SlideShare ist ein Scribd-Unternehmen logo
1 von 14
Downloaden Sie, um offline zu lesen
2014 First Quarter
Results Webcast
May 1, 2014
Speaker
2
Randall Oliphant
Executive Chairman
Cautionary statements
3
All monetary amounts in U.S. dollars unless otherwise stated
Total cash costs shown net of by-product sales unless otherwise stated
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
Certain information contained in this presentation, including any information relating to New Gold’s future financial or operating performance are “forward looking”. All statements in this presentation,
other than statements of historical fact, which address events or developments that New Gold expects to occur are “forward-looking statements”. Forward-looking statements are statements that are
not historical facts and are generally, but not always, identified by the use of forward-looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,
“intends”, “anticipates”, “projects”, “potential”, “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “should”, “might” or “will
be taken”, “occur” or “be achieved” or the negative connotation of such terms. Forward-looking statements in this presentation include, among others, statements with respect to: guidance for
production, total cash costs, all-in sustaining costs and capital expenditures; mine life at various mines and projects; the expected throughput and recovery rates at New Afton; planned modifications
to the New Afton mine and mill and related timing, costs, return and payback period; expected future mining activities; exploration potential; the estimation of Mineral Reserves and Resources and
the realization of such estimates; the results of the Rainy River and Blackwater Feasibility Studies, including expected production and costs; the timing of permitting activities and environmental
assessment processes; expected timing of project development and construction activities and; the potential annual production and cash costs, and the potential for a block cave, at the El Morro
project.
All forward-looking statements in this presentation are based on the opinions and estimates of management as of the date such statements are made and are subject to important risk factors and
uncertainties, many of which are beyond New Gold’s ability to control or predict. Certain material assumptions regarding our forward-looking statements are discussed in this presentation, New
Gold’s MD&As, its Annual Information Form and its Technical Reports filed at www.sedar.com. In addition to, and subject to, such assumptions discussed in more detail elsewhere, the forward-
looking statements in this presentation are also subject to the following assumptions: (1) there being no signification disruptions affecting New Gold’s operations; (2) political and legal developments
in jurisdictions where New Gold operates, or may in the future operate, being consistent with New Gold’s current expectations; (3) the accuracy of New Gold’s current mineral reserve and resource
estimates; (4) the exchange rate between the Canadian dollar, Australian dollar, Mexican Peso and U.S. dollar being approximately consistent with current levels; (5) prices for diesel, natural gas,
fuel oil, electricity and other key supplies being approximately consistent with current levels; (6) labour and material costs increasing on a basis consistent with New Gold’s current expectations; (7)
permitting and arrangements with First Nations and other Aboriginal groups in respect of Rainy River and Blackwater being consistent with New Gold’s current expectations; (8) all environmental
approvals (including the environmental assessment process for the Blackwater and Rainy River projects), required permits, licenses and authorizations being obtained from the relevant
governments and other relevant stakeholders within the expected timelines; and (9) the results of the feasibility studies for the Rainy River and Blackwater projects being realized.
Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause actual
results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. Such factors include, without limitation:
significant capital requirements; price volatility in the spot and forward markets for commodities; fluctuations in the international currency markets and in the rates of exchange of the currencies of
Canada, the United States, Australia, Mexico and Chile; discrepancies between actual and estimated production, between actual and estimated reserves and resources and between actual and
estimated metallurgical recoveries; changes in national and local government legislation in Canada, the United States, Australia, Mexico and Chile or any other country in which New Gold currently
or may in the future carry on business; taxation; controls, regulations and political or economic developments in the countries in which New Gold does or may carry on business; the speculative
nature of mineral exploration and development, including the risks of obtaining and maintaining the validity and enforceability of the necessary licenses and permits and complying with the
permitting requirements of each jurisdiction in which New Gold operates, including, but not limited to: in Canada, obtaining the necessary permits for the Blackwater and Rainy River projects; in
Mexico, where Cerro San Pedro has a history of ongoing legal challenges related to our environmental authorization (EIS); and in Chile, where the courts have temporarily suspended the approval
of the environmental permit for El Morro; the lack of certainty with respect to foreign legal systems, which may not be immune from the influence of political pressure, corruption or other factors that
are inconsistent with the rule of law; the uncertainties inherent to current and future legal challenges New Gold is or may become a party to; diminishing quantities or grades of reserves and
resources; competition; loss of key employees; additional funding requirements; rising costs of labour, supplies, fuel and equipment; actual results of current exploration or reclamation activities;
uncertainties inherent to mining economic studies including the feasibility studies for Rainy River and Blackwater; changes in project parameters as plans continue to be refined; accidents; labour
disputes; defective title to mineral claims or property or contests over claims to mineral properties; unexpected delays and costs inherent to consulting and accommodating rights of First Nations and
other Aboriginal groups; uncertainties with respect to obtaining all necessary surface and other land use rights or tenure for Rainy River; risks, uncertainties and unanticipated delays associated with
obtaining and maintaining necessary licenses, permits and authorizations and complying with permitting requirements, including those associated with the environmental assessment processes for
Blackwater and Rainy River. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental events and hazards,
industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance or inability to obtain insurance to cover these
risks) as well as “Risk Factors” included in New Gold’s disclosure documents filed on and available at www.sedar.com.
Forward-looking statements are not guarantees of future performance, and actual results and future events could materially differ from those anticipated in such statements. All of the forward-
looking statements contained in this presentation are qualified by these cautionary statements. New Gold expressly disclaims any intention or obligation to update or revise any forward-looking
statements whether as a result of new information, events or otherwise, except in accordance with applicable securities laws.
The footnotes and endnotes to this presentation contain important information. The endnotes are found at the end of the presentation.
2014 first quarter highlights
4
91,317oz $674per oz
All-in sustaining costs(1)
Successfully completed
Rainy River Feasibility
Study and advanced
project
+$
24million
Increase cash balance during quarter
Gold production Costs
$254per oz
Total cash costs(2)
New Afton
Financial Rainy River Cash and Equivalents
New Afton achieved record
quarterly gold and copper
production
$81million
Net cash generated
from operations
$
438million
Cash balance at March 31, 2014
1. Refer to Endnote on all-in sustaining costs under the heading “Non-GAAP Measures”.
2. Refer to Endnote on total cash costs under the heading “Non-GAAP Measures”.
27,364oz - Gold
22mlbs - Copper
+39%versus Q1’13
Mine-by-mine operating results
5
New Afton 27 ($1,283) ($664)
Mesquite 28 $893 $1,069
Peak Mines 20 $757 $1,102
Cerro San Pedro 19 $947 $1,080
94 $254 $674
2014 FIRST QUARTER
Gold sales
(000s ounces)
Cash costs(1)
($/oz)
All-in Sustaining
costs(2) ($/oz)
New Afton co-product costs(1)
Gold ($/oz) $413 $630
Copper ($/lb) $0.93 $1.41
1. Refer to Endnote on total cash costs under the heading “Non-GAAP Measures”.
2. Refer to Endnote on all-in sustaining costs under the heading “Non-GAAP Measures”.
Co-product
cash costs(1)
Co-product all-in
sustaining costs(2)
NEW AFTON
2014 FIRST QUARTER
Consolidated financial summary
6
2013 FIRST QUARTER2014 FIRST QUARTER
Revenues ($ million) $191 $202
Operating margin(1) ($ million) $92 $96
Adjusted net earnings(2) ($ million) $18 $21
Adjusted net earnings per share(2) ($/share) $0.04 $0.04
Net earnings ($ million) ($2) $36
Net earnings per share ($/share) ($0.00) $0.08
Net cash generated from operations ($ million) $81 $59
1. Refer to Endnote on operating margin under the heading “Non-GAAP Measures”.
2. Refer to Endnote on adjusted net earnings under the heading “Non-GAAP Measures”.
7
Projects update
• Average daily throughput in first quarter ~12,900 tonnes
• Ordered vertimill and other equipment
• Engaged AMEC as EPCM partner
• Project remains on-time for mid-2015 commissioning and on-budget ($45 million)
• Successfully completed Feasibility Study
• Submitted final Environmental Assessment report for review/comment
• Began ordering long lead time equipment
• Engaged AMEC as EPCM partner
• Drilled 41 exploration holes targeting extensions of Intrepid Zone and west of
open pit
• Neared completion of Environmental Assessment report (to be filed in second
quarter)
• Initiated engineering studies for planned transmission line route and tailings
storage facility
• Established priority targets for 2014 exploration program (to commence in May)
New Afton Expansion
Rainy River
Blackwater
8
Rainy River – Progress milestones
2014 2015
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Complete Feasibility Study
Submit Environmental Assessment Report
Order Long Lead Equipment
Award EPCM Contract
Detailed Engineering & Procurement
Provincial Environmental Assessment Approval
Federal Environmental Assessment Approval
Construction/Other Permits
Arrival of Mobile Equipment
Begin Construction - Water Management Facility
Pour First Concrete for Mill Building
Commence Pre-Strip
Arrival of Mill Equipment
Complete Enclosure of Mill Building
Targeted milestones
1. Near-term milestones based on company plans which are consistent with timelines presented in the Rainy River Technical Report, entitled “Feasibility Study of the Rainy River Project, Ontario, Canada” dated February 14, 2014 and available on SEDAR.
Targeting commissioning in late 2016 with first year of full production in 2017
9
Organic pipeline
• Mesquite return to run rate (2015+)
• New Afton expansion (mid-2015)
• Rainy River development (2015/2016)
• CSP to residual leaching (2016)
Existing low cost production base to be further enhanced by our
lower cost development projects(1)
• Sequence Blackwater development
• El Morro advanced
2014(2) 2017(3) Future Potential(4)
GOLDPRODUCTION
1. Refer to Endnote on all-in sustaining costs under the heading “Non-GAAP Measures”. Rainy River and Blackwater life-of-mine all-in sustaining costs are estimated to be $736/oz and $685/oz, respectively, based on their respective Feasibility Studies.
2. Based on mid-point of 2014 guidance.
3. Based on expected annual production from current operations according to their respective mine plans, including positive production impact of New Afton’s mill expansion targeted for mid-2015, Mesquite mine plan moving into grades more in line with
reserve grade, which is partially offset by Cerro San Pedro ceasing active mining and moving into residual leaching, and includes the first year of full production from Rainy River. Assumes on-time completion of Rainy River.
4. Based on ~325Koz annual production from Rainy River, ~485Koz annual production from Blackwater and ~90Koz annual production from El Morro as outlined in the Feasibility Studies for these projects, and production contribution from New Afton,
Mesquite and the Peak Mines according to their respective mine plans. Assumes the timely development of Blackwater and El Morro.
10
Cash flow growth and value
$79
$182
$230 $236 $249
$287
~$400 ~$400
~$600
$0
$100
$200
$300
$400
$500
$600
$700
2009 2010 2011 2012 2013 2014E 2015E 2016E 2017E
1. For 2013, figure shown is Adjusted net cash generated from operations. Net cash generated from operations in the 2013 period included certain non-recurring cash flows. Net cash generated from operations in 2013 was $172 million.
2. 2014E based on Bloomberg consensus CFPS of $0.57 multiplied by 504 million basic shares outstanding.
3. 2015 to 2017 estimates based on the following price and exchange rate assumptions (which were also used for 2014 guidance): Gold - $1,300/oz, Silver - $22.00/oz, Copper - $3.25/lb, USD/CDN - $0.90, USD/AUD - $0.88. 2015 estimated cash flow
assumes: successful mill expansion to 14,000 tonnes per day at New Afton in mid-2015, Mesquite moving into mining of higher grade areas of the open pit in 2015 in accordance with the current mine plan, Peak’s copper production increasing from 2014
levels in accordance with the current mine plan, and Cerro San Pedro mining higher grade material in its final year of active mining in accordance with the current mine plan. 2016 estimated cash flow assumes: New Afton processing for a full year at
14,000 tonnes per day, Mesquite remaining in higher grade areas in accordance with the current mine plan, Peak further increasing its copper production in accordance with the current mine plan, and Cerro San Pedro moving into its first year of residual
leaching in accordance with the current mine plan. 2017 estimated cash flow assumes: Rainy River commercial production is achieved on schedule and Rainy River has its first full year of production in 2017 with a production level consistent with the
project’s feasibility study, New Afton processing 14,000 tonnes per day, Mesquite remaining in higher grade areas in accordance with the current mine plan, Peak further increasing its copper production in accordance with the current mine plan, and
Cerro San Pedro continuing its residual leaching in accordance with the current mine plan. Assumes no non-recurring cash flows in 2014, 2015, 2016 and 2017.
4. Based on the average of the estimates by research analysts for the net asset values of the Blackwater and El Morro assets.
(2)
NET CASH FROM OPERATIONS ($ MILLIONS)
Enterprise Value $3.0 billion
Consensus Blackwater and El Morro Value(4) $0.7 billion
Enterprise Value (excluding Blackwater and El Morro) $2.3 billion
Trading at ~3.8x 2017E cash flow at 2014 guidance prices
(3)(3) (3)(1)
Catalysts
11
2014 costs declining versus 2013
New Afton production and cash flow continues to increase
New Afton C-zone exploration
Rainy River regional exploration
Blackwater regional exploration
Rainy River and Blackwater permitting
New Afton mill expansion
Cash flow growth
New Gold investment thesis
12
A history
of value
creation
Peer-leading
growth pipeline
Among
lowest-cost
producers with
established track
record
Invested and
experienced
team
Portfolio
of assets
in top-rated
jurisdictions
Establishing the leading
intermediate gold company
Endnotes
13
TECHNICAL INFORMATION
The scientific and technical information in this presentation has been reviewed and approved by Mark A. Petersen, Vice President, Exploration of New Gold. Mr. Petersen is an AIPG Certified Professional
Geologist and a “Qualified Person” under National Instrument 43-101.
NON-GAAP MEASURES
(1) ALL-IN SUSTAINING COSTS
Consistent with guidance announced in 2013 by the World Gold Council, an association of various gold mining companies from around the world of which New Gold is a member, New Gold defines “all-in
sustaining costs” per ounce as the sum of total cash costs, capital expenditures that are sustaining in nature, corporate general and administrative costs, capitalized and expensed exploration that is
sustaining in nature and environmental reclamation costs, all divided by the ounces of gold sold to arrive at a per ounce figure. New Gold believes this non-GAAP financial measure provides further
transparency into costs associated with producing gold and will assist analysts, investors and other stakeholders of the company in assessing the company’s operating performance, its ability to generate
free cash flow from current operations and its overall value. This data is furnished to provide additional information and is a non-GAAP financial measure. All-in sustaining costs presented do not have a
standardized meaning under GAAP and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of
performance prepared in accordance with GAAP and is not necessarily indicative of cash flow from operations under GAAP or operating costs presented under GAAP. Further details regarding all-in
sustaining costs and a reconciliation to the nearest GAAP measures are provided in our MD&A accompanying our financial statements filed from time to time on www.sedar.com.
(2) TOTAL CASH COSTS
“Total cash costs” per ounce figures are non-GAAP measures which are calculated in accordance with a standard developed by The Gold Institute, a worldwide association of suppliers of gold and gold
products that ceased operations in 2002. Adoption of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measures of other companies. New Gold
reports total cash costs on a sales basis. The company believes that certain investors use this information to evaluate the company’s ability to generate liquidity through operating cash flow and that this
measure, along with sales, is considered to be a key indicator of the company’s ability to generate operating earnings and cash flow from its mining operations. Total cash costs include mine site operating
costs such as mining, processing and administration costs, royalties, production taxes, and realized gains and losses on fuel contracts, but are exclusive of amortization, reclamation, capital and exploration
costs and net of by-product sales. Total cash costs are then divided by ounces of gold sold to arrive at a per ounce figure. Co-product cash costs remove the impact of other metal sales that are produced as
a by-product of gold production and apportion the cash costs to each metal produced on a percentage of revenue basis, and subsequently divides the amount by the total ounces of gold or silver or pounds
of copper sold, as the case may be, to arrive at per ounce or per pound figures. Unless otherwise indicated, all total cash cost information in this presentation is net of by-product sales. These measures,
along with sales, are considered to be a key indicator of a company’s ability to generate operating earnings and cash flow from its mining operations. This data is furnished to provide additional information
and is a non-GAAP financial measure. Total cash costs and co-product cash costs presented do not have a standardized meaning under GAAP and may not be comparable to similar measures presented by
other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP and is not necessarily indicative of cash flow from
operations under GAAP or operating costs presented under GAAP. Further details regarding total cash costs and a reconciliation to the nearest GAAP measures are provided in our MD&A accompanying
our financial statements filed from time to time on www.sedar.com.
(3) ADJUSTED NET EARNINGS
“Adjusted net earnings” and “adjusted net earnings per share” are non-GAAP financial measures. Net earnings have been adjusted and tax affected for the group of costs in “Other gains and losses” on the
condensed consolidated income statement. The adjusted entries are also impacted for tax to the extent that the underlying entries are impacted for tax in the unadjusted net earnings from continuing
operations. The company uses this measure for its own internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect fair value changes on senior notes and non-
hedged derivatives, foreign currency translation and fair value through profit or loss and financial asset gains/losses. Consequently, the presentation of adjusted net earnings and adjusted net earnings per
share enables investors and analysts to better understand the underlying operating performance of our core mining business through the eyes of management. Management periodically evaluates the
components of adjusted net earnings and adjusted net earnings per share based on an internal assessment of performance measures that are useful for evaluating the operating performance of our
business and a review of the non-GAAP measures used by mining industry analysts and other mining companies. Adjusted net earnings and adjusted net earnings per share are intended to provide
additional information only and do not have any standardized definition under IFRS and may not be comparable to similar measures presented by other companies. They should not be considered in isolation
or as a substitute for measures of performance prepared in accordance with IFRS. The measures are not necessarily indicative of operating profit or cash flows from operations as determined under IFRS.
Further details regarding adjusted net earnings and a reconciliation for first quarter figures are provided in our MD&A accompanying our financial statements filed from time to time on www.sedar.com.
(4) OPERATING MARGIN
“Operating margin” is a non-GAAP financial measure with no standard meaning under GAAP, which management uses to further evaluate the company’s results of operations in each reporting period.
Operating margin is calculated as revenue less operating expenses and therefore does not include depreciation and depletion. Operating margin is intended to provide additional information only and does
not have any standardized definition under IFRS; it should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Other companies may calculate
this measure differently and this measure is unlikely to be comparable to similar measures presented by other companies. Further details regarding operating margin and a reconciliation for first quarter
figures are provided in our MD&A accompanying our financial statements filed from time to time on www.sedar.com.
Contact information
14
Investor Relations
Hannes Portmann
Vice President, Corporate Development
416-324-6014
hannes.portmann@newgold.com

Weitere ähnliche Inhalte

Was ist angesagt?

Investor day presentation february 2014v final
Investor day presentation   february 2014v finalInvestor day presentation   february 2014v final
Investor day presentation february 2014v finalnewgold2011
 
Investor day presentation february 2014 v final
Investor day presentation   february 2014 v finalInvestor day presentation   february 2014 v final
Investor day presentation february 2014 v finalnewgold2011
 
New Gold Corporate Presentation - BAML May 2014
New Gold Corporate Presentation - BAML May 2014New Gold Corporate Presentation - BAML May 2014
New Gold Corporate Presentation - BAML May 2014newgold2011
 
2015 q1 earnings webcast v final
2015 q1 earnings webcast v final2015 q1 earnings webcast v final
2015 q1 earnings webcast v finalnewgold2011
 
AGM 2015 Presentation
AGM 2015 PresentationAGM 2015 Presentation
AGM 2015 Presentationnewgold2011
 
Corporate Presentation March 2015
Corporate Presentation March 2015Corporate Presentation March 2015
Corporate Presentation March 2015newgold2011
 
Corporate Presentation May 2015
Corporate Presentation May 2015Corporate Presentation May 2015
Corporate Presentation May 2015newgold2011
 
Denver corporate presentation - september 2015
Denver   corporate presentation - september 2015Denver   corporate presentation - september 2015
Denver corporate presentation - september 2015newgold2011
 
Scotia london corporate presentation - june 2015
Scotia london   corporate presentation - june 2015Scotia london   corporate presentation - june 2015
Scotia london corporate presentation - june 2015newgold2011
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014newgold2011
 
Print version (cibc) corporate presentation - january 2014
Print version (cibc)   corporate presentation - january 2014Print version (cibc)   corporate presentation - january 2014
Print version (cibc) corporate presentation - january 2014newgold2011
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015newgold2011
 
Print version (td) corporate presentation - january 2014
Print version (td)   corporate presentation - january 2014Print version (td)   corporate presentation - january 2014
Print version (td) corporate presentation - january 2014newgold2011
 
Corporate presentation december 2015
Corporate presentation   december 2015Corporate presentation   december 2015
Corporate presentation december 2015newgold2011
 
Corporate presentation june 2015
Corporate presentation   june 2015Corporate presentation   june 2015
Corporate presentation june 2015newgold2011
 
Scotiabank Mining Panel Discussion
Scotiabank Mining Panel DiscussionScotiabank Mining Panel Discussion
Scotiabank Mining Panel Discussionnewgold2011
 
Barclays print version corporate presentation - march 2014 v final
Barclays print version   corporate presentation - march 2014 v finalBarclays print version   corporate presentation - march 2014 v final
Barclays print version corporate presentation - march 2014 v finalnewgold2011
 
2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)newgold2011
 
RBC London Gold Conference
RBC London Gold ConferenceRBC London Gold Conference
RBC London Gold Conferencenewgold2011
 

Was ist angesagt? (19)

Investor day presentation february 2014v final
Investor day presentation   february 2014v finalInvestor day presentation   february 2014v final
Investor day presentation february 2014v final
 
Investor day presentation february 2014 v final
Investor day presentation   february 2014 v finalInvestor day presentation   february 2014 v final
Investor day presentation february 2014 v final
 
New Gold Corporate Presentation - BAML May 2014
New Gold Corporate Presentation - BAML May 2014New Gold Corporate Presentation - BAML May 2014
New Gold Corporate Presentation - BAML May 2014
 
2015 q1 earnings webcast v final
2015 q1 earnings webcast v final2015 q1 earnings webcast v final
2015 q1 earnings webcast v final
 
AGM 2015 Presentation
AGM 2015 PresentationAGM 2015 Presentation
AGM 2015 Presentation
 
Corporate Presentation March 2015
Corporate Presentation March 2015Corporate Presentation March 2015
Corporate Presentation March 2015
 
Corporate Presentation May 2015
Corporate Presentation May 2015Corporate Presentation May 2015
Corporate Presentation May 2015
 
Denver corporate presentation - september 2015
Denver   corporate presentation - september 2015Denver   corporate presentation - september 2015
Denver corporate presentation - september 2015
 
Scotia london corporate presentation - june 2015
Scotia london   corporate presentation - june 2015Scotia london   corporate presentation - june 2015
Scotia london corporate presentation - june 2015
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014
 
Print version (cibc) corporate presentation - january 2014
Print version (cibc)   corporate presentation - january 2014Print version (cibc)   corporate presentation - january 2014
Print version (cibc) corporate presentation - january 2014
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015
 
Print version (td) corporate presentation - january 2014
Print version (td)   corporate presentation - january 2014Print version (td)   corporate presentation - january 2014
Print version (td) corporate presentation - january 2014
 
Corporate presentation december 2015
Corporate presentation   december 2015Corporate presentation   december 2015
Corporate presentation december 2015
 
Corporate presentation june 2015
Corporate presentation   june 2015Corporate presentation   june 2015
Corporate presentation june 2015
 
Scotiabank Mining Panel Discussion
Scotiabank Mining Panel DiscussionScotiabank Mining Panel Discussion
Scotiabank Mining Panel Discussion
 
Barclays print version corporate presentation - march 2014 v final
Barclays print version   corporate presentation - march 2014 v finalBarclays print version   corporate presentation - march 2014 v final
Barclays print version corporate presentation - march 2014 v final
 
2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)
 
RBC London Gold Conference
RBC London Gold ConferenceRBC London Gold Conference
RBC London Gold Conference
 

Andere mochten auch

Print version (cibc) corporate presentation - january 2014
Print version (cibc)   corporate presentation - january 2014Print version (cibc)   corporate presentation - january 2014
Print version (cibc) corporate presentation - january 2014newgold2011
 
Print version corporate presentation - november 6, 2012.pdf
Print version   corporate presentation - november 6, 2012.pdfPrint version   corporate presentation - november 6, 2012.pdf
Print version corporate presentation - november 6, 2012.pdfnewgold2011
 
Print version corporate presentation - february 6, 2013
Print version   corporate presentation - february 6, 2013Print version   corporate presentation - february 6, 2013
Print version corporate presentation - february 6, 2013newgold2011
 
Corporate Presentation August 1, 2012
Corporate Presentation   August 1, 2012Corporate Presentation   August 1, 2012
Corporate Presentation August 1, 2012newgold2011
 
Corporate presentation august 2016
Corporate presentation   august 2016Corporate presentation   august 2016
Corporate presentation august 2016newgold2011
 
Investor day 2013 v final
Investor day 2013 v finalInvestor day 2013 v final
Investor day 2013 v finalnewgold2011
 

Andere mochten auch (6)

Print version (cibc) corporate presentation - january 2014
Print version (cibc)   corporate presentation - january 2014Print version (cibc)   corporate presentation - january 2014
Print version (cibc) corporate presentation - january 2014
 
Print version corporate presentation - november 6, 2012.pdf
Print version   corporate presentation - november 6, 2012.pdfPrint version   corporate presentation - november 6, 2012.pdf
Print version corporate presentation - november 6, 2012.pdf
 
Print version corporate presentation - february 6, 2013
Print version   corporate presentation - february 6, 2013Print version   corporate presentation - february 6, 2013
Print version corporate presentation - february 6, 2013
 
Corporate Presentation August 1, 2012
Corporate Presentation   August 1, 2012Corporate Presentation   August 1, 2012
Corporate Presentation August 1, 2012
 
Corporate presentation august 2016
Corporate presentation   august 2016Corporate presentation   august 2016
Corporate presentation august 2016
 
Investor day 2013 v final
Investor day 2013 v finalInvestor day 2013 v final
Investor day 2013 v final
 

Ähnlich wie 2014 first quarter webcast v final

New gold corporate presentation - baml may 2014
New gold   corporate presentation - baml may 2014New gold   corporate presentation - baml may 2014
New gold corporate presentation - baml may 2014newgold2011
 
Corporate presentation january 2016
Corporate presentation   january 2016Corporate presentation   january 2016
Corporate presentation january 2016newgold2011
 
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 GuidanceFourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidancenewgold2011
 
Investor day presentation february 2014
Investor day presentation   february 2014Investor day presentation   february 2014
Investor day presentation february 2014newgold2011
 
Corporate presentation may 2016 (baml)
Corporate presentation   may 2016 (baml)Corporate presentation   may 2016 (baml)
Corporate presentation may 2016 (baml)newgold2011
 
Corporate presentation june 2016
Corporate presentation   june 2016Corporate presentation   june 2016
Corporate presentation june 2016newgold2011
 
New gold presentation april 2018 v final
New gold presentation april 2018 v finalNew gold presentation april 2018 v final
New gold presentation april 2018 v finalnewgold2011
 
Corporate presentation september 2016 v final
Corporate presentation   september 2016 v finalCorporate presentation   september 2016 v final
Corporate presentation september 2016 v finalnewgold2011
 
Third Quarter 2013 Financial Results Presentation
Third Quarter 2013 Financial Results PresentationThird Quarter 2013 Financial Results Presentation
Third Quarter 2013 Financial Results Presentationnewgold2011
 
New Gold 2015 Corporate Presentation
New Gold 2015 Corporate PresentationNew Gold 2015 Corporate Presentation
New Gold 2015 Corporate Presentationnewgold2011
 
Corporate presentation november 2015 (1 on 1 meeting)
Corporate presentation   november 2015 (1 on 1 meeting)Corporate presentation   november 2015 (1 on 1 meeting)
Corporate presentation november 2015 (1 on 1 meeting)newgold2011
 

Ähnlich wie 2014 first quarter webcast v final (11)

New gold corporate presentation - baml may 2014
New gold   corporate presentation - baml may 2014New gold   corporate presentation - baml may 2014
New gold corporate presentation - baml may 2014
 
Corporate presentation january 2016
Corporate presentation   january 2016Corporate presentation   january 2016
Corporate presentation january 2016
 
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 GuidanceFourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
 
Investor day presentation february 2014
Investor day presentation   february 2014Investor day presentation   february 2014
Investor day presentation february 2014
 
Corporate presentation may 2016 (baml)
Corporate presentation   may 2016 (baml)Corporate presentation   may 2016 (baml)
Corporate presentation may 2016 (baml)
 
Corporate presentation june 2016
Corporate presentation   june 2016Corporate presentation   june 2016
Corporate presentation june 2016
 
New gold presentation april 2018 v final
New gold presentation april 2018 v finalNew gold presentation april 2018 v final
New gold presentation april 2018 v final
 
Corporate presentation september 2016 v final
Corporate presentation   september 2016 v finalCorporate presentation   september 2016 v final
Corporate presentation september 2016 v final
 
Third Quarter 2013 Financial Results Presentation
Third Quarter 2013 Financial Results PresentationThird Quarter 2013 Financial Results Presentation
Third Quarter 2013 Financial Results Presentation
 
New Gold 2015 Corporate Presentation
New Gold 2015 Corporate PresentationNew Gold 2015 Corporate Presentation
New Gold 2015 Corporate Presentation
 
Corporate presentation november 2015 (1 on 1 meeting)
Corporate presentation   november 2015 (1 on 1 meeting)Corporate presentation   november 2015 (1 on 1 meeting)
Corporate presentation november 2015 (1 on 1 meeting)
 

Mehr von newgold2011

New gold presentation may 2018 v final
New gold presentation may 2018 v finalNew gold presentation may 2018 v final
New gold presentation may 2018 v finalnewgold2011
 
Agm april-2018-v final
Agm april-2018-v finalAgm april-2018-v final
Agm april-2018-v finalnewgold2011
 
Corporate Presentation February 2018
Corporate Presentation February 2018Corporate Presentation February 2018
Corporate Presentation February 2018newgold2011
 
New gold presentation january 2018 v final (4)
New gold presentation january 2018 v final (4)New gold presentation january 2018 v final (4)
New gold presentation january 2018 v final (4)newgold2011
 
New gold presentation november 2017v final
New gold presentation november 2017v finalNew gold presentation november 2017v final
New gold presentation november 2017v finalnewgold2011
 
New gold presentation october 2017v final
New gold presentation october 2017v finalNew gold presentation october 2017v final
New gold presentation october 2017v finalnewgold2011
 
New gold denver gold forum september 24 27, 2017
New gold denver gold forum september 24 27, 2017New gold denver gold forum september 24 27, 2017
New gold denver gold forum september 24 27, 2017newgold2011
 
New gold presentation september 2017 v final
New gold presentation september 2017 v finalNew gold presentation september 2017 v final
New gold presentation september 2017 v finalnewgold2011
 
New gold presentation june 2017 v final
New gold presentation june 2017 v finalNew gold presentation june 2017 v final
New gold presentation june 2017 v finalnewgold2011
 
New gold baml global metals, mining & steel conference 16 18 may 2017
New gold baml global metals, mining & steel conference 16 18 may 2017New gold baml global metals, mining & steel conference 16 18 may 2017
New gold baml global metals, mining & steel conference 16 18 may 2017newgold2011
 
New gold presentation march 2017 v website
New gold presentation march 2017 v websiteNew gold presentation march 2017 v website
New gold presentation march 2017 v websitenewgold2011
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v finalnewgold2011
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v finalnewgold2011
 
Corporate presentation november 2016 v final
Corporate presentation   november 2016 v finalCorporate presentation   november 2016 v final
Corporate presentation november 2016 v finalnewgold2011
 
Corporate presentation april 2016
Corporate presentation   april 2016Corporate presentation   april 2016
Corporate presentation april 2016newgold2011
 
Corporate presentation march 2016
Corporate presentation   march 2016Corporate presentation   march 2016
Corporate presentation march 2016newgold2011
 
Investor day presentation
Investor day presentation Investor day presentation
Investor day presentation newgold2011
 
Rainy river site visit presentation v final
Rainy river site visit presentation v finalRainy river site visit presentation v final
Rainy river site visit presentation v finalnewgold2011
 

Mehr von newgold2011 (18)

New gold presentation may 2018 v final
New gold presentation may 2018 v finalNew gold presentation may 2018 v final
New gold presentation may 2018 v final
 
Agm april-2018-v final
Agm april-2018-v finalAgm april-2018-v final
Agm april-2018-v final
 
Corporate Presentation February 2018
Corporate Presentation February 2018Corporate Presentation February 2018
Corporate Presentation February 2018
 
New gold presentation january 2018 v final (4)
New gold presentation january 2018 v final (4)New gold presentation january 2018 v final (4)
New gold presentation january 2018 v final (4)
 
New gold presentation november 2017v final
New gold presentation november 2017v finalNew gold presentation november 2017v final
New gold presentation november 2017v final
 
New gold presentation october 2017v final
New gold presentation october 2017v finalNew gold presentation october 2017v final
New gold presentation october 2017v final
 
New gold denver gold forum september 24 27, 2017
New gold denver gold forum september 24 27, 2017New gold denver gold forum september 24 27, 2017
New gold denver gold forum september 24 27, 2017
 
New gold presentation september 2017 v final
New gold presentation september 2017 v finalNew gold presentation september 2017 v final
New gold presentation september 2017 v final
 
New gold presentation june 2017 v final
New gold presentation june 2017 v finalNew gold presentation june 2017 v final
New gold presentation june 2017 v final
 
New gold baml global metals, mining & steel conference 16 18 may 2017
New gold baml global metals, mining & steel conference 16 18 may 2017New gold baml global metals, mining & steel conference 16 18 may 2017
New gold baml global metals, mining & steel conference 16 18 may 2017
 
New gold presentation march 2017 v website
New gold presentation march 2017 v websiteNew gold presentation march 2017 v website
New gold presentation march 2017 v website
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v final
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v final
 
Corporate presentation november 2016 v final
Corporate presentation   november 2016 v finalCorporate presentation   november 2016 v final
Corporate presentation november 2016 v final
 
Corporate presentation april 2016
Corporate presentation   april 2016Corporate presentation   april 2016
Corporate presentation april 2016
 
Corporate presentation march 2016
Corporate presentation   march 2016Corporate presentation   march 2016
Corporate presentation march 2016
 
Investor day presentation
Investor day presentation Investor day presentation
Investor day presentation
 
Rainy river site visit presentation v final
Rainy river site visit presentation v finalRainy river site visit presentation v final
Rainy river site visit presentation v final
 

Kürzlich hochgeladen

B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...SUHANI PANDEY
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna SpA
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...mriyagarg453
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...SUHANI PANDEY
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableSheetaleventcompany
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationPaul West-Sells
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...SUHANI PANDEY
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024TeckResourcesLtd
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 

Kürzlich hochgeladen (20)

B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 

2014 first quarter webcast v final

  • 1. 2014 First Quarter Results Webcast May 1, 2014
  • 3. Cautionary statements 3 All monetary amounts in U.S. dollars unless otherwise stated Total cash costs shown net of by-product sales unless otherwise stated CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS Certain information contained in this presentation, including any information relating to New Gold’s future financial or operating performance are “forward looking”. All statements in this presentation, other than statements of historical fact, which address events or developments that New Gold expects to occur are “forward-looking statements”. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the use of forward-looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, “projects”, “potential”, “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “should”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation of such terms. Forward-looking statements in this presentation include, among others, statements with respect to: guidance for production, total cash costs, all-in sustaining costs and capital expenditures; mine life at various mines and projects; the expected throughput and recovery rates at New Afton; planned modifications to the New Afton mine and mill and related timing, costs, return and payback period; expected future mining activities; exploration potential; the estimation of Mineral Reserves and Resources and the realization of such estimates; the results of the Rainy River and Blackwater Feasibility Studies, including expected production and costs; the timing of permitting activities and environmental assessment processes; expected timing of project development and construction activities and; the potential annual production and cash costs, and the potential for a block cave, at the El Morro project. All forward-looking statements in this presentation are based on the opinions and estimates of management as of the date such statements are made and are subject to important risk factors and uncertainties, many of which are beyond New Gold’s ability to control or predict. Certain material assumptions regarding our forward-looking statements are discussed in this presentation, New Gold’s MD&As, its Annual Information Form and its Technical Reports filed at www.sedar.com. In addition to, and subject to, such assumptions discussed in more detail elsewhere, the forward- looking statements in this presentation are also subject to the following assumptions: (1) there being no signification disruptions affecting New Gold’s operations; (2) political and legal developments in jurisdictions where New Gold operates, or may in the future operate, being consistent with New Gold’s current expectations; (3) the accuracy of New Gold’s current mineral reserve and resource estimates; (4) the exchange rate between the Canadian dollar, Australian dollar, Mexican Peso and U.S. dollar being approximately consistent with current levels; (5) prices for diesel, natural gas, fuel oil, electricity and other key supplies being approximately consistent with current levels; (6) labour and material costs increasing on a basis consistent with New Gold’s current expectations; (7) permitting and arrangements with First Nations and other Aboriginal groups in respect of Rainy River and Blackwater being consistent with New Gold’s current expectations; (8) all environmental approvals (including the environmental assessment process for the Blackwater and Rainy River projects), required permits, licenses and authorizations being obtained from the relevant governments and other relevant stakeholders within the expected timelines; and (9) the results of the feasibility studies for the Rainy River and Blackwater projects being realized. Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. Such factors include, without limitation: significant capital requirements; price volatility in the spot and forward markets for commodities; fluctuations in the international currency markets and in the rates of exchange of the currencies of Canada, the United States, Australia, Mexico and Chile; discrepancies between actual and estimated production, between actual and estimated reserves and resources and between actual and estimated metallurgical recoveries; changes in national and local government legislation in Canada, the United States, Australia, Mexico and Chile or any other country in which New Gold currently or may in the future carry on business; taxation; controls, regulations and political or economic developments in the countries in which New Gold does or may carry on business; the speculative nature of mineral exploration and development, including the risks of obtaining and maintaining the validity and enforceability of the necessary licenses and permits and complying with the permitting requirements of each jurisdiction in which New Gold operates, including, but not limited to: in Canada, obtaining the necessary permits for the Blackwater and Rainy River projects; in Mexico, where Cerro San Pedro has a history of ongoing legal challenges related to our environmental authorization (EIS); and in Chile, where the courts have temporarily suspended the approval of the environmental permit for El Morro; the lack of certainty with respect to foreign legal systems, which may not be immune from the influence of political pressure, corruption or other factors that are inconsistent with the rule of law; the uncertainties inherent to current and future legal challenges New Gold is or may become a party to; diminishing quantities or grades of reserves and resources; competition; loss of key employees; additional funding requirements; rising costs of labour, supplies, fuel and equipment; actual results of current exploration or reclamation activities; uncertainties inherent to mining economic studies including the feasibility studies for Rainy River and Blackwater; changes in project parameters as plans continue to be refined; accidents; labour disputes; defective title to mineral claims or property or contests over claims to mineral properties; unexpected delays and costs inherent to consulting and accommodating rights of First Nations and other Aboriginal groups; uncertainties with respect to obtaining all necessary surface and other land use rights or tenure for Rainy River; risks, uncertainties and unanticipated delays associated with obtaining and maintaining necessary licenses, permits and authorizations and complying with permitting requirements, including those associated with the environmental assessment processes for Blackwater and Rainy River. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental events and hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance or inability to obtain insurance to cover these risks) as well as “Risk Factors” included in New Gold’s disclosure documents filed on and available at www.sedar.com. Forward-looking statements are not guarantees of future performance, and actual results and future events could materially differ from those anticipated in such statements. All of the forward- looking statements contained in this presentation are qualified by these cautionary statements. New Gold expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, events or otherwise, except in accordance with applicable securities laws. The footnotes and endnotes to this presentation contain important information. The endnotes are found at the end of the presentation.
  • 4. 2014 first quarter highlights 4 91,317oz $674per oz All-in sustaining costs(1) Successfully completed Rainy River Feasibility Study and advanced project +$ 24million Increase cash balance during quarter Gold production Costs $254per oz Total cash costs(2) New Afton Financial Rainy River Cash and Equivalents New Afton achieved record quarterly gold and copper production $81million Net cash generated from operations $ 438million Cash balance at March 31, 2014 1. Refer to Endnote on all-in sustaining costs under the heading “Non-GAAP Measures”. 2. Refer to Endnote on total cash costs under the heading “Non-GAAP Measures”. 27,364oz - Gold 22mlbs - Copper +39%versus Q1’13
  • 5. Mine-by-mine operating results 5 New Afton 27 ($1,283) ($664) Mesquite 28 $893 $1,069 Peak Mines 20 $757 $1,102 Cerro San Pedro 19 $947 $1,080 94 $254 $674 2014 FIRST QUARTER Gold sales (000s ounces) Cash costs(1) ($/oz) All-in Sustaining costs(2) ($/oz) New Afton co-product costs(1) Gold ($/oz) $413 $630 Copper ($/lb) $0.93 $1.41 1. Refer to Endnote on total cash costs under the heading “Non-GAAP Measures”. 2. Refer to Endnote on all-in sustaining costs under the heading “Non-GAAP Measures”. Co-product cash costs(1) Co-product all-in sustaining costs(2) NEW AFTON 2014 FIRST QUARTER
  • 6. Consolidated financial summary 6 2013 FIRST QUARTER2014 FIRST QUARTER Revenues ($ million) $191 $202 Operating margin(1) ($ million) $92 $96 Adjusted net earnings(2) ($ million) $18 $21 Adjusted net earnings per share(2) ($/share) $0.04 $0.04 Net earnings ($ million) ($2) $36 Net earnings per share ($/share) ($0.00) $0.08 Net cash generated from operations ($ million) $81 $59 1. Refer to Endnote on operating margin under the heading “Non-GAAP Measures”. 2. Refer to Endnote on adjusted net earnings under the heading “Non-GAAP Measures”.
  • 7. 7 Projects update • Average daily throughput in first quarter ~12,900 tonnes • Ordered vertimill and other equipment • Engaged AMEC as EPCM partner • Project remains on-time for mid-2015 commissioning and on-budget ($45 million) • Successfully completed Feasibility Study • Submitted final Environmental Assessment report for review/comment • Began ordering long lead time equipment • Engaged AMEC as EPCM partner • Drilled 41 exploration holes targeting extensions of Intrepid Zone and west of open pit • Neared completion of Environmental Assessment report (to be filed in second quarter) • Initiated engineering studies for planned transmission line route and tailings storage facility • Established priority targets for 2014 exploration program (to commence in May) New Afton Expansion Rainy River Blackwater
  • 8. 8 Rainy River – Progress milestones 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Complete Feasibility Study Submit Environmental Assessment Report Order Long Lead Equipment Award EPCM Contract Detailed Engineering & Procurement Provincial Environmental Assessment Approval Federal Environmental Assessment Approval Construction/Other Permits Arrival of Mobile Equipment Begin Construction - Water Management Facility Pour First Concrete for Mill Building Commence Pre-Strip Arrival of Mill Equipment Complete Enclosure of Mill Building Targeted milestones 1. Near-term milestones based on company plans which are consistent with timelines presented in the Rainy River Technical Report, entitled “Feasibility Study of the Rainy River Project, Ontario, Canada” dated February 14, 2014 and available on SEDAR. Targeting commissioning in late 2016 with first year of full production in 2017
  • 9. 9 Organic pipeline • Mesquite return to run rate (2015+) • New Afton expansion (mid-2015) • Rainy River development (2015/2016) • CSP to residual leaching (2016) Existing low cost production base to be further enhanced by our lower cost development projects(1) • Sequence Blackwater development • El Morro advanced 2014(2) 2017(3) Future Potential(4) GOLDPRODUCTION 1. Refer to Endnote on all-in sustaining costs under the heading “Non-GAAP Measures”. Rainy River and Blackwater life-of-mine all-in sustaining costs are estimated to be $736/oz and $685/oz, respectively, based on their respective Feasibility Studies. 2. Based on mid-point of 2014 guidance. 3. Based on expected annual production from current operations according to their respective mine plans, including positive production impact of New Afton’s mill expansion targeted for mid-2015, Mesquite mine plan moving into grades more in line with reserve grade, which is partially offset by Cerro San Pedro ceasing active mining and moving into residual leaching, and includes the first year of full production from Rainy River. Assumes on-time completion of Rainy River. 4. Based on ~325Koz annual production from Rainy River, ~485Koz annual production from Blackwater and ~90Koz annual production from El Morro as outlined in the Feasibility Studies for these projects, and production contribution from New Afton, Mesquite and the Peak Mines according to their respective mine plans. Assumes the timely development of Blackwater and El Morro.
  • 10. 10 Cash flow growth and value $79 $182 $230 $236 $249 $287 ~$400 ~$400 ~$600 $0 $100 $200 $300 $400 $500 $600 $700 2009 2010 2011 2012 2013 2014E 2015E 2016E 2017E 1. For 2013, figure shown is Adjusted net cash generated from operations. Net cash generated from operations in the 2013 period included certain non-recurring cash flows. Net cash generated from operations in 2013 was $172 million. 2. 2014E based on Bloomberg consensus CFPS of $0.57 multiplied by 504 million basic shares outstanding. 3. 2015 to 2017 estimates based on the following price and exchange rate assumptions (which were also used for 2014 guidance): Gold - $1,300/oz, Silver - $22.00/oz, Copper - $3.25/lb, USD/CDN - $0.90, USD/AUD - $0.88. 2015 estimated cash flow assumes: successful mill expansion to 14,000 tonnes per day at New Afton in mid-2015, Mesquite moving into mining of higher grade areas of the open pit in 2015 in accordance with the current mine plan, Peak’s copper production increasing from 2014 levels in accordance with the current mine plan, and Cerro San Pedro mining higher grade material in its final year of active mining in accordance with the current mine plan. 2016 estimated cash flow assumes: New Afton processing for a full year at 14,000 tonnes per day, Mesquite remaining in higher grade areas in accordance with the current mine plan, Peak further increasing its copper production in accordance with the current mine plan, and Cerro San Pedro moving into its first year of residual leaching in accordance with the current mine plan. 2017 estimated cash flow assumes: Rainy River commercial production is achieved on schedule and Rainy River has its first full year of production in 2017 with a production level consistent with the project’s feasibility study, New Afton processing 14,000 tonnes per day, Mesquite remaining in higher grade areas in accordance with the current mine plan, Peak further increasing its copper production in accordance with the current mine plan, and Cerro San Pedro continuing its residual leaching in accordance with the current mine plan. Assumes no non-recurring cash flows in 2014, 2015, 2016 and 2017. 4. Based on the average of the estimates by research analysts for the net asset values of the Blackwater and El Morro assets. (2) NET CASH FROM OPERATIONS ($ MILLIONS) Enterprise Value $3.0 billion Consensus Blackwater and El Morro Value(4) $0.7 billion Enterprise Value (excluding Blackwater and El Morro) $2.3 billion Trading at ~3.8x 2017E cash flow at 2014 guidance prices (3)(3) (3)(1)
  • 11. Catalysts 11 2014 costs declining versus 2013 New Afton production and cash flow continues to increase New Afton C-zone exploration Rainy River regional exploration Blackwater regional exploration Rainy River and Blackwater permitting New Afton mill expansion Cash flow growth
  • 12. New Gold investment thesis 12 A history of value creation Peer-leading growth pipeline Among lowest-cost producers with established track record Invested and experienced team Portfolio of assets in top-rated jurisdictions Establishing the leading intermediate gold company
  • 13. Endnotes 13 TECHNICAL INFORMATION The scientific and technical information in this presentation has been reviewed and approved by Mark A. Petersen, Vice President, Exploration of New Gold. Mr. Petersen is an AIPG Certified Professional Geologist and a “Qualified Person” under National Instrument 43-101. NON-GAAP MEASURES (1) ALL-IN SUSTAINING COSTS Consistent with guidance announced in 2013 by the World Gold Council, an association of various gold mining companies from around the world of which New Gold is a member, New Gold defines “all-in sustaining costs” per ounce as the sum of total cash costs, capital expenditures that are sustaining in nature, corporate general and administrative costs, capitalized and expensed exploration that is sustaining in nature and environmental reclamation costs, all divided by the ounces of gold sold to arrive at a per ounce figure. New Gold believes this non-GAAP financial measure provides further transparency into costs associated with producing gold and will assist analysts, investors and other stakeholders of the company in assessing the company’s operating performance, its ability to generate free cash flow from current operations and its overall value. This data is furnished to provide additional information and is a non-GAAP financial measure. All-in sustaining costs presented do not have a standardized meaning under GAAP and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP and is not necessarily indicative of cash flow from operations under GAAP or operating costs presented under GAAP. Further details regarding all-in sustaining costs and a reconciliation to the nearest GAAP measures are provided in our MD&A accompanying our financial statements filed from time to time on www.sedar.com. (2) TOTAL CASH COSTS “Total cash costs” per ounce figures are non-GAAP measures which are calculated in accordance with a standard developed by The Gold Institute, a worldwide association of suppliers of gold and gold products that ceased operations in 2002. Adoption of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measures of other companies. New Gold reports total cash costs on a sales basis. The company believes that certain investors use this information to evaluate the company’s ability to generate liquidity through operating cash flow and that this measure, along with sales, is considered to be a key indicator of the company’s ability to generate operating earnings and cash flow from its mining operations. Total cash costs include mine site operating costs such as mining, processing and administration costs, royalties, production taxes, and realized gains and losses on fuel contracts, but are exclusive of amortization, reclamation, capital and exploration costs and net of by-product sales. Total cash costs are then divided by ounces of gold sold to arrive at a per ounce figure. Co-product cash costs remove the impact of other metal sales that are produced as a by-product of gold production and apportion the cash costs to each metal produced on a percentage of revenue basis, and subsequently divides the amount by the total ounces of gold or silver or pounds of copper sold, as the case may be, to arrive at per ounce or per pound figures. Unless otherwise indicated, all total cash cost information in this presentation is net of by-product sales. These measures, along with sales, are considered to be a key indicator of a company’s ability to generate operating earnings and cash flow from its mining operations. This data is furnished to provide additional information and is a non-GAAP financial measure. Total cash costs and co-product cash costs presented do not have a standardized meaning under GAAP and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP and is not necessarily indicative of cash flow from operations under GAAP or operating costs presented under GAAP. Further details regarding total cash costs and a reconciliation to the nearest GAAP measures are provided in our MD&A accompanying our financial statements filed from time to time on www.sedar.com. (3) ADJUSTED NET EARNINGS “Adjusted net earnings” and “adjusted net earnings per share” are non-GAAP financial measures. Net earnings have been adjusted and tax affected for the group of costs in “Other gains and losses” on the condensed consolidated income statement. The adjusted entries are also impacted for tax to the extent that the underlying entries are impacted for tax in the unadjusted net earnings from continuing operations. The company uses this measure for its own internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect fair value changes on senior notes and non- hedged derivatives, foreign currency translation and fair value through profit or loss and financial asset gains/losses. Consequently, the presentation of adjusted net earnings and adjusted net earnings per share enables investors and analysts to better understand the underlying operating performance of our core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings and adjusted net earnings per share based on an internal assessment of performance measures that are useful for evaluating the operating performance of our business and a review of the non-GAAP measures used by mining industry analysts and other mining companies. Adjusted net earnings and adjusted net earnings per share are intended to provide additional information only and do not have any standardized definition under IFRS and may not be comparable to similar measures presented by other companies. They should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures are not necessarily indicative of operating profit or cash flows from operations as determined under IFRS. Further details regarding adjusted net earnings and a reconciliation for first quarter figures are provided in our MD&A accompanying our financial statements filed from time to time on www.sedar.com. (4) OPERATING MARGIN “Operating margin” is a non-GAAP financial measure with no standard meaning under GAAP, which management uses to further evaluate the company’s results of operations in each reporting period. Operating margin is calculated as revenue less operating expenses and therefore does not include depreciation and depletion. Operating margin is intended to provide additional information only and does not have any standardized definition under IFRS; it should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Other companies may calculate this measure differently and this measure is unlikely to be comparable to similar measures presented by other companies. Further details regarding operating margin and a reconciliation for first quarter figures are provided in our MD&A accompanying our financial statements filed from time to time on www.sedar.com.
  • 14. Contact information 14 Investor Relations Hannes Portmann Vice President, Corporate Development 416-324-6014 hannes.portmann@newgold.com