Creators Group of Engineering is an engineering concern established in 1995 and
specialized in the field of Mechanical, Electrical, and HVAC & Trading works. The company has a
proven track of completing major project in Oil & Gas, Power Projects, Armed Forces, Residential high
rise building.
Creators Group of Engineering is an ISO: 9001, ISO: 14001 and OSHAS: 18001 Certified
Company
Creators Group of Engineering has endeavored in the construction industry and not only
established a name in the engineering field but also provided satisfactory and quality works for
their client. The company’s growth has been mainly due to its development of technical skills
with the application of the modern techniques used in the industry.
The company has a team of technical skilled individuals having vast experience in the relevant
fields of the Engineering and Technology. They are contributing their due shares in completion
of the projects within schedule and to the entire satisfaction of the clients.
Creators Group of Engineering commits to become one of the emergent integrated Mechanical, Electrical,
HVAC & Trading Company in this Pakistan with our stable slogan “Safety, Quality and Schedule”
INTRODUCTION
Engineering Solutions for a Better World …
Creators Group of Engineering provides to their reputable client’s 24-hour standby operation
and maintenance services. The company offers job-by-job and annual service/maintenance
contracts.
 (Trunkey based Projects) Design, Drawing, Installation & Commissioning
 Service inspection and preventative maintenance
 Breakdowns 24 Hour Callout
 Changing Demands
 Training and system operation
Creators Group of Engineering is specialized in providing Consultancy, Designing, Supplying,
Surveying, Trading and Installing of Mechanical, Electrical, HVAC system.
MECHANICAL WORKS
 Fire-Fighting System
 Compressed Air System
 Plumbing & Sanitary System
 Process and Utility Piping
 Steel Structure
ELECTRICAL WORKS
 Sub Station (HV& LV) System
 Lighting, Lightning Protector System
 Grounding System
 Telephone, Communication System
HVAC
SCOPE OF BUSINESS
 Central Air Conditioning & Ventilation
 Heating Oven & Paint Booth
 Cooling Water System
 Refrigeration Units
 Cold storage and Freezers Unit
 Mobile AC and Refrigeration Unit
Lab safety Equipment:
 Manufacturing of Laminar flow Station for OT & Pharma
 Fume Hood, Laminar , Safety Cabinet
 HEPA Housing and Filters
 Sampling Booths
TRADING
Creators Group of Engineering Trading Division provides reliable distributorship solutions and
brand management of international recognized products from around the world.
We have been providing Products to our customer since 1996 regarding all technical supplies as
per user requirement and General orders. Some of our customers are listed below.
1. BHP Petroleum
2. OMV Maurice Energy. Ltd.
3. Hinopak Motor Pvt. Ltd.
4. Hascol Petroleum
5. Pak-Arab Refinery Company (PARCO)
6. Child Aid Association
7. Jaffer Agro Services
Major Product for Trading:
 All Types of Refurbished Equipment from Europe.
 Mechanical process equipment and their parts.
 Electrical & controls
 Safety Equipment and PPEs.
 Industrial Fans (Ceiling/Cycle/Wall/Stand Types)
 Pipes and Fittings (MS, Seamless, GI, HDPE, PPRC, UPVC all class)
 Different Processing Valves (Gate, Check, Balancing, Foot, Float, Globe)
 Insulation Material
Supply Chain Management Process:
CGE develop optimized supply chain integrated solutions that directly contribute to bottom-line
results by providing reliability, responsiveness and agility within your organization. CGE has the
expertise to optimize your supply chain with tools that can help strengthen supplier relationships,
reduce costs, balance inventory, improve customer service, and mitigate risk, thus delivering
sustainable competitive advantage.
CGE provides highly specialized advanced multi-echelon planning skills so that clients can focus
on their core business.
 Received Query from our valuable customers
 Analysis all term of query including specification, cost, stock availability and etc.
 Reducing the risk of potential supply chain disruption through early
 Provide best quotation to customer will all aspect & specification
 integration for easy order transmission
 Received Order from customer including terms and conditions.
 Observe item order and quantity
Query Query Mature Quotation
Order
Acceptance
P.O RoutingStockProcuerment
Maunufacture/
Import
Shipment
Planning
Order Dispatch
 Manage stock of related and repeatedly item for customer convenience.
 Reduce Order Lead time by stock of major items
 Manual data capture of P.O. details
 Order to vendors via web or email(Local & Import if necessary)
 Online order receipt and acceptance from vendors
 Order revision management
 Compliance to pre-defined order milestones
 Configurable vendor performance criteria and reporting
 Reducing information delays by using 24/7 service for Customer
 Visibility to purchase orders in transit
 Role-specific views of orders and inventory movements
 Measure lead time consistency (promise to actual variance)
 Supplier document and regulatory compliance
 Received Order from Supplier and mature it with Customer Order
 Dispatch Order to Customer at their Location or by any reliable source
VISION:
Ensure value to every customer through quality craftsmanship and lasting solutions delivered by
skilled professionals.
Mission:
"To help customers increase the return on their building investment."
Safety:
Creators Group of Engineering pledges to create a safe working environment for all employees,
customers and community.
Quality:
We support our customers to maximize their benefits by providing good quality services and
products, on time with our professional design and construction solutions.
Integrity:
We conduct our business with honesty, ethical and honorable manner.
Innovation:
Improving constantly the management system, operation system and applying new technology
is foundation for Creators Group of Engineering sustainable development.
Teamwork:
We always establish and collaborate with our partners, our clients and our employees based on
VISION & Mission
Core Values
trust, respect and openness.
Works in Hand
M/S BHP Petroleum Pakistan
Contact person (Mr. Javed Malhi: Mechanical Engineer---- 0300-8528561)
 BHP Billiton Zam Zama Gas Field Dadu.
 Technical Supplies through worldwide.
 Operation and maintenance contract for HVAC and Refrigeration Equipment.
M/S Child Aid Association
Contact person (Dr. Salman Burny ---- 0321-2186686)
 Jinnah Hospital Children ward
 Installation of HVAC system for IV section in children ward.
 Contract for servicing and maintenance of all MEP.
M/S Hinopak Motors Ltd.
Contact person (Jamal Qamar: Manager Maintenance. ---- 0300-8286795)
 Operation and maintenance of reciprocating chiller and other mechanical work related to
HVAC. (On call services)
 Execution and modification in existing Plant to improve production.
 Replacement of Packaged Type AC units for Engine Shop. (Capacity 100TR)
Jaffer Brother
Contact person (Mr. Javed Shahmim. Supply Chain Manager 0345-8273070)
 Design, installation work related to HVAC for Fermentation Lab at Fatima Fertilizer
 Design, installation work related to Electrical for Fermentation Lab at Fatima Fertilizer
 Design, installation of Cold Storage for Fermentation Lab at Fatima Fertilizer
M/S HASCOL Petroleum Ltd.
Contact person (Mr. Habib Uddin: Project Manager ---- 0321-2444171)
 Operation and maintenance contract of HVAC for All Sindh Region
 Technical Supplies.
M/S FMD Lab (Peshawar).
Contact person (Mr. Danish: C.E.O ---- 0300-9506759)
 Design, Execution & Commissioning of Sterile Area and BSL 3.
Work Done
S.No. Company Description of Job Year
Project Cost
Million (Rs.)
1
Aga Khan University
Hospital
Plumbing & HVAC Work for Sopariwala
Building
2014 1.4
2
Aga Khan University
Hospital
Plumbing Work for Pond at FOB Building 2014 0.9
3
Aga Khan University
Hospital
HVAC & Plumbing Work for Cytotoxic
Pharmacy
2015 1.6
4 Aicon
Provide Consultancy for Equipment
Manufacturing
2012 1.2
5
BHP Billiton Zam Zama
Gas Plant (Phase 1)
Installation of Screw chiller with FCUs 2003 to 2004 5.6
6
BHP Billiton Zam Zama
Gas Plant (Phase 2)
Installation of Screw chiller with FCUs 2006 to 2007 7.8
7 Cold Kraft Installation of Cold Storage 2010 to 2011 0.8
8 Dockyard Refurbishment of AC Mobile Equipment 2012 2.5
9 Hilton Pharma Installation of AHUs and Duct Work 1998 to 2000 0.6
10 Hinopak Motors Ltd.
Supply and Installation of Central
Exhaust System for Paint Shop
2008 to 2009 1.8
11 Hinopak Motors Ltd. Refurbishment of Reciprocating Chiller 2013 1.5
12 Hinopak Motors Ltd.
Repair & Maintenance of AC Packaged
type Units at Engine Shop
2014 1.9
13 Hinopak Motors Ltd.
Supply & Installation of Chilled Water &
Fresh Air Supply System at PTED
2015 8.7
14 Hinopak Motors Ltd.
Supply & Installation of Ventilation &
Exhaust System at BOP
2015 2.2
15 IBA ( Karachi University ) HVAC Piping Work at Plant Room 2013 0.4
16 Jaffer Agro Services
Overhauling of Scrubbing Exhaust
System
2014 1.5
17 Jinnah Hospital HVAC & Lab Equipment Installation 2010 to 2011 1.2
18 Liberty Power Project
Installation of chiller and AHUs at plant
and for colony
1998 to 2000 2.8
19 Linz Pharma Modification of Existing HVAC system 2014 2.5
20 Mediate Pharma Modification of Existing HVAC system 2005 0.5
21 Nabi Qasim Pharma Installation of AHUs and Duct Work 2001 to 2002 1.4
22 PARCO
Refurbishment of Reciprocating Chiller
And replacement of Duct work
2014 3.4
23 Roush Power Plant
Installation of Chiller, AHUs & FCUs for
different areas of Plant
1997 to 1999 1.8
24
Sindh Poultry Vaccination
Research Building
Installation of HVAC system for Lab Area 2003 to 2004 3.8
25
Walmart Global
Marketing
Operation and Maintenance Contract. 2010 to 2011 0.3
26 Zia Uddin Hospital
Installation & Commissioning of Lab
Equipment
2006 to 2007 2.6
ORGANIZATION SETUP
01. Main-Office (Karachi)
Office No. 429, 4th
Floor, Mashrique Center,
Block-14, Gulshan-e-Iqbal, Karachi
02. Work Shop
Plot # 165, Category C-I, Sector 6-B, North Karachi, Industrial Area, Karachi.
03. Site Setup
Our site setup depends upon the nature of work for each field. Nos. of staff depends upon
the span & nature of the work.
C.E.O
Management
Accounts &
Finance
Office Assistant
Management
Representitve
Mechanical
Workshop
Projects
HVAC
Projects
Commissioning
Electrical
Projects
Procurement
Imports
Local Purchase
PROJECT MANAGEMENT
Our past experiences have proven that Creators
Group of Engineering is one of the integrated
company in the field of Mechanical, Electrical, and
HVAC & Trading works with outstanding
performance records providing the driving force
behind a complete of system services and products
supply for our customers in a trustful and reliable
way based upon the past proven track record.
We have plentiful experiences from the stand point
of such a job handling as general consolation,
feasibility study at the beginning stage of the
project, development, detail design, procurement,
manufacturing, fabrication, installation, and
commissioning, testing, hand – over based on Turn
– Key project and on the site.
LIST OF EQUIPMENT AND MACHINES
DESCRIPTION QUANTITY
1. Hydraulic press 02 nos.
2. Lock former machine 01 no.
3. Manual bender machine 03 nos.
4. Welding machine 06 nos.
5. Welding generator 02 nos.
6. Duct Manufacturing Machine 01 set.
7. Sheet Banding Hydraulic Press 01 no.
8. Sheet roller 01 no.
9. Electricity generator 04 nos.
10. Speed cutter 04 nos.
11. Hand grinder 10 nos.
12. Lath machine 02 nos.
13. Shaper Machine 01 no.
14. Milling Machine 01 no.
15. Bench drill machine 04 nos.
16. Hilti drill machine 16 nos.
17. Drill machine 12 nos.
18. Pipe cutting & Treading machine 04 nos.
19. Pipe threading machine up to 4” thick 01 comp. Set
20. Gas cutting Set/Brazing Set 10 comp. Set
Commissioning, Testing and Balancing Equipment:
a. Micro manometer for air balancing
b. Micro manometer for water balancing
c. Capture hood for measuring air flow
d. Digital Anemometer
e. Electronic mugger testing
f. Noise Level Meter
g. Light Intensity Meter
h. Multi-meters
i. Clamp on Multi-Meter
QA/ QC PLAN
 Quality Policy and Authority:
Management is totally committed to providing commercial & industrial General contracting
services that comply fully with the specification and expectation of our valued clients The
QCM has the responsibility and organizational freedom to identity quality control problems,
stop works, recommend solution and verify resolution off such problems.
 Management Responsibility:
Management has the responsibility to define and document its policy and objectives for and
commitment to quality. Management will ensure that its policy is understood, implemented
and maintained at all levels of the organization.
 Quality System:
Documented quality system procedure and instruction to ensure that all activities and
performed in accordance with established requirement. Effective management support to
ensure compliance and the use of the QA/AC procedure and instructions.
 Project Review and Setup:
Upon receipt of a request for proposal (RFQ) from a client, Management will review the
requirement of the FRQ and determine if a proposal will be submitted to perform the work.
If management decides to submit a proposal for the work, a project manager is assigned the
responsibility of generating the proposal to perform the work. The proposal must include all
costs related to completing the work in accordance with the client’s specifications.
 Document Control:
Revisions to the QA/QC document shall be by section and approved for adequacy by the
authorized personnel prior to issue. A revised table of contents indicating the newly issued
approved and accepted revision shall accompany the revised sections
 Purchasing and Material Control:
The Project Manager has the overall responsibility to ensure that all materials and services
purchased are in accordance with established QA/QC procedure the project specifications
and drawings.
 Material Certification and Traceability:
The Project Manager shall ensure that all materials and equipment furnished by the client
are verified, stored and maintained until incorporation into work. Any such items that are
damaged or otherwise unsuitable for use shall be recorded and reported to the client
immediately, where, and to the extent that traceability is a specified requirement of the
contract, individual products or product batches shall have a unique identification. This
identification shall be recorded in the Job File and issued to the client with specified As-Built
Data.
 Process Control:
During project setup the project manager develops the project QA/QC plan covering all
construction activities and applicable process which directly affect quality. The Project
Manager shall ensure that these process are carried out under controlled conditions.
 Inspection and Testing:
All Material and equipment shall be inspected and tested to ensure conformance with the
project requirement before it is released for use. Verification that all items conform to
specified requirement of the quality plan shall be documented and filed in the project
QA/AC file
 Inspection, Measuring and Test Equipment:
The QCM shall ensure that all inspection, measuring, and test equipment is controlled,
calibrated and maintained, whether owned by CGE or provided by the client, Equipment
shall be uses in a manner which ensure that measurement uncertainty is knows and is
consistent with the required measurement capability.
 Control of Non-Conforming Actions and Corrective Actions:
The project manager shall established and maintain procedure to ensure that any work that
does not conform to specified requirement is prevented from inadvertent release to the
client. Control shall provide for identification, documentation, evaluation, segregation when
practical, and disposition of nonconforming work and for notification to management as
required.
 Audit, Records and Training:
The QCM shall carry out internal audits to verify whether quality activities comply with
planned arrangement and to determine the effectiveness of the quality system. The QCM
shall maintain records on the performance and adequacy of each project’s QA/QC activities.
SAFETY POLICY
Safety both on site and in the office is our top priority. We consider that creating a safe working
environment which poses no harm to the health and life of all employees and customers is our
responsibility.
Compliance with occupational health and safety requirements is “must” in all of the Creators
Group of Engineering building operations.
It is a requirement of our company safety regulations that each employee is made aware of their
individual responsibilities, their obligation to implement the rules and to undertake frequent
training to ensure that a safe working environment is instigated and maintained at each project
site.
The Creators Group of Engineering safety policy demands cooperation and compliance
from all relevant parties such as suppliers and sub-contractors. The safety system has been
improved by the involvement of all participants to ensure that no one works in an unsafe
environment.
CGE Profile
CGE Profile
CGE Profile
CGE Profile
CGE Profile
CGE Profile

Weitere ähnliche Inhalte

Was ist angesagt?

MANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMurat Cengiz
 
Mitchell Lee resume
Mitchell Lee resumeMitchell Lee resume
Mitchell Lee resumeMitchell Lee
 
Lindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company ProfileLindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company Profilelindinger123
 
What we are about- Residential HVAC
What we are about- Residential HVACWhat we are about- Residential HVAC
What we are about- Residential HVACrobwhite1
 
Intertek - Industry Services
Intertek - Industry ServicesIntertek - Industry Services
Intertek - Industry Servicesogonzalez1997
 
REDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngREDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngNasrin Khazali
 
ICS Oil & Gas Controls Brochure
ICS Oil & Gas Controls BrochureICS Oil & Gas Controls Brochure
ICS Oil & Gas Controls BrochurejdeanEE
 
Intertek - Industry Services 2013
Intertek - Industry Services 2013Intertek - Industry Services 2013
Intertek - Industry Services 2013ogonzalez1997
 
Pipe Stress Analysis of Ethane Vaporizer Skid using CAESAR II
Pipe Stress Analysis of Ethane Vaporizer Skid using CAESAR IIPipe Stress Analysis of Ethane Vaporizer Skid using CAESAR II
Pipe Stress Analysis of Ethane Vaporizer Skid using CAESAR IIRishabh Engineering Services
 
Century III, Inc.
Century III, Inc.Century III, Inc.
Century III, Inc.Dan Zhou
 
Commercial Presentation - August 2015
Commercial Presentation - August 2015Commercial Presentation - August 2015
Commercial Presentation - August 2015Greg Ganske
 
Prequalification%20document%20(final)
Prequalification%20document%20(final)Prequalification%20document%20(final)
Prequalification%20document%20(final)KYAW SAN OO -
 
colinmahercv05jan2017.1
colinmahercv05jan2017.1colinmahercv05jan2017.1
colinmahercv05jan2017.1colin maher
 

Was ist angesagt? (20)

MANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATION
 
Mitchell Lee resume
Mitchell Lee resumeMitchell Lee resume
Mitchell Lee resume
 
KI Brochure
KI BrochureKI Brochure
KI Brochure
 
ashi new
ashi newashi new
ashi new
 
GS Profile Presentation(Jacobs)
GS Profile Presentation(Jacobs)GS Profile Presentation(Jacobs)
GS Profile Presentation(Jacobs)
 
Line Card
Line CardLine Card
Line Card
 
Lindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company ProfileLindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company Profile
 
Hansraj .Prod.RTF
Hansraj .Prod.RTFHansraj .Prod.RTF
Hansraj .Prod.RTF
 
What we are about- Residential HVAC
What we are about- Residential HVACWhat we are about- Residential HVAC
What we are about- Residential HVAC
 
Intertek - Industry Services
Intertek - Industry ServicesIntertek - Industry Services
Intertek - Industry Services
 
REDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngREDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 Eng
 
ICS Oil & Gas Controls Brochure
ICS Oil & Gas Controls BrochureICS Oil & Gas Controls Brochure
ICS Oil & Gas Controls Brochure
 
CV English_OCT2016_A Oreamuno
CV English_OCT2016_A OreamunoCV English_OCT2016_A Oreamuno
CV English_OCT2016_A Oreamuno
 
Intertek - Industry Services 2013
Intertek - Industry Services 2013Intertek - Industry Services 2013
Intertek - Industry Services 2013
 
Pipe Stress Analysis of Ethane Vaporizer Skid using CAESAR II
Pipe Stress Analysis of Ethane Vaporizer Skid using CAESAR IIPipe Stress Analysis of Ethane Vaporizer Skid using CAESAR II
Pipe Stress Analysis of Ethane Vaporizer Skid using CAESAR II
 
Century III, Inc.
Century III, Inc.Century III, Inc.
Century III, Inc.
 
Commercial Presentation - August 2015
Commercial Presentation - August 2015Commercial Presentation - August 2015
Commercial Presentation - August 2015
 
Prequalification%20document%20(final)
Prequalification%20document%20(final)Prequalification%20document%20(final)
Prequalification%20document%20(final)
 
colinmahercv05jan2017.1
colinmahercv05jan2017.1colinmahercv05jan2017.1
colinmahercv05jan2017.1
 
DOUGLAS D 2
DOUGLAS D 2DOUGLAS D 2
DOUGLAS D 2
 

Andere mochten auch

Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanacocirleamarius
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanacocirleamarius
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanacocirleamarius
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanacocirleamarius
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanacocirleamarius
 
Indra - AviationMENA
Indra - AviationMENAIndra - AviationMENA
Indra - AviationMENAPablo Salcedo
 

Andere mochten auch (7)

Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romana
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romana
 
New microsoft office word document
New microsoft office word documentNew microsoft office word document
New microsoft office word document
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romana
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romana
 
Cocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romanaCocirlea.marius.xc infanteria.romana
Cocirlea.marius.xc infanteria.romana
 
Indra - AviationMENA
Indra - AviationMENAIndra - AviationMENA
Indra - AviationMENA
 

Ähnlich wie CGE Profile

Ähnlich wie CGE Profile (20)

2015 Company Profile
2015 Company Profile2015 Company Profile
2015 Company Profile
 
Al tehene profile2021
Al tehene profile2021Al tehene profile2021
Al tehene profile2021
 
Potentia Engineering profile
Potentia Engineering profile Potentia Engineering profile
Potentia Engineering profile
 
Potentia Engineering Profile
Potentia Engineering Profile Potentia Engineering Profile
Potentia Engineering Profile
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Evio profile
Evio profileEvio profile
Evio profile
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Finpower Aircon LLC
Finpower  Aircon LLCFinpower  Aircon LLC
Finpower Aircon LLC
 
Resume
ResumeResume
Resume
 
Pharmachem Product Cata.pptx
Pharmachem Product Cata.pptxPharmachem Product Cata.pptx
Pharmachem Product Cata.pptx
 
MJ FM hvac
MJ FM hvacMJ FM hvac
MJ FM hvac
 
Kalpesh-Maintenance (BE-Mechanical)Press
Kalpesh-Maintenance (BE-Mechanical)Press Kalpesh-Maintenance (BE-Mechanical)Press
Kalpesh-Maintenance (BE-Mechanical)Press
 
Introduction Benyan - KH Egineering L.L.C.
Introduction Benyan - KH Egineering L.L.C.Introduction Benyan - KH Egineering L.L.C.
Introduction Benyan - KH Egineering L.L.C.
 
Vijayaraj CV
Vijayaraj CVVijayaraj CV
Vijayaraj CV
 
Presentation CES Bio May 2016
Presentation CES Bio May 2016Presentation CES Bio May 2016
Presentation CES Bio May 2016
 
Vtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsVtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcs
 
Tech ed-equipment-company
Tech ed-equipment-companyTech ed-equipment-company
Tech ed-equipment-company
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
Corporate-Profile
Corporate-ProfileCorporate-Profile
Corporate-Profile
 
ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016
 

CGE Profile

  • 1.
  • 2. Contents Introduction Scope of business Vision & Mission Core Values Work in Hand Work Done Organization Setup Project Management List of Equipment and Machines QA / QC Plan Safety Policy ISO, OHSAS, GST, SRB Certification
  • 3. Creators Group of Engineering is an engineering concern established in 1995 and specialized in the field of Mechanical, Electrical, and HVAC & Trading works. The company has a proven track of completing major project in Oil & Gas, Power Projects, Armed Forces, Residential high rise building. Creators Group of Engineering is an ISO: 9001, ISO: 14001 and OSHAS: 18001 Certified Company Creators Group of Engineering has endeavored in the construction industry and not only established a name in the engineering field but also provided satisfactory and quality works for their client. The company’s growth has been mainly due to its development of technical skills with the application of the modern techniques used in the industry. The company has a team of technical skilled individuals having vast experience in the relevant fields of the Engineering and Technology. They are contributing their due shares in completion of the projects within schedule and to the entire satisfaction of the clients. Creators Group of Engineering commits to become one of the emergent integrated Mechanical, Electrical, HVAC & Trading Company in this Pakistan with our stable slogan “Safety, Quality and Schedule” INTRODUCTION
  • 4. Engineering Solutions for a Better World … Creators Group of Engineering provides to their reputable client’s 24-hour standby operation and maintenance services. The company offers job-by-job and annual service/maintenance contracts.  (Trunkey based Projects) Design, Drawing, Installation & Commissioning  Service inspection and preventative maintenance  Breakdowns 24 Hour Callout  Changing Demands  Training and system operation Creators Group of Engineering is specialized in providing Consultancy, Designing, Supplying, Surveying, Trading and Installing of Mechanical, Electrical, HVAC system. MECHANICAL WORKS  Fire-Fighting System  Compressed Air System  Plumbing & Sanitary System  Process and Utility Piping  Steel Structure ELECTRICAL WORKS  Sub Station (HV& LV) System  Lighting, Lightning Protector System  Grounding System  Telephone, Communication System HVAC SCOPE OF BUSINESS
  • 5.  Central Air Conditioning & Ventilation  Heating Oven & Paint Booth  Cooling Water System  Refrigeration Units  Cold storage and Freezers Unit  Mobile AC and Refrigeration Unit Lab safety Equipment:  Manufacturing of Laminar flow Station for OT & Pharma  Fume Hood, Laminar , Safety Cabinet  HEPA Housing and Filters  Sampling Booths TRADING Creators Group of Engineering Trading Division provides reliable distributorship solutions and brand management of international recognized products from around the world. We have been providing Products to our customer since 1996 regarding all technical supplies as per user requirement and General orders. Some of our customers are listed below. 1. BHP Petroleum 2. OMV Maurice Energy. Ltd. 3. Hinopak Motor Pvt. Ltd. 4. Hascol Petroleum 5. Pak-Arab Refinery Company (PARCO) 6. Child Aid Association 7. Jaffer Agro Services Major Product for Trading:  All Types of Refurbished Equipment from Europe.  Mechanical process equipment and their parts.  Electrical & controls  Safety Equipment and PPEs.  Industrial Fans (Ceiling/Cycle/Wall/Stand Types)  Pipes and Fittings (MS, Seamless, GI, HDPE, PPRC, UPVC all class)  Different Processing Valves (Gate, Check, Balancing, Foot, Float, Globe)
  • 6.  Insulation Material Supply Chain Management Process: CGE develop optimized supply chain integrated solutions that directly contribute to bottom-line results by providing reliability, responsiveness and agility within your organization. CGE has the expertise to optimize your supply chain with tools that can help strengthen supplier relationships, reduce costs, balance inventory, improve customer service, and mitigate risk, thus delivering sustainable competitive advantage. CGE provides highly specialized advanced multi-echelon planning skills so that clients can focus on their core business.  Received Query from our valuable customers  Analysis all term of query including specification, cost, stock availability and etc.  Reducing the risk of potential supply chain disruption through early  Provide best quotation to customer will all aspect & specification  integration for easy order transmission  Received Order from customer including terms and conditions.  Observe item order and quantity Query Query Mature Quotation Order Acceptance P.O RoutingStockProcuerment Maunufacture/ Import Shipment Planning Order Dispatch
  • 7.  Manage stock of related and repeatedly item for customer convenience.  Reduce Order Lead time by stock of major items  Manual data capture of P.O. details  Order to vendors via web or email(Local & Import if necessary)  Online order receipt and acceptance from vendors  Order revision management  Compliance to pre-defined order milestones  Configurable vendor performance criteria and reporting  Reducing information delays by using 24/7 service for Customer  Visibility to purchase orders in transit  Role-specific views of orders and inventory movements  Measure lead time consistency (promise to actual variance)  Supplier document and regulatory compliance  Received Order from Supplier and mature it with Customer Order  Dispatch Order to Customer at their Location or by any reliable source
  • 8. VISION: Ensure value to every customer through quality craftsmanship and lasting solutions delivered by skilled professionals. Mission: "To help customers increase the return on their building investment." Safety: Creators Group of Engineering pledges to create a safe working environment for all employees, customers and community. Quality: We support our customers to maximize their benefits by providing good quality services and products, on time with our professional design and construction solutions. Integrity: We conduct our business with honesty, ethical and honorable manner. Innovation: Improving constantly the management system, operation system and applying new technology is foundation for Creators Group of Engineering sustainable development. Teamwork: We always establish and collaborate with our partners, our clients and our employees based on VISION & Mission Core Values
  • 9. trust, respect and openness. Works in Hand M/S BHP Petroleum Pakistan Contact person (Mr. Javed Malhi: Mechanical Engineer---- 0300-8528561)  BHP Billiton Zam Zama Gas Field Dadu.  Technical Supplies through worldwide.  Operation and maintenance contract for HVAC and Refrigeration Equipment. M/S Child Aid Association Contact person (Dr. Salman Burny ---- 0321-2186686)  Jinnah Hospital Children ward  Installation of HVAC system for IV section in children ward.  Contract for servicing and maintenance of all MEP. M/S Hinopak Motors Ltd. Contact person (Jamal Qamar: Manager Maintenance. ---- 0300-8286795)  Operation and maintenance of reciprocating chiller and other mechanical work related to HVAC. (On call services)  Execution and modification in existing Plant to improve production.  Replacement of Packaged Type AC units for Engine Shop. (Capacity 100TR) Jaffer Brother Contact person (Mr. Javed Shahmim. Supply Chain Manager 0345-8273070)  Design, installation work related to HVAC for Fermentation Lab at Fatima Fertilizer  Design, installation work related to Electrical for Fermentation Lab at Fatima Fertilizer  Design, installation of Cold Storage for Fermentation Lab at Fatima Fertilizer
  • 10. M/S HASCOL Petroleum Ltd. Contact person (Mr. Habib Uddin: Project Manager ---- 0321-2444171)  Operation and maintenance contract of HVAC for All Sindh Region  Technical Supplies. M/S FMD Lab (Peshawar). Contact person (Mr. Danish: C.E.O ---- 0300-9506759)  Design, Execution & Commissioning of Sterile Area and BSL 3.
  • 11. Work Done S.No. Company Description of Job Year Project Cost Million (Rs.) 1 Aga Khan University Hospital Plumbing & HVAC Work for Sopariwala Building 2014 1.4 2 Aga Khan University Hospital Plumbing Work for Pond at FOB Building 2014 0.9 3 Aga Khan University Hospital HVAC & Plumbing Work for Cytotoxic Pharmacy 2015 1.6 4 Aicon Provide Consultancy for Equipment Manufacturing 2012 1.2 5 BHP Billiton Zam Zama Gas Plant (Phase 1) Installation of Screw chiller with FCUs 2003 to 2004 5.6 6 BHP Billiton Zam Zama Gas Plant (Phase 2) Installation of Screw chiller with FCUs 2006 to 2007 7.8 7 Cold Kraft Installation of Cold Storage 2010 to 2011 0.8 8 Dockyard Refurbishment of AC Mobile Equipment 2012 2.5 9 Hilton Pharma Installation of AHUs and Duct Work 1998 to 2000 0.6 10 Hinopak Motors Ltd. Supply and Installation of Central Exhaust System for Paint Shop 2008 to 2009 1.8 11 Hinopak Motors Ltd. Refurbishment of Reciprocating Chiller 2013 1.5 12 Hinopak Motors Ltd. Repair & Maintenance of AC Packaged type Units at Engine Shop 2014 1.9 13 Hinopak Motors Ltd. Supply & Installation of Chilled Water & Fresh Air Supply System at PTED 2015 8.7 14 Hinopak Motors Ltd. Supply & Installation of Ventilation & Exhaust System at BOP 2015 2.2 15 IBA ( Karachi University ) HVAC Piping Work at Plant Room 2013 0.4
  • 12. 16 Jaffer Agro Services Overhauling of Scrubbing Exhaust System 2014 1.5 17 Jinnah Hospital HVAC & Lab Equipment Installation 2010 to 2011 1.2 18 Liberty Power Project Installation of chiller and AHUs at plant and for colony 1998 to 2000 2.8 19 Linz Pharma Modification of Existing HVAC system 2014 2.5 20 Mediate Pharma Modification of Existing HVAC system 2005 0.5 21 Nabi Qasim Pharma Installation of AHUs and Duct Work 2001 to 2002 1.4 22 PARCO Refurbishment of Reciprocating Chiller And replacement of Duct work 2014 3.4 23 Roush Power Plant Installation of Chiller, AHUs & FCUs for different areas of Plant 1997 to 1999 1.8 24 Sindh Poultry Vaccination Research Building Installation of HVAC system for Lab Area 2003 to 2004 3.8 25 Walmart Global Marketing Operation and Maintenance Contract. 2010 to 2011 0.3 26 Zia Uddin Hospital Installation & Commissioning of Lab Equipment 2006 to 2007 2.6
  • 13. ORGANIZATION SETUP 01. Main-Office (Karachi) Office No. 429, 4th Floor, Mashrique Center, Block-14, Gulshan-e-Iqbal, Karachi 02. Work Shop Plot # 165, Category C-I, Sector 6-B, North Karachi, Industrial Area, Karachi. 03. Site Setup Our site setup depends upon the nature of work for each field. Nos. of staff depends upon the span & nature of the work. C.E.O Management Accounts & Finance Office Assistant Management Representitve Mechanical Workshop Projects HVAC Projects Commissioning Electrical Projects Procurement Imports Local Purchase
  • 14. PROJECT MANAGEMENT Our past experiences have proven that Creators Group of Engineering is one of the integrated company in the field of Mechanical, Electrical, and HVAC & Trading works with outstanding performance records providing the driving force behind a complete of system services and products supply for our customers in a trustful and reliable way based upon the past proven track record. We have plentiful experiences from the stand point of such a job handling as general consolation, feasibility study at the beginning stage of the project, development, detail design, procurement, manufacturing, fabrication, installation, and commissioning, testing, hand – over based on Turn – Key project and on the site.
  • 15. LIST OF EQUIPMENT AND MACHINES DESCRIPTION QUANTITY 1. Hydraulic press 02 nos. 2. Lock former machine 01 no. 3. Manual bender machine 03 nos. 4. Welding machine 06 nos. 5. Welding generator 02 nos. 6. Duct Manufacturing Machine 01 set. 7. Sheet Banding Hydraulic Press 01 no. 8. Sheet roller 01 no. 9. Electricity generator 04 nos. 10. Speed cutter 04 nos. 11. Hand grinder 10 nos. 12. Lath machine 02 nos. 13. Shaper Machine 01 no. 14. Milling Machine 01 no. 15. Bench drill machine 04 nos. 16. Hilti drill machine 16 nos. 17. Drill machine 12 nos. 18. Pipe cutting & Treading machine 04 nos. 19. Pipe threading machine up to 4” thick 01 comp. Set 20. Gas cutting Set/Brazing Set 10 comp. Set Commissioning, Testing and Balancing Equipment: a. Micro manometer for air balancing b. Micro manometer for water balancing c. Capture hood for measuring air flow d. Digital Anemometer e. Electronic mugger testing f. Noise Level Meter g. Light Intensity Meter h. Multi-meters i. Clamp on Multi-Meter
  • 16. QA/ QC PLAN  Quality Policy and Authority: Management is totally committed to providing commercial & industrial General contracting services that comply fully with the specification and expectation of our valued clients The QCM has the responsibility and organizational freedom to identity quality control problems, stop works, recommend solution and verify resolution off such problems.  Management Responsibility: Management has the responsibility to define and document its policy and objectives for and commitment to quality. Management will ensure that its policy is understood, implemented and maintained at all levels of the organization.  Quality System: Documented quality system procedure and instruction to ensure that all activities and performed in accordance with established requirement. Effective management support to ensure compliance and the use of the QA/AC procedure and instructions.  Project Review and Setup: Upon receipt of a request for proposal (RFQ) from a client, Management will review the requirement of the FRQ and determine if a proposal will be submitted to perform the work. If management decides to submit a proposal for the work, a project manager is assigned the responsibility of generating the proposal to perform the work. The proposal must include all costs related to completing the work in accordance with the client’s specifications.  Document Control: Revisions to the QA/QC document shall be by section and approved for adequacy by the authorized personnel prior to issue. A revised table of contents indicating the newly issued approved and accepted revision shall accompany the revised sections
  • 17.  Purchasing and Material Control: The Project Manager has the overall responsibility to ensure that all materials and services purchased are in accordance with established QA/QC procedure the project specifications and drawings.  Material Certification and Traceability: The Project Manager shall ensure that all materials and equipment furnished by the client are verified, stored and maintained until incorporation into work. Any such items that are damaged or otherwise unsuitable for use shall be recorded and reported to the client immediately, where, and to the extent that traceability is a specified requirement of the contract, individual products or product batches shall have a unique identification. This identification shall be recorded in the Job File and issued to the client with specified As-Built Data.  Process Control: During project setup the project manager develops the project QA/QC plan covering all construction activities and applicable process which directly affect quality. The Project Manager shall ensure that these process are carried out under controlled conditions.  Inspection and Testing: All Material and equipment shall be inspected and tested to ensure conformance with the project requirement before it is released for use. Verification that all items conform to specified requirement of the quality plan shall be documented and filed in the project QA/AC file  Inspection, Measuring and Test Equipment: The QCM shall ensure that all inspection, measuring, and test equipment is controlled, calibrated and maintained, whether owned by CGE or provided by the client, Equipment shall be uses in a manner which ensure that measurement uncertainty is knows and is consistent with the required measurement capability.
  • 18.  Control of Non-Conforming Actions and Corrective Actions: The project manager shall established and maintain procedure to ensure that any work that does not conform to specified requirement is prevented from inadvertent release to the client. Control shall provide for identification, documentation, evaluation, segregation when practical, and disposition of nonconforming work and for notification to management as required.  Audit, Records and Training: The QCM shall carry out internal audits to verify whether quality activities comply with planned arrangement and to determine the effectiveness of the quality system. The QCM shall maintain records on the performance and adequacy of each project’s QA/QC activities.
  • 19. SAFETY POLICY Safety both on site and in the office is our top priority. We consider that creating a safe working environment which poses no harm to the health and life of all employees and customers is our responsibility. Compliance with occupational health and safety requirements is “must” in all of the Creators Group of Engineering building operations. It is a requirement of our company safety regulations that each employee is made aware of their individual responsibilities, their obligation to implement the rules and to undertake frequent training to ensure that a safe working environment is instigated and maintained at each project site. The Creators Group of Engineering safety policy demands cooperation and compliance from all relevant parties such as suppliers and sub-contractors. The safety system has been improved by the involvement of all participants to ensure that no one works in an unsafe environment.