SlideShare ist ein Scribd-Unternehmen logo
1 von 19
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
PROJECT RISK MANAGEMENT
 Example: Company Trip
 Identify
 Response
 Owner
1
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
PROJECT RISK MANAGEMENT
 Risk is an uncertain event or condition that, if occurs, has an
effect on at least one project objective.
 Issue is a point or matter in question or in dispute.
 Threat: Negative risks
 Opportunities: Positive risks
 Risk management objectives:
 increase the probability and impact of positive events
(opportunities).
 decrease the probability and impact of negative events
(threat).
2
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
PROJECT RISK MANAGEMENT
 Risk Attitudes
 Risk Averse: people are not comfortable with risks; they are
willing to avoid the risks, doesn’t like risk.
 Risk Neutral: people manage risks based on their expected
value, that is, probability times impact. In other words, their
decisions towards risks are not biased by any other factors,
except for the risks’ expected value.
 Risk Seeker: people see risks as challenges and feel exciting
dealing with them.
 Risk Tolerant: people are indifferent about risks. This means
they do not pay much attention to risks, until these risks
become real problems.
3
PROJECT RISK MANAGEMENT
 11.1 Plan Risk Management
 11.2 Identify Risks
 11.3 Perform Qualitative Risk
Analysis
 11.4 Perform Quantitative Risk
Analysis
 11.5 Plan Risk Responses
 11.6 Control Risks
4
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
PROJECT RISK MANAGEMENT
5
Knowledge
Area
Process
Initiating Planning Executing
Monitoring &
Contol
Closing
Project Risk
Management
11.1 Plan Risk
Management
11.2 Identify Risks
11.3 Perform
Qualitative Risk
Analysis
11.4 Perform
Quantitative Risk
Analysis
11.5 Plan Risk
Responses
11.6 Control
Risks
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.1 PLAN RISK MANAGEMENT
 Plan Risk Management is the process of defining how to conduct
risk management activities for a project.
 Risk Management Plan include:
 Methodology.
 Roles and responsibilities.
 Budgeting.
 Timing.
 Risk categories.
 …
6
Inputs Tool&Techniques Outputs
.1 Project management plan
.2 Project charter
.3 Stakeholder register
.4 EEFs
.5 OPAs
.1 Analytical techniques
.2 Expert judgment
.3 Meetings
.1 Risk management plan
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.1 PLAN RISK MANAGEMENT
 Risk categories: Provide a means for grouping potential causes of risk.
Several approaches can be used, for example, a structure based on
project objectives by category
Example of a Risk Breakdown Structure (RBS)
7
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.2 IDENTIFY RISKS
 Identify Risks is the process of determining which risks may affect
the project and documenting their characteristics.
8
Inputs Tool&Techniques Outputs
.1 Risk management plan
.2 Cost management plan
.3 Schedule management plan
.4 Quality management plan
.5 Human resource management
plan
.6 Scope baseline
.7 Activity cost estimates
.8 Activity duration estimates
.9 Stakeholder register
.10 Project documents
.11 Procurement documents
.12 EEFs
.13 OPAs
.1 Documentation reviews
.2 Information gathering
techniques
.3 Checklist analysis
.4 Assumptions analysis
.5 Diagramming techniques
.6 SWOT analysis
.7 Expert judgment
.1 Risk register
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.2 IDENTIFY RISKS
 SWOT Analysis: This analysis looks at the project to identify its strengths and
weaknesses and thereby identify risks (opportunities and threats).
9
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.2 IDENTIFY RISKS
 Risk Register
10
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.3 PERFORM QUALITATIVE RISK ANALYSIS
 Perform Qualitative Risk Analysis is the process of
prioritizing risks for further analysis or action by
assessing and combining their probability of occurrence
and impact.
11
Inputs Tool&Techniques Outputs
.1 Risk management plan
.2 Scope baseline
.3 Risk register
.4 EEFs
.5 OPAs
.1 Risk probability and
impact assessment
.2 Probability and impact
matrix
.3 Risk data quality
assessment
.4 Risk categorization
.5 Risk urgency assessment
.6 Expert judgment
.1 Project documents
updates
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.3 PERFORM QUALITATIVE RISK ANALYSIS
 Probability and Impact Matrix
12
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.4 PERFORM QUANTITATIVE RISK ANALYSIS
 Perform Quantitative Risk Analysis is the process of
numerically analyzing the effect of identified risks on
overall project objectives.
13
Inputs Tool&Techniques Outputs
.1 Risk management plan
.2 Cost management plan
.3 Schedule management
plan
.4 Risk register
.5 EEFs
.6 OPAs
.1 Data gathering and
representation
techniques
.2 Quantitative risk
analysis
and modeling techniques
.3 Expert judgment
.1 Project documents
updates
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.4 PERFORM QUANTITATIVE RISK ANALYSIS
 Expected monetary value analysis
 Expected monetary value (EMV) = Probability * Impact
14
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.5 PLAN RISK RESPONSES
 Plan Risk Responses is the process of developing
options and actions to enhance opportunities and to
reduce threats to project objectives.
15
Inputs Tool&Techniques Outputs
.1 Risk management plan
.2 Risk register
.1 Strategies for negative
risks or threats
.2 Strategies for positive
risks or opportunities
.3 Contingent response
strategies
.4 Expert judgment
.1 Project management
plan
updates
.2 Project documents
updates
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.5 PLAN RISK RESPONSES
 Strategies for Negative Risks or Threats
 Avoid: Changing the project management plan to eliminate
the threat entirely: extending the schedule, changing the
strategy, or reducing scope
 Transfer: Make another party responsible for the risk by
purchasing insurance, performance bonds, warranties, or
guarantees or by outsourcing the work.
 Mitigate: Taking early action to reduce the probability and/or
impact of a threat
 Accept: Do nothing and say, “If it happens, it happens:”
16
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.5 PLAN RISK RESPONSES
 Strategies for Positive Risks or Opportunities
 Exploit: Add work or change the project to make sure the
opportunity occurs.
 Enhance: Increase the likelihood (probability) and/or positive
impacts of the risk event.
 Share: Allocate ownership of the opportunity to a third party
(forming a partnership, team, or joint venture) that is best
able to achieve the opportunity
 Accept: Do nothing and say, “If it happens, it happens:”
17
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.5 PLAN RISK RESPONSES
 Contingency plans are plans describing the specific actions that
will be taken if the opportunity or threat occurs.
 Secondary risks that arise as a direct outcome of implementing a
risk response.
 Residual risks These are the risks that remain after risk response
planning.
 Fallback plans These plans are specific actions that will be taken if
the contingency plan is not effective.
 Contingency reserves that are calculated based on the
quantitative risk analysis of the project and the organization’s risk
thresholds.
 Risk response owners A key concept in risk response planning is
that the project manager does not have to do it all and neither
does the team.
18
SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013
11.6 CONTROL RISKS
 Control Risks is the process of implementing risk
response plans, tracking identified risks, monitoring
residual risks, identifying new risks, and evaluating risk
process effectiveness throughout the project.
19
Inputs Tool&Techniques Outputs
.1 Project management plan
.2 Risk register
.3 Work performance data
.4 Work performance
reports
.1 Risk reassessment
.2 Risk audits
.3 Variance and trend
analysis
.4 Technical
performance
measurement
.5 Reserve analysis
.6 Meetings
.1 Work performance
information
.2 Change requests
.3 Project management plan
updates
.4 Project documents
updates
.5 Organizational process
assets updates

Weitere ähnliche Inhalte

Was ist angesagt?

Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3
Nam Trung
 
Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9
Nam Trung
 
Smsvn pmp training_slides_chapter_1
Smsvn pmp training_slides_chapter_1Smsvn pmp training_slides_chapter_1
Smsvn pmp training_slides_chapter_1
Nam Trung
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
bletindia
 
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Mubashir Ali
 

Was ist angesagt? (20)

Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3Smsvn pmp training_slides_chapter_3
Smsvn pmp training_slides_chapter_3
 
Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9Smsvn pmp training_slides_chapter_9
Smsvn pmp training_slides_chapter_9
 
Smsvn pmp training_slides_chapter_1
Smsvn pmp training_slides_chapter_1Smsvn pmp training_slides_chapter_1
Smsvn pmp training_slides_chapter_1
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Free PMP® Exam Sample Question
Free PMP® Exam Sample QuestionFree PMP® Exam Sample Question
Free PMP® Exam Sample Question
 
Pmp(project management professional ) presentation
Pmp(project management professional ) presentationPmp(project management professional ) presentation
Pmp(project management professional ) presentation
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Pmi rmp-2020 - v6
Pmi rmp-2020 - v6Pmi rmp-2020 - v6
Pmi rmp-2020 - v6
 
PMP Exam Sample Questions
PMP Exam Sample QuestionsPMP Exam Sample Questions
PMP Exam Sample Questions
 
PMP Exam Prep Plus: Why E-Learning?
PMP Exam Prep Plus: Why E-Learning?PMP Exam Prep Plus: Why E-Learning?
PMP Exam Prep Plus: Why E-Learning?
 
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Certified Project Consultant
Certified Project Consultant  Certified Project Consultant
Certified Project Consultant
 
Anosha jamshed projectmanager
Anosha jamshed projectmanagerAnosha jamshed projectmanager
Anosha jamshed projectmanager
 
Certified Planning Engineer CPE
Certified Planning Engineer CPE Certified Planning Engineer CPE
Certified Planning Engineer CPE
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
PMP Exam Notes
PMP Exam NotesPMP Exam Notes
PMP Exam Notes
 
PMP Study Guides
PMP Study GuidesPMP Study Guides
PMP Study Guides
 

Andere mochten auch

Smsvn conflicts
Smsvn conflictsSmsvn conflicts
Smsvn conflicts
Nam Trung
 
Pmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterPmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charter
Yudha Pratama, PMP
 

Andere mochten auch (13)

Smsvn conflicts
Smsvn conflictsSmsvn conflicts
Smsvn conflicts
 
Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3Project Management Class ( based on PMBOK) - Day 3
Project Management Class ( based on PMBOK) - Day 3
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
Pmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterPmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charter
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Project management
Project managementProject management
Project management
 
Oil and Gas Project Management Training Solutions
Oil and Gas Project Management Training SolutionsOil and Gas Project Management Training Solutions
Oil and Gas Project Management Training Solutions
 
Integration Management Presentation
Integration Management Presentation Integration Management Presentation
Integration Management Presentation
 
Project Management: Initiating Process Group - Lesson 1
Project Management: Initiating Process Group - Lesson 1 Project Management: Initiating Process Group - Lesson 1
Project Management: Initiating Process Group - Lesson 1
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Step by step guide on project risk management
Step by step guide on project risk managementStep by step guide on project risk management
Step by step guide on project risk management
 
Smsvn quality attitude
Smsvn quality attitudeSmsvn quality attitude
Smsvn quality attitude
 

Ähnlich wie Smsvn pmp training_slides_chapter_11

2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1
reddvise
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
ejlp12
 

Ähnlich wie Smsvn pmp training_slides_chapter_11 (20)

Schwalbe-11ProjectRisk.ppt
Schwalbe-11ProjectRisk.pptSchwalbe-11ProjectRisk.ppt
Schwalbe-11ProjectRisk.ppt
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
11 risk management
11 risk management11 risk management
11 risk management
 
12 Project RISK and ISSUES Management.pdf
12 Project RISK and ISSUES Management.pdf12 Project RISK and ISSUES Management.pdf
12 Project RISK and ISSUES Management.pdf
 
Ch_1_PRM.pdf
Ch_1_PRM.pdfCh_1_PRM.pdf
Ch_1_PRM.pdf
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
Manage risks
Manage risksManage risks
Manage risks
 
PMP Muzette Charles_Sp2019_Week5_Chapter11_Risk
PMP Muzette Charles_Sp2019_Week5_Chapter11_RiskPMP Muzette Charles_Sp2019_Week5_Chapter11_Risk
PMP Muzette Charles_Sp2019_Week5_Chapter11_Risk
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
PMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk ManagementPMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk Management
 
NCV 4 Project Management Hands-On Support Slide Show - Module5
NCV 4 Project Management Hands-On Support Slide Show - Module5NCV 4 Project Management Hands-On Support Slide Show - Module5
NCV 4 Project Management Hands-On Support Slide Show - Module5
 
Pmp risk management
Pmp risk managementPmp risk management
Pmp risk management
 
For Ch -6 == Risk Monitoring & Controlling.pptx
For Ch -6 == Risk Monitoring & Controlling.pptxFor Ch -6 == Risk Monitoring & Controlling.pptx
For Ch -6 == Risk Monitoring & Controlling.pptx
 
PPT SE SACHIN.ppt
PPT SE SACHIN.pptPPT SE SACHIN.ppt
PPT SE SACHIN.ppt
 
Risk mgmt
Risk mgmtRisk mgmt
Risk mgmt
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”
 
Project of entrepreneurship
Project of entrepreneurship Project of entrepreneurship
Project of entrepreneurship
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbaz
 
Risk management process
Risk management  processRisk management  process
Risk management process
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 

Kürzlich hochgeladen (20)

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 

Smsvn pmp training_slides_chapter_11

  • 1. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 PROJECT RISK MANAGEMENT  Example: Company Trip  Identify  Response  Owner 1
  • 2. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 PROJECT RISK MANAGEMENT  Risk is an uncertain event or condition that, if occurs, has an effect on at least one project objective.  Issue is a point or matter in question or in dispute.  Threat: Negative risks  Opportunities: Positive risks  Risk management objectives:  increase the probability and impact of positive events (opportunities).  decrease the probability and impact of negative events (threat). 2
  • 3. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 PROJECT RISK MANAGEMENT  Risk Attitudes  Risk Averse: people are not comfortable with risks; they are willing to avoid the risks, doesn’t like risk.  Risk Neutral: people manage risks based on their expected value, that is, probability times impact. In other words, their decisions towards risks are not biased by any other factors, except for the risks’ expected value.  Risk Seeker: people see risks as challenges and feel exciting dealing with them.  Risk Tolerant: people are indifferent about risks. This means they do not pay much attention to risks, until these risks become real problems. 3
  • 4. PROJECT RISK MANAGEMENT  11.1 Plan Risk Management  11.2 Identify Risks  11.3 Perform Qualitative Risk Analysis  11.4 Perform Quantitative Risk Analysis  11.5 Plan Risk Responses  11.6 Control Risks 4
  • 5. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 PROJECT RISK MANAGEMENT 5 Knowledge Area Process Initiating Planning Executing Monitoring & Contol Closing Project Risk Management 11.1 Plan Risk Management 11.2 Identify Risks 11.3 Perform Qualitative Risk Analysis 11.4 Perform Quantitative Risk Analysis 11.5 Plan Risk Responses 11.6 Control Risks
  • 6. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.1 PLAN RISK MANAGEMENT  Plan Risk Management is the process of defining how to conduct risk management activities for a project.  Risk Management Plan include:  Methodology.  Roles and responsibilities.  Budgeting.  Timing.  Risk categories.  … 6 Inputs Tool&Techniques Outputs .1 Project management plan .2 Project charter .3 Stakeholder register .4 EEFs .5 OPAs .1 Analytical techniques .2 Expert judgment .3 Meetings .1 Risk management plan
  • 7. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.1 PLAN RISK MANAGEMENT  Risk categories: Provide a means for grouping potential causes of risk. Several approaches can be used, for example, a structure based on project objectives by category Example of a Risk Breakdown Structure (RBS) 7
  • 8. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.2 IDENTIFY RISKS  Identify Risks is the process of determining which risks may affect the project and documenting their characteristics. 8 Inputs Tool&Techniques Outputs .1 Risk management plan .2 Cost management plan .3 Schedule management plan .4 Quality management plan .5 Human resource management plan .6 Scope baseline .7 Activity cost estimates .8 Activity duration estimates .9 Stakeholder register .10 Project documents .11 Procurement documents .12 EEFs .13 OPAs .1 Documentation reviews .2 Information gathering techniques .3 Checklist analysis .4 Assumptions analysis .5 Diagramming techniques .6 SWOT analysis .7 Expert judgment .1 Risk register
  • 9. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.2 IDENTIFY RISKS  SWOT Analysis: This analysis looks at the project to identify its strengths and weaknesses and thereby identify risks (opportunities and threats). 9
  • 10. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.2 IDENTIFY RISKS  Risk Register 10
  • 11. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.3 PERFORM QUALITATIVE RISK ANALYSIS  Perform Qualitative Risk Analysis is the process of prioritizing risks for further analysis or action by assessing and combining their probability of occurrence and impact. 11 Inputs Tool&Techniques Outputs .1 Risk management plan .2 Scope baseline .3 Risk register .4 EEFs .5 OPAs .1 Risk probability and impact assessment .2 Probability and impact matrix .3 Risk data quality assessment .4 Risk categorization .5 Risk urgency assessment .6 Expert judgment .1 Project documents updates
  • 12. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.3 PERFORM QUALITATIVE RISK ANALYSIS  Probability and Impact Matrix 12
  • 13. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.4 PERFORM QUANTITATIVE RISK ANALYSIS  Perform Quantitative Risk Analysis is the process of numerically analyzing the effect of identified risks on overall project objectives. 13 Inputs Tool&Techniques Outputs .1 Risk management plan .2 Cost management plan .3 Schedule management plan .4 Risk register .5 EEFs .6 OPAs .1 Data gathering and representation techniques .2 Quantitative risk analysis and modeling techniques .3 Expert judgment .1 Project documents updates
  • 14. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.4 PERFORM QUANTITATIVE RISK ANALYSIS  Expected monetary value analysis  Expected monetary value (EMV) = Probability * Impact 14
  • 15. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.5 PLAN RISK RESPONSES  Plan Risk Responses is the process of developing options and actions to enhance opportunities and to reduce threats to project objectives. 15 Inputs Tool&Techniques Outputs .1 Risk management plan .2 Risk register .1 Strategies for negative risks or threats .2 Strategies for positive risks or opportunities .3 Contingent response strategies .4 Expert judgment .1 Project management plan updates .2 Project documents updates
  • 16. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.5 PLAN RISK RESPONSES  Strategies for Negative Risks or Threats  Avoid: Changing the project management plan to eliminate the threat entirely: extending the schedule, changing the strategy, or reducing scope  Transfer: Make another party responsible for the risk by purchasing insurance, performance bonds, warranties, or guarantees or by outsourcing the work.  Mitigate: Taking early action to reduce the probability and/or impact of a threat  Accept: Do nothing and say, “If it happens, it happens:” 16
  • 17. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.5 PLAN RISK RESPONSES  Strategies for Positive Risks or Opportunities  Exploit: Add work or change the project to make sure the opportunity occurs.  Enhance: Increase the likelihood (probability) and/or positive impacts of the risk event.  Share: Allocate ownership of the opportunity to a third party (forming a partnership, team, or joint venture) that is best able to achieve the opportunity  Accept: Do nothing and say, “If it happens, it happens:” 17
  • 18. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.5 PLAN RISK RESPONSES  Contingency plans are plans describing the specific actions that will be taken if the opportunity or threat occurs.  Secondary risks that arise as a direct outcome of implementing a risk response.  Residual risks These are the risks that remain after risk response planning.  Fallback plans These plans are specific actions that will be taken if the contingency plan is not effective.  Contingency reserves that are calculated based on the quantitative risk analysis of the project and the organization’s risk thresholds.  Risk response owners A key concept in risk response planning is that the project manager does not have to do it all and neither does the team. 18
  • 19. SMSVN – PMP Training Course 2013 – Chapter 11 Prepared by Nguyen Quy Son - 20/08/2013 11.6 CONTROL RISKS  Control Risks is the process of implementing risk response plans, tracking identified risks, monitoring residual risks, identifying new risks, and evaluating risk process effectiveness throughout the project. 19 Inputs Tool&Techniques Outputs .1 Project management plan .2 Risk register .3 Work performance data .4 Work performance reports .1 Risk reassessment .2 Risk audits .3 Variance and trend analysis .4 Technical performance measurement .5 Reserve analysis .6 Meetings .1 Work performance information .2 Change requests .3 Project management plan updates .4 Project documents updates .5 Organizational process assets updates