Work Breakdown Structure

By: Nazila Mazaheri
   Artinarsing Rao
   Sharmithas
   Madhukumar
   Sandhya Urs J
Introduction
   Dividing complex projects to simpler
    and manageable tasks is the process
    identified as Work Breakdown
    Structure (WBS).

   Usually, the project managers use this
    method for simplifying the project
    execution. In WBS, much larger tasks
    are broken-down to manageable
    chunks of work. These chunks can be
    easily supervised and estimated.
A work breakdown structure
 In project management and systems
  engineering, is a deliverable oriented
  decomposition of a project into smaller
  components.
 A work breakdown structure element
  may be a product, data, a service, or
  any combination. A WBS also provides
  the necessary framework for detailed
  cost estimating and control along with
  providing guidance for schedule
  development and control
example of outlined WBS.
WBS helps manager
◦ Facilitates evaluation of cost, time, and
  technical performance of the organization on
  a project.
◦ Provides management with information
  appropriate to each organizational level.
◦ Helps in the development of the organization.
  breakdown structure which assigns project
  responsibilities to organizational units and
  individuals
◦ Helps manager plan, schedule, and budget.
◦ Defines communication channels and assists
  in coordinating the various project elements.
few reasons for creating a WBS in
           a project.
 Accurate and readable project
  organization.
 Accurate assignment of
  responsibilities to the project team.
 Indicates the project milestones and
  control points.
 Helps to estimate the cost, time, and
  risk.
 Illustrate the project scope, so the
  stakeholders can have a better
  understanding of the same.
Purpose of WBS
   There are three reasons to use a WBS
    in your projects:
     first is that is helps more accurately and
      specifically define and organize the scope of
      the total project.
      The second reason for using a WBS in your
      projects is to help with assigning
      responsibilities, resource allocation, monitoring
      the project, and controlling the project
      Finally, it allows you double check all the
      deliverables' specifics with the stakeholders
      and make sure there is nothing missing or
      overlapping.
Process of WBS
   First, let's look at what all we need to
    get started. There are several inputs
    you will need to get you off on the right
    foot:

     The Project Scope Statement
     The Project Scope Management Plan
     Organizational Process Assets
     Approved Change Requests - (PMBOK Guide)
Process of WBS
   You will use certain tools as well:


     Work Breakdown Structure Templates



     Decomposition - (PMBOK Guide)
Process of WBS
   Finally, using these inputs and tools
    you will create the following outputs:
     Work Breakdown Structure
     WBS Dictionary
     Scope Baseline
     Project Scope Statement (updates)
     Project Scope Management Plan (updates)
     Requested Changes - (PMBOK Guide)
How to build a WBS
 Begin with the Charter, focusing on Objectives
  and Deliverables
 Break the main product(s) down into sub-
  products
   Set the structure to match how you’ll manage the
    project
   Lowest level not too detailed, not too large
   Is there a need for Integration?
   Identify support activities
   Check for completeness - is all the effort
    included?
   Develop a coding structure if needed
   Assign work package managers
Pitfalls
    There are common pitfalls to creating a WBS.
    If you can keep these few possible, you and
    your team will be much more successful at
    creating a useful and accurate Work
    Breakdown Structure.

   Level of Work Package Detail
   Deliverables Not Activities or Tasks
   WBS is not a Plan or Schedule
   WBS Updates Require Change Control
   WBS is not an Organizational Hierarchy
Following are a few reasons
for creating a WBS in a project
 Accurate and readable project
  organization.
 Accurate assignment of
  responsibilities to the project team.
 Indicates the project milestones and
  control points.
 Helps to estimate the cost, time, and
  risk.
 Illustrate the project scope, so the
  stakeholders can have a better
  understanding of the same.
Construction of a WBS
   Identifying the main deliverables of a project is
    the starting point for deriving a work breakdown
    structure.

   This important step is usually done by the project
    managers and the subject matter experts (SMEs)
    involved in the project. Once this step is
    completed, the subject matter experts start
    breaking down the high-level tasks into smaller
    chunks of work.

   In the process of breaking down the tasks, one
    can break them down into different levels of
    detail. One can detail a high level task into ten
    sub tasks while another can detail the same high
    level task into 20 sub tasks.
Goals For WBS
   Giving visibility to important work
    efforts.

   Giving visibility to risky work efforts.

   Illustrate the correlation between the
    activities and deliverables.

   Show clear ownership by task leaders.
Thank you

Weitere ähnliche Inhalte

Was ist angesagt?

Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jIIT delhi
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
WBS presentation
WBS presentationWBS presentation
WBS presentationjpstewar
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Zulfiquer Ahmed Amin
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoringharoldtaylor1113
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource SmoothingDavidMcLachlan1
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 

Was ist angesagt? (20)

Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
project management information system
project management information systemproject management information system
project management information system
 
WBS presentation
WBS presentationWBS presentation
WBS presentation
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
crashing of project
crashing of project crashing of project
crashing of project
 
Evolution of project management
Evolution of project managementEvolution of project management
Evolution of project management
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
 
Critical path method
Critical path methodCritical path method
Critical path method
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 

Andere mochten auch

Different types of wbs structures
Different types of wbs structuresDifferent types of wbs structures
Different types of wbs structuressanddrap
 
Wbsを作ろう!
Wbsを作ろう!Wbsを作ろう!
Wbsを作ろう!yujifukatani
 
Fms manipuladores roboticos
Fms manipuladores roboticosFms manipuladores roboticos
Fms manipuladores roboticosAndre Gallardo
 
Tracking Project WBS
Tracking Project WBSTracking Project WBS
Tracking Project WBSCameron
 
WBS Thesis Guide to Chart
WBS Thesis Guide to ChartWBS Thesis Guide to Chart
WBS Thesis Guide to ChartAmil Ramdhan
 
Enterprise Project Structure (EPS)
Enterprise Project Structure (EPS)Enterprise Project Structure (EPS)
Enterprise Project Structure (EPS)Nikhil Raj
 
Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use Thisproject management
 
How To Write Af Good Project
How To Write Af Good ProjectHow To Write Af Good Project
How To Write Af Good ProjectSteen Hillebrecht
 
The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013Russell Archibald
 
Public Health Dentistry
Public  Health  DentistryPublic  Health  Dentistry
Public Health Dentistryshabeel pn
 
Project characteristics
Project characteristicsProject characteristics
Project characteristicsIke Abrahams
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structureStefan Csosz
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?Kenny Hirschmann
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown StructureNicola2903
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures Ian Cammack
 
Project control. Management
Project control. ManagementProject control. Management
Project control. ManagementMarius Miron
 

Andere mochten auch (20)

Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 
Different types of wbs structures
Different types of wbs structuresDifferent types of wbs structures
Different types of wbs structures
 
WBSを始めよう
WBSを始めようWBSを始めよう
WBSを始めよう
 
Wbsを作ろう!
Wbsを作ろう!Wbsを作ろう!
Wbsを作ろう!
 
Fms manipuladores roboticos
Fms manipuladores roboticosFms manipuladores roboticos
Fms manipuladores roboticos
 
Tracking Project WBS
Tracking Project WBSTracking Project WBS
Tracking Project WBS
 
WBS Thesis Guide to Chart
WBS Thesis Guide to ChartWBS Thesis Guide to Chart
WBS Thesis Guide to Chart
 
Enterprise Project Structure (EPS)
Enterprise Project Structure (EPS)Enterprise Project Structure (EPS)
Enterprise Project Structure (EPS)
 
Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use This
 
How To Write Af Good Project
How To Write Af Good ProjectHow To Write Af Good Project
How To Write Af Good Project
 
The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013
 
Public Health Dentistry
Public  Health  DentistryPublic  Health  Dentistry
Public Health Dentistry
 
Project characteristics
Project characteristicsProject characteristics
Project characteristics
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structure
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures
 
Project termination
Project terminationProject termination
Project termination
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 

Ähnlich wie Work breakdown structure ppt

workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfDipakBorse6
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02sayyed sabir
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structureumair khan
 
Understanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfUnderstanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfTEWMAGAZINE
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope ManagementRKDickey
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docxevonnehoggarth79783
 
How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)Insaf Ali Soomro PMP
 
Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfdeepaksatrker
 
Project scope management
 Project scope management Project scope management
Project scope managementSidraSaleem17
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptssuser8cd298
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxChantellPantoja184
 
A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )Kimberly Williams
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
WBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxWBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxRedhaElhuni
 

Ähnlich wie Work breakdown structure ppt (20)

workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
 
Prince.wbs.sow
Prince.wbs.sowPrince.wbs.sow
Prince.wbs.sow
 
Babu 143
Babu 143Babu 143
Babu 143
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure
 
Understanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfUnderstanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdf
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope Management
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
 
How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)
 
Lect2
Lect2Lect2
Lect2
 
Subject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdfSubject - Project ManagementDescribe what the WBS is and why you .pdf
Subject - Project ManagementDescribe what the WBS is and why you .pdf
 
Project scope management
 Project scope management Project scope management
Project scope management
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).ppt
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
 
A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )A Work Breakdown Structure ( Wbs )
A Work Breakdown Structure ( Wbs )
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 
WBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxWBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptx
 
Ch05
Ch05Ch05
Ch05
 

Kürzlich hochgeladen

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 

Kürzlich hochgeladen (20)

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 

Work breakdown structure ppt

  • 1. Work Breakdown Structure By: Nazila Mazaheri Artinarsing Rao Sharmithas Madhukumar Sandhya Urs J
  • 2. Introduction  Dividing complex projects to simpler and manageable tasks is the process identified as Work Breakdown Structure (WBS).  Usually, the project managers use this method for simplifying the project execution. In WBS, much larger tasks are broken-down to manageable chunks of work. These chunks can be easily supervised and estimated.
  • 3. A work breakdown structure  In project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components.  A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control
  • 5. WBS helps manager ◦ Facilitates evaluation of cost, time, and technical performance of the organization on a project. ◦ Provides management with information appropriate to each organizational level. ◦ Helps in the development of the organization. breakdown structure which assigns project responsibilities to organizational units and individuals ◦ Helps manager plan, schedule, and budget. ◦ Defines communication channels and assists in coordinating the various project elements.
  • 6. few reasons for creating a WBS in a project.  Accurate and readable project organization.  Accurate assignment of responsibilities to the project team.  Indicates the project milestones and control points.  Helps to estimate the cost, time, and risk.  Illustrate the project scope, so the stakeholders can have a better understanding of the same.
  • 7. Purpose of WBS  There are three reasons to use a WBS in your projects: first is that is helps more accurately and specifically define and organize the scope of the total project.  The second reason for using a WBS in your projects is to help with assigning responsibilities, resource allocation, monitoring the project, and controlling the project  Finally, it allows you double check all the deliverables' specifics with the stakeholders and make sure there is nothing missing or overlapping.
  • 8. Process of WBS  First, let's look at what all we need to get started. There are several inputs you will need to get you off on the right foot: The Project Scope Statement The Project Scope Management Plan Organizational Process Assets Approved Change Requests - (PMBOK Guide)
  • 9. Process of WBS  You will use certain tools as well: Work Breakdown Structure Templates Decomposition - (PMBOK Guide)
  • 10. Process of WBS  Finally, using these inputs and tools you will create the following outputs: Work Breakdown Structure WBS Dictionary Scope Baseline Project Scope Statement (updates) Project Scope Management Plan (updates) Requested Changes - (PMBOK Guide)
  • 11. How to build a WBS  Begin with the Charter, focusing on Objectives and Deliverables  Break the main product(s) down into sub- products  Set the structure to match how you’ll manage the project  Lowest level not too detailed, not too large  Is there a need for Integration?  Identify support activities  Check for completeness - is all the effort included?  Develop a coding structure if needed  Assign work package managers
  • 12. Pitfalls There are common pitfalls to creating a WBS. If you can keep these few possible, you and your team will be much more successful at creating a useful and accurate Work Breakdown Structure.  Level of Work Package Detail  Deliverables Not Activities or Tasks  WBS is not a Plan or Schedule  WBS Updates Require Change Control  WBS is not an Organizational Hierarchy
  • 13. Following are a few reasons for creating a WBS in a project  Accurate and readable project organization.  Accurate assignment of responsibilities to the project team.  Indicates the project milestones and control points.  Helps to estimate the cost, time, and risk.  Illustrate the project scope, so the stakeholders can have a better understanding of the same.
  • 14. Construction of a WBS  Identifying the main deliverables of a project is the starting point for deriving a work breakdown structure.  This important step is usually done by the project managers and the subject matter experts (SMEs) involved in the project. Once this step is completed, the subject matter experts start breaking down the high-level tasks into smaller chunks of work.  In the process of breaking down the tasks, one can break them down into different levels of detail. One can detail a high level task into ten sub tasks while another can detail the same high level task into 20 sub tasks.
  • 15. Goals For WBS  Giving visibility to important work efforts.  Giving visibility to risky work efforts.  Illustrate the correlation between the activities and deliverables.  Show clear ownership by task leaders.