SlideShare ist ein Scribd-Unternehmen logo
1 von 17
Nirjhar Chakravorti
Nirjhar Chakravorti has completed Graduation in Mechanical Engineering
in 2000 from Jalpaiguri Government Engineering College, India.
Nirjhar has received & Post Graduate Diploma in Business Management
(PGDBM) certificate from Institute of Management Technology
(IMT), CDL, Ghaziabad.
Nirjhar has experience in design, development and project engineering.
During professional life, Nirjhar has worked on different engineering
activities, like core design, management planning and project
engineering, along with the analysis of life cycle costing for capital
expenditure of a profit making company.
Also, Nirjhar has worked on organizational re-structuring, implementation
of ISO, six sigma and total productive maintenance (TPM).
After erection & commissioning of a new plant,
a company named ABC private limited focuses
on production…
Operation engineers remain busy to produce more and
more product
Maintenance engineers stay busy to oil the machine
Procurement engineers remain busy to keep inventory
And so on…..

The result: Management is happy, as Return on
Investment generates fast
Operators report small adjustment of various machines
for ease of operation
Fitters report accessibility problem of various machines
while lubricating oil, as part of preventive maintenance
Machines start breakdown, despite of preventive
maintenance, due to bolt shearing, shaft breakdown,
bearing failure, etc.
Procurement engineer plans to maintain high inventory
for costly spare parts as getting spare part is a time
consuming affair.
The result: Production hampers.
Effect: Maintenance Engineers try various options, but
can not analyze root cause. So problems remain at its
own place.
A customer asked for big order execution. But the
company can not bag the order as plant has not
capacity to meet the stiff delivery schedule of the
customer. The competitor grasp the order as they plan
for enhancement of the plant capacity. But ABC Private
limited has not any infrastructure to improve
machine’s production capacity.
The only way out is to install a new set of machines for
same sizes of product with enhanced production
rate, which is not an economical and feasible option, in
such a short time.
The result: Loss of order, loss in market share.
Effect: Helplessness.
To handle these situations in future, a probable
solution is to….

Set up an In-house Design & Engineering
centre.
The result: Implementation of comprehensive
Operation & Maintenance (O&M) Management which
can analyze failures, adjust machines for considerable
production improvement, eliminate minor inherent
design errors of the machines, prepare drawings for
major spare parts to reduce inventory cost, etc.
Effect: Profit maximization, maintain market share.
Effective O&M is one of the most cost-effective
methods for ensuring reliability, safety, and efficiency.
Pillars of O&M Management are….
 Operation
 Maintenance
 Engineering
 Training
 Administration
The purpose of O&M Management is to prepare a link
between these pillars, i.e. establishing an OMETA link.
To ensure effective O&M Management, following need
to be done:
 Set up a design & engineering centre
 Link design and engineering centre activities with
operation and maintenance activities.
Benefit:
 Maintenance engineers can concentrate in hardcore
maintenance activities, instead of searching for design
related activities.
 Operation engineers need not to worry when drastic
production increment is required beyond machine’s
design capacity. They can concentrate in production
and operation management only.
Engineering Support :
Engineering Support Administration – To guarantee effective
execution and control of technical support.
Equipment Modifications – To ensure proper
design, review, control, realization, and documentation of
equipment design modifications in a timely manner.
Equipment Performance Monitoring – To perform monitoring
actions that optimize machine reliability and efficiency.
Engineering Support Procedures and Documentation – To
ensure that engineering documents provide appropriate
direction and that they support the efficiency and safe
operations of the machine.
Reliable facility
for
production&
maintenance

Modify series
equipments
when production
needs to e
increased up to
an extent

Failure Analysis
for regular
breakdowns

Small design
changes in
machines to
Minimize spare
Ensure safety
ensure lesser
part inventory
breakdown
Design of new machines if
Training to operation &
required
Maintenance Team
Measure actual
Tracking
Life Cycle Cost
operation compared
energy
Analysis when new
to full utilization
consumption
investment made
operation
Design & Engineering Centre shall drive the
O&M Management system within the
organization.
Design & Engineering centre shall be trained
with machine design, project management,
maintenance engineering, safety regulations
and basic economic analysis.
Design & Engineering Centre need to obtain full
support from their management structure in
order to carry out an effective O&M program.
Alternate
location:
Major metro city
near plant/
factory

Best location:
Within Plant/
Factory Premises
Plant/ Factory Premises:

Advantage:
Easy access to plant
Provide in-hand solution
Better control and implementation



Disadvantage:
Most of the plants/ factories located away from cities.
So retaining design & engineering centre professionals
become an issue, which hamper proper
implementation of O&M program. Company needs
proper people for successful implementation of O&M
program. Also, if people associated with O&M program
leaves company regularly, then it is tough to re-orient
the team.
Major metro city near plant/ factory:
 Disadvantage:
It is tough to control plant activities (especially
operation & maintenance management) from
remote location.



Advantage:
Recruiting and retaining members of the Design &
Engineering Centre. Any company and department
is build by human recourse, so recruiting and
retaining proper people is the key to success for
any organization.
Major metro city near plant/ factory:
To overcome major disadvantages, company need to establish proper planning and control for design &
engineering centre.
Some simple rule:
The members need to be properly trained (w.r.t. design, factory layout, project execution,
economics, energy conservation and EHS point of view).
The members should visit plant at least for 4 days every month (irrespective of their workload and
assignment).
After any new development, design & engineering centre must visit factory along with complete
design plan and discuss with all respective person (including maintenance, operation, safety and
procurement). Designer must discuss the issues with operators.
Management should encourage maintenance and operation people (supervisor, officers including
operators) to propose suggestion for improvement to design & engineering centre. Design &
engineering centre must verify any proposal with proper logic and data and accept/ reject with
proper data based reasoning.
Design & engineering centre has to work on both developmental and execution mode, depending
on demand of situation. The modus of operandi must be situational and flexible.
Cost analysis (including life cycle cost analysis) should be practiced after any design activity.
Design and engineering centre must encourage and train plant & operation personnel regarding
various developmental concepts (like total productive maintenance, six sigma, lean production,
etc).
Design and engineering centre personnel should impart training to plant and operation personnel
(officers, supervisors, operators).
Modus of operandi for remote design & engineering centre
can be designed and planned with more accurately, once the
company decided to implement such function.
Flexibility is the key for design and engineering centre . So,
function and activities of design and engineering centre
should be customized to implement effective and efficient
operation and maintenance management .
Design & Engineering Centre’s effects are mostly intangible
and long run; so to get the short term benefit this concept
can not be effective.
But design & engineering centre’s objective must be SMART
and long term to ensure proper O&M management.
Plant & Maintenance Engineering

Weitere ähnliche Inhalte

Was ist angesagt?

Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
Abhik Rathod
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type
suresh tusia
 

Was ist angesagt? (20)

Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
Computerized maintenance management system (cmms)
Computerized maintenance management system (cmms)Computerized maintenance management system (cmms)
Computerized maintenance management system (cmms)
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Maintenance work
Maintenance workMaintenance work
Maintenance work
 
Condition Based Maintenance
Condition Based MaintenanceCondition Based Maintenance
Condition Based Maintenance
 
Machinery Maintenance
Machinery MaintenanceMachinery Maintenance
Machinery Maintenance
 
OFFICE TPM PPT
OFFICE TPM PPTOFFICE TPM PPT
OFFICE TPM PPT
 
PM PRESENTATION
PM PRESENTATIONPM PRESENTATION
PM PRESENTATION
 
Machine maintenance presentation
Machine maintenance presentationMachine maintenance presentation
Machine maintenance presentation
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Spare parts management
Spare parts management Spare parts management
Spare parts management
 
Preventive maintenance (vuthy ng)
Preventive maintenance (vuthy ng)Preventive maintenance (vuthy ng)
Preventive maintenance (vuthy ng)
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type
 
Cmms
CmmsCmms
Cmms
 

Andere mochten auch

Controlled indoor farming on a local basis
Controlled indoor farming on a local basisControlled indoor farming on a local basis
Controlled indoor farming on a local basis
Larry Lipman
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
Pallavi Yadav
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
PANKAJ TIKEKAR
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
Satyaki Sikdar
 
difference between literary and technical writing
difference between literary and technical writingdifference between literary and technical writing
difference between literary and technical writing
muhammad ilyas
 

Andere mochten auch (20)

Maintenance
MaintenanceMaintenance
Maintenance
 
Controlled indoor farming on a local basis
Controlled indoor farming on a local basisControlled indoor farming on a local basis
Controlled indoor farming on a local basis
 
Control Environment Agriculture
Control Environment AgricultureControl Environment Agriculture
Control Environment Agriculture
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
Hydroponics-An Explosive Fact Of Our Times
Hydroponics-An Explosive Fact Of Our TimesHydroponics-An Explosive Fact Of Our Times
Hydroponics-An Explosive Fact Of Our Times
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
Plant maintenance
Plant maintenancePlant maintenance
Plant maintenance
 
Hydroponics ppt
Hydroponics pptHydroponics ppt
Hydroponics ppt
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
 
A Presentation On Construction & GTA Services – An Overview 29th November...
A Presentation On Construction  & GTA Services – An Overview  29th November...A Presentation On Construction  & GTA Services – An Overview  29th November...
A Presentation On Construction & GTA Services – An Overview 29th November...
 
(Overall safety of plant)
(Overall safety of plant)(Overall safety of plant)
(Overall safety of plant)
 
Fluidization and fluidized bed
Fluidization and fluidized bedFluidization and fluidized bed
Fluidization and fluidized bed
 
Fuel economy
Fuel economyFuel economy
Fuel economy
 
Introduction to Jwala Techno Engineering Pvt. Ltd.
Introduction to Jwala Techno Engineering Pvt. Ltd.Introduction to Jwala Techno Engineering Pvt. Ltd.
Introduction to Jwala Techno Engineering Pvt. Ltd.
 
difference between literary and technical writing
difference between literary and technical writingdifference between literary and technical writing
difference between literary and technical writing
 
Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...
Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...
Greenhouse Gas Emissions and Soil Carbon Stocks in the Agricultural Phase of ...
 
Containerized Farms
Containerized FarmsContainerized Farms
Containerized Farms
 
Introduction to-technical-writing-anuja
Introduction to-technical-writing-anujaIntroduction to-technical-writing-anuja
Introduction to-technical-writing-anuja
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
 
Basics of uv spectroscopy
Basics of uv spectroscopyBasics of uv spectroscopy
Basics of uv spectroscopy
 

Ähnlich wie Plant & Maintenance Engineering

Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
Rohit Tyagi
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
ssuserb6619e
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
5Asdfghjkl
 

Ähnlich wie Plant & Maintenance Engineering (20)

Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
 
JP Sharma _ CV
JP Sharma _ CVJP Sharma _ CV
JP Sharma _ CV
 
updated Resume
updated Resumeupdated Resume
updated Resume
 
Saurabh Rathore
Saurabh RathoreSaurabh Rathore
Saurabh Rathore
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
FINAL PROJECT-MBA
FINAL PROJECT-MBAFINAL PROJECT-MBA
FINAL PROJECT-MBA
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Ketul Resume
Ketul ResumeKetul Resume
Ketul Resume
 
Heath Nijem
Heath NijemHeath Nijem
Heath Nijem
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
 
Yogesh Sharma
Yogesh SharmaYogesh Sharma
Yogesh Sharma
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Ce seminar
Ce seminarCe seminar
Ce seminar
 
Tpm assignment- roll no. 56 to 60
Tpm  assignment- roll no. 56 to 60Tpm  assignment- roll no. 56 to 60
Tpm assignment- roll no. 56 to 60
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Rsume
RsumeRsume
Rsume
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 

Mehr von Nirjhar Chakravorti

Destination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering OutsourcingDestination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering Outsourcing
Nirjhar Chakravorti
 

Mehr von Nirjhar Chakravorti (8)

Know the Leader inside you
Know the Leader inside youKnow the Leader inside you
Know the Leader inside you
 
Technological Advancement & Present engineering practices in india
Technological Advancement & Present engineering practices in indiaTechnological Advancement & Present engineering practices in india
Technological Advancement & Present engineering practices in india
 
Organizational Structure and Human Asset Planning (for Project Based Organiza...
Organizational Structure and Human Asset Planning (for Project Based Organiza...Organizational Structure and Human Asset Planning (for Project Based Organiza...
Organizational Structure and Human Asset Planning (for Project Based Organiza...
 
Destination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering OutsourcingDestination Kolkata for Engineering Outsourcing
Destination Kolkata for Engineering Outsourcing
 
Product design concept
Product design conceptProduct design concept
Product design concept
 
Raw Material In Iron Making
Raw Material In Iron MakingRaw Material In Iron Making
Raw Material In Iron Making
 
Paper Making Process by Nirjhar
Paper Making Process by NirjharPaper Making Process by Nirjhar
Paper Making Process by Nirjhar
 
Gear Box Nirjhar
Gear Box NirjharGear Box Nirjhar
Gear Box Nirjhar
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 

Plant & Maintenance Engineering

  • 2. Nirjhar Chakravorti has completed Graduation in Mechanical Engineering in 2000 from Jalpaiguri Government Engineering College, India. Nirjhar has received & Post Graduate Diploma in Business Management (PGDBM) certificate from Institute of Management Technology (IMT), CDL, Ghaziabad. Nirjhar has experience in design, development and project engineering. During professional life, Nirjhar has worked on different engineering activities, like core design, management planning and project engineering, along with the analysis of life cycle costing for capital expenditure of a profit making company. Also, Nirjhar has worked on organizational re-structuring, implementation of ISO, six sigma and total productive maintenance (TPM).
  • 3. After erection & commissioning of a new plant, a company named ABC private limited focuses on production… Operation engineers remain busy to produce more and more product Maintenance engineers stay busy to oil the machine Procurement engineers remain busy to keep inventory And so on….. The result: Management is happy, as Return on Investment generates fast
  • 4. Operators report small adjustment of various machines for ease of operation Fitters report accessibility problem of various machines while lubricating oil, as part of preventive maintenance Machines start breakdown, despite of preventive maintenance, due to bolt shearing, shaft breakdown, bearing failure, etc. Procurement engineer plans to maintain high inventory for costly spare parts as getting spare part is a time consuming affair. The result: Production hampers. Effect: Maintenance Engineers try various options, but can not analyze root cause. So problems remain at its own place.
  • 5. A customer asked for big order execution. But the company can not bag the order as plant has not capacity to meet the stiff delivery schedule of the customer. The competitor grasp the order as they plan for enhancement of the plant capacity. But ABC Private limited has not any infrastructure to improve machine’s production capacity. The only way out is to install a new set of machines for same sizes of product with enhanced production rate, which is not an economical and feasible option, in such a short time. The result: Loss of order, loss in market share. Effect: Helplessness.
  • 6. To handle these situations in future, a probable solution is to…. Set up an In-house Design & Engineering centre. The result: Implementation of comprehensive Operation & Maintenance (O&M) Management which can analyze failures, adjust machines for considerable production improvement, eliminate minor inherent design errors of the machines, prepare drawings for major spare parts to reduce inventory cost, etc. Effect: Profit maximization, maintain market share.
  • 7. Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and efficiency. Pillars of O&M Management are….  Operation  Maintenance  Engineering  Training  Administration The purpose of O&M Management is to prepare a link between these pillars, i.e. establishing an OMETA link.
  • 8. To ensure effective O&M Management, following need to be done:  Set up a design & engineering centre  Link design and engineering centre activities with operation and maintenance activities. Benefit:  Maintenance engineers can concentrate in hardcore maintenance activities, instead of searching for design related activities.  Operation engineers need not to worry when drastic production increment is required beyond machine’s design capacity. They can concentrate in production and operation management only.
  • 9. Engineering Support : Engineering Support Administration – To guarantee effective execution and control of technical support. Equipment Modifications – To ensure proper design, review, control, realization, and documentation of equipment design modifications in a timely manner. Equipment Performance Monitoring – To perform monitoring actions that optimize machine reliability and efficiency. Engineering Support Procedures and Documentation – To ensure that engineering documents provide appropriate direction and that they support the efficiency and safe operations of the machine.
  • 10. Reliable facility for production& maintenance Modify series equipments when production needs to e increased up to an extent Failure Analysis for regular breakdowns Small design changes in machines to Minimize spare Ensure safety ensure lesser part inventory breakdown Design of new machines if Training to operation & required Maintenance Team Measure actual Tracking Life Cycle Cost operation compared energy Analysis when new to full utilization consumption investment made operation
  • 11. Design & Engineering Centre shall drive the O&M Management system within the organization. Design & Engineering centre shall be trained with machine design, project management, maintenance engineering, safety regulations and basic economic analysis. Design & Engineering Centre need to obtain full support from their management structure in order to carry out an effective O&M program.
  • 12. Alternate location: Major metro city near plant/ factory Best location: Within Plant/ Factory Premises
  • 13. Plant/ Factory Premises:  Advantage: Easy access to plant Provide in-hand solution Better control and implementation  Disadvantage: Most of the plants/ factories located away from cities. So retaining design & engineering centre professionals become an issue, which hamper proper implementation of O&M program. Company needs proper people for successful implementation of O&M program. Also, if people associated with O&M program leaves company regularly, then it is tough to re-orient the team.
  • 14. Major metro city near plant/ factory:  Disadvantage: It is tough to control plant activities (especially operation & maintenance management) from remote location.  Advantage: Recruiting and retaining members of the Design & Engineering Centre. Any company and department is build by human recourse, so recruiting and retaining proper people is the key to success for any organization.
  • 15. Major metro city near plant/ factory: To overcome major disadvantages, company need to establish proper planning and control for design & engineering centre. Some simple rule: The members need to be properly trained (w.r.t. design, factory layout, project execution, economics, energy conservation and EHS point of view). The members should visit plant at least for 4 days every month (irrespective of their workload and assignment). After any new development, design & engineering centre must visit factory along with complete design plan and discuss with all respective person (including maintenance, operation, safety and procurement). Designer must discuss the issues with operators. Management should encourage maintenance and operation people (supervisor, officers including operators) to propose suggestion for improvement to design & engineering centre. Design & engineering centre must verify any proposal with proper logic and data and accept/ reject with proper data based reasoning. Design & engineering centre has to work on both developmental and execution mode, depending on demand of situation. The modus of operandi must be situational and flexible. Cost analysis (including life cycle cost analysis) should be practiced after any design activity. Design and engineering centre must encourage and train plant & operation personnel regarding various developmental concepts (like total productive maintenance, six sigma, lean production, etc). Design and engineering centre personnel should impart training to plant and operation personnel (officers, supervisors, operators).
  • 16. Modus of operandi for remote design & engineering centre can be designed and planned with more accurately, once the company decided to implement such function. Flexibility is the key for design and engineering centre . So, function and activities of design and engineering centre should be customized to implement effective and efficient operation and maintenance management . Design & Engineering Centre’s effects are mostly intangible and long run; so to get the short term benefit this concept can not be effective. But design & engineering centre’s objective must be SMART and long term to ensure proper O&M management.