INTRODUCTION
• Storm water are usually water from snow/ice
or from nearby stream, river or runoff
surface
• Natural sentiment such as forest, the soil
absorbs much of the stormwater. In developed
place such as cities, unmanaged stormwater
can create 2 types of problem. First problem
would be flooding and water pollution.
• Water pollution, is due to the impervious
surface such as parking lots; road and
building that the stormwater are unable to be
absorbed by the ground. Therefore,
generating more runoff than natural
sentiment. Flooding is due the objects that
are collected during rain. It will all be
transported to a drain causing it to block it.
• To combat stormwater, a storm drain is
installed throughout the cities. It is designed to
drain excessive rain from impervious
surfaces.
SUSTAINABLE STORMWATER MANAGEMANT
SYSTEM
• Rainwater is absorbed and soaked into the ground and then it evaporates
from the surface, taken up by plants, or finding its way slowly into rivers or
streams. Any development will affect and make an impact to this
environment and change the natural water cycle.
GREEN INFRASTRUCTURE & GRAY
INFRASTRUCTURE
Green infrastructure functioned as water management that protects, restores, or mimics the
natural water cycle. Gray infrastructure is man-made designed to move urban storm-water
away from the built environment. Both infrastructure are involved in stormwater
management system.
GREEN ROOF
Green roofs are a multi-layered system with living plants growing on roof top.The most
typical built up includes roof deck, waterproofing layer, protection layers, drainage layer, filter
sheet, growing substrate and vegetation. Green roofs enable rainfall infiltration and
evapotranspiration of stored water. The vegetation and soil absorb and filter the water.
ADVANTAGES
Provide a barrier of
greenery that helps
to protect the
waterproof
membrane
underneath and thus
increase the
lifespan of the roof
DISADVANTAGE
S
An increase in
weight load (require
more structural
support to be
implemented)
MAINTENANCE
• Litter removal may
be required
• Inspection and
replacement of
plants will be
required on a
regular basis
Pervious surfaces can be either porous or permeable. Porous surfacing is a surface that
infiltrates water across the entire surface while permeable surfaces designed to allow
storm-water runoff to filter through surface voids into an underlying stone reservoir for
temporary storage or infiltration.
PERVIOUS SURFACE
ADVANTAGES
Reduced need for
deep excavations for
drainage, which can
have significant cost
benefits
DISADVANTAGE
S
Risk of long-term
clogging and weed
growth if poorly
maintained
MAINTENANCE
• Periodic
vacuuming
• Repair and patch
surfaces with
similar pervious
materials
• Shallow, broad and vegetated channels
• Allow storm water to slow down and go through the process of sedimentation,
filtration, evapotranspiration and partially infiltration
• Located along the roadway
• Drain away through the soil within several hours or days
• Check dams and berms - promote settling and infiltration.
GRASSED SWALES
Wet Swales at Sue Donaldson
Dry Swales at Delaware Department of
Transportation
There are two types of swales:
WET SWALES
treat storm water through physical and
biological action
DRY SWALES
treat storm water through infiltration
WET SWALES DRY SWALES
ADVANTAGES
Pollution and
blockages are visible
and easy to remove
DISADVANTAGE
S
Limit the
opportunities to use
trees for landscaping
MAINTENANCE
• Removal of trash
and debris regularly
• Grass cutting and
removal of cuttings
• Clearing of inlets,
culverts and outlets
to avoid clogging
- contains plants that can survive in soil soaked with water
- collect and slow the storm-water runoff
- increase the infiltration into the soil
- practice mimics natural hydrology by the process of infiltrating, evaporating and
transpiring
- commonly found on private properties
How it works?
1. Water settle on the garden surface then soak through the plants and filter media
2. Sediments are trapped on the surface of the garden
3. Soil and plant roots work together to filter the water naturally
RAIN GARDENS
Greenest Street in America,
Chicago
ADVANTAGES
Can be designed to
work in most
soil types
DISADVANTAGE
S
Not suitable for areas
with steep slopes.
MAINTENANCE
• Vegetation
management
• Removal of trash
and debris
regularly
• Inlet and outlet
cleaning
- Similar with rain gardens
- Specially designed and engineered to manage and treat stormwater runoff
- Shallow landscape depressions which included soil mixes and control structures such as
• under drains to aid the control of flow
• catch basins to filter sediment
• check dams to slow the water flow
- Commonly found on commercial properties or any public areas
BIORETENTION AREAS
Baltusrol Crescent, Melbourne
ADVANTAGES
Provide wildlife
habitats
DISADVANTAGE
S
Require extra
maintenance
MAINTENANCE
• Regular inspection
• Removal of trash
and debris
regularly
• Replacement of
mulch layer
• Vegetation
management
DETENTION AND RETENTION PONDS
DETENTION BASINS (DRY POND)
• Open and flat areas of grass
• Normally dry during low flow
periods
• Allow filtration and
sedimentation process to take
place
• Provide temporary storage
• Works by allowing a large basin
area for water and the water
slowly drains out through the
outlet at the bottom as
designed
RETENTION PONDS (WET POND)
• Open areas of shallow water
• Accommodate water and provide
temporary storage for excess
water
• Improve the quality of water
through settling, often employed
as flood control devices
• Water level rises temporarily and
retain a permanent pool of water
• Allows large amounts of water to
enter the pond and allows small
amounts of water drains out
through the outlet
Detention Pond
Retention Pond
ADVANTAGES
Surrounding areas
have vegetative
buffer that can
withstand dry or wet
conditions.
DISADVANTAGE
S
Breeding grounds for
mosquitoes and
other diseases
MAINTENANCE
• Removal of trash
and debris
regularly
• Inlet and outlet
cleaning
• Vegetation
management
DETENTION POND
ADVANTAGES
Provide wildlife
habitats
DISADVANTAGE
S
Negative water
quality impacts if
not properly designed
MAINTENANCE
• Removal of trash
and debris
regularly
• Inlet and outlet
cleaning
• Vegetation
management
RETENTION POND
• Consists of shallow ponds and marshy areas, covered almost entirely in aquatic
vegetation
WETLANDS
Treated by the
process of
Sedimentation
Filtration
Digestion
Oxidation
Reduction
Absorption
Precipitation
There are two types of wetlands:
NATURAL WETLANDS
filter the contaminated water running into
the stream, river or ocean
CONSTRUCTED WETLANDS
filter the water flow from inlet pipe and gravel
through wetland plants and flow out from outlet
pipe and gravel for further treatment.
Natural Wetlands at Ramsey-Washington
Metro Watershed District
Constructed Wetlands from Gold Coast City
Council
NATURAL WETLANDS CONSTRUCTED WETLANDS
ADVANTAGES
Can tolerate both
great and small
volumes of water
DISADVANTAGE
S
Unable to treat highly
toxic modern
wastewater
MAINTENANCE
• Removal of trash
and debris
regularly
• Inlet and outlet
cleaning
• Vegetation
management to
retain high
vegetation
coverage
RILLS AND
CHANNELS
• Allow to collect water, slow down
and provide storage for slit and oil.
• Outlets are designed as a mini oil
separator, so it is very effective at
treating pollution.
• Allow water flows along with the
variety of cross sections rills and
channels
ADVANTAGES
Very effective in
water & pollution
treatment
DISADVANTAGE
S
Need to give careful
consideration to
crossings
MAINTENANCE
• Removal of trash
and debris
regularly
• Routine
maintenance
• Intensive
maintenance
required one every
five years
• Underground storage tank system is
a storage tank with underground
piping connected
• Carry storm water from detention or
retention ponds.
• The system consists of storage
structures, inlet and outlet pipes
• Addition features at the inlet pipes
helps to improve the water quality
by removing floatable, oils and
grease, and sediments.
• Cooperate with other storm water
system to achieve the best result.
UNDERGROUND
STORAGE
ADVANTAGES
Protected damage
from animals and
natural disasters
DISADVANTAGE
S
Relatively expensive
due to their
specialised
construction
MAINTENANCE
• Inspection and
prevention of
leakage and spills
• Clean up by soil
and groundwater
investigation and
remediation
• Corrosion
protection for tanks
and piping
• Consists of internal components which
are permanent pool for sedimentation
• Inlet and outlet pipes which able to create
flow patterns and flow conditions that
aids in sediments removal.
• An underground storage structure smaller
than underground storage tank system.
HYDRODYNAMIC
SEPARATORS
ADVANTAGES
Space saving since it
is installed
underground
DISADVANTAGE
S
Only can remove
limited amounts of
pollutants
MAINTENANCE
• Cleaning and
disposal of
sediments and oils
• Removal of trash
and debris
regularly
• Inspection and
prevention of
leakage or spills
STORMWATER
MANAGEMENT
ADVANTAGES
CHEMICAL
HOME PROTECTION
ROAD SAFETY
TECHNOLOGY
MAINTENANCE
STORMWATER
MANAGEMENT
DISADVANTAGES
DAMAGE ROOT
SYSTEM
CASE STUDY
UNIVERSITY OF MINNESOTA
DULUTH
The University of Minnesota Duluth discharges storm-water to
several waters, including Lake Superior and two trout streams.
Lake
Superior
Trout Stream
WATERSHED
The main portion of UMD campus is in three
watersheds.
University of Minnesota Duluth have more than 60 preventative storm
water features in place to treat the runoff to varying degrees before it
discharges to streams.
WET PONDS
Eric Clarke Pond
Fire Hall Pond
Rock Pond
Swenson Science Research Pond
FILTRATION
PONDS
Lot L-3 Filtration Basins
Ianni Hall Volleyball Court
Glensheen
Plan
SWALE
Glensheen Parking
Lot
Modifying soil surface by adding geo-grids, mesh, sand or
rock to stabilize surface to prevent ponding.
The gravel road surface of Rock Hill Road is replaced with
geoweb mesh, and crushed rock or topsoil mixture to
stabilize surface and prevent rutting.
MODIFIED SOILS
RAIN GARDEN/
BIO-RETENTION
PONDS
The Lot B UMD Rain Garden was built to help
protect Oregon Creek by slowing, cooling and
filtering the runoff water from the adjacent
parking lot.
It was designed and engineered as a bioretention
pond and is composed of plantings, a drain tile
system, and a water level control system.
Lot B UMD Rain Garden
The Rain Garden in University Minnesota Duluth is one third acre in size. It
handles stormwater from 2.5 acres of Parking Lot B and can hold as much as
60,000 US gallons of water.
HYDRODYNAMI
C
SEPARATORS
The UMD campus has installed hydrodynamic
separator in LOT G, Sports Health Centre,
Chester Park and Swenson Civil Engineering
Centre to separate oils and solids from moving
stormwater by gravity.
The parking lot was refurbished in 2004 to
include an underground “vault” consisting of
large diameter pipes to temporarily store
stormwater parking lot runoff.
Lot G, behind UMD Library
UNDERGROUND
TANK
For the past five years, University of Minnesota
Duluth campus have had installed a few
pervious pavement including concrete pavers,
recycled rubber pavers and pervious surface.
PERVIOUS
SURFACES
The lower tier is a green roof
that helps to insulate the
building as well as curb
storm water runoff.
A view of the partial green
roof from top of a stairwell in
Civil Engineering.
Bagley Outdoor Classroo
GREEN ROOF
A majority of these plantings are in areas that
would hold sod, a high maintenance method of
landscaping.
Low maintenance alternative plantings help to
diversify the appearance of the campus as well
as reduce carbon footprint.
ALTERNATIVE
PLANTINGS
Objective : To reduce the quantity and to
improve the quality of storm water runoff.
SWPPP requires SIX minimum control
measures :
1. Public Education and Outreach
2. Public Involvement and Participation
3. Illicit Discharge Detection and
Elimination
4. Construction Storm Water Runoff
Control
5. Post Construction Storm Water
6. Pollution Prevention and Good
STORM WATER POLLUTION PREVENTION
PROGRAM
• Provide educational storm water resources for
its campus and greater community
• Protect and enhance the region’s shared
water resources through storm water pollution
prevention
• UMD Educational materials :
1. Illicit Discharge Poster (2015)
2. Illicit Discharge Quiz Slideshow (2013)
1. PUBLIC EDUCATION AND OUTREACH
2. PUBLIC INVOLVEMENT AND PARTICIPATION
• UMD welcomes involvement from the public including the employees,
students, and contractors that make up the campus community.
• Strongly encourage the involvement in creation, implementation and
evaluation.
IDEAS :
- Include storm-water information to be taught in classes
- Welcome the assistance in reviewing their best management practices
- Assistance in hands-on clean ups / special projects
3. ILLICIT DISCHARGE DETECTION AND
ELIMINATION
Illicit discharge is any discharge to the municipal separate storm server
system (MS4) that is not composed entirely of storm water.
STEPS TAKEN BY UMD TO DETECT AND ELIMINATE ILLICIT
DISCHARGES :
• UMD has developed and continue to maintain storm sewer system
maps.
• Physical observations (odour, colour and condition) during stormwater
outlet inspections.
• Programs like the UMD Spill Prevention Control and Countermeasures
Plan can identify potential illicit discharges.
• Building-by-building document allows the determination of potential
interconnections for the buildings.
4. CONSTRUCTION SITE RUNOFF CONTROL
Sediment runoff rates from construction sites are typically 10-20 times
greater than those of agricultural lands, and 1000-2000 times greater
than those of forest lands. Hence, in time it may cause serious impact to
water bodies.
Cause: contractor flushes
newly installed hydrant
near an unprotected catch
Effect: Sediment plumb in
a nearby trout stream is
polluted.
Hence, UMD construction projects are required to have provisional and
sediment control measures incorporated in the design.
The construction documents must identify relevant details as well as
contractor execution and inspection responsibilities.
5. POST CONSTRUCTION STORM WATER
Post construction storm water has brought significant impact to water
bodies.
Prior planning and design can minimise pollutants and it’s the most cost-
effective approach to storm water quality management.
Examples:
- A green roof
on Bagley
Outdoor
Classroom
designed to
reduce storm
water inputs to
Tischer Creek.
6. POLLUTION PREVENTION AND GOOD
HOUSEKEEPING
UMD is
establishing a
system of good
housekeeping
practices that
recognise that
the campus
operates in an
urban area.
POSSIBLE PROBLEMS
& RECOMMENDATIONS
GREEN ROOF
Problems
Plant Selection
• Type of plant factors in the performance of the
green roof.
• If chosen poorly, the plant would not be able to
survive the climate
• Maintenance would be costly as consistently
require to change the plant
Dead Plants
GREEN ROOF
Recommendation
• Species that are able to accumulate nutrients and use water effectively
• Herbaceous Species - Tulbaghia Violacea
• Shrubby Species - Leonotis Leonurus.
UNDERGROUND
Problems
• Allowing direct recharge of groundwater
• Infiltration system underground would be affected hence restricting the
movement of water.
UNDERGROUND
Recommendation
• Only soils which are suitable for infiltration able to allow a direct recharge
• Acceptable soils for underground system include sand, sandy loam and loam.
• Sandy soils are permeable while soils with clay should be avoided because it
restricts the movement of water.
Sand Sandy Loam
SWALES
Problems
• Not effective enough in reducing the bacteria levels and pollutants alone
• Wet swales will be a nuisance by allowing mosquito breeding
Polluted Swales
SWALES
Recommendation
• Check dams can be constructed with the swales
• Prevent erosion and promote sedimentation by decreasing runoff volume, rate,
and velocity
• More effective at mitigating runoff quantity and quality than those without.
Grass Swales with Rock Check
POND
Problems
Effectiveness of pollutant removal
• Settling area being relative small hence harder to separate sediments.
• Problems in Impede flow and trap remaining pollutants
• Unable to remove pollutant alone
Pond Infiltration System Problem
POND
Recommendation
• The addition of a sediment forebay increase the settling area for sediments.
• Construction of shallow ledges along the edge to have aquatic plants that
prevents the entering of flow and trapped pollutants.
CONCLUSION
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Planning and management of water
Planning and management of waterPlanning and management of water
Planning and management of waterSiddhi Vakharia
 
Sem 2 bs1 storm water system
Sem 2 bs1 storm water systemSem 2 bs1 storm water system
Sem 2 bs1 storm water systemEst
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage designdobariya axit
 
Planning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityMona Prajapati
 
DEWATS Decentralized waste water treatment technology
DEWATS Decentralized waste water treatment  technologyDEWATS Decentralized waste water treatment  technology
DEWATS Decentralized waste water treatment technologyRajneesh Gautam
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building Aroh Thombre
 
Water supply final
Water supply finalWater supply final
Water supply finalRiya Bagchi
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenancesAjay B.K
 
Storm water rain water harvesting
Storm water   rain water harvestingStorm water   rain water harvesting
Storm water rain water harvestingDipesh Jain
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and PumpingGAURAV. H .TANDON
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage systemDipesh Jain
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewagesidrarashiddar
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyManish Pandey
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management ReportArissa Loh
 
SEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaSEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaMayank Oza
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesTulsiram Bhattarai
 

Was ist angesagt? (20)

Planning and management of water
Planning and management of waterPlanning and management of water
Planning and management of water
 
Sem 2 bs1 storm water system
Sem 2 bs1 storm water systemSem 2 bs1 storm water system
Sem 2 bs1 storm water system
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage design
 
Drainage System
Drainage SystemDrainage System
Drainage System
 
Planning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad city
 
DEWATS Decentralized waste water treatment technology
DEWATS Decentralized waste water treatment  technologyDEWATS Decentralized waste water treatment  technology
DEWATS Decentralized waste water treatment technology
 
Water demand
Water demandWater demand
Water demand
 
L 2 sources and water supply schemes
L 2 sources and water supply schemesL 2 sources and water supply schemes
L 2 sources and water supply schemes
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building
 
Water supply final
Water supply finalWater supply final
Water supply final
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenances
 
Storm water rain water harvesting
Storm water   rain water harvestingStorm water   rain water harvesting
Storm water rain water harvesting
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
 
Building drainage system
Building drainage systemBuilding drainage system
Building drainage system
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewage
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish Pandey
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management Report
 
SEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaSEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank oza
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 

Ähnlich wie Sustainable storm water management Presentation Slides

Power point presentation on Rainwater harvesting
Power point presentation on Rainwater harvestingPower point presentation on Rainwater harvesting
Power point presentation on Rainwater harvestingMonujBorah
 
Final presentation
Final presentationFinal presentation
Final presentationw ss
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvestingAbsar Ahmed
 
Water harvesting principles and methods
Water harvesting principles and methodsWater harvesting principles and methods
Water harvesting principles and methodsTharun Reddy
 
Water Harvesting principles,types of water Harvesting
Water Harvesting  principles,types of water HarvestingWater Harvesting  principles,types of water Harvesting
Water Harvesting principles,types of water HarvestingTharun Reddy
 
rainwater harvesting.pptx
rainwater harvesting.pptxrainwater harvesting.pptx
rainwater harvesting.pptxswalihaka1
 
Rain water harvesting PPT
Rain water harvesting PPTRain water harvesting PPT
Rain water harvesting PPTSamay057
 
Commercial Property Storm Preparation in Southern California
Commercial Property Storm Preparation in Southern CaliforniaCommercial Property Storm Preparation in Southern California
Commercial Property Storm Preparation in Southern CaliforniaHeaviland Landscape Management
 
Water Conservation SCR.pptx
Water Conservation SCR.pptxWater Conservation SCR.pptx
Water Conservation SCR.pptxshohannair7078
 
Rain water harvesting powerpoint
Rain water harvesting powerpointRain water harvesting powerpoint
Rain water harvesting powerpointraje20kaur
 
Drought management and water harvesting
Drought management and water harvestingDrought management and water harvesting
Drought management and water harvestingascivil
 
Drought management and water harvesting
Drought management and water harvesting Drought management and water harvesting
Drought management and water harvesting Yash Patel
 
rain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdfrain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdfshrishridharshri3693
 

Ähnlich wie Sustainable storm water management Presentation Slides (20)

Power point presentation on Rainwater harvesting
Power point presentation on Rainwater harvestingPower point presentation on Rainwater harvesting
Power point presentation on Rainwater harvesting
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Study of urban flooding
Study of urban floodingStudy of urban flooding
Study of urban flooding
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
Water harvesting principles and methods
Water harvesting principles and methodsWater harvesting principles and methods
Water harvesting principles and methods
 
Water Harvesting principles,types of water Harvesting
Water Harvesting  principles,types of water HarvestingWater Harvesting  principles,types of water Harvesting
Water Harvesting principles,types of water Harvesting
 
rainwater harvesting.pptx
rainwater harvesting.pptxrainwater harvesting.pptx
rainwater harvesting.pptx
 
Rain water harvesting PPT
Rain water harvesting PPTRain water harvesting PPT
Rain water harvesting PPT
 
Commercial Property Storm Preparation in Southern California
Commercial Property Storm Preparation in Southern CaliforniaCommercial Property Storm Preparation in Southern California
Commercial Property Storm Preparation in Southern California
 
Water Conservation SCR.pptx
Water Conservation SCR.pptxWater Conservation SCR.pptx
Water Conservation SCR.pptx
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 
Rain water harvesting powerpoint
Rain water harvesting powerpointRain water harvesting powerpoint
Rain water harvesting powerpoint
 
Enviro 2016
Enviro 2016Enviro 2016
Enviro 2016
 
Rain Water Harvesting
Rain Water HarvestingRain Water Harvesting
Rain Water Harvesting
 
Drought management and water harvesting
Drought management and water harvestingDrought management and water harvesting
Drought management and water harvesting
 
Drought management and water harvesting
Drought management and water harvesting Drought management and water harvesting
Drought management and water harvesting
 
Mahan 03 oct 2013
Mahan 03 oct 2013Mahan 03 oct 2013
Mahan 03 oct 2013
 
rain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdfrain-water-harvesting-Seminar-Report-pdf.pdf
rain-water-harvesting-Seminar-Report-pdf.pdf
 
Rainwater harvesting
 Rainwater harvesting Rainwater harvesting
Rainwater harvesting
 

Mehr von Arissa Loh

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final ReportArissa Loh
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group AssignmentArissa Loh
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual AssignmentArissa Loh
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final ReportArissa Loh
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation SlidesArissa Loh
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of ContractArissa Loh
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost AppraisalArissa Loh
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final ReportArissa Loh
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation SlidesArissa Loh
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Arissa Loh
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentationArissa Loh
 
PP2 final report
PP2 final reportPP2 final report
PP2 final reportArissa Loh
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808Arissa Loh
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesArissa Loh
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slidesArissa Loh
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation Arissa Loh
 
Tender Presentation
Tender PresentationTender Presentation
Tender PresentationArissa Loh
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishesArissa Loh
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesArissa Loh
 

Mehr von Arissa Loh (20)

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final Report
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation Slides
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of Contract
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost Appraisal
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final Report
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation Slides
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentation
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slides
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation
 
Tender Presentation
Tender PresentationTender Presentation
Tender Presentation
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishes
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 

Kürzlich hochgeladen

Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 

Kürzlich hochgeladen (20)

Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 

Sustainable storm water management Presentation Slides

  • 1. B U I L D I N G S E R V I C E S I GROUP MEMBER : DARREN TAN QUAN WEN LOH MUN TONG LEONG LI JING LEW QUO MING YEE JYH LIN TAM ZHAO WEI SUSTAINABLE STORMWATER MANAGEMANT
  • 2. INTRODUCTION • Storm water are usually water from snow/ice or from nearby stream, river or runoff surface • Natural sentiment such as forest, the soil absorbs much of the stormwater. In developed place such as cities, unmanaged stormwater can create 2 types of problem. First problem would be flooding and water pollution. • Water pollution, is due to the impervious surface such as parking lots; road and building that the stormwater are unable to be absorbed by the ground. Therefore, generating more runoff than natural sentiment. Flooding is due the objects that are collected during rain. It will all be transported to a drain causing it to block it. • To combat stormwater, a storm drain is installed throughout the cities. It is designed to drain excessive rain from impervious surfaces.
  • 3. SUSTAINABLE STORMWATER MANAGEMANT SYSTEM • Rainwater is absorbed and soaked into the ground and then it evaporates from the surface, taken up by plants, or finding its way slowly into rivers or streams. Any development will affect and make an impact to this environment and change the natural water cycle.
  • 4. GREEN INFRASTRUCTURE & GRAY INFRASTRUCTURE Green infrastructure functioned as water management that protects, restores, or mimics the natural water cycle. Gray infrastructure is man-made designed to move urban storm-water away from the built environment. Both infrastructure are involved in stormwater management system.
  • 5. GREEN ROOF Green roofs are a multi-layered system with living plants growing on roof top.The most typical built up includes roof deck, waterproofing layer, protection layers, drainage layer, filter sheet, growing substrate and vegetation. Green roofs enable rainfall infiltration and evapotranspiration of stored water. The vegetation and soil absorb and filter the water.
  • 6. ADVANTAGES Provide a barrier of greenery that helps to protect the waterproof membrane underneath and thus increase the lifespan of the roof DISADVANTAGE S An increase in weight load (require more structural support to be implemented) MAINTENANCE • Litter removal may be required • Inspection and replacement of plants will be required on a regular basis
  • 7. Pervious surfaces can be either porous or permeable. Porous surfacing is a surface that infiltrates water across the entire surface while permeable surfaces designed to allow storm-water runoff to filter through surface voids into an underlying stone reservoir for temporary storage or infiltration. PERVIOUS SURFACE
  • 8. ADVANTAGES Reduced need for deep excavations for drainage, which can have significant cost benefits DISADVANTAGE S Risk of long-term clogging and weed growth if poorly maintained MAINTENANCE • Periodic vacuuming • Repair and patch surfaces with similar pervious materials
  • 9. • Shallow, broad and vegetated channels • Allow storm water to slow down and go through the process of sedimentation, filtration, evapotranspiration and partially infiltration • Located along the roadway • Drain away through the soil within several hours or days • Check dams and berms - promote settling and infiltration. GRASSED SWALES
  • 10. Wet Swales at Sue Donaldson Dry Swales at Delaware Department of Transportation There are two types of swales: WET SWALES treat storm water through physical and biological action DRY SWALES treat storm water through infiltration
  • 11. WET SWALES DRY SWALES
  • 12. ADVANTAGES Pollution and blockages are visible and easy to remove DISADVANTAGE S Limit the opportunities to use trees for landscaping MAINTENANCE • Removal of trash and debris regularly • Grass cutting and removal of cuttings • Clearing of inlets, culverts and outlets to avoid clogging
  • 13. - contains plants that can survive in soil soaked with water - collect and slow the storm-water runoff - increase the infiltration into the soil - practice mimics natural hydrology by the process of infiltrating, evaporating and transpiring - commonly found on private properties How it works? 1. Water settle on the garden surface then soak through the plants and filter media 2. Sediments are trapped on the surface of the garden 3. Soil and plant roots work together to filter the water naturally RAIN GARDENS
  • 14. Greenest Street in America, Chicago
  • 15. ADVANTAGES Can be designed to work in most soil types DISADVANTAGE S Not suitable for areas with steep slopes. MAINTENANCE • Vegetation management • Removal of trash and debris regularly • Inlet and outlet cleaning
  • 16. - Similar with rain gardens - Specially designed and engineered to manage and treat stormwater runoff - Shallow landscape depressions which included soil mixes and control structures such as • under drains to aid the control of flow • catch basins to filter sediment • check dams to slow the water flow - Commonly found on commercial properties or any public areas BIORETENTION AREAS
  • 18. ADVANTAGES Provide wildlife habitats DISADVANTAGE S Require extra maintenance MAINTENANCE • Regular inspection • Removal of trash and debris regularly • Replacement of mulch layer • Vegetation management
  • 19. DETENTION AND RETENTION PONDS DETENTION BASINS (DRY POND) • Open and flat areas of grass • Normally dry during low flow periods • Allow filtration and sedimentation process to take place • Provide temporary storage • Works by allowing a large basin area for water and the water slowly drains out through the outlet at the bottom as designed RETENTION PONDS (WET POND) • Open areas of shallow water • Accommodate water and provide temporary storage for excess water • Improve the quality of water through settling, often employed as flood control devices • Water level rises temporarily and retain a permanent pool of water • Allows large amounts of water to enter the pond and allows small amounts of water drains out through the outlet Detention Pond Retention Pond
  • 20.
  • 21. ADVANTAGES Surrounding areas have vegetative buffer that can withstand dry or wet conditions. DISADVANTAGE S Breeding grounds for mosquitoes and other diseases MAINTENANCE • Removal of trash and debris regularly • Inlet and outlet cleaning • Vegetation management DETENTION POND
  • 22. ADVANTAGES Provide wildlife habitats DISADVANTAGE S Negative water quality impacts if not properly designed MAINTENANCE • Removal of trash and debris regularly • Inlet and outlet cleaning • Vegetation management RETENTION POND
  • 23. • Consists of shallow ponds and marshy areas, covered almost entirely in aquatic vegetation WETLANDS Treated by the process of Sedimentation Filtration Digestion Oxidation Reduction Absorption Precipitation
  • 24. There are two types of wetlands: NATURAL WETLANDS filter the contaminated water running into the stream, river or ocean CONSTRUCTED WETLANDS filter the water flow from inlet pipe and gravel through wetland plants and flow out from outlet pipe and gravel for further treatment. Natural Wetlands at Ramsey-Washington Metro Watershed District Constructed Wetlands from Gold Coast City Council
  • 26. ADVANTAGES Can tolerate both great and small volumes of water DISADVANTAGE S Unable to treat highly toxic modern wastewater MAINTENANCE • Removal of trash and debris regularly • Inlet and outlet cleaning • Vegetation management to retain high vegetation coverage
  • 27. RILLS AND CHANNELS • Allow to collect water, slow down and provide storage for slit and oil. • Outlets are designed as a mini oil separator, so it is very effective at treating pollution. • Allow water flows along with the variety of cross sections rills and channels
  • 28. ADVANTAGES Very effective in water & pollution treatment DISADVANTAGE S Need to give careful consideration to crossings MAINTENANCE • Removal of trash and debris regularly • Routine maintenance • Intensive maintenance required one every five years
  • 29. • Underground storage tank system is a storage tank with underground piping connected • Carry storm water from detention or retention ponds. • The system consists of storage structures, inlet and outlet pipes • Addition features at the inlet pipes helps to improve the water quality by removing floatable, oils and grease, and sediments. • Cooperate with other storm water system to achieve the best result. UNDERGROUND STORAGE
  • 30. ADVANTAGES Protected damage from animals and natural disasters DISADVANTAGE S Relatively expensive due to their specialised construction MAINTENANCE • Inspection and prevention of leakage and spills • Clean up by soil and groundwater investigation and remediation • Corrosion protection for tanks and piping
  • 31. • Consists of internal components which are permanent pool for sedimentation • Inlet and outlet pipes which able to create flow patterns and flow conditions that aids in sediments removal. • An underground storage structure smaller than underground storage tank system. HYDRODYNAMIC SEPARATORS
  • 32. ADVANTAGES Space saving since it is installed underground DISADVANTAGE S Only can remove limited amounts of pollutants MAINTENANCE • Cleaning and disposal of sediments and oils • Removal of trash and debris regularly • Inspection and prevention of leakage or spills
  • 35. CASE STUDY UNIVERSITY OF MINNESOTA DULUTH
  • 36.
  • 37. The University of Minnesota Duluth discharges storm-water to several waters, including Lake Superior and two trout streams. Lake Superior Trout Stream
  • 38. WATERSHED The main portion of UMD campus is in three watersheds.
  • 39. University of Minnesota Duluth have more than 60 preventative storm water features in place to treat the runoff to varying degrees before it discharges to streams.
  • 40. WET PONDS Eric Clarke Pond Fire Hall Pond Rock Pond Swenson Science Research Pond
  • 41. FILTRATION PONDS Lot L-3 Filtration Basins Ianni Hall Volleyball Court
  • 43. Modifying soil surface by adding geo-grids, mesh, sand or rock to stabilize surface to prevent ponding. The gravel road surface of Rock Hill Road is replaced with geoweb mesh, and crushed rock or topsoil mixture to stabilize surface and prevent rutting. MODIFIED SOILS
  • 44. RAIN GARDEN/ BIO-RETENTION PONDS The Lot B UMD Rain Garden was built to help protect Oregon Creek by slowing, cooling and filtering the runoff water from the adjacent parking lot. It was designed and engineered as a bioretention pond and is composed of plantings, a drain tile system, and a water level control system. Lot B UMD Rain Garden
  • 45. The Rain Garden in University Minnesota Duluth is one third acre in size. It handles stormwater from 2.5 acres of Parking Lot B and can hold as much as 60,000 US gallons of water.
  • 46. HYDRODYNAMI C SEPARATORS The UMD campus has installed hydrodynamic separator in LOT G, Sports Health Centre, Chester Park and Swenson Civil Engineering Centre to separate oils and solids from moving stormwater by gravity.
  • 47. The parking lot was refurbished in 2004 to include an underground “vault” consisting of large diameter pipes to temporarily store stormwater parking lot runoff. Lot G, behind UMD Library UNDERGROUND TANK
  • 48. For the past five years, University of Minnesota Duluth campus have had installed a few pervious pavement including concrete pavers, recycled rubber pavers and pervious surface. PERVIOUS SURFACES
  • 49. The lower tier is a green roof that helps to insulate the building as well as curb storm water runoff. A view of the partial green roof from top of a stairwell in Civil Engineering. Bagley Outdoor Classroo GREEN ROOF
  • 50. A majority of these plantings are in areas that would hold sod, a high maintenance method of landscaping. Low maintenance alternative plantings help to diversify the appearance of the campus as well as reduce carbon footprint. ALTERNATIVE PLANTINGS
  • 51. Objective : To reduce the quantity and to improve the quality of storm water runoff. SWPPP requires SIX minimum control measures : 1. Public Education and Outreach 2. Public Involvement and Participation 3. Illicit Discharge Detection and Elimination 4. Construction Storm Water Runoff Control 5. Post Construction Storm Water 6. Pollution Prevention and Good STORM WATER POLLUTION PREVENTION PROGRAM
  • 52. • Provide educational storm water resources for its campus and greater community • Protect and enhance the region’s shared water resources through storm water pollution prevention • UMD Educational materials : 1. Illicit Discharge Poster (2015) 2. Illicit Discharge Quiz Slideshow (2013) 1. PUBLIC EDUCATION AND OUTREACH
  • 53. 2. PUBLIC INVOLVEMENT AND PARTICIPATION • UMD welcomes involvement from the public including the employees, students, and contractors that make up the campus community. • Strongly encourage the involvement in creation, implementation and evaluation. IDEAS : - Include storm-water information to be taught in classes - Welcome the assistance in reviewing their best management practices - Assistance in hands-on clean ups / special projects
  • 54. 3. ILLICIT DISCHARGE DETECTION AND ELIMINATION Illicit discharge is any discharge to the municipal separate storm server system (MS4) that is not composed entirely of storm water. STEPS TAKEN BY UMD TO DETECT AND ELIMINATE ILLICIT DISCHARGES : • UMD has developed and continue to maintain storm sewer system maps. • Physical observations (odour, colour and condition) during stormwater outlet inspections. • Programs like the UMD Spill Prevention Control and Countermeasures Plan can identify potential illicit discharges. • Building-by-building document allows the determination of potential interconnections for the buildings.
  • 55. 4. CONSTRUCTION SITE RUNOFF CONTROL Sediment runoff rates from construction sites are typically 10-20 times greater than those of agricultural lands, and 1000-2000 times greater than those of forest lands. Hence, in time it may cause serious impact to water bodies. Cause: contractor flushes newly installed hydrant near an unprotected catch Effect: Sediment plumb in a nearby trout stream is polluted.
  • 56. Hence, UMD construction projects are required to have provisional and sediment control measures incorporated in the design. The construction documents must identify relevant details as well as contractor execution and inspection responsibilities.
  • 57. 5. POST CONSTRUCTION STORM WATER Post construction storm water has brought significant impact to water bodies. Prior planning and design can minimise pollutants and it’s the most cost- effective approach to storm water quality management. Examples: - A green roof on Bagley Outdoor Classroom designed to reduce storm water inputs to Tischer Creek.
  • 58. 6. POLLUTION PREVENTION AND GOOD HOUSEKEEPING UMD is establishing a system of good housekeeping practices that recognise that the campus operates in an urban area.
  • 60. GREEN ROOF Problems Plant Selection • Type of plant factors in the performance of the green roof. • If chosen poorly, the plant would not be able to survive the climate • Maintenance would be costly as consistently require to change the plant Dead Plants
  • 61. GREEN ROOF Recommendation • Species that are able to accumulate nutrients and use water effectively • Herbaceous Species - Tulbaghia Violacea • Shrubby Species - Leonotis Leonurus.
  • 62. UNDERGROUND Problems • Allowing direct recharge of groundwater • Infiltration system underground would be affected hence restricting the movement of water.
  • 63. UNDERGROUND Recommendation • Only soils which are suitable for infiltration able to allow a direct recharge • Acceptable soils for underground system include sand, sandy loam and loam. • Sandy soils are permeable while soils with clay should be avoided because it restricts the movement of water. Sand Sandy Loam
  • 64. SWALES Problems • Not effective enough in reducing the bacteria levels and pollutants alone • Wet swales will be a nuisance by allowing mosquito breeding Polluted Swales
  • 65. SWALES Recommendation • Check dams can be constructed with the swales • Prevent erosion and promote sedimentation by decreasing runoff volume, rate, and velocity • More effective at mitigating runoff quantity and quality than those without. Grass Swales with Rock Check
  • 66. POND Problems Effectiveness of pollutant removal • Settling area being relative small hence harder to separate sediments. • Problems in Impede flow and trap remaining pollutants • Unable to remove pollutant alone Pond Infiltration System Problem
  • 67. POND Recommendation • The addition of a sediment forebay increase the settling area for sediments. • Construction of shallow ledges along the edge to have aquatic plants that prevents the entering of flow and trapped pollutants.

Hinweis der Redaktion

  1. Constructed year: 1994 Reconstructed year: 2010
  2. Lot G located behind the UMD Library, it produces stormwater that flows to the west branch of Tischer Creek, which is a designated trout stream. This technology shall reduce peak flows, reduce the temperature of runoff heated by the asphalt in summer, settle sediments that can be collected and disposed of properly, and skim oils and grease for proper disposal.
  3. Swenson Civil Engineering Loading Deck. Sports and Health Centre Sidewalk, Chiller Plant Parking Area
  4. Alternative plantings can be found throughout campus
  5. Alternative plantings can be found throughout campus
  6. Alternative plantings can be found throughout campus
  7. Alternative plantings can be found throughout campus
  8. Alternative plantings can be found throughout campus
  9. Alternative plantings can be found throughout campus
  10. Alternative plantings can be found throughout campus
  11. Alternative plantings can be found throughout campus
  12. Alternative plantings can be found throughout campus
  13. Alternative plantings can be found throughout campus
  14. Alternative plantings can be found throughout campus
  15. Alternative plantings can be found throughout campus
  16. Alternative plantings can be found throughout campus
  17. Alternative plantings can be found throughout campus
  18. Alternative plantings can be found throughout campus
  19. Alternative plantings can be found throughout campus
  20. Alternative plantings can be found throughout campus
  21. Alternative plantings can be found throughout campus
  22. Alternative plantings can be found throughout campus
  23. Alternative plantings can be found throughout campus