM4
BM3
BM
BM2
BM1
Schematic View of MBM Exchange 10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
16
BM8
BM7
BM6
BM5
BM8
BM1
2
BM7
BM1
1
BM6
BM1
0
BM5 BM9
BM4
BM3
BM
BM2
BM1
BM Compression Activity… 10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
17
BM8
BM7
BM6
BM5
BM4
BM3
BM2
BM1
Power Saving
Controller Card Repository
LCC Cards Repository
Less No. of NGTK Required For MAX-
NG Conversion
Schematic View after BM Compression 10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
18
 Power Saving
 Controller Card Inventory
 LCC Cards Inventory
 Less No. of NGTK Required For MAX-NG Conversion
Main Advantage
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
19
Pre-Deployment Activity (Contd.)
 Migration of existing BRI connection to alternate solution like
CDMA VPN
 Network Configuration between SDCA and Core switch by MPLS
NOC
 Last Mile connectivity between MAX-NG Aggregator and MPLS
Core through RPR
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
20
Pre-Deployment Activity
 Configuration of Required IP addresses at MPLS for MAX-NG VLAN
 Verification of various equipment as per the site configuration and
final BOM.
 Retrofit data preparation for MAX to MAX-NG migration for C5
subscribers creation, Routing and Trunking Data, various Access
Gateway related Data.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
21
Requirement
 The uplink connectivity is through 1GigE Optical patch cord.
 The length of patch cord for the above connectivity.
 The type of connectorization at ADM end of RPR i.e. FC or LC or SC
so that the patch cord can be supplied accordingly.
Kindly mail this information urgently to cdotmaxng@gmail.com
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
22
Deployment Related Activity
 Infrastructure Installation at Main exchange site i.e. 2-Slot and 6-
Slot Chassis.
 Installation of network elements and configuration at Remote site
for the IP connectivity.
 Installation of MAX-NG Access Equipment, EBM, LAN Switch and
Client Terminal at site
 Configuration of LAGs as per Co-located BMs and Remote BMs
 Configuration of MLS as per Network Connection
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
23
Deployment Related Activity
 Configuration of MG/SG (if required for POI), V5AG and PRIAG as
per working ISUP Signalling & Media links, AIs and PRI Links
 Network Data Creation in Class-4 SS for connectivity of SDCA to L2
TAX and POIs
 Configuration w.r.t Billing and Provisioning through BSNL CDR
system and Clarity system
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
24
Planning for MAX-NG Installation
 One BM Cabinet at MBM location will be use as MAX-NG BM
 MAX-NG BM will house CACU (Central Access Control Unit) system to
install common elements for that MBM i.e.
Main Aggregation Switch (1+1)
Network Access Gateway Card (1+1)
Ethernet-to-E1 Bridge Main (1+1)
Shelf Manager Card (1+1)
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
25
Planning for MAX-NG BM
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
26
MAX-NG BM for CACU System
10-08-2022
27
 All the E1s for the Network i.e. POI PCMs, V5.2 AN-RAXs and PRI-
PBX are required to re-route to MAX-NG BM.
 One Card Frame of MAX-NG BM has a provision of DDF to
terminate all the above mentioned E1s.
Copyright © 2016 C-DOT. All Rights Reserved
DDF Unit for MAX-NG BM
10-08-2022
28
Assy. With MDF Tag Block to DDF Plate Assy.
Complete Assy. With MDF Tag Block to DDF Plate Assy.
Fully Assembled Card Frame with MDF Tag Blocks
Copyright © 2016 C-DOT. All Rights Reserved
Planning at Line BM / RSU Site
 At Co-located Line BM / RBM site, new LAGU (Line Access Gateway
Unit) system will be installed in place of bottom two Card frame of
Base Module.
 LAGU system house only 02 nos of NGTJ-LAG Card and 02 nos of TSI
card.
 CAT-5e LAN cable for Co-located Line BM or existing E1 Cables in
case of RSU are directly terminated on the backplane of LAGU system.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
29
Suggestion
Few Suggestion / Maintenance after MAX-NG:
 IPM should be connected at MDF for Lightning Protection
 High Voltage Protection (HVP) module developed by C-DOT to be installed
in the exchange at Heavy Lightning Prone Area
 Proper checking of Earthing of exchange.
 Proper training of MAX-NG maintenance staff.
 Proper maintenance of Power plant, Generator and battery back-up
arrangement.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
30
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
31
Feedback :- cdotmaxng@gmail.com
THANK YOU

Weitere ähnliche Inhalte

Ähnlich wie 07_PRE_MIGRATION_ACT.ppt

Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Jian Shen
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computingKhoonSeang (Richard) Kang
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computingKhoonSeang (Richard) Kang
 
Internet of things case studies of edge computing
Internet of things   case studies of edge computingInternet of things   case studies of edge computing
Internet of things case studies of edge computingKhoonSeang (Richard) Kang
 
2 s120 commissioning
2 s120 commissioning2 s120 commissioning
2 s120 commissioningconfidencial
 
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...Ike Alisson
 
06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale ages06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale agesRCCSRENKEI
 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM International
 
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication NetworksMIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication NetworksMIPI Alliance
 
Broad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the fieldBroad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the fieldTom Benson
 
Industrial communication
Industrial communicationIndustrial communication
Industrial communicationMahmoud Hussein
 
Sspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gilSspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gilSSPI Brasil
 
15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptx15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptxnitin_009
 
Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...KathiravanRS
 
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」BitVisor
 
Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?ADVA
 
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...Ryuichi Yasunaga
 
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdfMeetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdfMariaAlcantara50
 

Ähnlich wie 07_PRE_MIGRATION_ACT.ppt (20)

Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computing
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computing
 
Internet of things case studies of edge computing
Internet of things   case studies of edge computingInternet of things   case studies of edge computing
Internet of things case studies of edge computing
 
MPI Communication
MPI CommunicationMPI Communication
MPI Communication
 
2 s120 commissioning
2 s120 commissioning2 s120 commissioning
2 s120 commissioning
 
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
 
06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale ages06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale ages
 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network Architecture
 
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication NetworksMIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
 
Broad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the fieldBroad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the field
 
Industrial communication
Industrial communicationIndustrial communication
Industrial communication
 
Sspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gilSspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gil
 
15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptx15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptx
 
Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...
 
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
 
Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?
 
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
 
SA call flow
SA call flowSA call flow
SA call flow
 
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdfMeetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
 

Mehr von nitin_009

BSNL_Context Setting.pptx
BSNL_Context Setting.pptxBSNL_Context Setting.pptx
BSNL_Context Setting.pptxnitin_009
 
BSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptxBSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptxnitin_009
 
self_motivation.ppt
self_motivation.pptself_motivation.ppt
self_motivation.pptnitin_009
 
Emergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptxEmergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptxnitin_009
 
cps_nitin_final.ppt
cps_nitin_final.pptcps_nitin_final.ppt
cps_nitin_final.pptnitin_009
 
HumanEvolutionLecture.ppt
HumanEvolutionLecture.pptHumanEvolutionLecture.ppt
HumanEvolutionLecture.pptnitin_009
 
wirelessbbppt.ppt
wirelessbbppt.pptwirelessbbppt.ppt
wirelessbbppt.pptnitin_009
 
p&b presentation.ppt
p&b presentation.pptp&b presentation.ppt
p&b presentation.pptnitin_009
 
ims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.pptims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.pptnitin_009
 
quality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptxquality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptxnitin_009
 
Talk-ISO.ppt
Talk-ISO.pptTalk-ISO.ppt
Talk-ISO.pptnitin_009
 

Mehr von nitin_009 (14)

BSNL_Context Setting.pptx
BSNL_Context Setting.pptxBSNL_Context Setting.pptx
BSNL_Context Setting.pptx
 
BSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptxBSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptx
 
IO_09.ppt
IO_09.pptIO_09.ppt
IO_09.ppt
 
self_motivation.ppt
self_motivation.pptself_motivation.ppt
self_motivation.ppt
 
Emergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptxEmergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptx
 
cps_nitin_final.ppt
cps_nitin_final.pptcps_nitin_final.ppt
cps_nitin_final.ppt
 
HumanEvolutionLecture.ppt
HumanEvolutionLecture.pptHumanEvolutionLecture.ppt
HumanEvolutionLecture.ppt
 
Team5.ppt
Team5.pptTeam5.ppt
Team5.ppt
 
wirelessbbppt.ppt
wirelessbbppt.pptwirelessbbppt.ppt
wirelessbbppt.ppt
 
p&b presentation.ppt
p&b presentation.pptp&b presentation.ppt
p&b presentation.ppt
 
ims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.pptims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.ppt
 
quality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptxquality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptx
 
Talk-ISO.ppt
Talk-ISO.pptTalk-ISO.ppt
Talk-ISO.ppt
 
Chap11
Chap11Chap11
Chap11
 

Kürzlich hochgeladen

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Kürzlich hochgeladen (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

07_PRE_MIGRATION_ACT.ppt

  • 1. PRE-MIGRATION ACTIVITY Copyright © 2016 C-DOT. All Rights Reserved 10-08-2022 1
  • 2. Pre-Retrofit Activity 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 2
  • 3. Pre-Retrofit Activity Site Survey of Exchange Total number of Co-located Line BMs Total number of Trunk BMs Total number of RSUs working Connectivity available at RSUs Total number of V5.2 AI links working Total number of PRI Links working Total number of BRI lines working Connectivity available for MPLS 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 3
  • 4. Pre-Deployment Activity  Filling the exchange Survey Sheet for Site-wise BOM preparation.  Total number of Co-located Line BMs and compaction of BMs as per corporate guidelines. BM Compression.ppt 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 4
  • 5. BM Compression 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 5
  • 6.  As per the PAN-India data most of the exchanges / BMs are working with only 30% to 40% loading.  In present Scenario the working ports of LCC Cards are distributed in a random fashion. Present Scenario 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 6
  • 7. Faulty Ports Working ports Spare Ports Present Working of Ports 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 7
  • 8.  We need to shift Terminal equipments in such a manner, so that the working subscriber should be moved to Base Module rack and then Line Module-01 and Line Module-02 rack.  In this manner subscribers are organized properly among the various racks. Action Item 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 8
  • 9. After Relocation - I Faulty Ports Working ports Spare Ports 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 9
  • 10. After Relocation - II Faulty Ports Working ports Spare Ports 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 10
  • 11. Final Result 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 11
  • 12. The Final Working Rack 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 12
  • 13. Main Advantage  This is applicable to Co-located BMs and Remote BMs.  This will lead to power saving.  It will generate inventory of Control cards of ATU (i.e. TIC/ISP/TUI) and Power Supply Cards. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 13
  • 14. Activity for MBM Sites 10-08-2022 14 Copyright © 2016 C-DOT. All Rights Reserved
  • 15. MBM Exchange  The same strategy can be implemented in the MBM exchange.  The equipment planning for MAX-NG has been done after considering the BM compression activity. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 15
  • 16. ] BM8 BM7 BM6 BM5 BM1 2 BM1 1 BM1 0 BM9 BM4 BM3 BM BM2 BM1 Schematic View of MBM Exchange 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 16
  • 17. BM8 BM7 BM6 BM5 BM8 BM1 2 BM7 BM1 1 BM6 BM1 0 BM5 BM9 BM4 BM3 BM BM2 BM1 BM Compression Activity… 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 17
  • 18. BM8 BM7 BM6 BM5 BM4 BM3 BM2 BM1 Power Saving Controller Card Repository LCC Cards Repository Less No. of NGTK Required For MAX- NG Conversion Schematic View after BM Compression 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 18
  • 19.  Power Saving  Controller Card Inventory  LCC Cards Inventory  Less No. of NGTK Required For MAX-NG Conversion Main Advantage 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 19
  • 20. Pre-Deployment Activity (Contd.)  Migration of existing BRI connection to alternate solution like CDMA VPN  Network Configuration between SDCA and Core switch by MPLS NOC  Last Mile connectivity between MAX-NG Aggregator and MPLS Core through RPR 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 20
  • 21. Pre-Deployment Activity  Configuration of Required IP addresses at MPLS for MAX-NG VLAN  Verification of various equipment as per the site configuration and final BOM.  Retrofit data preparation for MAX to MAX-NG migration for C5 subscribers creation, Routing and Trunking Data, various Access Gateway related Data. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 21
  • 22. Requirement  The uplink connectivity is through 1GigE Optical patch cord.  The length of patch cord for the above connectivity.  The type of connectorization at ADM end of RPR i.e. FC or LC or SC so that the patch cord can be supplied accordingly. Kindly mail this information urgently to cdotmaxng@gmail.com 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 22
  • 23. Deployment Related Activity  Infrastructure Installation at Main exchange site i.e. 2-Slot and 6- Slot Chassis.  Installation of network elements and configuration at Remote site for the IP connectivity.  Installation of MAX-NG Access Equipment, EBM, LAN Switch and Client Terminal at site  Configuration of LAGs as per Co-located BMs and Remote BMs  Configuration of MLS as per Network Connection 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 23
  • 24. Deployment Related Activity  Configuration of MG/SG (if required for POI), V5AG and PRIAG as per working ISUP Signalling & Media links, AIs and PRI Links  Network Data Creation in Class-4 SS for connectivity of SDCA to L2 TAX and POIs  Configuration w.r.t Billing and Provisioning through BSNL CDR system and Clarity system 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 24
  • 25. Planning for MAX-NG Installation  One BM Cabinet at MBM location will be use as MAX-NG BM  MAX-NG BM will house CACU (Central Access Control Unit) system to install common elements for that MBM i.e. Main Aggregation Switch (1+1) Network Access Gateway Card (1+1) Ethernet-to-E1 Bridge Main (1+1) Shelf Manager Card (1+1) 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 25
  • 26. Planning for MAX-NG BM 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 26
  • 27. MAX-NG BM for CACU System 10-08-2022 27  All the E1s for the Network i.e. POI PCMs, V5.2 AN-RAXs and PRI- PBX are required to re-route to MAX-NG BM.  One Card Frame of MAX-NG BM has a provision of DDF to terminate all the above mentioned E1s. Copyright © 2016 C-DOT. All Rights Reserved
  • 28. DDF Unit for MAX-NG BM 10-08-2022 28 Assy. With MDF Tag Block to DDF Plate Assy. Complete Assy. With MDF Tag Block to DDF Plate Assy. Fully Assembled Card Frame with MDF Tag Blocks Copyright © 2016 C-DOT. All Rights Reserved
  • 29. Planning at Line BM / RSU Site  At Co-located Line BM / RBM site, new LAGU (Line Access Gateway Unit) system will be installed in place of bottom two Card frame of Base Module.  LAGU system house only 02 nos of NGTJ-LAG Card and 02 nos of TSI card.  CAT-5e LAN cable for Co-located Line BM or existing E1 Cables in case of RSU are directly terminated on the backplane of LAGU system. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 29
  • 30. Suggestion Few Suggestion / Maintenance after MAX-NG:  IPM should be connected at MDF for Lightning Protection  High Voltage Protection (HVP) module developed by C-DOT to be installed in the exchange at Heavy Lightning Prone Area  Proper checking of Earthing of exchange.  Proper training of MAX-NG maintenance staff.  Proper maintenance of Power plant, Generator and battery back-up arrangement. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 30
  • 31. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 31 Feedback :- cdotmaxng@gmail.com THANK YOU