North Central Area Committee Meeting
21st January 2019
Strategic Housing Development
Application
Reg. Ref: SHD0004/18 - ABP Reference: 303296-18
Applicant: Cairn Homes Properties Ltd.
Location: Griffith Avenue, Marino, Dublin 9 Site
Development: Mixed use scheme comprising 8 no.
houses and 377 no. apartments,
crèche, café and multi purpose space and
a residential amenity building.
Website: www.griffithavenueplanning.com
 Proposals for 100+ houses or 200+ student accommodation bedspaces to An Bord
Pleanála (ABP)
 Pre-application consultation with Planning Authority (4 weeks).
 Pre-application consultation with ABP (7 weeks)
 ABP opinion whether proposal constitutes a reasonable basis for application
 SHD application to ABP (16 weeks)
 Planning Authority to inform relevant Area Committee meeting
 Send report of Chief Executive to ABP within 8 weeks
 Report include summary of the views expressed by elected members at the Area
Committee meeting
 Report to recommend permission be granted or refused having regard to proper
planning and sustainable development and the objectives of the development plan
Strategic Housing Development (SHD)
Summary of Process
 Section 247 consultations were held under Section 5 of the Planning and
Development (Housing) and Residential Tenancies Act 2016.
 4no consultations with the Local Authority
 1no consultation with An Bord Pleanála
 An Bord Pleanála issued the Notice of Pre-Application Consultation Opinion,
which states the following specific information should be submitted as part of
the application:
 Architectural Design Statement – outlining design rationale
 An Architectural Heritage Report
 An Archaeological Assessment report
 Revised Traffic and Transport Assessment
 Analysis of daylighting, overshadowing and overlooking
 Tree protection measures
What has happened to date?
What has happened to date?
 An Bord Pleanála deemed the application was
reasonable to be lodged and the application was lodged
on 20th December 2018
 An Bord Pleanála validated the application on the 7th
January 2019
 On receipt of the application by DCC, all relevant internal
departments were notified.
Site Location Map
Site Context Map
Development Plan – Zoning Objective
Z12:
To ensure existing
environmental
amenities are
protected in the
predominantly
residential future
use of these lands.
Site Planning History
DCC Reg. Ref 2347/15 (ABP Reg.
Ref. PL29N.245580)
Permission GRANTED on appeal for 101
no. residential units, revised boundary
treatment, amendments to layout and
design of the road and associated site and
infrastructural works.
DCC Reg. Ref 3226/09 (ABP
Reg. Ref. PL29N.234636)
Permission GRANTED on appeal
for a new vehicular and
pedestrian entrance and
associated works directly from
Griffith Avenue.
Proposed Development
 Follows previously approved building line (reg. ref. 2347/15)
 Public park (20%)
 Access road to the Marino Institute of Education (reg. ref. 3226/09)
 A total of 385 no. Residential units
 377 no. apartments arranged in 7 no. blocks
 23 no. studio apartments (6%)
 115 no. 1-bed apartments (31%)
 190 no. 2 bed apartments (50%)
 49 no. 3 bed apartments (13%)
 8 no. 5 bed terraced houses
 Mixed use building
 crèche (279 sqm) with ancillary outdoor play area;
 café and multi-purpose space (222 sqm)
 Residents amenity (1,458 sqm) Ground floor/basement Block 2
 concierge, residents’ lounge, gymnasium, meeting room, cinema/games
room, manager’s office and caretaker’s store
Proposed Development
 367 car parking no. spaces
 682 no. cycle parking spaces
 Vehicular access from Griffith Avenue (new signalised junction)
 2 no. additional pedestrian accesses from Griffith Avenue
 Public park circa 6,250sqm (20% of overall site area 3.1ha)
 Communal open space (terraced gardens located between
apartment blocks)
 Private open space (balconies and terraces)
 Plot Ratio 1.16
 Site Coverage 23%
 Density 124 no. units per ha
Proposed Layout
Public Park
Finger Blocks
Communal
Terraced Gardens
Mix of Uses
Height Guidelines
• Dublin City Development Plan 2016-2022 provides a maximum permissible
height of up to 16m for the subject site
• Urban Development and Building Height Guidelines 2018
• Development plans shall not provide numerical limitations on building height
• Reviews, variations or amendments of plans to ensure proper alignment of national
planning policies
• Development management criteria to be applied to development proposals for
buildings taller than prevailing building heights. The applicant to demonstrate that
the proposal satisfies the follows criteria:
• Accessibility to public transport
• Landscape and visual Impact Assessment
• The contribution to positive place-making and the creation of visual interest in the
streetscape
• The avoidance of long uninterrupted walls of building in the form of perimeter blocks or slab
blocks
• Access to sunlight and daylight
• Micro-climatic impacts
• Urban design statement
• Relevant environmental assessments including AA Screening and Ecological Impact
Assessment.
B1
B2
B3
B4
B5
B6B7
Proposed Height
Maximum height 26m
Block 1: 5 storeys
Block 2: 5/6 storeys
Block 3: 5/7 storeys
Block 4: 4 storeys
Block 5: 5 storeys
Block 6: 7/6 storeys
Block 7: 6/8 storeys
Elevations to Griffith Avenue
Front Elevation of Houses
Western Elevation Public Park
(Block 1 & Multi-use building )
Western Elevation Public Park
(Blocks 2 & 7)
East and West Elevations
(Blocks 3 & 6)
East and West Elevations
(Blocks 4 & 5)
Level 2 Floor Plan
2 Bed Apartment Layouts
Part V
38no. Part V Apartments:
 Block 1 (entire block)
 10 no. 1 bedroom units
 25 no. 2 bedroom units
 Block 7
 2 no. 1 bedroom units
 1 no. 2 bedroom units
Transport Impact Assessment
 Modal split for the area indicates (CSO 2016):
 Walk 23%
 Cyclists 14%
 Public Transport 22%
 Private car 31%
 Vehicular access via proposed signalised junction on Griffith Avenue
 The development is expected to generate approximately 273 arrivals
and 272 departures per day
 162 trips AM peak
 159 trips PM peak
 367 no. car parking spaces and 682 cycle parking spaces
 Internal road network provides access to Marino Institute of Education
 Mobility Management Plan following occupation of the development
Proposed Signalised Junction
Proposed Drainage
 A new surface water drain is proposed on Griffith Avenue connecting to
an existing 750mm surface water sewer at junction of Malahide Road
 A new foul sewer is proposed on Griffith Avenue connecting to an
existing 450mm foul sewer on Malahide Road
 The proposed development is to connect into an existing 300mm water
main adjacent to the site
 Expected peak flow water demand 11.5 litres/second
 Water conservation to reduce demand on network:
 Dual flush toilets
 Low flow rate taps
 Water saving self-closing timed flow fittings
Phasing
Materials
Griffith Avenue
View 3
Griffith Avenue
View 4
Griffith Avenue
View 7
Griffith Avenue
View 8
Griffith Avenue
View 9
Griffith Avenue
View 10
Scoil Mhuire
View 13b
Croydon
Park
Marino
View 14
Glandore
Road
View 15a
View 16
Malahide
Road
View 20
The Casino
View 21
Entrance View From Griffith Avenue
View A
View B
View C
 Members comments at meeting will be summarised and sent to ABP with CE report
 Formal observations to An Bord Pleanála by 5:30pm on 1st February 2019, ABP Ref.
303296-18 (€20 submission fee to ABP)
 Further details of the application can be viewed at available at:
www.griffithavenueplanning.com
 Guidance on SHD procedure on ABP website http://www.pleanala.ie/
 Chief Executive Report due by the 22nd February 2019
 An Bord Pleanála due decide case by 23rd April 2019.
Conclusion
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

Redevelopment of east kidwai nagar meenakshy thakur nbcc
Redevelopment of east kidwai nagar meenakshy thakur nbccRedevelopment of east kidwai nagar meenakshy thakur nbcc
Redevelopment of east kidwai nagar meenakshy thakur nbcccurrenttym
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]Michael Walton
 
Fnbe march’15 enbe
Fnbe march’15 enbeFnbe march’15 enbe
Fnbe march’15 enbe温 庄壁
 
Designing for the Circular Economy – the Gatwick Airport Project #cethinking
Designing for the Circular Economy – the Gatwick Airport Project #cethinkingDesigning for the Circular Economy – the Gatwick Airport Project #cethinking
Designing for the Circular Economy – the Gatwick Airport Project #cethinkingCircular Economy Thinking
 
Green Gardiner: A Proposal for Creative Urban Infrastructure
Green Gardiner: A Proposal for Creative Urban InfrastructureGreen Gardiner: A Proposal for Creative Urban Infrastructure
Green Gardiner: A Proposal for Creative Urban InfrastructureCalvin Brook
 
FNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdfFNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdf温 庄壁
 
Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)ÖMER KILIÇ
 
Brownfield + greenfield zones
Brownfield + greenfield zonesBrownfield + greenfield zones
Brownfield + greenfield zonesMrs Coles
 
Irish Green Building Council- A Greenest City Strategy
Irish Green Building Council- A Greenest City StrategyIrish Green Building Council- A Greenest City Strategy
Irish Green Building Council- A Greenest City StrategyIrish Green Building Council
 
Murrayville Heritage Conservation Area
Murrayville Heritage Conservation AreaMurrayville Heritage Conservation Area
Murrayville Heritage Conservation Areajgabateman
 
RE developement of Bhindhi baazar
RE developement of Bhindhi baazarRE developement of Bhindhi baazar
RE developement of Bhindhi baazarYash Agrawal
 
What Makes A Building Green
What Makes A Building Green   What Makes A Building Green
What Makes A Building Green JIT KUMAR GUPTA
 
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...Jesse Souki
 
Blackwater uda-open-space-townscape-stragety-report
Blackwater uda-open-space-townscape-stragety-reportBlackwater uda-open-space-townscape-stragety-report
Blackwater uda-open-space-townscape-stragety-reportEnas1brahim
 

Was ist angesagt? (20)

City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
 
Redevelopment of east kidwai nagar meenakshy thakur nbcc
Redevelopment of east kidwai nagar meenakshy thakur nbccRedevelopment of east kidwai nagar meenakshy thakur nbcc
Redevelopment of east kidwai nagar meenakshy thakur nbcc
 
URBAN DESIGN BOOK COMPENDIUM 1-2 (creating the the urban structure)
URBAN DESIGN BOOK COMPENDIUM 1-2 (creating the the urban structure)URBAN DESIGN BOOK COMPENDIUM 1-2 (creating the the urban structure)
URBAN DESIGN BOOK COMPENDIUM 1-2 (creating the the urban structure)
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]
 
Fnbe march’15 enbe
Fnbe march’15 enbeFnbe march’15 enbe
Fnbe march’15 enbe
 
Designing for the Circular Economy – the Gatwick Airport Project #cethinking
Designing for the Circular Economy – the Gatwick Airport Project #cethinkingDesigning for the Circular Economy – the Gatwick Airport Project #cethinking
Designing for the Circular Economy – the Gatwick Airport Project #cethinking
 
Green Gardiner: A Proposal for Creative Urban Infrastructure
Green Gardiner: A Proposal for Creative Urban InfrastructureGreen Gardiner: A Proposal for Creative Urban Infrastructure
Green Gardiner: A Proposal for Creative Urban Infrastructure
 
URBAN DESIGN COMPENDIUM 1 & 2...(INTEGRATED DESIGN)
URBAN DESIGN COMPENDIUM 1 & 2...(INTEGRATED DESIGN)URBAN DESIGN COMPENDIUM 1 & 2...(INTEGRATED DESIGN)
URBAN DESIGN COMPENDIUM 1 & 2...(INTEGRATED DESIGN)
 
FNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdfFNBE March’15 ENBE.pdf
FNBE March’15 ENBE.pdf
 
Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)Sudan workshop | Morocco Country Presentation (Part 2)
Sudan workshop | Morocco Country Presentation (Part 2)
 
Brownfield + greenfield zones
Brownfield + greenfield zonesBrownfield + greenfield zones
Brownfield + greenfield zones
 
Irish Green Building Council- A Greenest City Strategy
Irish Green Building Council- A Greenest City StrategyIrish Green Building Council- A Greenest City Strategy
Irish Green Building Council- A Greenest City Strategy
 
W2W
W2WW2W
W2W
 
Murrayville Heritage Conservation Area
Murrayville Heritage Conservation AreaMurrayville Heritage Conservation Area
Murrayville Heritage Conservation Area
 
URBAN DESIGN COMPENDIUM 1 & 2...(DELIVERING QUALITY AND ADDING VALUE)
URBAN DESIGN COMPENDIUM 1 & 2...(DELIVERING QUALITY AND ADDING VALUE)URBAN DESIGN COMPENDIUM 1 & 2...(DELIVERING QUALITY AND ADDING VALUE)
URBAN DESIGN COMPENDIUM 1 & 2...(DELIVERING QUALITY AND ADDING VALUE)
 
Beachy Central Park Expansion
Beachy Central Park ExpansionBeachy Central Park Expansion
Beachy Central Park Expansion
 
RE developement of Bhindhi baazar
RE developement of Bhindhi baazarRE developement of Bhindhi baazar
RE developement of Bhindhi baazar
 
What Makes A Building Green
What Makes A Building Green   What Makes A Building Green
What Makes A Building Green
 
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
Leveraging the Honolulu Rail Transit Project for Economic Growth and Building...
 
Blackwater uda-open-space-townscape-stragety-report
Blackwater uda-open-space-townscape-stragety-reportBlackwater uda-open-space-townscape-stragety-report
Blackwater uda-open-space-townscape-stragety-report
 

Ähnlich wie Griffith Avenue SHD ncac presentation 21 01-2019

GV_SR_PC16-04 Staff Report_07252016
GV_SR_PC16-04 Staff Report_07252016GV_SR_PC16-04 Staff Report_07252016
GV_SR_PC16-04 Staff Report_07252016GalvestonPlanning
 
RP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRoger Pearson
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019E'ville Eye
 
Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017Chalgrove Airfield
 
AH CCM 04.09.18 Item #4 1001 Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001 Townsend - CambridgeAH CCM 04.09.18 Item #4 1001 Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001 Townsend - Cambridgeahcitycouncil
 
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
AH CCM 04.09.18 Item #4   1001Townsend - CambridgeAH CCM 04.09.18 Item #4   1001Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001Townsend - CambridgeMarian Vargas Mendoza
 
NJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNew Jersey Future
 
Item # 7 - Katherine Ct (Final Review)
Item # 7 - Katherine Ct (Final Review)Item # 7 - Katherine Ct (Final Review)
Item # 7 - Katherine Ct (Final Review)ahcitycouncil
 
Brochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept PlanBrochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept PlanStonnington Connect
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Wallace Roberts & Todd
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20Heritage Wind
 
WPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxWPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxcyberyogi07
 
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Michael Hewitt, GISP
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities us2unionsquare
 
KEJORA_EIA_TRC_-_May_2021_Rev3.pptx
KEJORA_EIA_TRC_-_May_2021_Rev3.pptxKEJORA_EIA_TRC_-_May_2021_Rev3.pptx
KEJORA_EIA_TRC_-_May_2021_Rev3.pptxAnandaNair4
 

Ähnlich wie Griffith Avenue SHD ncac presentation 21 01-2019 (20)

GV_SR_PC16-04 Staff Report_07252016
GV_SR_PC16-04 Staff Report_07252016GV_SR_PC16-04 Staff Report_07252016
GV_SR_PC16-04 Staff Report_07252016
 
LEED ND Squalicum Lofts
LEED ND Squalicum LoftsLEED ND Squalicum Lofts
LEED ND Squalicum Lofts
 
RP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for onlineRP Portfolio-No Video Links-16dec15-small for online
RP Portfolio-No Video Links-16dec15-small for online
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019
 
Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017Enquiry by Design day 2 summary notes, 20 January 2017
Enquiry by Design day 2 summary notes, 20 January 2017
 
Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance. Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance.
 
AH CCM 04.09.18 Item #4 1001 Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001 Townsend - CambridgeAH CCM 04.09.18 Item #4 1001 Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001 Townsend - Cambridge
 
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
AH CCM 04.09.18 Item #4   1001Townsend - CambridgeAH CCM 04.09.18 Item #4   1001Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
 
Clean Ohio Conservation Applicant Workshop
Clean Ohio Conservation Applicant WorkshopClean Ohio Conservation Applicant Workshop
Clean Ohio Conservation Applicant Workshop
 
NJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality Antonicello
 
draftstadiumeir
draftstadiumeirdraftstadiumeir
draftstadiumeir
 
Item # 7 - Katherine Ct (Final Review)
Item # 7 - Katherine Ct (Final Review)Item # 7 - Katherine Ct (Final Review)
Item # 7 - Katherine Ct (Final Review)
 
Brochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept PlanBrochure - Draft Gardiner Park Concept Plan
Brochure - Draft Gardiner Park Concept Plan
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20
 
Gaap info
Gaap infoGaap info
Gaap info
 
WPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxWPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptx
 
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
KEJORA_EIA_TRC_-_May_2021_Rev3.pptx
KEJORA_EIA_TRC_-_May_2021_Rev3.pptxKEJORA_EIA_TRC_-_May_2021_Rev3.pptx
KEJORA_EIA_TRC_-_May_2021_Rev3.pptx
 

Mehr von Naoise

Sk 069 - ga working drawings
Sk 069 - ga working drawingsSk 069 - ga working drawings
Sk 069 - ga working drawingsNaoise
 
Clontarf to city centre cycle scheme
Clontarf to city centre cycle schemeClontarf to city centre cycle scheme
Clontarf to city centre cycle schemeNaoise
 
17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressed17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressedNaoise
 
Report no. 082019 of the environment strategic policy committee changes to ...
Report no. 082019 of the environment strategic policy committee   changes to ...Report no. 082019 of the environment strategic policy committee   changes to ...
Report no. 082019 of the environment strategic policy committee changes to ...Naoise
 
Letter to An Taoiseach
Letter to An TaoiseachLetter to An Taoiseach
Letter to An TaoiseachNaoise
 
DCC CEO Report to ABP
DCC CEO Report to ABPDCC CEO Report to ABP
DCC CEO Report to ABPNaoise
 
Doc09102017 00001
Doc09102017 00001Doc09102017 00001
Doc09102017 00001Naoise
 
2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slides2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slidesNaoise
 
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...Naoise
 
Abp150416
Abp150416Abp150416
Abp150416Naoise
 
DCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportDCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportNaoise
 
Dollymount Flood Defence schematic
Dollymount Flood Defence schematicDollymount Flood Defence schematic
Dollymount Flood Defence schematicNaoise
 
Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2Naoise
 
Draft Litter Management Plan
Draft Litter Management PlanDraft Litter Management Plan
Draft Litter Management PlanNaoise
 
Dollymount externalexpert ommgoc
Dollymount externalexpert ommgocDollymount externalexpert ommgoc
Dollymount externalexpert ommgocNaoise
 
Dollymount External Expert
Dollymount External ExpertDollymount External Expert
Dollymount External ExpertNaoise
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber BridgeNaoise
 
Fairview Christmas Lights Switchon
Fairview Christmas Lights SwitchonFairview Christmas Lights Switchon
Fairview Christmas Lights SwitchonNaoise
 
S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015Naoise
 
S2S driver eye level below Sea Wall
S2S driver eye level below Sea WallS2S driver eye level below Sea Wall
S2S driver eye level below Sea WallNaoise
 

Mehr von Naoise (20)

Sk 069 - ga working drawings
Sk 069 - ga working drawingsSk 069 - ga working drawings
Sk 069 - ga working drawings
 
Clontarf to city centre cycle scheme
Clontarf to city centre cycle schemeClontarf to city centre cycle scheme
Clontarf to city centre cycle scheme
 
17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressed17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressed
 
Report no. 082019 of the environment strategic policy committee changes to ...
Report no. 082019 of the environment strategic policy committee   changes to ...Report no. 082019 of the environment strategic policy committee   changes to ...
Report no. 082019 of the environment strategic policy committee changes to ...
 
Letter to An Taoiseach
Letter to An TaoiseachLetter to An Taoiseach
Letter to An Taoiseach
 
DCC CEO Report to ABP
DCC CEO Report to ABPDCC CEO Report to ABP
DCC CEO Report to ABP
 
Doc09102017 00001
Doc09102017 00001Doc09102017 00001
Doc09102017 00001
 
2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slides2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slides
 
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...
 
Abp150416
Abp150416Abp150416
Abp150416
 
DCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportDCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence Report
 
Dollymount Flood Defence schematic
Dollymount Flood Defence schematicDollymount Flood Defence schematic
Dollymount Flood Defence schematic
 
Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2
 
Draft Litter Management Plan
Draft Litter Management PlanDraft Litter Management Plan
Draft Litter Management Plan
 
Dollymount externalexpert ommgoc
Dollymount externalexpert ommgocDollymount externalexpert ommgoc
Dollymount externalexpert ommgoc
 
Dollymount External Expert
Dollymount External ExpertDollymount External Expert
Dollymount External Expert
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber Bridge
 
Fairview Christmas Lights Switchon
Fairview Christmas Lights SwitchonFairview Christmas Lights Switchon
Fairview Christmas Lights Switchon
 
S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015
 
S2S driver eye level below Sea Wall
S2S driver eye level below Sea WallS2S driver eye level below Sea Wall
S2S driver eye level below Sea Wall
 

Kürzlich hochgeladen

VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...tanu pandey
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Kürzlich hochgeladen (20)

VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 

Griffith Avenue SHD ncac presentation 21 01-2019

  • 1. North Central Area Committee Meeting 21st January 2019
  • 2. Strategic Housing Development Application Reg. Ref: SHD0004/18 - ABP Reference: 303296-18 Applicant: Cairn Homes Properties Ltd. Location: Griffith Avenue, Marino, Dublin 9 Site Development: Mixed use scheme comprising 8 no. houses and 377 no. apartments, crèche, café and multi purpose space and a residential amenity building. Website: www.griffithavenueplanning.com
  • 3.  Proposals for 100+ houses or 200+ student accommodation bedspaces to An Bord Pleanála (ABP)  Pre-application consultation with Planning Authority (4 weeks).  Pre-application consultation with ABP (7 weeks)  ABP opinion whether proposal constitutes a reasonable basis for application  SHD application to ABP (16 weeks)  Planning Authority to inform relevant Area Committee meeting  Send report of Chief Executive to ABP within 8 weeks  Report include summary of the views expressed by elected members at the Area Committee meeting  Report to recommend permission be granted or refused having regard to proper planning and sustainable development and the objectives of the development plan Strategic Housing Development (SHD) Summary of Process
  • 4.  Section 247 consultations were held under Section 5 of the Planning and Development (Housing) and Residential Tenancies Act 2016.  4no consultations with the Local Authority  1no consultation with An Bord Pleanála  An Bord Pleanála issued the Notice of Pre-Application Consultation Opinion, which states the following specific information should be submitted as part of the application:  Architectural Design Statement – outlining design rationale  An Architectural Heritage Report  An Archaeological Assessment report  Revised Traffic and Transport Assessment  Analysis of daylighting, overshadowing and overlooking  Tree protection measures What has happened to date?
  • 5. What has happened to date?  An Bord Pleanála deemed the application was reasonable to be lodged and the application was lodged on 20th December 2018  An Bord Pleanála validated the application on the 7th January 2019  On receipt of the application by DCC, all relevant internal departments were notified.
  • 8. Development Plan – Zoning Objective Z12: To ensure existing environmental amenities are protected in the predominantly residential future use of these lands.
  • 9. Site Planning History DCC Reg. Ref 2347/15 (ABP Reg. Ref. PL29N.245580) Permission GRANTED on appeal for 101 no. residential units, revised boundary treatment, amendments to layout and design of the road and associated site and infrastructural works. DCC Reg. Ref 3226/09 (ABP Reg. Ref. PL29N.234636) Permission GRANTED on appeal for a new vehicular and pedestrian entrance and associated works directly from Griffith Avenue.
  • 10. Proposed Development  Follows previously approved building line (reg. ref. 2347/15)  Public park (20%)  Access road to the Marino Institute of Education (reg. ref. 3226/09)  A total of 385 no. Residential units  377 no. apartments arranged in 7 no. blocks  23 no. studio apartments (6%)  115 no. 1-bed apartments (31%)  190 no. 2 bed apartments (50%)  49 no. 3 bed apartments (13%)  8 no. 5 bed terraced houses  Mixed use building  crèche (279 sqm) with ancillary outdoor play area;  café and multi-purpose space (222 sqm)  Residents amenity (1,458 sqm) Ground floor/basement Block 2  concierge, residents’ lounge, gymnasium, meeting room, cinema/games room, manager’s office and caretaker’s store
  • 11. Proposed Development  367 car parking no. spaces  682 no. cycle parking spaces  Vehicular access from Griffith Avenue (new signalised junction)  2 no. additional pedestrian accesses from Griffith Avenue  Public park circa 6,250sqm (20% of overall site area 3.1ha)  Communal open space (terraced gardens located between apartment blocks)  Private open space (balconies and terraces)  Plot Ratio 1.16  Site Coverage 23%  Density 124 no. units per ha
  • 12. Proposed Layout Public Park Finger Blocks Communal Terraced Gardens
  • 14. Height Guidelines • Dublin City Development Plan 2016-2022 provides a maximum permissible height of up to 16m for the subject site • Urban Development and Building Height Guidelines 2018 • Development plans shall not provide numerical limitations on building height • Reviews, variations or amendments of plans to ensure proper alignment of national planning policies • Development management criteria to be applied to development proposals for buildings taller than prevailing building heights. The applicant to demonstrate that the proposal satisfies the follows criteria: • Accessibility to public transport • Landscape and visual Impact Assessment • The contribution to positive place-making and the creation of visual interest in the streetscape • The avoidance of long uninterrupted walls of building in the form of perimeter blocks or slab blocks • Access to sunlight and daylight • Micro-climatic impacts • Urban design statement • Relevant environmental assessments including AA Screening and Ecological Impact Assessment.
  • 15. B1 B2 B3 B4 B5 B6B7 Proposed Height Maximum height 26m Block 1: 5 storeys Block 2: 5/6 storeys Block 3: 5/7 storeys Block 4: 4 storeys Block 5: 5 storeys Block 6: 7/6 storeys Block 7: 6/8 storeys
  • 18. Western Elevation Public Park (Block 1 & Multi-use building )
  • 19. Western Elevation Public Park (Blocks 2 & 7)
  • 20. East and West Elevations (Blocks 3 & 6)
  • 21. East and West Elevations (Blocks 4 & 5)
  • 23. 2 Bed Apartment Layouts
  • 24. Part V 38no. Part V Apartments:  Block 1 (entire block)  10 no. 1 bedroom units  25 no. 2 bedroom units  Block 7  2 no. 1 bedroom units  1 no. 2 bedroom units
  • 25. Transport Impact Assessment  Modal split for the area indicates (CSO 2016):  Walk 23%  Cyclists 14%  Public Transport 22%  Private car 31%  Vehicular access via proposed signalised junction on Griffith Avenue  The development is expected to generate approximately 273 arrivals and 272 departures per day  162 trips AM peak  159 trips PM peak  367 no. car parking spaces and 682 cycle parking spaces  Internal road network provides access to Marino Institute of Education  Mobility Management Plan following occupation of the development
  • 27. Proposed Drainage  A new surface water drain is proposed on Griffith Avenue connecting to an existing 750mm surface water sewer at junction of Malahide Road  A new foul sewer is proposed on Griffith Avenue connecting to an existing 450mm foul sewer on Malahide Road  The proposed development is to connect into an existing 300mm water main adjacent to the site  Expected peak flow water demand 11.5 litres/second  Water conservation to reduce demand on network:  Dual flush toilets  Low flow rate taps  Water saving self-closing timed flow fittings
  • 41. Entrance View From Griffith Avenue
  • 45.  Members comments at meeting will be summarised and sent to ABP with CE report  Formal observations to An Bord Pleanála by 5:30pm on 1st February 2019, ABP Ref. 303296-18 (€20 submission fee to ABP)  Further details of the application can be viewed at available at: www.griffithavenueplanning.com  Guidance on SHD procedure on ABP website http://www.pleanala.ie/  Chief Executive Report due by the 22nd February 2019  An Bord Pleanála due decide case by 23rd April 2019. Conclusion