2. DEFINATIONS
AERODROME REFERENCE POINT (ARP) — This is a
designated point, which is established in the horizontal
plane.
ELEVATION OR REDUCED LEVEL — The vertical
distance of a point or a level, on or affixed to the
surface of the earth, measured from the mean sea
level.
3. TRANSITIONAL AREA — An area which is below a
specified surface sloping upwards and outwards
from the edge of the approach funnel and from a
line originating at the end of the inner edge of
each approach area, drawn parallel to the runway
centre line in the direction of landing.
APPROACH FUNNEL
RUNWAY STRIP
4.
5. PROHIBITED AREAS
No building or structure shall be constructed or
erected, or no tree shall be planted, on any land within
the limits of the aerodromes listed and in respect of the
aerodrome at Thiruvananthapuram.
These requirements shall be applicable for the land
enclosed in approach funnels of the runway with a
maximum distance of 360 m measured from each
runway and along the extended centre line of the
runway.
6. THE REQUIREMENTS OF APPROACH
FUNNEL AND AN INSTRUMENT RUNWAY
SHALL BE AS FOLLOWS
An instrument runway is a runway served by
visual and non-visual aid or aids providing at
least directional guidance adequate for a
straight in approach and intended for the
operation of aircraft using instrument
approach procedures.
Approach funnel in the case of an
instrument runway means the area in the
shape of an isosceles trapezium having the -
7. i. longer parallel side 4800 m long (2 400 m on
either side of the extended centre line of the
runway)
ii. and smaller parallel side 300 m long (150 m on
either side of the extended centre line of the
runway)
where the smaller and longer parallel sides are placed
at a distance of 60 m and 15060 m, respectively,
from the end of the runway and at right angles to
the extended centre line.
8. IN THE CASE OF A NON-INSTRUMENT RUNWAY,
THE APPROACH FUNNEL MEANS THE AREA IN THE
SHAPE OF AN ISOSCELES TRAPEZIUM HAVING
the longer parallel side 1800 m long (900 m on either side of
the extended centre line of the runway)
and smaller parallel side 180 m long (90 m on either side of the
extended centre line of the runway),
where the smaller and longer parallel sides are placed at a
distance of 60 m and 6540 m, respectively, from the end of
the runway
And at right angles to the extended centre line.
Thereafter, the trapezium is followed by a contiguous
rectangular area of that width for the remainder of the length
up to a distance of 15060 m from the end of the runway.
9. SPECIAL CLAUSE FOR THE AERODROME AT
THIRUVANANTHAPURAM:
These requirements shall be applicable for the land
enclosed in approach funnels of all runways with a
maximum distance of 304.80 m, measured from each
runway
and along extended centre line of the runway,
and the land enclosed in a belt of 30.48 m width
outside the operational boundary of the aerodrome.
For the purpose of this clause, the requirements of
approach funnel and operational boundary shall be as
given
10. APPROACH FUNNEL means the area in the shape of an isosceles
trapezium having the longer parallel side of length 4724.4 m (2
362.2 m on either side of the extended centre line of the
runway)
and smaller parallel side of 152.4 m (76.2 m on either side of
the extended centre line of the runway)
where the smaller and longer parallel sides are placed at a
distance of 60.9 m and 15301 m, respectively, from the end of
the runway and at right angles to the extended centre line.
OPERATIONAL BOUNDARY means an area enclosed between
parallel lines at a distance of 152.4 m on either side of the
centre line of the runways or 30.4 m from the boundary
fencing of the aerodrome, whichever is greater.
11. HEIGHT RESTRICTIONS
No building or structure higher than the height specified
in tables shall be constructed or erected
or no tree which is likely to grow or ordinarily grows
higher than the height specified in the tables shall be
planted, on any land within a radius of 20 km from ARP
of the aerodromes listed
12. HEIGHT RESTRICTION
WITH RESPECT TO
APPROACH FUNNELS
This shall be applicable
for the land enclosed in
the approach funnels of
all runways where
distances are measured
from each end of the
runway, along extended
centre line of the
runway.
S.N
O
AREA MAXIMUM PERMISSIBLE HEIGHT
AHOVE THE ELEVATION OF THE
NEAREST RUNWAY END
1 More than 360 m but not
exceeding 510 m
6
2 More than 510 m but not
exceeding 660 m
9
3 More than 660 m but not
exceeding 810 m
12
4 More than 810 m but not
exceeding 960 m
15
5 More than 960 m but not
exceeding 1110 m
18
6 More than 1110 m but not
exceeding 1260 m
21
7 More than 1 260 m but not
exceeding 1410 m
24
8 More than 1410 m but not
exceeding 1560 m
27
9 More than 1560 m 30
13. HEIGHT RESTRICTION
WITH RESPECT TO
TRANSITIONAL AREA
S.
NO.
DISTANCE FROM THE INNER BOUNDARY OF
THE TRANSITIONAL AREA SPECIFIED
MAXIMUM
PERMISSIBLE HEIGHT
ABOVE THE
ELEVATION OF THE
ARP
1 UPTO 21m 0
2 21 m TO LESS THAN 42m 3
3 42m TO LESS THAN 63m 6
4 63m TO LESS THAN 84m 9
5 84m TO LESS THAN 105m 12
6 105m TO LESS THAN 126m 15
7 126m TO LESS THAN 147m 18
8 147m TO LESS THAN 168m 21
9 168m TO LESS THAN 189m 24
10 189m TO LESS THAN 210m 27
11 ABOVE 210m 30
14. Height restriction with respect to transitional area
and shall be applicable for the land enclosed in the
transitional area of all runways where distances are
measured from the associated runway strip and the
edge of the associated approach funnels, forming
the inner boundary of the transitional area and
along a line at right angles to the centre line of the
runway.
The height restrictions are also same as above as in
case of the aerodrome at Thiruvananthapuram
within a radius of 20 km from ARP
15. FURTHER HEIGHT RESTRICTIONS FOR THE
AERODROME AT THIRUVANANTHAPURAM
AREA MAXIMUM PERMISSIBLE
HEIGHT
ABOVE GROUND LEVEL
The area lying between the coastline and
the Chakai canal
3
The area lying in a belt of 457.2 m width
between the Eastem Bank of the Chakai
canaL and a Line running parallel to this
canal for the entire
Length
6
A parallel belt of 762 m width running East of
area (ii) above
15.2
A parallel belt of 609.6 m width running East
of area above
24.3
Rest of the area extending up to 20 km from
ARP
30.4
16. WATER SUPPLY
Nature of Station Where Bathing Facilities
are Provided
litres/capita
Where Bathing Facilities
are not Provided
litres / capita
International and
domestic airports
70 40
17. SANITATION
Type of Airport WC for Males WC for Females Urinals for Males
Only
Domestic airports
For 200 persons 5 8 6
For 400 persons 9 15 12
For 600 persons 12 20 16
For 800 persons 16 26 20
For 1000 persons 18 29 22
International
airports
For 200 persons 6 10 8
For 600 persons 12 20 16
For 1000 persons 18 29 22
19. INTRODUCTION
“Institutional Building”- Includes a building
constructed by Government, Semi- Government
Organizations or Registered Trusts and used for medical or
other treatment, …….care of persons suffering from
physical or mental illness , handicap, disease or infirmity,
care of orphans, abandoned women, children and
infants,…….., mental hospitals…………
20. BYE LAWS
F.A.R - 1.5 (Rule 61- Bhumi Vikas Niyam )
The width of the main street on which the building
abuts shall not be less than 12.0 m.
Open spaces around the building should be at least
6m.
Main access to the buiding atlest 5m.
21. LAND AREA REQUIREMENT
Sr.n
o
Land area
requirement
(min )
N.B.C
Land area
requirement
(min )
Raipur
master plan
1 . Dispensary 1500 0.08 ha-
0.12ha
2 Nursing home and
child welfare
20 -30 45000 0.2 - 0.3 ha 0.2 to 0.5 ha
3. Intermediate hospital 80 -100 1 lakh 1 ha -3 ha 1ha to 3ha
22. Sr.
no.
Land area
requirement
(min )
N.B.C
Land area
requirement
(min )
Raipur
master plan
4. Intermediate 200 1 lakh 3.70 ha 2.7 ha
5. General 500 2 5 lakh 6 ha 6 ha
6. Multi-specialty
hospital
200 1 lakh 9 ha 9 ha
7. Specialty
hospital
200 1 lakh 3.7 ha 3.7
24. Stairways Ramps Lifts EXIT DOORS
(unit width
of 50 cm)
25 50 75 75
NO. OF OCCUPANTS THAT COULD BE SAFELY
EVACUATED OR MOVED FROM ONE NO. OF
EACH
Min. width =2m
Min. corridor
width=2.4mt
25. • In case of nursing homes,
hospitals etc. area
exceeding 300 sq m. at
each floor one of the exit
facility shall be a ramp of
not less than 2.4 m. in
width.
Minimum width = 2.4m
Slope :
Min. =1:8
max=1:10
27. SANITATION REQUIREMENT
Sr.no. FITMENTS HOSPITAL WITH
IPD
HOSPITAL
WITH OPD
ADMINIS-
TRATIVE BLOCK
1. Water closet One for 8 beds One for 100
persons
One for 25
male
One for 15
females
2. Ablution taps one for each
w.c.
One for
each w.c.
One for each
w.c.
3. Wash basins 2 for 30 beds One for 100
beds
One for 25
persons
4. Cleaner’s sink One for each
ward
One on each
floor
5. Kitchen sink One for each
floor
6. Urinals - One for 50
persons
One for 20
persons
28. Sr.NO. FITMENTS HOSPITALS
FOR IPD
HOSPITALS
FOR OPD
ADMINIS-
TRATIVE
BLOCK
7. Baths with showers One bath for
every 8 beds
- One on
each floor
8. Bed pan washing
sinks
One for
each ward
- -
Note: one water tap is mandatory for every 50 persons .
30. PUBLIC BUILDINGS
The words “public building” means
nursing home, hospitals, social, cultural
and other institutions, government and
semi-government
offices, Schools, college, university etc…
34. SET BACK
Sl. No. Height of the Building Set back (front rear and sides in each plot)
1 10 (in meters) 5 (in meters)
2 15 5
3 18 6
4 21 7
5 24 8
6 27 9
7 30 10
8 35 11
9 40 12
10 45 13
11 50 14
12 55 and above 16
35. PARKING
BUILDINGS Equivalent Car Spaces (ECS)
per 100 sq m. of floor area
HOSPITALS, SOCIAL, CULTURAL AND OTHER
INSTITUTIONS, GOVERNMENT AND SEMI-
GOVERNMENT OFFICES.
0.50 - 1.50
EDUCATIONAL INSTITUTIONS 0.25 - 0.75
One car
parking space
For the provision of car parking spaces, the space standards shall
be as under:
i) For open parking 20.0 sq m. per equivalent car space.
ii) For ground floor covered parking 25.0 sq m. per equivalent car space.
iii) For basement 30.0 sq m. per equivalent car space
36. WATER REQUIREMENT
BUILDINGS Liters per head per day
NURSING HOME, HOSPITALS 340 (per bed)
SOCIAL, CULTURAL AND OTHER
INSTITUTIONS
15
GOVERNMENT AND SEMI-
GOVERNMENT OFFICES
45
EDUCATIONAL INSTITUTIONS 135
37. SANITATION REQUIREMENT
Fitments For Male Public For Female Public For Male Staff For Female Staff
Water closets 1 per 100 persons up
to 400 persons; and
for over 400 persons,
add at the rate of 1
per 250 persons or
part thereof
3 per 100 persons up
to 200 persons; and
for over 200 persons
add at the rate of 2
per 100 persons or
part thereof
1 for 1 to 15
persons
2 for 16 to 35
Persons
1 for 1 to 12
persons
2 for 13 to 25
persons
Ablution taps 1 in each water closet 1 in each water closet 1 in each water
closet
1 in each water
closet
Urinals 1 for 25 persons Nil up to 6
persons;1 for 7 to
20 persons
2 for 21 to 45
persons
Wash basins 1 for every 200
persons
1 for every 200
persons
1 for 1 to 15
persons
2 for 16 to 35
persons
1 for 1 to 12
persons
2 for 13 to 25
persons