The Gantt Chart
The Theory of Henry
Laurence Gantt
The Purpose of a Gantt Chart:
• To illustrate the relationship between project
activities & time.
• To show the multiple project activities on one chart
• To provide a simple & easy to understand
representation of project scheduling
Example of a simple Gantt Chart
 You will see that a Gantt Chart is basically a Bar Chart.
Representing project activities against time.
Creating a Gantt Chart:
There are two methods to creating a Gantt Chart (Maylor, 2005).
1. Using a Forward Schedule: starting with the list of activities
and a given start date (6th Sept in previous example) follow them
forwards in time until you hit given deadline.
2. Using a Backward Schedule: look at the deadline, from that
date work in the logical list of activities.
Both of these methods allow you to ensure that all necessary
activities can possibly be completed within the given project
time frame.
Steps to Creating a Gantt Chart:
1. Determine Project start date and deadline.
2. Gather all information surrounding the list of activities within
a project – the Work Breakdown Structure may be useful for this.
3. Determine how long each activity will take
4. Evaluate what activities are dependant on others
5. Create Graph shell including the timeline and list of activities.
6. Using either Forward Scheduling or Backward Scheduling,
Begin to add bars ensuring to include dependencies and the full
duration for each activity.
Example:
Consider the following:
Activity Duration Dependant On
1. Read Literature 21 days N/A
2. Conduct Literature Review 14 days 1
3. Arrange Client Visits 7 days N/A
4. Prepare Surveys 5 days 1 and 3
5. Conduct Surveys 14 days 4
6. Analyse Surveys 10 days 5
7. Write Up 30 days 1,2,3,4,5 and 6
Project Start Date = 1st September
Deadline = 20th Decemeber
• Step 5 - From the previous slide, steps 1-4 are
already complete. We now need to create a
‘Graph Shell’.
• Step 6 – have a go at using either Forward
Scheduling or Backward Scheduling to
populate the graph.
The Finished Product:
The Advantages:
• A useful tool for displaying time-based
information within a project.
• Very simple to create
• They provide a useful overview of project
activities, a good starting point for project
planning.
• The charts are widely used and understood.
• There exists several PC software packages that
allow you to build Gantt Charts.
The Limitations:
• The Gantt Chart does not explain the
reasoning behind the chosen duration of each
activity. (Maylor, 2001)
• The Gantt Chart is very difficult to update
when changes to the project plan take place.
This makes it time consuming and results in
long-term planning being very difficult.
(Goldratt, 1997)
• Gantt Charts encourage a one-step approach to
planning – this prevents flexibility in project planning.
• Modern day Gantt Charts, using PC software, can look
very professional without actually having meaning,
preventing project teams from challenging their
content. This can lead to difficulties later in the
project. (Maylor, 2001)
• As Gantt Charts are difficult to update manually, they
can often become obsolete.
• The charts do not consider project costs or resources.
Alternatives
• PERT/GERT
• Work Breakdown Structure
• Critical Path Method
• Resource Levelling
• Many Others!
Program Evaluation and Review
Technique (PERT):
• Also a very traditional project planning
technique
• PERT shows the list of activities within a
project, their duration and the relationship
between them
• PERT is a complex process however it can help
to deliver a well defined project plan.
A Basic PERT Diagram:
Graphical Evaluation and Review
Technique (GERT):
• Similar to PERT, however allows for looping,
branching and the display of multiple project
results.
• GERT can show possibilities if a section of a
project were to fail.
• Further GERT reading = Meredith and Mantel
Further Reading:

Weitere ähnliche Inhalte

Was ist angesagt?

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost)  4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost) Dania Abdel-aziz
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksPrasad Thanthratey
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts Litunya Laurean
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project managementJared C. Powell
 
Principles of Architecture and qualities of architecture by Pravin Minde
Principles  of  Architecture and qualities of architecture by Pravin MindePrinciples  of  Architecture and qualities of architecture by Pravin Minde
Principles of Architecture and qualities of architecture by Pravin MindePravin Minde
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource SmoothingDavidMcLachlan1
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt341741357
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
Sketching and Drawing in Design
Sketching and Drawing in DesignSketching and Drawing in Design
Sketching and Drawing in DesignR. Sosa
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction ProductivitySunil Manjeri
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of schedulingjmd2011
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Schedulingsaurabmi2
 
Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7Hari Krishna Shrestha
 

Was ist angesagt? (20)

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost)  4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost)
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/Slacks
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Principles of Architecture and qualities of architecture by Pravin Minde
Principles  of  Architecture and qualities of architecture by Pravin MindePrinciples  of  Architecture and qualities of architecture by Pravin Minde
Principles of Architecture and qualities of architecture by Pravin Minde
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Sketching and Drawing in Design
Sketching and Drawing in DesignSketching and Drawing in Design
Sketching and Drawing in Design
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
 
Gantt and PERT chart
Gantt and PERT chartGantt and PERT chart
Gantt and PERT chart
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of scheduling
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Milestones
MilestonesMilestones
Milestones
 
Gantt chart
Gantt chartGantt chart
Gantt chart
 
Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7Construction Management in Developing Countries, Lecture 7
Construction Management in Developing Countries, Lecture 7
 

Ähnlich wie Gantt chart discuss 2

The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt ChartNicola2903
 
Unit 3 Project scheduling - gantt chart.pptx
Unit 3 Project scheduling - gantt chart.pptxUnit 3 Project scheduling - gantt chart.pptx
Unit 3 Project scheduling - gantt chart.pptxtanishkagupta907
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.pptMdHelalHossain6
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingHariasha
 
Project control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaProject control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaDiscover JKUAT
 
CTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxCTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxRaoAnkitYadav1
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxRaoAnkitYadav1
 
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfGagandeepKaur617299
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterpreetidamakale
 
WBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersWBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersTam Nguyen, PMP, CSM
 
-Project-Management.ppt
-Project-Management.ppt-Project-Management.ppt
-Project-Management.pptTecnicoItca
 
PM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxPM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxMdSabujHossen2
 
PM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxPM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxMdSabujHossen2
 
Time Management Power Point Presentation
Time Management Power Point PresentationTime Management Power Point Presentation
Time Management Power Point Presentationklharms
 

Ähnlich wie Gantt chart discuss 2 (20)

The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
 
Unit 3 Project scheduling - gantt chart.pptx
Unit 3 Project scheduling - gantt chart.pptxUnit 3 Project scheduling - gantt chart.pptx
Unit 3 Project scheduling - gantt chart.pptx
 
GANTT CHARTS.pptx
GANTT CHARTS.pptxGANTT CHARTS.pptx
GANTT CHARTS.pptx
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chart
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
Unit II.pptx
Unit II.pptxUnit II.pptx
Unit II.pptx
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
Project control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaProject control tools by Samuel obino mokaya
Project control tools by Samuel obino mokaya
 
CTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxCTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptx
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptx
 
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
Gantt Charts.ppt
Gantt Charts.pptGantt Charts.ppt
Gantt Charts.ppt
 
WBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersWBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira users
 
-Project-Management.ppt
-Project-Management.ppt-Project-Management.ppt
-Project-Management.ppt
 
PM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxPM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptx
 
PM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxPM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptx
 
Time Management Power Point Presentation
Time Management Power Point PresentationTime Management Power Point Presentation
Time Management Power Point Presentation
 

Mehr von Makati Science High School

Types of graphs and charts and their uses with examples and pics
Types of graphs and charts and their uses  with examples and picsTypes of graphs and charts and their uses  with examples and pics
Types of graphs and charts and their uses with examples and picsMakati Science High School
 

Mehr von Makati Science High School (20)

Writing a Scientific Paper
Writing a Scientific PaperWriting a Scientific Paper
Writing a Scientific Paper
 
Research Paper Rubrics 2020
Research Paper Rubrics 2020Research Paper Rubrics 2020
Research Paper Rubrics 2020
 
Statistical test discuss 5
Statistical test discuss 5Statistical test discuss 5
Statistical test discuss 5
 
Measures of variation discuss 2.1
Measures of variation discuss  2.1Measures of variation discuss  2.1
Measures of variation discuss 2.1
 
Measures of dispersion discuss 2.2
Measures of dispersion discuss 2.2Measures of dispersion discuss 2.2
Measures of dispersion discuss 2.2
 
Materials and methods discuss
Materials and methods  discussMaterials and methods  discuss
Materials and methods discuss
 
Inferential stat tests samples discuss 4
Inferential stat tests samples discuss 4Inferential stat tests samples discuss 4
Inferential stat tests samples discuss 4
 
Ds vs Is discuss 3.1
Ds vs Is discuss 3.1Ds vs Is discuss 3.1
Ds vs Is discuss 3.1
 
Descriptive inferential-discuss 1
Descriptive  inferential-discuss 1Descriptive  inferential-discuss 1
Descriptive inferential-discuss 1
 
Central tendency m,m,m 1.2
Central tendency m,m,m 1.2Central tendency m,m,m 1.2
Central tendency m,m,m 1.2
 
Central tendency discuss 2
Central tendency  discuss 2Central tendency  discuss 2
Central tendency discuss 2
 
Types of graphs and charts and their uses with examples and pics
Types of graphs and charts and their uses  with examples and picsTypes of graphs and charts and their uses  with examples and pics
Types of graphs and charts and their uses with examples and pics
 
Levels of measurement discuss
Levels of measurement   discussLevels of measurement   discuss
Levels of measurement discuss
 
Gantt chart discuss 3
Gantt chart discuss 3Gantt chart discuss 3
Gantt chart discuss 3
 
Gantt chart discuss 1
Gantt chart discuss 1Gantt chart discuss 1
Gantt chart discuss 1
 
Research Designs -9 experimental Designs
Research Designs -9 experimental DesignsResearch Designs -9 experimental Designs
Research Designs -9 experimental Designs
 
Research designs Pt 1
Research designs Pt 1Research designs Pt 1
Research designs Pt 1
 
Identifying variables
Identifying variablesIdentifying variables
Identifying variables
 
Kinds and classifications of research
Kinds and classifications of researchKinds and classifications of research
Kinds and classifications of research
 
Research Ethical Issues
Research Ethical IssuesResearch Ethical Issues
Research Ethical Issues
 

Kürzlich hochgeladen

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 

Kürzlich hochgeladen (20)

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 

Gantt chart discuss 2

  • 1. The Gantt Chart The Theory of Henry Laurence Gantt
  • 2. The Purpose of a Gantt Chart: • To illustrate the relationship between project activities & time. • To show the multiple project activities on one chart • To provide a simple & easy to understand representation of project scheduling
  • 3. Example of a simple Gantt Chart  You will see that a Gantt Chart is basically a Bar Chart. Representing project activities against time.
  • 4. Creating a Gantt Chart: There are two methods to creating a Gantt Chart (Maylor, 2005). 1. Using a Forward Schedule: starting with the list of activities and a given start date (6th Sept in previous example) follow them forwards in time until you hit given deadline. 2. Using a Backward Schedule: look at the deadline, from that date work in the logical list of activities. Both of these methods allow you to ensure that all necessary activities can possibly be completed within the given project time frame.
  • 5. Steps to Creating a Gantt Chart: 1. Determine Project start date and deadline. 2. Gather all information surrounding the list of activities within a project – the Work Breakdown Structure may be useful for this. 3. Determine how long each activity will take 4. Evaluate what activities are dependant on others 5. Create Graph shell including the timeline and list of activities. 6. Using either Forward Scheduling or Backward Scheduling, Begin to add bars ensuring to include dependencies and the full duration for each activity.
  • 6. Example: Consider the following: Activity Duration Dependant On 1. Read Literature 21 days N/A 2. Conduct Literature Review 14 days 1 3. Arrange Client Visits 7 days N/A 4. Prepare Surveys 5 days 1 and 3 5. Conduct Surveys 14 days 4 6. Analyse Surveys 10 days 5 7. Write Up 30 days 1,2,3,4,5 and 6 Project Start Date = 1st September Deadline = 20th Decemeber
  • 7. • Step 5 - From the previous slide, steps 1-4 are already complete. We now need to create a ‘Graph Shell’.
  • 8. • Step 6 – have a go at using either Forward Scheduling or Backward Scheduling to populate the graph. The Finished Product:
  • 9. The Advantages: • A useful tool for displaying time-based information within a project. • Very simple to create • They provide a useful overview of project activities, a good starting point for project planning. • The charts are widely used and understood. • There exists several PC software packages that allow you to build Gantt Charts.
  • 10. The Limitations: • The Gantt Chart does not explain the reasoning behind the chosen duration of each activity. (Maylor, 2001) • The Gantt Chart is very difficult to update when changes to the project plan take place. This makes it time consuming and results in long-term planning being very difficult. (Goldratt, 1997)
  • 11. • Gantt Charts encourage a one-step approach to planning – this prevents flexibility in project planning. • Modern day Gantt Charts, using PC software, can look very professional without actually having meaning, preventing project teams from challenging their content. This can lead to difficulties later in the project. (Maylor, 2001) • As Gantt Charts are difficult to update manually, they can often become obsolete. • The charts do not consider project costs or resources.
  • 12. Alternatives • PERT/GERT • Work Breakdown Structure • Critical Path Method • Resource Levelling • Many Others!
  • 13. Program Evaluation and Review Technique (PERT): • Also a very traditional project planning technique • PERT shows the list of activities within a project, their duration and the relationship between them • PERT is a complex process however it can help to deliver a well defined project plan.
  • 14. A Basic PERT Diagram:
  • 15. Graphical Evaluation and Review Technique (GERT): • Similar to PERT, however allows for looping, branching and the display of multiple project results. • GERT can show possibilities if a section of a project were to fail. • Further GERT reading = Meredith and Mantel