SlideShare ist ein Scribd-Unternehmen logo
1 von 6
MAX W. SIMNITT, JR.
27706 Rainy Creek Court (713) 870-2810
Fulshear, Texas 77441 max.simnitt@yahoo.com
DETAILED WORK HISTORY
Director of Operations & Projects – Prometheus Energy Group
In addition to the duties as Director of Projects (see below), responsible for managing
the development and implementation of Field Operations processes and procedures,
establishing and measuring safety and performance metrics, reducing/optimizing Cost
of Goods and Services, as well as overheads/SG&A. Data capture and reporting
developed include: Safety Observations, Incident Reporting, JSAs, uptime reliability,
downtime cause, effect and repair details, onsite LNG volumes, Preventive
Maintenance schedule and completion, inventory control, and field purchase
requisitions.
• Representative customers include but are not limited to: Shell, Ensign, EnCana,
Antero, Apache, Noble, Anadarko, Halliburton, Schlumberger, Aggreko,
Seneca, UGI Services, Western Milling, Caterpillar, Denison Mines, Lisbon
Valley Mines, MolyCorp Rare Earths Mine, Glanbia Foods, KLEEN Laundry, the
University of Massachusetts in Amherst, Western Milling, Bowerman Landfill,
Black Hills, Bonanza Creek, Synergy, Rice Energy, Nevada Milling and Mining,
Hollister Mine.
Responsible for managing all aspects of operations of the Lisbon LNG production
facility in Moab, UT; including, Capital Expansion, Safety, production, preventive
maintenance, COGS, and overheads/SG&As.
Provided Business development support on proposals in the form of variable and fixed
cost estimates for capital, operating and logistics expenses; negotiation of Terms and
Conditions; as well as account management and customer relations.
Member of the Executive Management Team, reporting directly to the CEO.
Director of Projects – Prometheus Energy Group
Responsible for management, development and implementation of all aspects of
projects, including Engineering, Environmental, Regulatory, Safety, Cost Control,
Scheduling, Feasibility Studies, Estimating, Contracts negotiation and administration,
Field Project Controls, Procurement, Expediting, Inspection, Construction,
Commissioning, Startup, and handover to Operations.
• Prometheus Energy - LNG Silesia, Coal Mine Methane to LNG project in
Katowice, Poland; Barrick Gold conversion from propane to Natural Gas in CA;
KLEEN Laundry conversion from LP to LNG in New Hampshire; MolyCorp LNG
Storage and Vaporization Project in CA; Cuervo Flare Gas to LNG project in
NM, Bowerman Landfill gas to LNG in CA
• Mobile LNG Storage and Vaporization kits for use in Drilling, Fracturing, Pipe
line integrity (supply of LNG/natural gas while the lines were down for testing
and repair) and interim LNG supply while stationary facilities were being built.
• Mobile LNG Storage and Fueling for use in Mine Haul equipment and testing of
Caterpillar Natural Gas Engines.
Member of the Executive Management Team, reporting directly to the CEO.
PAGE 1 OF 5
MAX W. SIMNITT, JR.
27706 Rainy Creek Court (713) 870-2810
Fulshear, Texas 77441 max.simnitt@yahoo.com
Project Manager – Bobcat Gas Storage
Responsible for management, development and implementation of all aspects of
Projects, including Engineering, Environmental, Regulatory, Safety, Cost Control,
Scheduling, Estimating, Contracts negotiation and administration, Field Project
Controls, Procurement, Expediting, Inspection, and Construction.
• Bobcat Gas Storage Facility, Port Barre, Louisiana. Projects include Phase 2
Compressor Station Expansion, Cavern Well 2 conversion to gas operations, Phase
3 Compressor Station Expansion, Cavern Well # 5 Drilling, Leaching Interconnects
to new Cavern Well #5, Gas Interconnects to CW-5, and ANR Meter Site
Modification
Manager of Project Services – Bobcat Gas Storage
Responsible for management, development & implementation of all aspects of Project
Services including Cost Control, Scheduling, Estimating, Procurement, Expediting,
Inspection, Subcontracts Administration, and Field Project Controls.
Responsible for developing budgets, controlling cost, executing schedules,
procurement, field project controls, and subcontracts administration in all stages of
Engineering, Procurement, Construction and Operations & Maintenance.
• Bobcat Gas Storage Facility, Port Barre, Louisiana. Projects include four Fresh
Water Wells, four Saltwater Disposal Wells, two Salt Cavern Wells, Compressor
Station Facility, Leaching Plant Facility, Electrical Substation, five Metering Stations
and interconnecting pipelines.
Project Services Manager – JP Kenny
Responsible for EPIC estimating, cost control, and scheduling.
• Deep Water Production, Gulf of Mexico, Business Unit, BP. Responsibilities
included Long Term Planning Report to Corporate Management and development of
Project Services procedures, processes, and programs for the Business Unit.
• Nakika Phase II Project, BP. The project included drilling and completion of two new
wells with tie-backs to the existing Na Kika platform.
Project Services Specialist – JP Kenny
Responsible for developing cost estimates, schedules, and proposal documentation.
• Ibhubesi Full Field Development, Forest Oil. The proposal included three Tension
Leg Platforms, ninety-nine wells, onshore and offshore export pipelines, and all
interconnecting pipe and umbilicals.
Project Engineer – Mustang Engineers & Constructors
Responsible for execution of project technical, contractual and commercial initiatives.
• Clean Fuels Program, Tesoro Northwest Company, Anacortes, Washington. The
PAGE 2 OF 5
MAX W. SIMNITT, JR.
27706 Rainy Creek Court (713) 870-2810
Fulshear, Texas 77441 max.simnitt@yahoo.com
project included Ultra Low Sulfur Diesel Unit, Low Sulfur Gas Cat Feed Hydrotreater
Unit and associated turnaround scope.
• Delayed Coker Project, Tesoro Northwest Company, Anacortes, Washington. The
project included Delayed Coker Unit, Coke Handling and Storage, Sulfur Recovery
Unit, Amine Unit, Sour Water Stripper Unit, and Offsites.
• Clean Fuels Project, Valero, Ardmore, Oklahoma. The project included the HDHDS
Co-Processor Unit, Cat Feed Hydrotreater, DHDS Unit, Crude Unit, Sat Gas Unit,
Platformer Booster Compressor, Diesel Rundown, and Offsites.
Chief Estimator – Mustang Engineers & Constructors
Responsible for estimates – Feasibility, FEED, and Detailed.
• Celanese Alliance Estimator for the Clear Lake, Bishop, Pampa, Pasadena, and Bay
City plants. Projects include Quench Recycle Pipe Modifications, Oxygen Unit
Piping, Low Energy Purification Project, ACH Tank Car Unloading.
• El Paso Alliance Estimator for the Aruba Plant. Projects include Coker Daearator
Addition, Desal Unit Filters, Finger Pier #3, Sulfur Storage Project, SGAR
Segregation Project, Fuel Oil Project, and Fuel Gas Project.
• Clean Fuels Program, Tesoro Northwest Company, Anacortes, Washington. The
project included Ultra Low Sulfur Diesel Unit, Low Sulfur Gas Cat Feed Hydrotreater
Unit and associated turnaround scope.
• Clean Fuels Project, Valero, Ardmore, Oklahoma. The project included the HDHDS
Co-Processor Unit, Cat Feed Hydrotreater, DHDS Unit, Crude Unit, Sats Gas Unit,
Platformer Booster Compressor Replacement, Diesel Rundown, and Offsites.
• Low Sulfur Gasoline Project, Amerada Hess Corporation, New Jersey, the project
included the Gasoline HDS Unit, INALK Unit, Hydrogen Unit, and Offsites
• Processing Units, Williams Refining, Mezeikiu refinery, Mazeikai, Lithuania. Project
included the NHT unit, Platformer Splitter unit, NHT & Naptha Splitter unit, LPG unit,
and Heater modifications.
Project Controls Manager – Jacobs Engineering Group
Responsible for EPC estimating, cost control, and scheduling.
• Lexan 635 and 680 Expansion Projects, GE Plastics, Burkeville, Alabama.
Supervised a team of 11 people. The project included Resin, CO/Phosgene, BPA,
Brine, and Finishing plants, as well as plant Utilities.
• Lexan Expansion Project Basic Engineering Package and definitive estimate,
GE Plastics, Burkeville, Alabama. The project included the Resin, CO/Phosgene,
BPA, Brine, and Finishing plants, as well as plant Utilities
Field Project Controls Manager – Litwin Engineers & Constructors and Jacobs
Responsible for construction and turnaround cost control, planning, scheduling, and
subcontracts administration.
PAGE 3 OF 5
MAX W. SIMNITT, JR.
27706 Rainy Creek Court (713) 870-2810
Fulshear, Texas 77441 max.simnitt@yahoo.com
• Line 3 Polypropylene Project, Aristech Chemical Corporation, LaPorte, Texas.
Supervised a field project control team of six people. The project included the
Montell process area, finishing and shipping areas, and all related offsite and utility
areas.
• Sour Crude Project, Total Petroleum, Ardmore, Oklahoma. Supervised a field
project control team of five people. The project included grassroots cat feed
hydrotreater, distillate hydrotreater revamp, grassroots sour water stripper, sour
water stripper revamp, electrical feeder system, flare unit, and cooling water tower.
• FCCU Modernization Project, Star Enterprises, Convent, Louisiana. Supervised a
field project control team of two people. The project included an FCC unit revamp
and turnaround, alkylation unit revamp, offsites and a new cooling tower.
• FCCU Rx/Regen MSCC Plant Conversion, TransAmerican Refining Corp., Norco,
Louisiana. Supervised a field project control team of two people. The project
included an FCC unit revamp, gas plant revamp, alkylation unit revamp, new flue
gas scrubber, C3/C4 treating unit revamp and offsites.
Senior Cost Engineer - Jacobs
Responsible for tracking and reporting TIC project cost, and for scheduling engineering,
procurement, and construction.
• Shell NOD Project and OFH Project, Norco, Louisiana. The project included
fractionation, caustic, compressor, quench, dryer, and utility areas.
Home Office Scheduler – Litwin & Jacobs
Responsible for scheduling engineering, procurement, and construction.
• Train 9 Polypropylene Project, Fina Oil and Chemical, LaPorte, Texas. The project
included the Montell process area, finishing and shipping areas, and all related
offsite and utility areas.
• East Plant DCS Modernization, Hess Oil Virgin Islands Corporation, St. Croix.
Responsible for scheduling engineering, procurement and construction.
• Reformulated Fuels Program, UNOCAL, Los Angeles Refinery, Wilmington,
California. The project included mid-barrel blending, pentane storage,
rundown/transfer piping, electrical power distribution, reformate splitter addition, and
alkylation fractionation revamp.
• Jose Upgrader Project, Total/Maraven/Norsk Hydro/Stat Oil, Jose, Venezuela.
Responsible for scheduling Phase I (pre-basic, basic, and detailed) engineering,
procurement and construction; and cost control.
• Hess Oil Virgin Islands Corporation, St. Croix (Offsites). The project included frame
5-25 megawatt gas turbine generator, rundown/transfer area, advanced wastewater
treatment unit, butane spheres, purge treatment unit, and LPG unit.
PAGE 4 OF 5
MAX W. SIMNITT, JR.
27706 Rainy Creek Court (713) 870-2810
Fulshear, Texas 77441 max.simnitt@yahoo.com
Field Planner/Scheduler – Litwin
Responsible for construction cost control, planning, scheduling and subcontracts
administration.
• Sun Oil, Philadelphia, Pennsylvania. The project included a grassroots Alkylation
Unit, FCC Unit Revamp, and Propane Propylene Recovery Unit.
• South Area Refinery Controls Upgrade, Ashland Petroleum, Canton, Ohio. The
project included Crude Unit, FCC Unit, DEMEX, C3/C4 Treater, Vacuum Unit and
DOT Unit.
• Naphtha Hydrotreater, CCR Platformer, Koch Refining Company, Corpus Christi,
Texas.
• Cat Cracker Turnaround, Fina Oil and Chemical, Big Spring, Texas.
Associate Estimator – Litwin
• Responsible for equipment, civil, structural, piping, instrumentation, electrical and
protective covering material take-offs, material pricing, and consolidation of data into
a project estimate.
PAGE 5 OF 5
MAX W. SIMNITT, JR.
27706 Rainy Creek Court (713) 870-2810
Fulshear, Texas 77441 max.simnitt@yahoo.com
Field Planner/Scheduler – Litwin
Responsible for construction cost control, planning, scheduling and subcontracts
administration.
• Sun Oil, Philadelphia, Pennsylvania. The project included a grassroots Alkylation
Unit, FCC Unit Revamp, and Propane Propylene Recovery Unit.
• South Area Refinery Controls Upgrade, Ashland Petroleum, Canton, Ohio. The
project included Crude Unit, FCC Unit, DEMEX, C3/C4 Treater, Vacuum Unit and
DOT Unit.
• Naphtha Hydrotreater, CCR Platformer, Koch Refining Company, Corpus Christi,
Texas.
• Cat Cracker Turnaround, Fina Oil and Chemical, Big Spring, Texas.
Associate Estimator – Litwin
• Responsible for equipment, civil, structural, piping, instrumentation, electrical and
protective covering material take-offs, material pricing, and consolidation of data into
a project estimate.
PAGE 5 OF 5

Weitere ähnliche Inhalte

Was ist angesagt?

Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhil Karow
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2Brian Levitt
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2kim himel
 
Dallas madson resume2
Dallas madson resume2Dallas madson resume2
Dallas madson resume2Dallas Madson
 
E J Piekenbrock Resume 5-2014 Revised
E  J  Piekenbrock Resume 5-2014 RevisedE  J  Piekenbrock Resume 5-2014 Revised
E J Piekenbrock Resume 5-2014 RevisedEugene Piekenbrock
 
MCS Presentation
MCS PresentationMCS Presentation
MCS PresentationArranEwan
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Malcolm Kiper
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment
 
Ruben J Quartana(September 2016)(2)
Ruben J Quartana(September 2016)(2)Ruben J Quartana(September 2016)(2)
Ruben J Quartana(September 2016)(2)Ruben Quartana
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth, PE
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Geotechnical Engineering Services
Geotechnical Engineering ServicesGeotechnical Engineering Services
Geotechnical Engineering ServicesVictor Panlilio
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015Blase Townsing
 

Was ist angesagt? (20)

Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
 
Dallas madson resume2
Dallas madson resume2Dallas madson resume2
Dallas madson resume2
 
E J Piekenbrock Resume 5-2014 Revised
E  J  Piekenbrock Resume 5-2014 RevisedE  J  Piekenbrock Resume 5-2014 Revised
E J Piekenbrock Resume 5-2014 Revised
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
RES
RESRES
RES
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
Ruben J Quartana(September 2016)(2)
Ruben J Quartana(September 2016)(2)Ruben J Quartana(September 2016)(2)
Ruben J Quartana(September 2016)(2)
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Geotechnical Engineering Services
Geotechnical Engineering ServicesGeotechnical Engineering Services
Geotechnical Engineering Services
 
DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 

Andere mochten auch

Oportunidad de vida
Oportunidad de vidaOportunidad de vida
Oportunidad de vidaAdri Pérez
 
Spirulina hellas α.ε.
Spirulina hellas α.ε.Spirulina hellas α.ε.
Spirulina hellas α.ε.deligianni
 
Terapia e lojes ekosistemike
Terapia e lojes ekosistemikeTerapia e lojes ekosistemike
Terapia e lojes ekosistemikeAnida Ago
 
1 lista de_exercícios_gaal-matemática
1 lista de_exercícios_gaal-matemática1 lista de_exercícios_gaal-matemática
1 lista de_exercícios_gaal-matemáticaCristian Rodrigues
 
Annette bussmann holder, hugo keller high tc superconductors and related tran...
Annette bussmann holder, hugo keller high tc superconductors and related tran...Annette bussmann holder, hugo keller high tc superconductors and related tran...
Annette bussmann holder, hugo keller high tc superconductors and related tran...Edward Flores
 
Poetry dedication for my little sister
Poetry dedication for my little sisterPoetry dedication for my little sister
Poetry dedication for my little sisterMichala_Weller
 
Andrew SM-U2080
Andrew SM-U2080Andrew SM-U2080
Andrew SM-U2080savomir
 
Grds international conference on health and life (4)
Grds international conference on health and life (4)Grds international conference on health and life (4)
Grds international conference on health and life (4)Global R & D Services
 
Aumento del salario del 26%
Aumento del salario del 26%Aumento del salario del 26%
Aumento del salario del 26%Cinny Lpez Rzn
 
Indigenous school attendance
Indigenous school attendanceIndigenous school attendance
Indigenous school attendanceGina Milgate
 
Become a Certified Awesome Admin
Become a Certified Awesome AdminBecome a Certified Awesome Admin
Become a Certified Awesome AdminStephen Noe
 
Inflación en méxico
Inflación en méxicoInflación en méxico
Inflación en méxicoBere Carsolio
 
Mi Galería De Fotos
Mi Galería De Fotos Mi Galería De Fotos
Mi Galería De Fotos Maiber Garcia
 
How Auctions Work
How Auctions WorkHow Auctions Work
How Auctions Workanafuto
 

Andere mochten auch (20)

Blogger
BloggerBlogger
Blogger
 
6° allende ed
6° allende ed6° allende ed
6° allende ed
 
Oportunidad de vida
Oportunidad de vidaOportunidad de vida
Oportunidad de vida
 
Spirulina hellas α.ε.
Spirulina hellas α.ε.Spirulina hellas α.ε.
Spirulina hellas α.ε.
 
Terapia e lojes ekosistemike
Terapia e lojes ekosistemikeTerapia e lojes ekosistemike
Terapia e lojes ekosistemike
 
Blogs
BlogsBlogs
Blogs
 
Simbología y génesis
Simbología y génesisSimbología y génesis
Simbología y génesis
 
1 lista de_exercícios_gaal-matemática
1 lista de_exercícios_gaal-matemática1 lista de_exercícios_gaal-matemática
1 lista de_exercícios_gaal-matemática
 
scan
scanscan
scan
 
Annette bussmann holder, hugo keller high tc superconductors and related tran...
Annette bussmann holder, hugo keller high tc superconductors and related tran...Annette bussmann holder, hugo keller high tc superconductors and related tran...
Annette bussmann holder, hugo keller high tc superconductors and related tran...
 
Poetry dedication for my little sister
Poetry dedication for my little sisterPoetry dedication for my little sister
Poetry dedication for my little sister
 
Presentación1
Presentación1Presentación1
Presentación1
 
Andrew SM-U2080
Andrew SM-U2080Andrew SM-U2080
Andrew SM-U2080
 
Grds international conference on health and life (4)
Grds international conference on health and life (4)Grds international conference on health and life (4)
Grds international conference on health and life (4)
 
Aumento del salario del 26%
Aumento del salario del 26%Aumento del salario del 26%
Aumento del salario del 26%
 
Indigenous school attendance
Indigenous school attendanceIndigenous school attendance
Indigenous school attendance
 
Become a Certified Awesome Admin
Become a Certified Awesome AdminBecome a Certified Awesome Admin
Become a Certified Awesome Admin
 
Inflación en méxico
Inflación en méxicoInflación en méxico
Inflación en méxico
 
Mi Galería De Fotos
Mi Galería De Fotos Mi Galería De Fotos
Mi Galería De Fotos
 
How Auctions Work
How Auctions WorkHow Auctions Work
How Auctions Work
 

Ähnlich wie Max Simnitt_03-2016_Work History Details

Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15 Mike Syslak
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistAlanna Scott
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins ResumeRusty Adkins
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Mark Kavanagh CV 2016 no dates
Mark Kavanagh CV  2016 no datesMark Kavanagh CV  2016 no dates
Mark Kavanagh CV 2016 no datesMark Kavanagh
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221Brad Young
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CVJaco Botha
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017SCOTT SITTNER
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
Breaux,Kyle 9-15-15
Breaux,Kyle  9-15-15Breaux,Kyle  9-15-15
Breaux,Kyle 9-15-15Kyle Breaux
 

Ähnlich wie Max Simnitt_03-2016_Work History Details (20)

Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls Specialist
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Mark Kavanagh CV 2016 no dates
Mark Kavanagh CV  2016 no datesMark Kavanagh CV  2016 no dates
Mark Kavanagh CV 2016 no dates
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - CopyCV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CV
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
Breaux,Kyle 9-15-15
Breaux,Kyle  9-15-15Breaux,Kyle  9-15-15
Breaux,Kyle 9-15-15
 

Max Simnitt_03-2016_Work History Details

  • 1. MAX W. SIMNITT, JR. 27706 Rainy Creek Court (713) 870-2810 Fulshear, Texas 77441 max.simnitt@yahoo.com DETAILED WORK HISTORY Director of Operations & Projects – Prometheus Energy Group In addition to the duties as Director of Projects (see below), responsible for managing the development and implementation of Field Operations processes and procedures, establishing and measuring safety and performance metrics, reducing/optimizing Cost of Goods and Services, as well as overheads/SG&A. Data capture and reporting developed include: Safety Observations, Incident Reporting, JSAs, uptime reliability, downtime cause, effect and repair details, onsite LNG volumes, Preventive Maintenance schedule and completion, inventory control, and field purchase requisitions. • Representative customers include but are not limited to: Shell, Ensign, EnCana, Antero, Apache, Noble, Anadarko, Halliburton, Schlumberger, Aggreko, Seneca, UGI Services, Western Milling, Caterpillar, Denison Mines, Lisbon Valley Mines, MolyCorp Rare Earths Mine, Glanbia Foods, KLEEN Laundry, the University of Massachusetts in Amherst, Western Milling, Bowerman Landfill, Black Hills, Bonanza Creek, Synergy, Rice Energy, Nevada Milling and Mining, Hollister Mine. Responsible for managing all aspects of operations of the Lisbon LNG production facility in Moab, UT; including, Capital Expansion, Safety, production, preventive maintenance, COGS, and overheads/SG&As. Provided Business development support on proposals in the form of variable and fixed cost estimates for capital, operating and logistics expenses; negotiation of Terms and Conditions; as well as account management and customer relations. Member of the Executive Management Team, reporting directly to the CEO. Director of Projects – Prometheus Energy Group Responsible for management, development and implementation of all aspects of projects, including Engineering, Environmental, Regulatory, Safety, Cost Control, Scheduling, Feasibility Studies, Estimating, Contracts negotiation and administration, Field Project Controls, Procurement, Expediting, Inspection, Construction, Commissioning, Startup, and handover to Operations. • Prometheus Energy - LNG Silesia, Coal Mine Methane to LNG project in Katowice, Poland; Barrick Gold conversion from propane to Natural Gas in CA; KLEEN Laundry conversion from LP to LNG in New Hampshire; MolyCorp LNG Storage and Vaporization Project in CA; Cuervo Flare Gas to LNG project in NM, Bowerman Landfill gas to LNG in CA • Mobile LNG Storage and Vaporization kits for use in Drilling, Fracturing, Pipe line integrity (supply of LNG/natural gas while the lines were down for testing and repair) and interim LNG supply while stationary facilities were being built. • Mobile LNG Storage and Fueling for use in Mine Haul equipment and testing of Caterpillar Natural Gas Engines. Member of the Executive Management Team, reporting directly to the CEO. PAGE 1 OF 5
  • 2. MAX W. SIMNITT, JR. 27706 Rainy Creek Court (713) 870-2810 Fulshear, Texas 77441 max.simnitt@yahoo.com Project Manager – Bobcat Gas Storage Responsible for management, development and implementation of all aspects of Projects, including Engineering, Environmental, Regulatory, Safety, Cost Control, Scheduling, Estimating, Contracts negotiation and administration, Field Project Controls, Procurement, Expediting, Inspection, and Construction. • Bobcat Gas Storage Facility, Port Barre, Louisiana. Projects include Phase 2 Compressor Station Expansion, Cavern Well 2 conversion to gas operations, Phase 3 Compressor Station Expansion, Cavern Well # 5 Drilling, Leaching Interconnects to new Cavern Well #5, Gas Interconnects to CW-5, and ANR Meter Site Modification Manager of Project Services – Bobcat Gas Storage Responsible for management, development & implementation of all aspects of Project Services including Cost Control, Scheduling, Estimating, Procurement, Expediting, Inspection, Subcontracts Administration, and Field Project Controls. Responsible for developing budgets, controlling cost, executing schedules, procurement, field project controls, and subcontracts administration in all stages of Engineering, Procurement, Construction and Operations & Maintenance. • Bobcat Gas Storage Facility, Port Barre, Louisiana. Projects include four Fresh Water Wells, four Saltwater Disposal Wells, two Salt Cavern Wells, Compressor Station Facility, Leaching Plant Facility, Electrical Substation, five Metering Stations and interconnecting pipelines. Project Services Manager – JP Kenny Responsible for EPIC estimating, cost control, and scheduling. • Deep Water Production, Gulf of Mexico, Business Unit, BP. Responsibilities included Long Term Planning Report to Corporate Management and development of Project Services procedures, processes, and programs for the Business Unit. • Nakika Phase II Project, BP. The project included drilling and completion of two new wells with tie-backs to the existing Na Kika platform. Project Services Specialist – JP Kenny Responsible for developing cost estimates, schedules, and proposal documentation. • Ibhubesi Full Field Development, Forest Oil. The proposal included three Tension Leg Platforms, ninety-nine wells, onshore and offshore export pipelines, and all interconnecting pipe and umbilicals. Project Engineer – Mustang Engineers & Constructors Responsible for execution of project technical, contractual and commercial initiatives. • Clean Fuels Program, Tesoro Northwest Company, Anacortes, Washington. The PAGE 2 OF 5
  • 3. MAX W. SIMNITT, JR. 27706 Rainy Creek Court (713) 870-2810 Fulshear, Texas 77441 max.simnitt@yahoo.com project included Ultra Low Sulfur Diesel Unit, Low Sulfur Gas Cat Feed Hydrotreater Unit and associated turnaround scope. • Delayed Coker Project, Tesoro Northwest Company, Anacortes, Washington. The project included Delayed Coker Unit, Coke Handling and Storage, Sulfur Recovery Unit, Amine Unit, Sour Water Stripper Unit, and Offsites. • Clean Fuels Project, Valero, Ardmore, Oklahoma. The project included the HDHDS Co-Processor Unit, Cat Feed Hydrotreater, DHDS Unit, Crude Unit, Sat Gas Unit, Platformer Booster Compressor, Diesel Rundown, and Offsites. Chief Estimator – Mustang Engineers & Constructors Responsible for estimates – Feasibility, FEED, and Detailed. • Celanese Alliance Estimator for the Clear Lake, Bishop, Pampa, Pasadena, and Bay City plants. Projects include Quench Recycle Pipe Modifications, Oxygen Unit Piping, Low Energy Purification Project, ACH Tank Car Unloading. • El Paso Alliance Estimator for the Aruba Plant. Projects include Coker Daearator Addition, Desal Unit Filters, Finger Pier #3, Sulfur Storage Project, SGAR Segregation Project, Fuel Oil Project, and Fuel Gas Project. • Clean Fuels Program, Tesoro Northwest Company, Anacortes, Washington. The project included Ultra Low Sulfur Diesel Unit, Low Sulfur Gas Cat Feed Hydrotreater Unit and associated turnaround scope. • Clean Fuels Project, Valero, Ardmore, Oklahoma. The project included the HDHDS Co-Processor Unit, Cat Feed Hydrotreater, DHDS Unit, Crude Unit, Sats Gas Unit, Platformer Booster Compressor Replacement, Diesel Rundown, and Offsites. • Low Sulfur Gasoline Project, Amerada Hess Corporation, New Jersey, the project included the Gasoline HDS Unit, INALK Unit, Hydrogen Unit, and Offsites • Processing Units, Williams Refining, Mezeikiu refinery, Mazeikai, Lithuania. Project included the NHT unit, Platformer Splitter unit, NHT & Naptha Splitter unit, LPG unit, and Heater modifications. Project Controls Manager – Jacobs Engineering Group Responsible for EPC estimating, cost control, and scheduling. • Lexan 635 and 680 Expansion Projects, GE Plastics, Burkeville, Alabama. Supervised a team of 11 people. The project included Resin, CO/Phosgene, BPA, Brine, and Finishing plants, as well as plant Utilities. • Lexan Expansion Project Basic Engineering Package and definitive estimate, GE Plastics, Burkeville, Alabama. The project included the Resin, CO/Phosgene, BPA, Brine, and Finishing plants, as well as plant Utilities Field Project Controls Manager – Litwin Engineers & Constructors and Jacobs Responsible for construction and turnaround cost control, planning, scheduling, and subcontracts administration. PAGE 3 OF 5
  • 4. MAX W. SIMNITT, JR. 27706 Rainy Creek Court (713) 870-2810 Fulshear, Texas 77441 max.simnitt@yahoo.com • Line 3 Polypropylene Project, Aristech Chemical Corporation, LaPorte, Texas. Supervised a field project control team of six people. The project included the Montell process area, finishing and shipping areas, and all related offsite and utility areas. • Sour Crude Project, Total Petroleum, Ardmore, Oklahoma. Supervised a field project control team of five people. The project included grassroots cat feed hydrotreater, distillate hydrotreater revamp, grassroots sour water stripper, sour water stripper revamp, electrical feeder system, flare unit, and cooling water tower. • FCCU Modernization Project, Star Enterprises, Convent, Louisiana. Supervised a field project control team of two people. The project included an FCC unit revamp and turnaround, alkylation unit revamp, offsites and a new cooling tower. • FCCU Rx/Regen MSCC Plant Conversion, TransAmerican Refining Corp., Norco, Louisiana. Supervised a field project control team of two people. The project included an FCC unit revamp, gas plant revamp, alkylation unit revamp, new flue gas scrubber, C3/C4 treating unit revamp and offsites. Senior Cost Engineer - Jacobs Responsible for tracking and reporting TIC project cost, and for scheduling engineering, procurement, and construction. • Shell NOD Project and OFH Project, Norco, Louisiana. The project included fractionation, caustic, compressor, quench, dryer, and utility areas. Home Office Scheduler – Litwin & Jacobs Responsible for scheduling engineering, procurement, and construction. • Train 9 Polypropylene Project, Fina Oil and Chemical, LaPorte, Texas. The project included the Montell process area, finishing and shipping areas, and all related offsite and utility areas. • East Plant DCS Modernization, Hess Oil Virgin Islands Corporation, St. Croix. Responsible for scheduling engineering, procurement and construction. • Reformulated Fuels Program, UNOCAL, Los Angeles Refinery, Wilmington, California. The project included mid-barrel blending, pentane storage, rundown/transfer piping, electrical power distribution, reformate splitter addition, and alkylation fractionation revamp. • Jose Upgrader Project, Total/Maraven/Norsk Hydro/Stat Oil, Jose, Venezuela. Responsible for scheduling Phase I (pre-basic, basic, and detailed) engineering, procurement and construction; and cost control. • Hess Oil Virgin Islands Corporation, St. Croix (Offsites). The project included frame 5-25 megawatt gas turbine generator, rundown/transfer area, advanced wastewater treatment unit, butane spheres, purge treatment unit, and LPG unit. PAGE 4 OF 5
  • 5. MAX W. SIMNITT, JR. 27706 Rainy Creek Court (713) 870-2810 Fulshear, Texas 77441 max.simnitt@yahoo.com Field Planner/Scheduler – Litwin Responsible for construction cost control, planning, scheduling and subcontracts administration. • Sun Oil, Philadelphia, Pennsylvania. The project included a grassroots Alkylation Unit, FCC Unit Revamp, and Propane Propylene Recovery Unit. • South Area Refinery Controls Upgrade, Ashland Petroleum, Canton, Ohio. The project included Crude Unit, FCC Unit, DEMEX, C3/C4 Treater, Vacuum Unit and DOT Unit. • Naphtha Hydrotreater, CCR Platformer, Koch Refining Company, Corpus Christi, Texas. • Cat Cracker Turnaround, Fina Oil and Chemical, Big Spring, Texas. Associate Estimator – Litwin • Responsible for equipment, civil, structural, piping, instrumentation, electrical and protective covering material take-offs, material pricing, and consolidation of data into a project estimate. PAGE 5 OF 5
  • 6. MAX W. SIMNITT, JR. 27706 Rainy Creek Court (713) 870-2810 Fulshear, Texas 77441 max.simnitt@yahoo.com Field Planner/Scheduler – Litwin Responsible for construction cost control, planning, scheduling and subcontracts administration. • Sun Oil, Philadelphia, Pennsylvania. The project included a grassroots Alkylation Unit, FCC Unit Revamp, and Propane Propylene Recovery Unit. • South Area Refinery Controls Upgrade, Ashland Petroleum, Canton, Ohio. The project included Crude Unit, FCC Unit, DEMEX, C3/C4 Treater, Vacuum Unit and DOT Unit. • Naphtha Hydrotreater, CCR Platformer, Koch Refining Company, Corpus Christi, Texas. • Cat Cracker Turnaround, Fina Oil and Chemical, Big Spring, Texas. Associate Estimator – Litwin • Responsible for equipment, civil, structural, piping, instrumentation, electrical and protective covering material take-offs, material pricing, and consolidation of data into a project estimate. PAGE 5 OF 5