SlideShare ist ein Scribd-Unternehmen logo
1 von 23
Submitted By:
Naresh Sharma
Amit Sharma
A PRESENTATION ON
Six Sigma Quality Standard
Submitted To:
Mr. Sandeep Sharda
INTRODUCTION
 Six Sigma is a set of techniques and tools for
process improvement. It was introduced by engineer
Bill Smith while working at Motorola in 1986.
 Jack Welch made it central to his business strategy
at General Electric in 1995.
 Six Sigma seeks to improve the quality of the
output of a process by identifying and removing the
causes of defects and minimizing variability in
manufacturing and business processes.
 It uses a set of quality management methods, mainly
empirical, statistical methods, and
creates a special infrastructure of people within the
organization, who are experts in these methods.
 A six sigma process is one in which 99.99966% of all
opportunities to produce some feature of a part are
statistically expected to be free of defects (3.4 defective
features per million opportunities).
INTRODUCTION (Continue)
DOCTRINE
 Six Sigma doctrine asserts:
 Continuous efforts to achieve stable and predictable
process results (e.g. by reducing process variation) are
of vital importance to business success.
 Manufacturing and business processes have
characteristics that can be defined, measured,
analyzed, improved, and controlled.
 Achieving sustained quality improvement requires
commitment from the entire organization, particularly
from top-level management.
 Features that set Six Sigma apart from previous
quality-improvement initiatives include:
 A clear focus on achieving measurable and
quantifiable financial returns from any Six Sigma
project.
 An increased emphasis on strong and passionate
management leadership and support.
 A clear commitment to making decisions on the basis
of verifiable data and statistical methods, rather than
assumptions and guesswork.
DOCTRINE (Continue..)
Difference Between Related Concepts
 Lean management and Six Sigma are two concepts
 Share similar methodologies and tools.
 Both programs are of Japanese origin.
 but they are two different programs.
 Lean management is focused on eliminating waste
and ensuring swift while
 Six Sigma's focus is on eliminating defects and
reducing variability.
Methodologies
 Six Sigma projects follow two project methodologies
inspired by Deming's Plan-Do-Check-Act Cycle. These
methodologies, composed of five phases each, bear the
acronyms DMAIC and DMADV.
 DMAIC is used for projects aimed at improving an
existing business process.
 DMADV is used for projects aimed at creating new
product or process designs.
DMAIC
DMAIC
 The DMAIC project methodology has five phases:
 Define the system, the voice of the customer and their
requirements, and the project goals, specifically.
 Measure key aspects of the current process and collect
relevant data; calculate the 'as-is' Process Capability.
 Analyze the data to investigate and verify cause-and-effect
relationships. Determine what the relationships are, and
attempt to ensure that all factors have been considered
 Improve or optimize the current process based upon data
analysis using techniques such as design of experiments ,
poka yoke or mistake proofing, and standard work to create a
new, future state process. Set up pilot runs to establish process
capability.
 Control the future state process to ensure that any deviations
from the target are corrected before they result in defects.
Implement control systems such as statistical process control,
production boards, visual workplaces, and continuously
monitor the process.
DMADV or DFSS
DMADV
 The DMADV project methodology, known as DFSS
("Design For Six Sigma"), features five phases:
 Define design goals that are consistent with customer
demands and the enterprise strategy.
 Measure and identify CTQs (characteristics that are
Critical To Quality), measure product capabilities,
production process capability, and measure risks.
 Analyze to develop and design alternatives
 Design an improved alternative, best suited per analysis
in the previous step
 Verify the design, set up pilot runs, implement the
production process and hand it over to the process
owner(s).
Implementation roles
 Executive Leadership
The CEO
Members of top management.
 They are responsible for setting up a vision for Six Sigma
implementation. by transcending departmental barriers
and overcoming inherent resistance to change.
 Champions take responsibility for Six Sigma
implementation across the organization in an integrated
manner.
 The Executive Leadership draws them from upper
management.
 Champions also act as mentors to Black Belts.
 Champions and Master Black Belts focus on
identifying projects/functions for Six Sigma.
 Master Black Belts, identified by Champions, act as
in-house coaches on Six Sigma.
 They assist Champions and guide Black Belts and
Green Belts.
 Apart from statistical tasks, ensuring consistent
application of Six Sigma across various functions and
departments.
 Black Belts operate under Master Black Belts to
apply Six Sigma methodology to specific projects.
 Green Belts are the employees who take up Six
Sigma implementation along with their other job
responsibilities, operating under the guidance of
Black Belts.
Application
 Six Sigma mostly finds application in large organizations.
 Consumer-driven Six Sigma saves Ford $300 million.
 Ford began its Six Sigma odyssey in late 1999 when the
director of quality for Ford's global truck business was
looking for new ways to improve quality.
 They did research, visited Six Sigma Academy, and
benchmarked with GE and other large companies that
were using Six Sigma.
 Phong Vu, who's now Ford's Six Sigma czar, officially
known as director of corporate deployment for Consumer
Driven 6-Sigma.
 Ford formally launched its Six Sigma process, which it
calls Consumer Driven 6-Sigma, in January of 2000.
 They started with the top management group, and then
moved on to the officer group and the leadership group,
which comprises their top 350 people.
The Ford DMAIC cycle follows:
 Define. During this first stage, Black Belts work to
identify the customers involved and what matters to them.
 Measure. The second stage requires Black Belts to
develop process measures, called "Y's," which enable
them to evaluate the performance of the process.
 Identify the input variables that cause variation in process
performance.
 Analyze. The third stage forces Black Belts to prioritize
the input variables that cause variation in process
performance, analyze data to determine the root causes of
problems and opportunities for improvement, and validate
process input variables with data.
 Common tools at this stage include process mapping,
graphical techniques, multivariate studies, hypothesis
testing, and correlation and regression analysis.
 Improve. At this point, Black Belts generate solutions to
the problem and select the one that best addresses the root
cause.
 Common tools at this stage include process mapping,
design of experiments, simulation and optimization.
 Control. The final stage institutionalizes the improvement
and implements the ongoing control. The goal is to sustain
the gains that have been made.
 Common tools at this stage include control plans, statistical
process control, gage control plans, preventive maintenance
and poka yoke (a Japanese concept, translated as "mistake
proofing").
 No Six Sigma project at Ford is considered finished
until the entire DMAIC cycle is complete and Ford can
audit the results to see the effect on customers and the
bottom line.
 In 2000, Consumer Driven 6-Sigma contributed $52
million to the bottom line. Ford estimates a $300
million contribution from closed projects and a two-
point increase in customer satisfaction in 2001.
THANK YOU !
ANY QUERY?

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
six sigma tqm
six sigma tqmsix sigma tqm
six sigma tqm
 
Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay Anand
 
principle of six sigma
principle of six sigmaprinciple of six sigma
principle of six sigma
 
Six sigma
Six sigma Six sigma
Six sigma
 
Six sigma ppt
Six sigma pptSix sigma ppt
Six sigma ppt
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Basics Six Sigma Fresher Guide
Basics Six Sigma Fresher GuideBasics Six Sigma Fresher Guide
Basics Six Sigma Fresher Guide
 
Jurans triology ppt
Jurans triology pptJurans triology ppt
Jurans triology ppt
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six sigma overview
Six sigma overviewSix sigma overview
Six sigma overview
 
Six sigma in manufacturing industry
Six sigma in manufacturing industrySix sigma in manufacturing industry
Six sigma in manufacturing industry
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma Principle and Methods
Six Sigma Principle and MethodsSix Sigma Principle and Methods
Six Sigma Principle and Methods
 
What is Six Sigma?,
What is Six Sigma?,What is Six Sigma?,
What is Six Sigma?,
 
Presentation on six sigma roles
Presentation on six sigma rolesPresentation on six sigma roles
Presentation on six sigma roles
 
Statistical Quality Control.
Statistical Quality Control.Statistical Quality Control.
Statistical Quality Control.
 

Ähnlich wie Six sigma

six-sigma-7300-WK9WCMu.pptx
six-sigma-7300-WK9WCMu.pptxsix-sigma-7300-WK9WCMu.pptx
six-sigma-7300-WK9WCMu.pptx
VishuBaniyan
 
Six sigma essentials
Six sigma   essentialsSix sigma   essentials
Six sigma essentials
Vidyavinutha
 

Ähnlich wie Six sigma (20)

SIX SIGMA
SIX SIGMASIX SIGMA
SIX SIGMA
 
SIX SIGMA.pptx
SIX SIGMA.pptxSIX SIGMA.pptx
SIX SIGMA.pptx
 
six sigma in supply chain management
   six sigma in supply chain management   six sigma in supply chain management
six sigma in supply chain management
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
SIX SIGMA PPT.pptx
SIX SIGMA PPT.pptxSIX SIGMA PPT.pptx
SIX SIGMA PPT.pptx
 
Six sigma
Six sigmaSix sigma
Six sigma
 
six-sigma-7300-WK9WCMu.pptx
six-sigma-7300-WK9WCMu.pptxsix-sigma-7300-WK9WCMu.pptx
six-sigma-7300-WK9WCMu.pptx
 
Six Sigma in Manufacturing Industries Barriers to Implementation.pdf
Six Sigma in Manufacturing Industries  Barriers to Implementation.pdfSix Sigma in Manufacturing Industries  Barriers to Implementation.pdf
Six Sigma in Manufacturing Industries Barriers to Implementation.pdf
 
what is FMEA and six sigma By Ihsanullah mansoor
what is FMEA and six sigma By Ihsanullah mansoorwhat is FMEA and six sigma By Ihsanullah mansoor
what is FMEA and six sigma By Ihsanullah mansoor
 
FME and Six sigma By Ihsanullah mansoor
FME and Six sigma By Ihsanullah mansoorFME and Six sigma By Ihsanullah mansoor
FME and Six sigma By Ihsanullah mansoor
 
FMEA and Six sigma By Ihsanullah mansoor
FMEA and Six sigma By Ihsanullah mansoorFMEA and Six sigma By Ihsanullah mansoor
FMEA and Six sigma By Ihsanullah mansoor
 
Six sigma final
Six sigma finalSix sigma final
Six sigma final
 
What does six sigma really mean??
What does six sigma really mean??What does six sigma really mean??
What does six sigma really mean??
 
6sigma
6sigma6sigma
6sigma
 
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
 
Introduction to Six Sigma.pptx
Introduction to Six Sigma.pptxIntroduction to Six Sigma.pptx
Introduction to Six Sigma.pptx
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
sixsigma-
sixsigma-sixsigma-
sixsigma-
 
Six sigma essentials
Six sigma   essentialsSix sigma   essentials
Six sigma essentials
 
sixsigma.pptx
sixsigma.pptxsixsigma.pptx
sixsigma.pptx
 

Mehr von naresh sharma (7)

Marketing mgmt
Marketing mgmtMarketing mgmt
Marketing mgmt
 
Written communication in business management
Written communication in business managementWritten communication in business management
Written communication in business management
 
Bill gates
Bill gatesBill gates
Bill gates
 
Ntpc Ltd.
Ntpc Ltd.Ntpc Ltd.
Ntpc Ltd.
 
Split of hp
Split of hpSplit of hp
Split of hp
 
Frederick w. taylor
Frederick w. taylorFrederick w. taylor
Frederick w. taylor
 
Dbms
DbmsDbms
Dbms
 

Kürzlich hochgeladen

internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 

Kürzlich hochgeladen (14)

Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 

Six sigma

  • 1. Submitted By: Naresh Sharma Amit Sharma A PRESENTATION ON Six Sigma Quality Standard Submitted To: Mr. Sandeep Sharda
  • 2. INTRODUCTION  Six Sigma is a set of techniques and tools for process improvement. It was introduced by engineer Bill Smith while working at Motorola in 1986.  Jack Welch made it central to his business strategy at General Electric in 1995.  Six Sigma seeks to improve the quality of the output of a process by identifying and removing the causes of defects and minimizing variability in manufacturing and business processes.
  • 3.  It uses a set of quality management methods, mainly empirical, statistical methods, and creates a special infrastructure of people within the organization, who are experts in these methods.  A six sigma process is one in which 99.99966% of all opportunities to produce some feature of a part are statistically expected to be free of defects (3.4 defective features per million opportunities). INTRODUCTION (Continue)
  • 4. DOCTRINE  Six Sigma doctrine asserts:  Continuous efforts to achieve stable and predictable process results (e.g. by reducing process variation) are of vital importance to business success.  Manufacturing and business processes have characteristics that can be defined, measured, analyzed, improved, and controlled.  Achieving sustained quality improvement requires commitment from the entire organization, particularly from top-level management.
  • 5.  Features that set Six Sigma apart from previous quality-improvement initiatives include:  A clear focus on achieving measurable and quantifiable financial returns from any Six Sigma project.  An increased emphasis on strong and passionate management leadership and support.  A clear commitment to making decisions on the basis of verifiable data and statistical methods, rather than assumptions and guesswork. DOCTRINE (Continue..)
  • 6. Difference Between Related Concepts  Lean management and Six Sigma are two concepts  Share similar methodologies and tools.  Both programs are of Japanese origin.  but they are two different programs.  Lean management is focused on eliminating waste and ensuring swift while  Six Sigma's focus is on eliminating defects and reducing variability.
  • 7. Methodologies  Six Sigma projects follow two project methodologies inspired by Deming's Plan-Do-Check-Act Cycle. These methodologies, composed of five phases each, bear the acronyms DMAIC and DMADV.  DMAIC is used for projects aimed at improving an existing business process.  DMADV is used for projects aimed at creating new product or process designs.
  • 9. DMAIC  The DMAIC project methodology has five phases:  Define the system, the voice of the customer and their requirements, and the project goals, specifically.  Measure key aspects of the current process and collect relevant data; calculate the 'as-is' Process Capability.  Analyze the data to investigate and verify cause-and-effect relationships. Determine what the relationships are, and attempt to ensure that all factors have been considered
  • 10.  Improve or optimize the current process based upon data analysis using techniques such as design of experiments , poka yoke or mistake proofing, and standard work to create a new, future state process. Set up pilot runs to establish process capability.  Control the future state process to ensure that any deviations from the target are corrected before they result in defects. Implement control systems such as statistical process control, production boards, visual workplaces, and continuously monitor the process.
  • 12. DMADV  The DMADV project methodology, known as DFSS ("Design For Six Sigma"), features five phases:  Define design goals that are consistent with customer demands and the enterprise strategy.  Measure and identify CTQs (characteristics that are Critical To Quality), measure product capabilities, production process capability, and measure risks.
  • 13.  Analyze to develop and design alternatives  Design an improved alternative, best suited per analysis in the previous step  Verify the design, set up pilot runs, implement the production process and hand it over to the process owner(s).
  • 14. Implementation roles  Executive Leadership The CEO Members of top management.  They are responsible for setting up a vision for Six Sigma implementation. by transcending departmental barriers and overcoming inherent resistance to change.  Champions take responsibility for Six Sigma implementation across the organization in an integrated manner.  The Executive Leadership draws them from upper management.  Champions also act as mentors to Black Belts.
  • 15.  Champions and Master Black Belts focus on identifying projects/functions for Six Sigma.  Master Black Belts, identified by Champions, act as in-house coaches on Six Sigma.  They assist Champions and guide Black Belts and Green Belts.  Apart from statistical tasks, ensuring consistent application of Six Sigma across various functions and departments.
  • 16.  Black Belts operate under Master Black Belts to apply Six Sigma methodology to specific projects.  Green Belts are the employees who take up Six Sigma implementation along with their other job responsibilities, operating under the guidance of Black Belts.
  • 17. Application  Six Sigma mostly finds application in large organizations.  Consumer-driven Six Sigma saves Ford $300 million.  Ford began its Six Sigma odyssey in late 1999 when the director of quality for Ford's global truck business was looking for new ways to improve quality.  They did research, visited Six Sigma Academy, and benchmarked with GE and other large companies that were using Six Sigma.  Phong Vu, who's now Ford's Six Sigma czar, officially known as director of corporate deployment for Consumer Driven 6-Sigma.
  • 18.  Ford formally launched its Six Sigma process, which it calls Consumer Driven 6-Sigma, in January of 2000.  They started with the top management group, and then moved on to the officer group and the leadership group, which comprises their top 350 people.
  • 19. The Ford DMAIC cycle follows:  Define. During this first stage, Black Belts work to identify the customers involved and what matters to them.  Measure. The second stage requires Black Belts to develop process measures, called "Y's," which enable them to evaluate the performance of the process.  Identify the input variables that cause variation in process performance.
  • 20.  Analyze. The third stage forces Black Belts to prioritize the input variables that cause variation in process performance, analyze data to determine the root causes of problems and opportunities for improvement, and validate process input variables with data.  Common tools at this stage include process mapping, graphical techniques, multivariate studies, hypothesis testing, and correlation and regression analysis.  Improve. At this point, Black Belts generate solutions to the problem and select the one that best addresses the root cause.
  • 21.  Common tools at this stage include process mapping, design of experiments, simulation and optimization.  Control. The final stage institutionalizes the improvement and implements the ongoing control. The goal is to sustain the gains that have been made.  Common tools at this stage include control plans, statistical process control, gage control plans, preventive maintenance and poka yoke (a Japanese concept, translated as "mistake proofing").
  • 22.  No Six Sigma project at Ford is considered finished until the entire DMAIC cycle is complete and Ford can audit the results to see the effect on customers and the bottom line.  In 2000, Consumer Driven 6-Sigma contributed $52 million to the bottom line. Ford estimates a $300 million contribution from closed projects and a two- point increase in customer satisfaction in 2001.
  • 23. THANK YOU ! ANY QUERY?