Progress Review
EV
PV
AC
SV
CV
ΔT
CumulativeValues
Time
CV -ve indicates over-budget
+ve indicates under-budget
SV -ve indicates behind schedule
+ve indicates ahead of schedule
CPI Indicates INR_ worth of work has been
done for each Rupee spent.
SPI Indicates that the project is progressing
at _% of the rate originally planned.
CostVariance (CV) Formula:CV= EV – AC
ScheduleVariance
(SV)
Formula: SV = EV – PV
Cost Performance
Index (CPI)
Formula: CPI = EV/AC
Schedule Performance
Index (SPI)
Formula: SPI = EV/PV
Item Formula Remark
Cost Variance (CV) EV – AC Negative value indicates over budget and positive
value indicates under budget
ScheduleVariance (SV) EV – PV Negative value indicates behind schedule and positive
value indicates ahead of schedule
Cost Performance Index (CPI) EV / AC Lesser than one indicates over budget and greater
than one indicates under budget
Schedule Performance Index (SPI) EV / PV Lesser than one indicates behind schedule and greater
than one indicates ahead of schedule
Estimate at Completion (EAC) BAC / CPI Considering that the rate of spending remains the
same
AC + ETC Considering that the current estimate is fundamentally
flawed
AC + (BAC – EV) Considering atypical variances
AC + [(BAC – EV) /CPI] Considering typical variances
Estimate to Complete (ETC) EAC – AC Considering that the current estimate is fundamentally
flawed
BAC – EV Considering atypical variances
(BAC – EV) / CPI Considering typical variances
Variance at Completion (VAC) BAC – EAC Considering the status of the budget expected at the
end of the project
FinancialTerm Definition
Benefit Cost Ratio
(BCR)
 Compares the benefits (revenues) to the costs of different options
Chart of Accounts  Any numbering system used to monitor project costs by category (for example, labor, supplies, and materials)
Depreciation  Reduced price of an asset over time attributable to deterioration, obsolescence, and impending retirement
 Applies particularly to physical assets such as equipment and structures
 Straight Line depreciation:Standard amount depreciating every year
 Accelerated depreciation: Value depreciating at a faster rate, for example, Double Declining method and Sum of the
Years Digits
Internal Rate of Return
(IRR)
 Rate at which the project inflows and project outflows are equal
 Project with greatest IRR is generally selected
Net Present Value
(NPV)
 Present value of the total benefits minus costs over many time periods
 Investment is profitable for positive NPV
 Project with greatest NPV is selected
Opportunity Cost  Opportunity given up by selecting one project over another
Payback Period  Time period it takes to recover the investment made in the project before the profits start accumulating
Present Value  The current value of future cash flows.
Sunk Cost  Expended costs, to be avoided when deciding whether to continue with a troubled project
THANKS

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsEssam Lotffy, PMP®, CCP®
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost managementImran Jamil
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementOleksandr Lutsaievskyi
 
Project controls
Project controlsProject controls
Project controlsAshok Kumar
 
Project planning-and-control
Project planning-and-controlProject planning-and-control
Project planning-and-controlJatindra Malik
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)Nur Azwin
 
An introduction to project management: Learning the basics
An introduction to project management:  Learning the basicsAn introduction to project management:  Learning the basics
An introduction to project management: Learning the basicsPaul Di Gangi
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 
Project control wps office
Project control wps officeProject control wps office
Project control wps officekaransingh1064
 

Was ist angesagt? (20)

4. project cost management
4. project cost management4. project cost management
4. project cost management
 
project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
 
Project cost management
Project cost managementProject cost management
Project cost management
 
Cost management
Cost managementCost management
Cost management
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost Management
 
Project controls
Project controlsProject controls
Project controls
 
Project management
Project managementProject management
Project management
 
Project planning-and-control
Project planning-and-controlProject planning-and-control
Project planning-and-control
 
Cost management
Cost managementCost management
Cost management
 
Project cost management
Project cost managementProject cost management
Project cost management
 
Project Management
Project ManagementProject Management
Project Management
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
 
An introduction to project management: Learning the basics
An introduction to project management:  Learning the basicsAn introduction to project management:  Learning the basics
An introduction to project management: Learning the basics
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Project control wps office
Project control wps officeProject control wps office
Project control wps office
 

Andere mochten auch

Book 2009 krok 2
Book 2009 krok 2Book 2009 krok 2
Book 2009 krok 2Raj Twix
 
Management Thought
Management ThoughtManagement Thought
Management ThoughtAsim Qureshi
 
Development of management thought - Prof. Smita.Verma
Development of management thought - Prof. Smita.VermaDevelopment of management thought - Prof. Smita.Verma
Development of management thought - Prof. Smita.VermaManagement Institute ,Pune
 
Development of Management Thought
Development of Management ThoughtDevelopment of Management Thought
Development of Management Thoughtamanpreetbhamra
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And ControllingTom Milner
 
Human resource planning & development
Human resource planning & developmentHuman resource planning & development
Human resource planning & developmentkavita sharma
 
Informal and formal groups
Informal and formal groupsInformal and formal groups
Informal and formal groupsMaridel Viernes
 
Chapter 5 Human Resources Management and Staffing
Chapter 5   Human Resources Management and StaffingChapter 5   Human Resources Management and Staffing
Chapter 5 Human Resources Management and StaffingArgon David
 
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...Stuart Gow
 
Staffing - Management
Staffing - ManagementStaffing - Management
Staffing - ManagementSanchit
 
Book 2007 krok 2
Book 2007 krok 2Book 2007 krok 2
Book 2007 krok 2Raj Twix
 
Principle and practices of management
Principle and practices of managementPrinciple and practices of management
Principle and practices of managementagarwalcards
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Jeremy Jay Lim
 

Andere mochten auch (20)

Book 2009 krok 2
Book 2009 krok 2Book 2009 krok 2
Book 2009 krok 2
 
Pmp cost chapter 7
Pmp cost chapter 7Pmp cost chapter 7
Pmp cost chapter 7
 
PM FrameWork: Module 4
PM FrameWork: Module 4PM FrameWork: Module 4
PM FrameWork: Module 4
 
Management Thought
Management ThoughtManagement Thought
Management Thought
 
Development of management thought - Prof. Smita.Verma
Development of management thought - Prof. Smita.VermaDevelopment of management thought - Prof. Smita.Verma
Development of management thought - Prof. Smita.Verma
 
Pmp exam questions
Pmp exam questionsPmp exam questions
Pmp exam questions
 
Development of Management Thought
Development of Management ThoughtDevelopment of Management Thought
Development of Management Thought
 
Organising - MANAGEMENT PROCESS
Organising - MANAGEMENT PROCESSOrganising - MANAGEMENT PROCESS
Organising - MANAGEMENT PROCESS
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
 
Principles & Practice Of Management
Principles & Practice Of ManagementPrinciples & Practice Of Management
Principles & Practice Of Management
 
Project planning
Project planning Project planning
Project planning
 
Human resource planning & development
Human resource planning & developmentHuman resource planning & development
Human resource planning & development
 
Informal and formal groups
Informal and formal groupsInformal and formal groups
Informal and formal groups
 
Chapter 5 Human Resources Management and Staffing
Chapter 5   Human Resources Management and StaffingChapter 5   Human Resources Management and Staffing
Chapter 5 Human Resources Management and Staffing
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...
Strategic Human Resource Management (SHRM) - MBA 423 Human Resources Manageme...
 
Staffing - Management
Staffing - ManagementStaffing - Management
Staffing - Management
 
Book 2007 krok 2
Book 2007 krok 2Book 2007 krok 2
Book 2007 krok 2
 
Principle and practices of management
Principle and practices of managementPrinciple and practices of management
Principle and practices of management
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 

Ähnlich wie Project Monitoring and Controlling Processes

Ähnlich wie Project Monitoring and Controlling Processes (20)

projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)
 
cost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.pptcost-managementtttttttttttttttttttttttttttttt.ppt
cost-managementtttttttttttttttttttttttttttttt.ppt
 
PMP COST FORMULAE
PMP COST FORMULAEPMP COST FORMULAE
PMP COST FORMULAE
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
Project Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge AreaProject Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge Area
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Lecture2
Lecture2Lecture2
Lecture2
 
Lecture2
Lecture2Lecture2
Lecture2
 
Lecture2
Lecture2Lecture2
Lecture2
 
Lecture2
Lecture2Lecture2
Lecture2
 
Lecture2
Lecture2Lecture2
Lecture2
 
Lecture2
Lecture2Lecture2
Lecture2
 
Lecture2
Lecture2Lecture2
Lecture2
 
Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value Analysis
 
Earned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docxEarned Value AnalysisTracking Project ProgressWh.docx
Earned Value AnalysisTracking Project ProgressWh.docx
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
Finanacial anaylsis
Finanacial anaylsisFinanacial anaylsis
Finanacial anaylsis
 

Mehr von Nishant Munjal

Database Management System
Database Management SystemDatabase Management System
Database Management SystemNishant Munjal
 
Array, string and pointer
Array, string and pointerArray, string and pointer
Array, string and pointerNishant Munjal
 
Introduction to computers
Introduction to computersIntroduction to computers
Introduction to computersNishant Munjal
 
Shell Programming Concept
Shell Programming ConceptShell Programming Concept
Shell Programming ConceptNishant Munjal
 
Asynchronous Transfer Mode
Asynchronous Transfer ModeAsynchronous Transfer Mode
Asynchronous Transfer ModeNishant Munjal
 
Overview of Cloud Computing
Overview of Cloud ComputingOverview of Cloud Computing
Overview of Cloud ComputingNishant Munjal
 
SQL Queries Information
SQL Queries InformationSQL Queries Information
SQL Queries InformationNishant Munjal
 
Database Design and Normalization Techniques
Database Design and Normalization TechniquesDatabase Design and Normalization Techniques
Database Design and Normalization TechniquesNishant Munjal
 
Transaction Processing Concept
Transaction Processing ConceptTransaction Processing Concept
Transaction Processing ConceptNishant Munjal
 
Database Management System
Database Management SystemDatabase Management System
Database Management SystemNishant Munjal
 
Relational Data Model Introduction
Relational Data Model IntroductionRelational Data Model Introduction
Relational Data Model IntroductionNishant Munjal
 
Virtualization, A Concept Implementation of Cloud
Virtualization, A Concept Implementation of CloudVirtualization, A Concept Implementation of Cloud
Virtualization, A Concept Implementation of CloudNishant Munjal
 
Technical education benchmarks
Technical education benchmarksTechnical education benchmarks
Technical education benchmarksNishant Munjal
 

Mehr von Nishant Munjal (20)

Database Management System
Database Management SystemDatabase Management System
Database Management System
 
Functions & Recursion
Functions & RecursionFunctions & Recursion
Functions & Recursion
 
Array, string and pointer
Array, string and pointerArray, string and pointer
Array, string and pointer
 
Programming in C
Programming in CProgramming in C
Programming in C
 
Introduction to computers
Introduction to computersIntroduction to computers
Introduction to computers
 
Unix Administration
Unix AdministrationUnix Administration
Unix Administration
 
Shell Programming Concept
Shell Programming ConceptShell Programming Concept
Shell Programming Concept
 
VI Editor
VI EditorVI Editor
VI Editor
 
Introduction to Unix
Introduction to UnixIntroduction to Unix
Introduction to Unix
 
Routing Techniques
Routing TechniquesRouting Techniques
Routing Techniques
 
Asynchronous Transfer Mode
Asynchronous Transfer ModeAsynchronous Transfer Mode
Asynchronous Transfer Mode
 
Overview of Cloud Computing
Overview of Cloud ComputingOverview of Cloud Computing
Overview of Cloud Computing
 
SQL Queries Information
SQL Queries InformationSQL Queries Information
SQL Queries Information
 
Database Design and Normalization Techniques
Database Design and Normalization TechniquesDatabase Design and Normalization Techniques
Database Design and Normalization Techniques
 
Concurrency Control
Concurrency ControlConcurrency Control
Concurrency Control
 
Transaction Processing Concept
Transaction Processing ConceptTransaction Processing Concept
Transaction Processing Concept
 
Database Management System
Database Management SystemDatabase Management System
Database Management System
 
Relational Data Model Introduction
Relational Data Model IntroductionRelational Data Model Introduction
Relational Data Model Introduction
 
Virtualization, A Concept Implementation of Cloud
Virtualization, A Concept Implementation of CloudVirtualization, A Concept Implementation of Cloud
Virtualization, A Concept Implementation of Cloud
 
Technical education benchmarks
Technical education benchmarksTechnical education benchmarks
Technical education benchmarks
 

Kürzlich hochgeladen

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 

Kürzlich hochgeladen (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 

Project Monitoring and Controlling Processes

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. Progress Review EV PV AC SV CV ΔT CumulativeValues Time CV -ve indicates over-budget +ve indicates under-budget SV -ve indicates behind schedule +ve indicates ahead of schedule CPI Indicates INR_ worth of work has been done for each Rupee spent. SPI Indicates that the project is progressing at _% of the rate originally planned. CostVariance (CV) Formula:CV= EV – AC ScheduleVariance (SV) Formula: SV = EV – PV Cost Performance Index (CPI) Formula: CPI = EV/AC Schedule Performance Index (SPI) Formula: SPI = EV/PV
  • 10. Item Formula Remark Cost Variance (CV) EV – AC Negative value indicates over budget and positive value indicates under budget ScheduleVariance (SV) EV – PV Negative value indicates behind schedule and positive value indicates ahead of schedule Cost Performance Index (CPI) EV / AC Lesser than one indicates over budget and greater than one indicates under budget Schedule Performance Index (SPI) EV / PV Lesser than one indicates behind schedule and greater than one indicates ahead of schedule Estimate at Completion (EAC) BAC / CPI Considering that the rate of spending remains the same AC + ETC Considering that the current estimate is fundamentally flawed AC + (BAC – EV) Considering atypical variances AC + [(BAC – EV) /CPI] Considering typical variances Estimate to Complete (ETC) EAC – AC Considering that the current estimate is fundamentally flawed BAC – EV Considering atypical variances (BAC – EV) / CPI Considering typical variances Variance at Completion (VAC) BAC – EAC Considering the status of the budget expected at the end of the project
  • 11. FinancialTerm Definition Benefit Cost Ratio (BCR)  Compares the benefits (revenues) to the costs of different options Chart of Accounts  Any numbering system used to monitor project costs by category (for example, labor, supplies, and materials) Depreciation  Reduced price of an asset over time attributable to deterioration, obsolescence, and impending retirement  Applies particularly to physical assets such as equipment and structures  Straight Line depreciation:Standard amount depreciating every year  Accelerated depreciation: Value depreciating at a faster rate, for example, Double Declining method and Sum of the Years Digits Internal Rate of Return (IRR)  Rate at which the project inflows and project outflows are equal  Project with greatest IRR is generally selected Net Present Value (NPV)  Present value of the total benefits minus costs over many time periods  Investment is profitable for positive NPV  Project with greatest NPV is selected Opportunity Cost  Opportunity given up by selecting one project over another Payback Period  Time period it takes to recover the investment made in the project before the profits start accumulating Present Value  The current value of future cash flows. Sunk Cost  Expended costs, to be avoided when deciding whether to continue with a troubled project