SlideShare ist ein Scribd-Unternehmen logo
1 von 38
„5S‟
   METHOD OF WORK PLACE
  ORGANIZATION AND VISUAL
         CONTROLS

Popularized by Hiroyuki Hirano (1990).
The origin is rooted in the works of two
American pioneers Frederick W. Taylor
 and Henry Ford – Studied by Japanese
               managers.
„5S‟ – Each „S‟ means.,
• SEIRI – Sort - Clearing
• SEITON – Set - Organizing
• SEISO – Shine – Cleaning
• SEIKETSU –Standardizing
• SHITSUKE – Sustain – Self
  Discipline and Training
COMMON MIND SETS…
• Its an additional burden. Too busy to do
  5S activities.

• Why clean it? It will get dirty again

• We cannot change the existing setup.

• More work pressure – No time for these
  things
COMMON MIND SETS…
• Expensive – Why to waste money?

• We are comfortable – Why to change?

• It will take time.
But the winning
companies says…
• Work efficiency enhanced due to
  organized work place
• Achieve remarkable cost reduction in
  production process and improved
  productivity by 20%
But the winning
companies says…
• Promotes safe, healthy and beautiful
  work environment
• From the bottom of the list we become
  the number two profit maker
• Waste elimination, Cycle time reduction,
  Space generation, Inventory reduction
  and improved work ethics
But the winning
companies says…
• World class companies do
  not succeed, it’s people
  who do
So,
What’s good in it?
„5S‟
• SEIRI – Sort - Clearing
• SEITON – Set - Organizing
• SEISO – Shine – Cleaning
• SEIKETSU –Standardizing
• SHITSUKE – Sustain – Self
  Discipline and Training
1S – SORT - Clearing
“…only what is needed, in the
    amounts necessary,
 as they are required…”

 Eliminate unwanted
items from your work
         area
SORT – Fights with Habits
                        r


                        r
SORT – Fights with Habits
• It is difficult and confusing to decide which
  would be wanted in future.
• People tend to keep extras or duplicates “just in
  case a need comes in future”

    JUST-IN-CASE            JUST-IN-TIME


• People do not realize the importance of space,
  believing in unlimited space availability.
A Simple Flow chart
What is unwanted?
1. Parts & Work in Process (WIP)
• Things fallen back behind the machine
• Extra WIP
• Stock of rejected items
• Items accumulated over period for rework
• Material awaiting disposal decision
• Material brought for some trial, still lying even
  after trial
• Small qty of material no longer in use
What is unwanted?
2. Tools, Toolings, Measuring devices
• Old jigs, tools not in use
• Broken tools, bits, etc.
• Measuring equipment not required for the operation
  being performed
3. Shelves and Lockers
• Shelves and lockers tends to collect things that
  nobody ever uses , like surplus, broken items etc.
4. Passages and Corners
• Dust, material not required seem to gather in corner
What is unwanted?
5. Besides Pillars, Floors
• These places tends to collect junk.
6. Walls and Boards
• Old out dated notices which have lost their
  relevance
• Dust, remains of torn notices, cello tape piece
What is unknown?

• Simple –
• Unable to decide whether it is useful or
  not.
• Good material – Not useful to you. May be
  of use to somebody else.
SEIRI = Sorting
Meaning     Distinguish between necessary and
            unnecessary items and eliminate the
            unnecessary items

Activity    Establish a criteria for eliminating unwanted items
            Eliminate unwanted items either by disposing
            them or by relocating them.

Success     Area saved or percentage of space available
Indicator
INTERACTIVE BIT


   Give me three examples
   of areas that could benefit
   from sorting
SEITON – SET -
         ORGANIZING
• “A place for everything and
  everything in its place”


• Identify and allocate a place for
  all the materials needed for your
  work.
SEITON – SET -
         ORGANIZING
• Decide where things belong.
• Decide how things should put
  away
• Obey the put away rules
SEITON – EXAMPLE
SEITON = SET-ORGANIZING
Meaning      To determine type of storage and layout
             that will ensure easy accessibility for
             everyone .

Activity    - Functional storage
            - Creating place for everything and putting
              everything in its place

Success - Time saved in searching
Indicator - Time saved in material handling
INTERACTIVE BIT
•   Discuss two areas where production
     is frustrating
         • Do the tools keep going missing, or do
           you have to wait for them to become
           available.
         • Do operators zig-zag around the area
           and/or get in each others way
         • Do we have Mix Ups?
SEISO – SHINE - CLEANING

• Here cleaning means more than
  just keeping things clean – Its for
  your safe.

• At least 5 minutes everyday for
  cleaning
SEISO-SHINE-CLEANING
Meaning     Cleaning trash, filth, dust and other foreign
            matter. Cleaning as a form of Inspection.


Activity    - Keep workplace spotlessly clean
            - Inspection while cleaning
            - Finding minor problems with cleaning inspection

Success      - Reduction in machine down time
Indicator    - Reduction in no. of accidents
INTERACTIVE BIT


   What areas of the factory
   are the dirtiest and/or are
   depressing to work in?
SEIKETSU -
        STANDARDIZING
• Regularising 5S activities by putting
  systems in place – Everyone does things
  the same way
• Make it easy for everyone to identify the
  state of normal or abnormal condition.
• For maintaining previous 3S, use visual
  management
      5S IS EASY TO DO ONCE –
     CONSISTENCY IS DIFFICULT
SEIKETSU - STANDARDIZING
 Meaning     Setting up standards / Norms for a neat,
                     clean,workplace and details of how
   to        maintain the norm (Procedure)

 Activity    - Innovative visual management
             - Colour coding
             - Early detection of problem and early action

 Success      Increase in 5S indicator
 Indicator
SHITSUKE – SUSTAIN – SELF
    DISCIPLINE & TRAINING
• Make „5S‟ is a HABIT
• Without this, the time involved
  in all the other S will be in
  vain.
SHITSUKE – SUSTAIN – SELF
   DISCIPLINE & TRAINING
• We need Everyone to maintain
  5S guidelines.
• To maintain discipline, we
  need to practice and repeat
  until it becomes way of life.
• Discipline is the core of 5S
SHITSUKE – SUSTAIN –
   SELF DISCIPLINE &
       TRAINING
• Commitment +
   Everyone‟s Involvement =
      Success to 5S
SHITSUKE-SUSTAIN
 Meaning     Every one sticks to the rule and makes it a
             habit


Activity     - Participation of everyone in developing good
               habits
             - Regular audits and aiming for higher level

 Success      High employee morale
 Indicator    Involvement of all people
SOME COMPARISONS
BEFORE 5S     AFTER 5S
The rules…
•   Remove fixed ideas.
•   Think of ways to make it possible.
•   No excuses needed.
•   Go for the simple solution, not the perfect one.
•   Correct mistakes right away.
•   Repeat „Why‟ 5 times.
•   Ask ideas from many people.
•   There is no end to improvement.
BENEFITS
 Reduced set-up times
 Reduced cycle times
 Reduce searching time
 Increased floor space
 Lower safety incident/accident rate
 Less wasted labor
 Better equipment reliability
 Higher Quality
 Lower cost
 Reliable Delivery
Roles and Responsibility
• Leaders must set the tone and lead by
  example.
• We should commit to the initiative,
  Provide time to the workforce to develop
  and implement 5S changes.
• Any implementation should have a drive.
• Conduct short, focussed and frequent
  communication sessions.
• Select areas that needs 5S – as pilot areas
• Share the successes
It’s a start….

Weitere ähnliche Inhalte

Was ist angesagt?

5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvementAdrian Oprea
 
How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...Iskcon Ahmedabad
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve ProjectIsidro Sid Calayag
 
5 s and workplace productivity cet
5 s and workplace productivity cet5 s and workplace productivity cet
5 s and workplace productivity cetMarlon Grande
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentationClive Sury
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)Zeeshan Syed
 
5s - materiały szkoleniowe
5s - materiały szkoleniowe 5s - materiały szkoleniowe
5s - materiały szkoleniowe abre
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAMDEEPAK SAHOO
 
5s a basic introduction
5s a basic introduction5s a basic introduction
5s a basic introductionsarah bridge
 

Was ist angesagt? (20)

5S
5S5S
5S
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...
 
5 s concept
5 s concept5 s concept
5 s concept
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve Project
 
5s implimantations
5s implimantations5s implimantations
5s implimantations
 
5 s and workplace productivity cet
5 s and workplace productivity cet5 s and workplace productivity cet
5 s and workplace productivity cet
 
5s basic principle
5s basic principle5s basic principle
5s basic principle
 
5s presentation
5s presentation5s presentation
5s presentation
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
 
5s presentation
5s presentation5s presentation
5s presentation
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
5s
5s5s
5s
 
5 s
5 s5 s
5 s
 
5S Complete Implementation Guide
5S Complete Implementation Guide 5S Complete Implementation Guide
5S Complete Implementation Guide
 
5S
5S5S
5S
 
5 S
5 S5 S
5 S
 
5s - materiały szkoleniowe
5s - materiały szkoleniowe 5s - materiały szkoleniowe
5s - materiały szkoleniowe
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
 
5s a basic introduction
5s a basic introduction5s a basic introduction
5s a basic introduction
 

Andere mochten auch

Advoco pharma case_study
Advoco pharma case_studyAdvoco pharma case_study
Advoco pharma case_studyjcvd12
 
Adv 067 eam-whitepaper_02
Adv 067 eam-whitepaper_02Adv 067 eam-whitepaper_02
Adv 067 eam-whitepaper_02jcvd12
 
Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]Murat Terzi
 
Oracle ebs r12eam part2
Oracle ebs r12eam part2Oracle ebs r12eam part2
Oracle ebs r12eam part2jcvd12
 
Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008
Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008
Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008jcvd12
 
Oracle ebs r12 eam module-upk
Oracle ebs r12 eam module-upkOracle ebs r12 eam module-upk
Oracle ebs r12 eam module-upkjcvd12
 
Root cause analysis common problems and solutions
Root cause analysis common problems and solutions Root cause analysis common problems and solutions
Root cause analysis common problems and solutions ASQ Reliability Division
 
Culture Or Quality
Culture Or QualityCulture Or Quality
Culture Or Qualityflevko
 
How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramSchoolDude
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenancePramod A
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)nfra erp
 
Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Mohammed Hamed Ahmed Soliman
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 

Andere mochten auch (20)

5-S Activity
5-S Activity5-S Activity
5-S Activity
 
5 s training
5 s training5 s training
5 s training
 
Advoco pharma case_study
Advoco pharma case_studyAdvoco pharma case_study
Advoco pharma case_study
 
Adv 067 eam-whitepaper_02
Adv 067 eam-whitepaper_02Adv 067 eam-whitepaper_02
Adv 067 eam-whitepaper_02
 
Apqp+english+version[1]
Apqp+english+version[1]Apqp+english+version[1]
Apqp+english+version[1]
 
The Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business successThe Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business success
 
Oracle ebs r12eam part2
Oracle ebs r12eam part2Oracle ebs r12eam part2
Oracle ebs r12eam part2
 
Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008
Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008
Workshop INFOR EAM 14th Maintenance Management Conference Dubai, Dec 18/2008
 
Maintenance Work Order Sheet
Maintenance Work Order SheetMaintenance Work Order Sheet
Maintenance Work Order Sheet
 
Oracle ebs r12 eam module-upk
Oracle ebs r12 eam module-upkOracle ebs r12 eam module-upk
Oracle ebs r12 eam module-upk
 
Root cause analysis common problems and solutions
Root cause analysis common problems and solutions Root cause analysis common problems and solutions
Root cause analysis common problems and solutions
 
5S Auditing Sheet
5S Auditing Sheet5S Auditing Sheet
5S Auditing Sheet
 
Culture Or Quality
Culture Or QualityCulture Or Quality
Culture Or Quality
 
5 S
5 S5 S
5 S
 
How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance Program
 
Advanced Maintenance Management
Advanced Maintenance ManagementAdvanced Maintenance Management
Advanced Maintenance Management
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
 
Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 

Ähnlich wie 5 s training

5 S Program Orientation Powerpoint Presentation
5 S Program Orientation Powerpoint Presentation5 S Program Orientation Powerpoint Presentation
5 S Program Orientation Powerpoint PresentationCobra143
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementationsudarshan jadwal
 
Kaizen and 5S technique Case study
Kaizen and 5S technique Case studyKaizen and 5S technique Case study
Kaizen and 5S technique Case studyArun Singh
 
5s & visual work place
5s & visual work place5s & visual work place
5s & visual work placeBishnu Sarker
 
How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.Shara Cuyno
 
Japanese practice on cleanliness
Japanese practice on cleanlinessJapanese practice on cleanliness
Japanese practice on cleanlinessKEVENLIAM
 
5 s methodology
5 s methodology5 s methodology
5 s methodologyAbhinav Kp
 
5 s training -recap
5 s  training -recap5 s  training -recap
5 s training -recapMANOJ ARORA
 
5s introduction - printer friendly version
5s introduction - printer friendly version5s introduction - printer friendly version
5s introduction - printer friendly versionsarah bridge
 
5 s nadeem-nafis
5 s nadeem-nafis5 s nadeem-nafis
5 s nadeem-nafisnadeemnafis
 

Ähnlich wie 5 s training (20)

5 s training
5 s training5 s training
5 s training
 
5 S Program Orientation Powerpoint Presentation
5 S Program Orientation Powerpoint Presentation5 S Program Orientation Powerpoint Presentation
5 S Program Orientation Powerpoint Presentation
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
Kaizen and 5S technique Case study
Kaizen and 5S technique Case studyKaizen and 5S technique Case study
Kaizen and 5S technique Case study
 
5s & visual work place
5s & visual work place5s & visual work place
5s & visual work place
 
How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.
 
Japanese practice on cleanliness
Japanese practice on cleanlinessJapanese practice on cleanliness
Japanese practice on cleanliness
 
5 s methodology
5 s methodology5 s methodology
5 s methodology
 
Work place
Work placeWork place
Work place
 
5s system
5s system5s system
5s system
 
5S The Practice of Good Housekeeping
5S The Practice of Good Housekeeping5S The Practice of Good Housekeeping
5S The Practice of Good Housekeeping
 
5 s
5 s5 s
5 s
 
5 s training -recap
5 s  training -recap5 s  training -recap
5 s training -recap
 
5s introduction - printer friendly version
5s introduction - printer friendly version5s introduction - printer friendly version
5s introduction - printer friendly version
 
5s
5s5s
5s
 
5s-160607184633.pdf
5s-160607184633.pdf5s-160607184633.pdf
5s-160607184633.pdf
 
5 s nadeem-nafis
5 s nadeem-nafis5 s nadeem-nafis
5 s nadeem-nafis
 
5 s principle
5 s principle5 s principle
5 s principle
 
6S Introduction.pdf
6S Introduction.pdf6S Introduction.pdf
6S Introduction.pdf
 
5sagri.pptx
5sagri.pptx5sagri.pptx
5sagri.pptx
 

5 s training

  • 1. „5S‟ METHOD OF WORK PLACE ORGANIZATION AND VISUAL CONTROLS Popularized by Hiroyuki Hirano (1990). The origin is rooted in the works of two American pioneers Frederick W. Taylor and Henry Ford – Studied by Japanese managers.
  • 2. „5S‟ – Each „S‟ means., • SEIRI – Sort - Clearing • SEITON – Set - Organizing • SEISO – Shine – Cleaning • SEIKETSU –Standardizing • SHITSUKE – Sustain – Self Discipline and Training
  • 3. COMMON MIND SETS… • Its an additional burden. Too busy to do 5S activities. • Why clean it? It will get dirty again • We cannot change the existing setup. • More work pressure – No time for these things
  • 4. COMMON MIND SETS… • Expensive – Why to waste money? • We are comfortable – Why to change? • It will take time.
  • 5. But the winning companies says… • Work efficiency enhanced due to organized work place • Achieve remarkable cost reduction in production process and improved productivity by 20%
  • 6. But the winning companies says… • Promotes safe, healthy and beautiful work environment • From the bottom of the list we become the number two profit maker • Waste elimination, Cycle time reduction, Space generation, Inventory reduction and improved work ethics
  • 7. But the winning companies says… • World class companies do not succeed, it’s people who do
  • 9. „5S‟ • SEIRI – Sort - Clearing • SEITON – Set - Organizing • SEISO – Shine – Cleaning • SEIKETSU –Standardizing • SHITSUKE – Sustain – Self Discipline and Training
  • 10. 1S – SORT - Clearing “…only what is needed, in the amounts necessary, as they are required…” Eliminate unwanted items from your work area
  • 11. SORT – Fights with Habits r r
  • 12. SORT – Fights with Habits • It is difficult and confusing to decide which would be wanted in future. • People tend to keep extras or duplicates “just in case a need comes in future” JUST-IN-CASE JUST-IN-TIME • People do not realize the importance of space, believing in unlimited space availability.
  • 13. A Simple Flow chart
  • 14. What is unwanted? 1. Parts & Work in Process (WIP) • Things fallen back behind the machine • Extra WIP • Stock of rejected items • Items accumulated over period for rework • Material awaiting disposal decision • Material brought for some trial, still lying even after trial • Small qty of material no longer in use
  • 15. What is unwanted? 2. Tools, Toolings, Measuring devices • Old jigs, tools not in use • Broken tools, bits, etc. • Measuring equipment not required for the operation being performed 3. Shelves and Lockers • Shelves and lockers tends to collect things that nobody ever uses , like surplus, broken items etc. 4. Passages and Corners • Dust, material not required seem to gather in corner
  • 16. What is unwanted? 5. Besides Pillars, Floors • These places tends to collect junk. 6. Walls and Boards • Old out dated notices which have lost their relevance • Dust, remains of torn notices, cello tape piece
  • 17. What is unknown? • Simple – • Unable to decide whether it is useful or not. • Good material – Not useful to you. May be of use to somebody else.
  • 18. SEIRI = Sorting Meaning Distinguish between necessary and unnecessary items and eliminate the unnecessary items Activity Establish a criteria for eliminating unwanted items Eliminate unwanted items either by disposing them or by relocating them. Success Area saved or percentage of space available Indicator
  • 19. INTERACTIVE BIT Give me three examples of areas that could benefit from sorting
  • 20. SEITON – SET - ORGANIZING • “A place for everything and everything in its place” • Identify and allocate a place for all the materials needed for your work.
  • 21. SEITON – SET - ORGANIZING • Decide where things belong. • Decide how things should put away • Obey the put away rules
  • 23. SEITON = SET-ORGANIZING Meaning To determine type of storage and layout that will ensure easy accessibility for everyone . Activity - Functional storage - Creating place for everything and putting everything in its place Success - Time saved in searching Indicator - Time saved in material handling
  • 24. INTERACTIVE BIT • Discuss two areas where production is frustrating • Do the tools keep going missing, or do you have to wait for them to become available. • Do operators zig-zag around the area and/or get in each others way • Do we have Mix Ups?
  • 25. SEISO – SHINE - CLEANING • Here cleaning means more than just keeping things clean – Its for your safe. • At least 5 minutes everyday for cleaning
  • 26. SEISO-SHINE-CLEANING Meaning Cleaning trash, filth, dust and other foreign matter. Cleaning as a form of Inspection. Activity - Keep workplace spotlessly clean - Inspection while cleaning - Finding minor problems with cleaning inspection Success - Reduction in machine down time Indicator - Reduction in no. of accidents
  • 27. INTERACTIVE BIT What areas of the factory are the dirtiest and/or are depressing to work in?
  • 28. SEIKETSU - STANDARDIZING • Regularising 5S activities by putting systems in place – Everyone does things the same way • Make it easy for everyone to identify the state of normal or abnormal condition. • For maintaining previous 3S, use visual management 5S IS EASY TO DO ONCE – CONSISTENCY IS DIFFICULT
  • 29. SEIKETSU - STANDARDIZING Meaning Setting up standards / Norms for a neat, clean,workplace and details of how to maintain the norm (Procedure) Activity - Innovative visual management - Colour coding - Early detection of problem and early action Success Increase in 5S indicator Indicator
  • 30. SHITSUKE – SUSTAIN – SELF DISCIPLINE & TRAINING • Make „5S‟ is a HABIT • Without this, the time involved in all the other S will be in vain.
  • 31. SHITSUKE – SUSTAIN – SELF DISCIPLINE & TRAINING • We need Everyone to maintain 5S guidelines. • To maintain discipline, we need to practice and repeat until it becomes way of life. • Discipline is the core of 5S
  • 32. SHITSUKE – SUSTAIN – SELF DISCIPLINE & TRAINING • Commitment + Everyone‟s Involvement = Success to 5S
  • 33. SHITSUKE-SUSTAIN Meaning Every one sticks to the rule and makes it a habit Activity - Participation of everyone in developing good habits - Regular audits and aiming for higher level Success High employee morale Indicator Involvement of all people
  • 35. The rules… • Remove fixed ideas. • Think of ways to make it possible. • No excuses needed. • Go for the simple solution, not the perfect one. • Correct mistakes right away. • Repeat „Why‟ 5 times. • Ask ideas from many people. • There is no end to improvement.
  • 36. BENEFITS  Reduced set-up times  Reduced cycle times  Reduce searching time  Increased floor space  Lower safety incident/accident rate  Less wasted labor  Better equipment reliability  Higher Quality  Lower cost  Reliable Delivery
  • 37. Roles and Responsibility • Leaders must set the tone and lead by example. • We should commit to the initiative, Provide time to the workforce to develop and implement 5S changes. • Any implementation should have a drive. • Conduct short, focussed and frequent communication sessions. • Select areas that needs 5S – as pilot areas • Share the successes