FINANCIAL PROPOSAL
RED BARN WIND PROJECT
       19997 Y City Rd, Gentry, AR 72734
Winds of Change Leaseholding, LLC ha




9/2009
          1. Summary:
               land in Northwest Arkansas for the purpose of developing a
               using 8 – 2.5MW Nordex N90 wind turbines. Winds of Cha
               LLC is developing the site for an Operations Partner to purch
               wind farm in accordance with a contract agreement.




10/2009
          2.   Business Concept: The business concept is to de
               where it is most abundant in Arkansas in partnership with the
               By choosing the 20MW size for a project we are able to redu
               and still have the necessary economies of scale which make l




11/2009
               more profitable. With the landowners having ownership in t
               to gain much more social acceptance and ease in regulation.

          3.   Summary of Lease: The wind energy lease agre




12/2009
               and automatically renewed for a subsequent 20 year period.
               landowners of the Red Barn Wind Project is based off of a m
               agreement from New York. The lease was modified to inclu
               lease applicable to meet landowners needs which included se
                                CHARTS
                                                                   APPENDIX C: MAPS
                                                                                      APPENDIX B: PROJECT ASSUMPTIONS
                                                                                                                                                      PROPOSAL FOR FINANCE
                                                                                                                        APPENDIX A: PROJECT SUMMARY




                                         RED BARN WIND PRO FORMA
                                                                                                                                                                             CONTENTS




               project has already accomplished. The final milestone is the
               Date which must occur before April 2013.




1/2010
               The Commencement date is determined as the official start o
               Phase of the project where construction begins, all landowne
2/2010
               Acre.

               The Annual Lease Payments are equal to $50/acre + $2,500
               MWh(estimated between $8000 and $8500) produced by tur
               payment is distributed to those within a designated radius of
3/2010




          4.   Description of Leased land: Some of the l
               1 is being leased from 9 signatories representing 560 acres of
               rural Benton County, Arkansas. It is between the towns of D
               AR. The Wildlife Wilderness Drive Thru Safari is to the we
               to the East. The land leased is in a rectangular shape giving
               row of wind turbines. The current land use is for pasture lan
4/2010




               and to raise chickens. The neighboring sites adjacent to the
Turbine Model                                Nordex N90 2.5MW
            Net Capacity Factor (Years 1-20)                    34%
            Total kWh Produced (Years 1-20)                1,188,325,502
            PPA                                               $0.0540
            C-BED PPA (NPV)                                   $0.0000



1
            Green Tag Rate                                    $0.0000
    WINDS OF CHANGE LEASEHOLDING LLC has leased 560 acres of land in North West Arkansas for the purpose of devel-




                                                                                                                                                  PROPOSAL FOR FINANCE
    openingTotal Installed Cost using (8) 2.5MW Nordex N90 wind turbines. Winds of Change Leaseholding, LLC is developing the site for
            a 20 MW wind farm                   $38,720,000
    an Operations Partner to purchase and operate the wind farm in accordance with a contract agreement.



2
          Local Investor Contribution             $182,000
    The BUSINESS CONCEPT is to develop wind energy where it is most abundant in Arkansas in partnership with the local
          Local Investor IRR                        45%
                                                  $501,133
          Local Investor Return (NPV) project allows us to reduce many costs while producing results that make large wind farms
    community. The smaller size of this
    profitable. With the landowners and community having ownership, the social acceptance and regulation is well received.
          Equity Investor Contribution $26,000,000



3
          Equity Investor IRR             19%
    The WIND ENERGY LEASE is a 25 year$6,604,547 which automatically renews for a subsequent 20 year period. The lease
          Equity Investor Return (NPV)  agreement
    signed by landowners of the Red Barn Wind Project is similar to a model wind lease in New York. Some of our modifications include
    expirations onRate leaserevenues) to meet landowner’s needs which included several milestones, of which most are completed. The
             O & M the (% of applicable             9.3%
    final milestone Cost per kW
             Capital is the Commencement Date, which must occur beofre April 2013.
                                                   $1,936

    The final commencement date is determined as the official start of the Operations Phase of the project. When construction begins all
            IRR (Years 1-20)                      22%
    landownersPresent Value per acre.
            Net recieve $75 (Years 1-20)       $13,538,953

    The Annual Lease Payments are equal to $50/acre + $2,500 per Turbine + $1 per MWh (estimated between $8,000 and $8,500)
    produced by turbine on property. This payment is distributed to those within a designated radius from the wind turbine.




4   The LEASED LAND has 9 signatories representing 560 acres of land. The land is in rural Benton County, Arkansas (refer to
    Appendix C) between Decatur and Gentry, AR. The Wildlife Wilderness Drive Thru Safari is to the West and Highway 59 is to the East.
    The land leased is in a rectangular shape giving way for an East/West row of wind turbines. The current land use is for pasture land to
    graze livestock and raise chickens. The sites adjacent to the wind turbine sites have been leased in most, but not all instances to further
    involve the community.




5
     The WIND DATA was gathered from 8 different sites and averaged. Refer to Appendix C for Map Images.
                                                                                         WIND
                                                                                        SPEED    AVG. MPH
                                                                 SITE                     M/S     @ 100M
                                                       1                               7.66        17.1584
                                                       2                               7.5         16.8
                                                       3                               7.6         17.024
                                                       4                               7.65        17.136
                                                       5                               7.6         17.024
                                                       6                               7.6         17.024
                                                       7                               7.47        16.7328
                                                       8                               7.62        17.0688
                                                       AVG.                            7.63625     17.1052




                                               2105 1st Ave S, Minneapolis, MN 55404
                              Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612
                                              info@windustry.org www.windustry.org
                                                                                                                                                   1
Turbine Model                                Nordex N90 2.5MW
            Net Capacity Factor (Years 1-20)                    34%
            Total kWh Produced (Years 1-20)                1,188,325,502
            PPA                                               $0.0540
            C-BED PPA (NPV)                                   $0.0000



6
            Green Tag Rate                                    $0.0000
    The DEVELOPMENT as of July 2010 has accomplished many of its primary beginning goals and many processes will be ongoing.




                                                                                                                                             PROPOSAL FOR FINANCE
    The long-term leases Cost
             Total Installed on proposed facility land$38,720,000
                                                       were signed in February 2009. Notice of funding was recieved September 2009 for a
    grant of $41,000 to be received after 75% of project funding is secured. One year wind measurement on site started August 2009.
    Transmission Investor Contribution
             Local study started May 2010, (60days)(30days)(30 days). Preliminary construction cost estimates May 2010.
                                                       $182,000




7
           Local Investor IRR                               45%
           Local Investor Return (NPV)
    Winds of Change Leaseholding, LLC is a             MANAGER
                                                          $501,133 MANAGED Limied Liability Company divided into three classes:
    Landowner, Investor, and Management. Long term decisions are discussed with all members and each class appoints one member to
                                                    $26,000,000
    be a representative of Contribution vote for their class regarding long term decisions.
            Equity Investor that class to
            Equity Investor IRR                        19%
    The daily operations and decisions
            Equity Investor Return (NPV) are the responsibility of the Manager, Mr. Nathan Wilson. A graduate of the University of Central
                                                    $6,604,547
    Arkansas with a Bachelor’s of Business Marketing and a Master’s of Business Administration; Mr. Wilson began networking with wind
    professionals at the American Wind Energy Association (AWEA) conference in 2007 and is now an Advocate Member.
            O & M Rate (% of revenues)             9.3%
            Capital Cost per kW                                   $1,936
    Nathan continued with Wind Site Assessment Training in St. Paul, Minnesota with a noted wind professional, Mick Sagrillo. Having
    performed site assessments in other regions of America, Mr. Wilson assessed in 2007 that the now named Red Barn Wind Project site
            IRR (Years 1-20)                         22%
    could produce windValue (Years a large scale development.
            Net Present energy for 1-20)          $13,538,953

    Management compensation has been set at $1000/month through the development phase to cover the expense of an office and living
    costs.




8
    STATEMENT of ASSETS & LIABILITIES :
    Assets                                                 Liabilites
    560 Acres Leased                                       Outstanding Legal Fees - $3,000
    Public Support
    Triton SODAR Wind Data (August 2009 - Current)
    Triton SODAR Deposit - $5,832
    Transmission Study Deposit - $5,000 - $20,000 (estimated cost of feasibility study)
    USDA REAP Grant - $40,000 (25% of project costs)
    Securities Offering Exemption from Registration




                                               2105 1st Ave S, Minneapolis, MN 55404
                              Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612
                                              info@windustry.org www.windustry.org
                                                                                                                                              2
Turbine Model                                  Nordex N90 2.5MW
         Net Capacity Factor (Years 1-20)                      34%
         Total kWh Produced (Years 1-20)                  1,188,325,502
         PPA                                                 $0.0540
         C-BED PPA (NPV)                                     $0.0000



9
         Green Tag Rate                                      $0.0000
    TOTAL DEVELOPMENT COSTS




                                                                                                                                                        PROPOSAL FOR FINANCE
         Total Installed Cost                                $38,720,000
      WIND STUDY                                                                               $70,000
        Local Investor Contribution                            $182,000
      TRANSMISSION STUDY
        Local Investor IRR                                       45%                           $45,000
      ENVIRONMENTAL(NPV)
        Local Investor Return STUDY                            $501,133                        $30,000
      PRE CONSTRUCTION
        Equity Investor Contribution                         $26,000,000
                                                                                                $6,000
      LEGAL EXPENSES
        Equity Investor IRR                                      19%                           $14,000
      ACCOUNTING EXPENSES
        Equity Investor Return (NPV)                          $6,604,547                        $1,000
      OVERHEAD EXPENSES
        O & M Rate (% of revenues)                                9.3%                         $17,000
         Capital Cost per kW                                     $1,936                   $182,000 TOTAL



10
        IRR (Years 1-20)                  22%
      STATEMENT OF FINANCIAL NEEDS: An additional $34,000 of funds needed to recieve the USDA REAP Grant award of
        Net Present Value (Years 1-20) $13,538,953
      $41,000. With this additional $75,000 we will be able to fully develop the project by completing the wind study, two more transmission studies,
      environmental studies, legal expenses, accounting, and overhead.




                                              2105 1st Ave S, Minneapolis, MN 55404
                             Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612
                                             info@windustry.org www.windustry.org
                                                                                                                                                         3
Turbine Model                                      Nordex N90 2.5MW




 PROJECT SUMMARY
               Net Capacity Factor (Years 1-20)                          34%
               Total kWh Produced (Years 1-20)                      1,188,325,502
               PPA                                                     $0.0540
               C-BED PPA (NPV)                                         $0.0000
               Green Tag Rate                                          $0.0000

               Total Installed Cost LLC
                      .95% Development,                                $38,720,000

                                                                                        Project Summary
                     (Landowners and Developer
                     non revenue recieving)                              $182,000
               Local Investor Contribution




                                                                                                                                           APPENDIX A
               Local Investor IRR Investors
                      .05% Development                                     45%
                           a  tions,
                                LLC
                       oper
               Local Investor Return (NPV)                               $501,133
                                                                                   Project Name                          Red Barn Wind
                          99%
               Equity Investor Contribution                            $26,000,000 Project Size (MW)                            20
               Equity Investor IRR                                         19%     Turbine Model                        Nordex N90 2.5MW
                    operation
   PRE-FLIP




               Equity Investor Return (NPV)                             $6,604,547 Net Capacity Factor (Years 1-20)            34%
                    ownership
               O & M Rate (% of revenues)1%                                9.3%
                                                                                   Total kWh Produced (Years 1-20)
                                                                                   PPA
                                                                                                                          1,188,325,502
                                                                                                                             $0.0540
               Capital Cost per kW                                        $1,936
                    approximately                                                  C-BED PPA (NPV)                           $0.0000
               IRR (Years10yrs
                         1-20)                                             22%     Green Tag Rate                            $0.0000
OWNERSHIP



               Net Present Value (Years 1-20)                          $13,538,953
                                                                                       Total Installed Cost                $38,720,000

                                                                                       Local Investor Contribution          $182,000
                                                                                       Local Investor IRR                     45%
                                                                                       Local Investor Return (NPV)          $501,133

                                                                                       Equity Investor Contribution        $26,000,000
                                                                                       Equity Investor IRR                     19%
                                                                                       Equity Investor Return (NPV)         $6,604,547
   POST-FLIP




                                                10%
                    community                                                          O & M Rate (% of revenues)             9.3%
                    ownership                                                          Capital Cost per kW                   $1,936

                                                                                       IRR (Years 1-20)                       22%
                                                                                       Net Present Value (Years 1-20)      $13,538,953
                       dev
                            90%
                          elopment, LLC

                     5% Operations Investors
                     5% Development Investors


                                                        2105 1st Ave S, Minneapolis, MN 55404
                                       Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612
                                                       info@windustry.org www.windustry.org
                                                                                                                                           4
Red Barn Wind Financialsummary
Red Barn Wind Financialsummary
Red Barn Wind Financialsummary
Red Barn Wind Financialsummary
Red Barn Wind Financialsummary
Red Barn Wind Financialsummary
Red Barn Wind Financialsummary

Weitere ähnliche Inhalte

Was ist angesagt?

Heritage sands edc january 2012
Heritage sands   edc january 2012Heritage sands   edc january 2012
Heritage sands edc january 2012Town of Dennis, MA
 
Winnovation Business Plan Competition Entry
Winnovation Business Plan Competition EntryWinnovation Business Plan Competition Entry
Winnovation Business Plan Competition Entrychcolli3
 
Form 8933 Carbon Dioxide Sequestration Credit
Form 8933  Carbon Dioxide Sequestration Credit  Form 8933  Carbon Dioxide Sequestration Credit
Form 8933 Carbon Dioxide Sequestration Credit taxman taxman
 
Water Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, CaliforniaWater Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, CaliforniaKaila694m
 

Was ist angesagt? (6)

Heritage sands edc january 2012
Heritage sands   edc january 2012Heritage sands   edc january 2012
Heritage sands edc january 2012
 
Winnovation Business Plan Competition Entry
Winnovation Business Plan Competition EntryWinnovation Business Plan Competition Entry
Winnovation Business Plan Competition Entry
 
Form 8933 Carbon Dioxide Sequestration Credit
Form 8933  Carbon Dioxide Sequestration Credit  Form 8933  Carbon Dioxide Sequestration Credit
Form 8933 Carbon Dioxide Sequestration Credit
 
Water Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, CaliforniaWater Efficient Landscape Guidelines - Costa Mesa, California
Water Efficient Landscape Guidelines - Costa Mesa, California
 
Kalabagh dam-1289 & 1292
Kalabagh dam-1289 & 1292Kalabagh dam-1289 & 1292
Kalabagh dam-1289 & 1292
 
Water Education Foundation San Diego Tour, by Kelley Gage
Water Education Foundation San Diego Tour, by Kelley GageWater Education Foundation San Diego Tour, by Kelley Gage
Water Education Foundation San Diego Tour, by Kelley Gage
 

Andere mochten auch

Request for Proposal to Host Softball Camp
Request for Proposal to Host Softball CampRequest for Proposal to Host Softball Camp
Request for Proposal to Host Softball CampKatelyn Lutz
 
Culminating Project Powerpoint
Culminating Project PowerpointCulminating Project Powerpoint
Culminating Project Powerpointmchalk36
 
Culminating project slide show
Culminating project slide showCulminating project slide show
Culminating project slide showshootingstar197
 
Theaker derek assignment4
Theaker derek assignment4Theaker derek assignment4
Theaker derek assignment4Derek Theaker
 
Final dep ed physical fitness test
Final dep ed physical fitness testFinal dep ed physical fitness test
Final dep ed physical fitness testS Marley
 
Philippine physical fitness test
Philippine physical fitness testPhilippine physical fitness test
Philippine physical fitness testMarianne Chicote
 
From Philippine Red Cross-BTC Module 1
From Philippine Red Cross-BTC Module 1From Philippine Red Cross-BTC Module 1
From Philippine Red Cross-BTC Module 1Edmund Villareal
 
Slideshare Project Proposal
Slideshare Project ProposalSlideshare Project Proposal
Slideshare Project ProposalJeane Paguio
 
WT Softball Game Notes (2-15-17)
WT Softball Game Notes (2-15-17)WT Softball Game Notes (2-15-17)
WT Softball Game Notes (2-15-17)West Texas A&M
 

Andere mochten auch (15)

Request for Proposal to Host Softball Camp
Request for Proposal to Host Softball CampRequest for Proposal to Host Softball Camp
Request for Proposal to Host Softball Camp
 
Culminating Project Powerpoint
Culminating Project PowerpointCulminating Project Powerpoint
Culminating Project Powerpoint
 
Culminating project slide show
Culminating project slide showCulminating project slide show
Culminating project slide show
 
Theaker derek assignment4
Theaker derek assignment4Theaker derek assignment4
Theaker derek assignment4
 
BASEBALL
BASEBALLBASEBALL
BASEBALL
 
History of baseball
History of baseballHistory of baseball
History of baseball
 
Final dep ed physical fitness test
Final dep ed physical fitness testFinal dep ed physical fitness test
Final dep ed physical fitness test
 
Basic Skills in Baseball
Basic Skills in BaseballBasic Skills in Baseball
Basic Skills in Baseball
 
Baseball powerpoint
Baseball powerpointBaseball powerpoint
Baseball powerpoint
 
Philippine physical fitness test
Philippine physical fitness testPhilippine physical fitness test
Philippine physical fitness test
 
softball
softballsoftball
softball
 
From Philippine Red Cross-BTC Module 1
From Philippine Red Cross-BTC Module 1From Philippine Red Cross-BTC Module 1
From Philippine Red Cross-BTC Module 1
 
Slideshare Project Proposal
Slideshare Project ProposalSlideshare Project Proposal
Slideshare Project Proposal
 
Project in mapeh
Project in mapehProject in mapeh
Project in mapeh
 
WT Softball Game Notes (2-15-17)
WT Softball Game Notes (2-15-17)WT Softball Game Notes (2-15-17)
WT Softball Game Notes (2-15-17)
 

Ähnlich wie Red Barn Wind Financialsummary

20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptxDonald Jones
 
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Energy Network marcus evans
 
20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awi20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awiDonald Jones
 
Argentina Solar PV Status and Market Outlook
Argentina Solar PV Status and Market OutlookArgentina Solar PV Status and Market Outlook
Argentina Solar PV Status and Market OutlookMauro G. Soares
 
Hrbwa dmmgjm 22_oct2012
Hrbwa dmmgjm 22_oct2012Hrbwa dmmgjm 22_oct2012
Hrbwa dmmgjm 22_oct2012DRIscience
 
March 2012 - Michigan Energy Forum - Richard Vander Veen
March 2012 - Michigan Energy Forum - Richard Vander VeenMarch 2012 - Michigan Energy Forum - Richard Vander Veen
March 2012 - Michigan Energy Forum - Richard Vander VeenAnnArborSPARK
 
State RPS targets and the CEC role in achieving success [CSTP 2010]
State RPS targets and the CEC role in achieving success [CSTP 2010]State RPS targets and the CEC role in achieving success [CSTP 2010]
State RPS targets and the CEC role in achieving success [CSTP 2010]Smithers Apex
 
Dss For Wind Power Plant
Dss For Wind Power PlantDss For Wind Power Plant
Dss For Wind Power PlantUPES
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOECD Environment
 
NewBase 09 October 2023 Energy News issue - 1663 by Khaled Al Awadi_compres...
NewBase  09 October 2023  Energy News issue - 1663 by Khaled Al Awadi_compres...NewBase  09 October 2023  Energy News issue - 1663 by Khaled Al Awadi_compres...
NewBase 09 October 2023 Energy News issue - 1663 by Khaled Al Awadi_compres...Khaled Al Awadi
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATIONAdewunmi Okumodi
 
New base 09 february 2021 energy news issue 1404 summary al awadi
New base 09 february  2021 energy news issue   1404  summary al awadiNew base 09 february  2021 energy news issue   1404  summary al awadi
New base 09 february 2021 energy news issue 1404 summary al awadiKhaled Al Awadi
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20Heritage Wind
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Asadullah Malik
 
New base special 12 february 2014
New base special  12 february 2014New base special  12 february 2014
New base special 12 february 2014Khaled Al Awadi
 

Ähnlich wie Red Barn Wind Financialsummary (20)

20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx
 
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
 
20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awi20120917 public consultation_doc-sev1_awi
20120917 public consultation_doc-sev1_awi
 
Wind sector brief
Wind sector briefWind sector brief
Wind sector brief
 
Argentina Solar PV Status and Market Outlook
Argentina Solar PV Status and Market OutlookArgentina Solar PV Status and Market Outlook
Argentina Solar PV Status and Market Outlook
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
prospectus4 ABingdon Hydro
prospectus4 ABingdon Hydroprospectus4 ABingdon Hydro
prospectus4 ABingdon Hydro
 
Hrbwa dmmgjm 22_oct2012
Hrbwa dmmgjm 22_oct2012Hrbwa dmmgjm 22_oct2012
Hrbwa dmmgjm 22_oct2012
 
March 2012 - Michigan Energy Forum - Richard Vander Veen
March 2012 - Michigan Energy Forum - Richard Vander VeenMarch 2012 - Michigan Energy Forum - Richard Vander Veen
March 2012 - Michigan Energy Forum - Richard Vander Veen
 
State RPS targets and the CEC role in achieving success [CSTP 2010]
State RPS targets and the CEC role in achieving success [CSTP 2010]State RPS targets and the CEC role in achieving success [CSTP 2010]
State RPS targets and the CEC role in achieving success [CSTP 2010]
 
Dss For Wind Power Plant
Dss For Wind Power PlantDss For Wind Power Plant
Dss For Wind Power Plant
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
 
NewBase 09 October 2023 Energy News issue - 1663 by Khaled Al Awadi_compres...
NewBase  09 October 2023  Energy News issue - 1663 by Khaled Al Awadi_compres...NewBase  09 October 2023  Energy News issue - 1663 by Khaled Al Awadi_compres...
NewBase 09 October 2023 Energy News issue - 1663 by Khaled Al Awadi_compres...
 
CCSE Conference Plenary Presentation
CCSE Conference Plenary PresentationCCSE Conference Plenary Presentation
CCSE Conference Plenary Presentation
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATION
 
New base 09 february 2021 energy news issue 1404 summary al awadi
New base 09 february  2021 energy news issue   1404  summary al awadiNew base 09 february  2021 energy news issue   1404  summary al awadi
New base 09 february 2021 energy news issue 1404 summary al awadi
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...
 
New base special 12 february 2014
New base special  12 february 2014New base special  12 february 2014
New base special 12 february 2014
 
Geo Epc Merrigan
Geo Epc MerriganGeo Epc Merrigan
Geo Epc Merrigan
 

Red Barn Wind Financialsummary

  • 1. FINANCIAL PROPOSAL RED BARN WIND PROJECT 19997 Y City Rd, Gentry, AR 72734
  • 2. Winds of Change Leaseholding, LLC ha 9/2009 1. Summary: land in Northwest Arkansas for the purpose of developing a using 8 – 2.5MW Nordex N90 wind turbines. Winds of Cha LLC is developing the site for an Operations Partner to purch wind farm in accordance with a contract agreement. 10/2009 2. Business Concept: The business concept is to de where it is most abundant in Arkansas in partnership with the By choosing the 20MW size for a project we are able to redu and still have the necessary economies of scale which make l 11/2009 more profitable. With the landowners having ownership in t to gain much more social acceptance and ease in regulation. 3. Summary of Lease: The wind energy lease agre 12/2009 and automatically renewed for a subsequent 20 year period. landowners of the Red Barn Wind Project is based off of a m agreement from New York. The lease was modified to inclu lease applicable to meet landowners needs which included se CHARTS APPENDIX C: MAPS APPENDIX B: PROJECT ASSUMPTIONS PROPOSAL FOR FINANCE APPENDIX A: PROJECT SUMMARY RED BARN WIND PRO FORMA CONTENTS project has already accomplished. The final milestone is the Date which must occur before April 2013. 1/2010 The Commencement date is determined as the official start o Phase of the project where construction begins, all landowne 2/2010 Acre. The Annual Lease Payments are equal to $50/acre + $2,500 MWh(estimated between $8000 and $8500) produced by tur payment is distributed to those within a designated radius of 3/2010 4. Description of Leased land: Some of the l 1 is being leased from 9 signatories representing 560 acres of rural Benton County, Arkansas. It is between the towns of D AR. The Wildlife Wilderness Drive Thru Safari is to the we to the East. The land leased is in a rectangular shape giving row of wind turbines. The current land use is for pasture lan 4/2010 and to raise chickens. The neighboring sites adjacent to the
  • 3. Turbine Model Nordex N90 2.5MW Net Capacity Factor (Years 1-20) 34% Total kWh Produced (Years 1-20) 1,188,325,502 PPA $0.0540 C-BED PPA (NPV) $0.0000 1 Green Tag Rate $0.0000 WINDS OF CHANGE LEASEHOLDING LLC has leased 560 acres of land in North West Arkansas for the purpose of devel- PROPOSAL FOR FINANCE openingTotal Installed Cost using (8) 2.5MW Nordex N90 wind turbines. Winds of Change Leaseholding, LLC is developing the site for a 20 MW wind farm $38,720,000 an Operations Partner to purchase and operate the wind farm in accordance with a contract agreement. 2 Local Investor Contribution $182,000 The BUSINESS CONCEPT is to develop wind energy where it is most abundant in Arkansas in partnership with the local Local Investor IRR 45% $501,133 Local Investor Return (NPV) project allows us to reduce many costs while producing results that make large wind farms community. The smaller size of this profitable. With the landowners and community having ownership, the social acceptance and regulation is well received. Equity Investor Contribution $26,000,000 3 Equity Investor IRR 19% The WIND ENERGY LEASE is a 25 year$6,604,547 which automatically renews for a subsequent 20 year period. The lease Equity Investor Return (NPV) agreement signed by landowners of the Red Barn Wind Project is similar to a model wind lease in New York. Some of our modifications include expirations onRate leaserevenues) to meet landowner’s needs which included several milestones, of which most are completed. The O & M the (% of applicable 9.3% final milestone Cost per kW Capital is the Commencement Date, which must occur beofre April 2013. $1,936 The final commencement date is determined as the official start of the Operations Phase of the project. When construction begins all IRR (Years 1-20) 22% landownersPresent Value per acre. Net recieve $75 (Years 1-20) $13,538,953 The Annual Lease Payments are equal to $50/acre + $2,500 per Turbine + $1 per MWh (estimated between $8,000 and $8,500) produced by turbine on property. This payment is distributed to those within a designated radius from the wind turbine. 4 The LEASED LAND has 9 signatories representing 560 acres of land. The land is in rural Benton County, Arkansas (refer to Appendix C) between Decatur and Gentry, AR. The Wildlife Wilderness Drive Thru Safari is to the West and Highway 59 is to the East. The land leased is in a rectangular shape giving way for an East/West row of wind turbines. The current land use is for pasture land to graze livestock and raise chickens. The sites adjacent to the wind turbine sites have been leased in most, but not all instances to further involve the community. 5 The WIND DATA was gathered from 8 different sites and averaged. Refer to Appendix C for Map Images. WIND SPEED AVG. MPH SITE M/S @ 100M 1 7.66 17.1584 2 7.5 16.8 3 7.6 17.024 4 7.65 17.136 5 7.6 17.024 6 7.6 17.024 7 7.47 16.7328 8 7.62 17.0688 AVG. 7.63625 17.1052 2105 1st Ave S, Minneapolis, MN 55404 Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612 info@windustry.org www.windustry.org 1
  • 4. Turbine Model Nordex N90 2.5MW Net Capacity Factor (Years 1-20) 34% Total kWh Produced (Years 1-20) 1,188,325,502 PPA $0.0540 C-BED PPA (NPV) $0.0000 6 Green Tag Rate $0.0000 The DEVELOPMENT as of July 2010 has accomplished many of its primary beginning goals and many processes will be ongoing. PROPOSAL FOR FINANCE The long-term leases Cost Total Installed on proposed facility land$38,720,000 were signed in February 2009. Notice of funding was recieved September 2009 for a grant of $41,000 to be received after 75% of project funding is secured. One year wind measurement on site started August 2009. Transmission Investor Contribution Local study started May 2010, (60days)(30days)(30 days). Preliminary construction cost estimates May 2010. $182,000 7 Local Investor IRR 45% Local Investor Return (NPV) Winds of Change Leaseholding, LLC is a MANAGER $501,133 MANAGED Limied Liability Company divided into three classes: Landowner, Investor, and Management. Long term decisions are discussed with all members and each class appoints one member to $26,000,000 be a representative of Contribution vote for their class regarding long term decisions. Equity Investor that class to Equity Investor IRR 19% The daily operations and decisions Equity Investor Return (NPV) are the responsibility of the Manager, Mr. Nathan Wilson. A graduate of the University of Central $6,604,547 Arkansas with a Bachelor’s of Business Marketing and a Master’s of Business Administration; Mr. Wilson began networking with wind professionals at the American Wind Energy Association (AWEA) conference in 2007 and is now an Advocate Member. O & M Rate (% of revenues) 9.3% Capital Cost per kW $1,936 Nathan continued with Wind Site Assessment Training in St. Paul, Minnesota with a noted wind professional, Mick Sagrillo. Having performed site assessments in other regions of America, Mr. Wilson assessed in 2007 that the now named Red Barn Wind Project site IRR (Years 1-20) 22% could produce windValue (Years a large scale development. Net Present energy for 1-20) $13,538,953 Management compensation has been set at $1000/month through the development phase to cover the expense of an office and living costs. 8 STATEMENT of ASSETS & LIABILITIES : Assets Liabilites 560 Acres Leased Outstanding Legal Fees - $3,000 Public Support Triton SODAR Wind Data (August 2009 - Current) Triton SODAR Deposit - $5,832 Transmission Study Deposit - $5,000 - $20,000 (estimated cost of feasibility study) USDA REAP Grant - $40,000 (25% of project costs) Securities Offering Exemption from Registration 2105 1st Ave S, Minneapolis, MN 55404 Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612 info@windustry.org www.windustry.org 2
  • 5. Turbine Model Nordex N90 2.5MW Net Capacity Factor (Years 1-20) 34% Total kWh Produced (Years 1-20) 1,188,325,502 PPA $0.0540 C-BED PPA (NPV) $0.0000 9 Green Tag Rate $0.0000 TOTAL DEVELOPMENT COSTS PROPOSAL FOR FINANCE Total Installed Cost $38,720,000 WIND STUDY $70,000 Local Investor Contribution $182,000 TRANSMISSION STUDY Local Investor IRR 45% $45,000 ENVIRONMENTAL(NPV) Local Investor Return STUDY $501,133 $30,000 PRE CONSTRUCTION Equity Investor Contribution $26,000,000 $6,000 LEGAL EXPENSES Equity Investor IRR 19% $14,000 ACCOUNTING EXPENSES Equity Investor Return (NPV) $6,604,547 $1,000 OVERHEAD EXPENSES O & M Rate (% of revenues) 9.3% $17,000 Capital Cost per kW $1,936 $182,000 TOTAL 10 IRR (Years 1-20) 22% STATEMENT OF FINANCIAL NEEDS: An additional $34,000 of funds needed to recieve the USDA REAP Grant award of Net Present Value (Years 1-20) $13,538,953 $41,000. With this additional $75,000 we will be able to fully develop the project by completing the wind study, two more transmission studies, environmental studies, legal expenses, accounting, and overhead. 2105 1st Ave S, Minneapolis, MN 55404 Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612 info@windustry.org www.windustry.org 3
  • 6. Turbine Model Nordex N90 2.5MW PROJECT SUMMARY Net Capacity Factor (Years 1-20) 34% Total kWh Produced (Years 1-20) 1,188,325,502 PPA $0.0540 C-BED PPA (NPV) $0.0000 Green Tag Rate $0.0000 Total Installed Cost LLC .95% Development, $38,720,000 Project Summary (Landowners and Developer non revenue recieving) $182,000 Local Investor Contribution APPENDIX A Local Investor IRR Investors .05% Development 45% a tions, LLC oper Local Investor Return (NPV) $501,133 Project Name Red Barn Wind 99% Equity Investor Contribution $26,000,000 Project Size (MW) 20 Equity Investor IRR 19% Turbine Model Nordex N90 2.5MW operation PRE-FLIP Equity Investor Return (NPV) $6,604,547 Net Capacity Factor (Years 1-20) 34% ownership O & M Rate (% of revenues)1% 9.3% Total kWh Produced (Years 1-20) PPA 1,188,325,502 $0.0540 Capital Cost per kW $1,936 approximately C-BED PPA (NPV) $0.0000 IRR (Years10yrs 1-20) 22% Green Tag Rate $0.0000 OWNERSHIP Net Present Value (Years 1-20) $13,538,953 Total Installed Cost $38,720,000 Local Investor Contribution $182,000 Local Investor IRR 45% Local Investor Return (NPV) $501,133 Equity Investor Contribution $26,000,000 Equity Investor IRR 19% Equity Investor Return (NPV) $6,604,547 POST-FLIP 10% community O & M Rate (% of revenues) 9.3% ownership Capital Cost per kW $1,936 IRR (Years 1-20) 22% Net Present Value (Years 1-20) $13,538,953 dev 90% elopment, LLC 5% Operations Investors 5% Development Investors 2105 1st Ave S, Minneapolis, MN 55404 Toll Free: 1-800-946-3640 Phone: 612-870-3461 Fax: 612-813-5612 info@windustry.org www.windustry.org 4