Project Management Practitioner: Project Initiation
A project is born. Say what, sounds like we're talking about a baby. Whose kid is it anyway? I mean,
whose project is it anyway and when was it born? I can't tell if it's a big baby or a small one; I mean
a big project or a small one. Oh yes, we are really talking about the birth of a project. Let's start with
defining a project so that we have a better footing as to purpose of this thing we call Project
Initiation. The doctrinal response to defining a project is: "It's a temporary group activity designed to
produce a unique product, service or result." The definition further establishes that it (project) has a
defined beginning and end time. (Project Management Institute: A Guide to the Project Management
Body of Knowledge (PMBOK® Guide) - 2013, Fifth Edition, Page 2)
Just as a clarification of the above reference book, the Project Management Institute's: A Guide to
the Project Management Body of Knowledge (aka, the PMBOK), contains the accepted industry
standard for project and program methodology. The U.S. Department of Defense (DOD) also has its
own PMBOK that is inclusive of the PMI published content and additional information tailored to
DOD requirements and procedures. Additional, for those that might be interested, the is also a U.S.
Department of Defense, Extension to: A Guide to the Project Management Body of Knowledge,
Published by the Defense Acquisition University Press, Fort Belvoir, Virginia 22060-5565 (DoD-
Ext.PMBOK)
Bottom Line
The birth of a project is more than a singular action or effort. Initiating a project is a mental and
academic exercise incorporating information collecting, evaluating, and decision making as to
whether a project is the solution. This exercise includes defining how the project's outcome of a
product or service will satisfy the business need; how it fits into the individual's or organization's
strategic plan; define the criteria in selecting the project, product or service; are there any (and
usually will be) historical perspective from other projects that may aid in decision making on if and
what this project will be.
Whether the proponent of the potential project is an individual, organization such as a business,
government, military, charity, sports team, or church body, just to name a few, the fundamental
questions come down to: what is our situation; what are the circumstances and conditions driving
our situation; and what is our desired end-state. Some of the usual reasons for starting a project
include market demand, customer request, technology advancement, legal or regulatory
requirement, and new product design or development. After thoroughly investigating and analyzing
the collective information, the individual or organization evaluates project selection methods,
perform decision making [link] to determine and identify the desired end-state that will further drive
the basis of the project.
Remember, projects come in all sizes: designing a new product, building a house, catering a party,
installing new services for a client, designing or providing training for a group, or anything that
meets the definition of: it has a defined start, a defined outcome of a product(s) or service(s), and a
planned end date and end-state (what does "done" look like: Scope).
Outcome of Project Initiation
The result of project initiation is the formal recognition and defining of a new project or that an
existing project should move to its next phase. It is not unusual for there to be a phase to phase
signoff process whereby the project sponsor/contract authority signs-off approving all the work
completed to date and allowing the next phase (the next phase new project) to move forward. A
Project Charter is the vehicle used to document and "formally authorizes the existence of a project
and provides the project manager with the authority to apply organizational resources to project
activities." (PMBOK Page 62)
The Project Charter
What's in it?At the least include the following information: name of the project; an initial scope
statement; name/assign the project manager (PM); define the PM's role and responsibilities; provide
initial risk, constraints (includes initial financial resources), and assumptions. Notate the internal
and external stakeholders who will interact and influence the overall outcome of the project. These
stakeholders may include the project team (if the team has not been assigned yet, then a simple
reference to "The Project Team" is sufficient). The sponsor or source for the authority of the project
is named and signs/dates the charter.
Who develops and writes the charter? It should be the business/organization's brain trust and the
sponsor that decided to create the project; however, more often than not, it is the PM and the
project team that assemble the charter after the fact of the sponsor/leadership's decision making
process. The PM/Team collects up all the pertinent data and assembles the charter with the
information they need and submit it to the sponsor/contract manager for signature.
Charter Described
Business Need: Describe: It can be a problem statement or improvement need statement of a
strategic importance to the company such as a newer more competitive product; it may be a need for
a new process, it can be regarding a new construction project. It must at the least be a fundamental
description of why this project is being pursued. What is driving the effort? Below are some of the
background subcategories that can be included; however, the sponsor and the PM should include
other subcategories as needed.
Project selection criteria: This is especially important when a project is to develop or may need to
develop multiple product or service options for further consideration.
Feasibility Studies: This may only be a general comment followed by a reference to another more
detailed "Feasibility Studies Report" assembled by the sponsor of the project. The study can be
useful to the PM and the team in ensuring that the project results/output product or service doable
for the company/business/government agency.
Project General Description: These are characteristics of the product or service with high level
requirements; a statement of the scope in general terms. This statement is often followed up by
referencing the reader/PM/Team to a Design Specifications Document.
Name the Project Sponsor/Contract Authority: This is the person with the authority to name and
further authorize the PM to lead and manage the project effort. Include the sponsor's position and a
line or block for the sponsor to sign-off as approving the Charter.
Assign The Project Manager: Assign the PM as soon as possible, his/her role, the individual PM's
responsibilities, level of authority, mechanism for status reporting, reference to project policies,
procedures and financial management requirements. Many businesses have a published
organization wide set of standard requirements that spells out the PM/Team responsibilities. If this
is the case, a business may simply notate that the PM/Team will provide and reporting in accordance
with the company's project standard operating procedures (SOP) document (include reference to the
specific page or section of the SOP.
Project Manager Authority and Responsibilities: Who is in charge of the project and what are his/her
authority and responsibilities. This may be a simple authority statement with a reference to a
corporate or organization's SOP.
Risk: It's true that there will be risk throughout the project but there are some risk items that can be
identified by the proponents or sponsor(s) of the project at the outset. Sometimes these are issues
tied to the assumptions explained in the previous paragraph. In other cases, they may be tied to
constraints; they will be covered in the next paragraph. Risk issues or items are those things that
may, if they occur, affect the project either good or bad. Yes, that's right, even good. For example, if
a business decides to try and create a new more competitive product and funds are limited to the
project; however, there are some talks with a potential investor that could bolster the available
project funds: that is a positive risk item. For the PM, it means that he/she may need to be prepared
for expanding the project scope. Or, on the down side, the new investor drops out, other current
investors drop out and funds become too tight to continue supporting the project, thus requiring the
PM to kill the project and moth-ball the work completed to date.
Remember, there will be plenty of other risk items that will be identified through the planning and
execution of the project. In fact, the risk identification and management of same will continue
through till the completion of the project. Some quick and easy risk items include: the start date may
move; the end date may move; funding may be reduced or cut; additional funding may be available
during the business budget review cycle; the might be the potential of a loss of key team members;
there may be a concern as to the potential unavailability of material or equipment resources when
they are need. These are just a few of the more obvious types of risk issues.
Careful identify and document any potential risk items that have to be either, planned for through
contingency planning, or at the least, kept in the back-of-the mind by the PM and the team: you
know, those just in case type of things. I'll talk more on Project Risk in another article.
Constraints: Look back at your risk items and determine whether or not some of these may also
create constraints on the project. You should have established a baseline budget for the project and
you may have already worked in some variance allowances such as a baseline budget of $500,000
with a variance of no more than 10 percent if funds are available; or, there it may be a max ceiling of
$500,000 period end of discussion. Project and product specifications can be constraints if they are,
for a lack or a better term or phrase, "do or die" requirements. Resources can be constraints. Let's
say that the organization feels that they cannot provide internal expertise or team members and or
equipment, this will require the PM to find the team and the resources from outside the organization
and, somehow, he/she will need to work with the sponsor on funding the staffing unless the fixed
budget is inclusive of all support requirements. A $500,000 budget will not go far in that case. A PM
or organization, especially in government, may be required to use only certain vendors. This too will
create a constraint and potential risk of availability.
Assumptions: Factors that are considered to be true for the purpose of moving forward. As we all
know, there are a lot of unknowns in business (and in government and the military). We assume we
are going to get paid for our work and we assume that the car will start before work and we assume
that we will wake up in the morning. However, all these events are not facts until proven or occur.
We assume that the project will have all the budgeted funds for the full duration of the project - but
it is not a fact until we reach the end, and then, only after the contracts have all been paid up. Thus,
we have our assumptions that we, for the sake moving forward, we treat as facts until proven
otherwise.
Stakeholders: This is sometimes left out but is beneficial when establishing who can authorize
contracts/funding for external resources such as contractors, as well as, naming those approved
internal and external resources or interest/vested agents: for example, functional managers or other
departments affected by the project.
Project Charter Example
[This is only a make believe example. It is also not a limitation to what can be in a project charter.]
Military/Business Need: Warfighting in the 21st century requires economy of force with weapons
systems that are universally adaptable to all branches of the military. Over these past several
decades weapons, equipment and vehicles have become more complex, expensive and less versatile.
Every branch of the military is scaling-down in numbers of personnel and equipment. In order to
maintain the ability to react quickly to threats, in the most effective way, within the limits of our
current and future warfighting resources, we need to pursue various unmanned weapon systems and
weapon systems that will maximize the ability of a small force to conduct successful military action
against a larger enemy force. The first step will be to develop an unmanned ground assault vehicle
that can be remotely operated in a manner similar to that of the current unmanned drone.
Project Description: Design and create a working prototype of an unmanned ground assault vehicle
that incorporates the design specifications/mission essential capabilities as outlined in the Detailed
Specifications Document (restricted).
Project Sponsor: U. S. Grant, General, U.S. Army: Signed/Dated _________________
Contract Authority: G. A. Custer, Colonel, U.S. Army: Signed/Dated ______________
Project Manager (PM): Ima Grate, PMP; date assigned 1 February 2014.
PM Responsible for ensuring all key milestones and objectives are met within the time, cost,
performance and quality constraints of this project. PM is authorized to hire additional personnel
resources in addition to the DOD provided team and manage all aspects of the project and issue
appropriate directives as pertinent to the project.
Constraints: Planned Budget = $4.5 million; Deadline for design model (concept model) is Apr 2015;
Prototype completion date 15 October, 2016 with live fire demonstration test date of 15 November,
2016. Other constraints are listed in the Design Specification Document. Other: list other
restrictions.....
Risk: Annual and semi-annual budget reviews may require revision of the planned budget. Other:
listed.....
Assumptions: Design, development and prototype construction and testing are independent of
current world threat events. Other: listed.....
Stakeholders: Listed in separate appendix.... Review, reference, or enter stakeholder date as shown
in the Project Charter.
Final Word
The beginning of the project determines the outcome of the project. Let's face it; if you have unclear
requirements, customer expectations, a lack of commitment from all the stakeholders, or no
dedicated and supportive sponsor, you have the makings of a troubled project.
Do you know why many project managers and program manager's refer to their offices or team
rooms as "War-Rooms"? It's because it is not unlike a military operations center or a tactical
operations center. Sometimes leading and managing a project can seem like leading and managing a
battlefield; there is a significant amount of reliance on information, cooperation and coordination.
A project manager and the team must have as much information as possible as to a clearly defined
outcome, a desired end-state. They must know who's sitting in their corner to aid in the
accomplishment of the mission; and, they must know who their enemies or potential adversaries
might be, to include risk, constraints and even assumptions. A bad start to a project or a military
mission can spell a less than desired ending to the same. A bad start is one of the enemies to a
successful project.
Note: I will be presenting an article dedicated the Project "War-Room" in the future. It will include a
comparison between a civilian project and that of a military operation. Current and former military
veterans should particularly benefit from understanding how their military experience directly
relates to the role and tasks of a project manager, program manager, coordinator, or project
administrator.
http://www.infobarrel.com/Project_Management_Practitioner_Project_Initiation

Weitere ähnliche Inhalte

Was ist angesagt?

Project Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingProject Management Overview by Darryl Vleeming
Project Management Overview by Darryl Vleeming
Darryl Vleeming
 
Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012
bm80
 
202project Feasibility
202project Feasibility202project Feasibility
202project Feasibility
btecexpert
 

Was ist angesagt? (20)

D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Project Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingProject Management Overview by Darryl Vleeming
Project Management Overview by Darryl Vleeming
 
Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012Project plan template v3.0 jan 2012
Project plan template v3.0 jan 2012
 
Project Management Notes 3
Project Management Notes 3Project Management Notes 3
Project Management Notes 3
 
202project Feasibility
202project Feasibility202project Feasibility
202project Feasibility
 
Budgeting & cost control
Budgeting & cost controlBudgeting & cost control
Budgeting & cost control
 
D012251726
D012251726D012251726
D012251726
 
module
modulemodule
module
 
Fun888 sportsbook: the best odd table in the gambling market
Fun888 sportsbook: the best odd table in the gambling marketFun888 sportsbook: the best odd table in the gambling market
Fun888 sportsbook: the best odd table in the gambling market
 
PFEG_1
PFEG_1PFEG_1
PFEG_1
 
Business English Vocabulary - Project Management (Part 2)
Business English Vocabulary - Project Management (Part 2)Business English Vocabulary - Project Management (Part 2)
Business English Vocabulary - Project Management (Part 2)
 
Publishable article
Publishable articlePublishable article
Publishable article
 
Cameron downing presentation
Cameron downing presentationCameron downing presentation
Cameron downing presentation
 
Ppt for Agricultural Project Planning Evaluation and Analysis in 2021
Ppt  for Agricultural Project Planning Evaluation and Analysis  in 2021Ppt  for Agricultural Project Planning Evaluation and Analysis  in 2021
Ppt for Agricultural Project Planning Evaluation and Analysis in 2021
 
IRJET- The Impact of Effective Planning on Project Success – A Literature Review
IRJET- The Impact of Effective Planning on Project Success – A Literature ReviewIRJET- The Impact of Effective Planning on Project Success – A Literature Review
IRJET- The Impact of Effective Planning on Project Success – A Literature Review
 
Project and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementProject and process engineering management industrial engineering management
Project and process engineering management industrial engineering management
 
Pm chapter 1...
Pm chapter 1...Pm chapter 1...
Pm chapter 1...
 
Project stakeholders
Project stakeholdersProject stakeholders
Project stakeholders
 
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECTGAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 

Ähnlich wie Project Management Practitioner: Project Initiation

Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
Tom Cremins
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
AASTHA76
 
4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf
eyevisioncare1
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
TechNoleGirl
 
Appendix ABusiness Plan AssignmentThe Business Plan will be ab.docx
Appendix ABusiness Plan AssignmentThe Business Plan will be ab.docxAppendix ABusiness Plan AssignmentThe Business Plan will be ab.docx
Appendix ABusiness Plan AssignmentThe Business Plan will be ab.docx
justine1simpson78276
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptx
MIANMNADEEM
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
cford1973
 
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docxGETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
gilbertkpeters11344
 
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docxGETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
shericehewat
 
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxPearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
AASTHA76
 
83 Chapter 5 PROJECT.docx
83                                Chapter 5    PROJECT.docx83                                Chapter 5    PROJECT.docx
83 Chapter 5 PROJECT.docx
ransayo
 
Project_management_Amit_dubey
Project_management_Amit_dubeyProject_management_Amit_dubey
Project_management_Amit_dubey
Amit Dubey
 
Projects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docxProjects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docx
briancrawford30935
 
C H A P T E R 1GETTING STARTEDOverview of the Project.docx
C H A P T E R  1GETTING STARTEDOverview of the Project.docxC H A P T E R  1GETTING STARTEDOverview of the Project.docx
C H A P T E R 1GETTING STARTEDOverview of the Project.docx
RAHUL126667
 

Ähnlich wie Project Management Practitioner: Project Initiation (20)

Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
 
Project management glossary_of_terms
Project management glossary_of_termsProject management glossary_of_terms
Project management glossary_of_terms
 
scope-statement-sample.doc
scope-statement-sample.docscope-statement-sample.doc
scope-statement-sample.doc
 
Appendix ABusiness Plan AssignmentThe Business Plan will be ab.docx
Appendix ABusiness Plan AssignmentThe Business Plan will be ab.docxAppendix ABusiness Plan AssignmentThe Business Plan will be ab.docx
Appendix ABusiness Plan AssignmentThe Business Plan will be ab.docx
 
Prince 2 Themes Part.1.pdf
Prince 2 Themes Part.1.pdfPrince 2 Themes Part.1.pdf
Prince 2 Themes Part.1.pdf
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptx
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docxGETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
 
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docxGETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
GETTING STARTEDOverview of the ProjectNothing is impossible fo.docx
 
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxPearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptx
 
83 Chapter 5 PROJECT.docx
83                                Chapter 5    PROJECT.docx83                                Chapter 5    PROJECT.docx
83 Chapter 5 PROJECT.docx
 
Project_management_Amit_dubey
Project_management_Amit_dubeyProject_management_Amit_dubey
Project_management_Amit_dubey
 
Projects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docxProjects in Contemporary Organizations The past several decades ha.docx
Projects in Contemporary Organizations The past several decades ha.docx
 
C H A P T E R 1GETTING STARTEDOverview of the Project.docx
C H A P T E R  1GETTING STARTEDOverview of the Project.docxC H A P T E R  1GETTING STARTEDOverview of the Project.docx
C H A P T E R 1GETTING STARTEDOverview of the Project.docx
 
Project Management 09
Project Management 09Project Management 09
Project Management 09
 

Project Management Practitioner: Project Initiation

  • 1. Project Management Practitioner: Project Initiation A project is born. Say what, sounds like we're talking about a baby. Whose kid is it anyway? I mean, whose project is it anyway and when was it born? I can't tell if it's a big baby or a small one; I mean a big project or a small one. Oh yes, we are really talking about the birth of a project. Let's start with defining a project so that we have a better footing as to purpose of this thing we call Project Initiation. The doctrinal response to defining a project is: "It's a temporary group activity designed to produce a unique product, service or result." The definition further establishes that it (project) has a defined beginning and end time. (Project Management Institute: A Guide to the Project Management Body of Knowledge (PMBOK® Guide) - 2013, Fifth Edition, Page 2) Just as a clarification of the above reference book, the Project Management Institute's: A Guide to the Project Management Body of Knowledge (aka, the PMBOK), contains the accepted industry standard for project and program methodology. The U.S. Department of Defense (DOD) also has its own PMBOK that is inclusive of the PMI published content and additional information tailored to DOD requirements and procedures. Additional, for those that might be interested, the is also a U.S. Department of Defense, Extension to: A Guide to the Project Management Body of Knowledge, Published by the Defense Acquisition University Press, Fort Belvoir, Virginia 22060-5565 (DoD- Ext.PMBOK) Bottom Line The birth of a project is more than a singular action or effort. Initiating a project is a mental and academic exercise incorporating information collecting, evaluating, and decision making as to whether a project is the solution. This exercise includes defining how the project's outcome of a product or service will satisfy the business need; how it fits into the individual's or organization's strategic plan; define the criteria in selecting the project, product or service; are there any (and usually will be) historical perspective from other projects that may aid in decision making on if and what this project will be. Whether the proponent of the potential project is an individual, organization such as a business, government, military, charity, sports team, or church body, just to name a few, the fundamental questions come down to: what is our situation; what are the circumstances and conditions driving our situation; and what is our desired end-state. Some of the usual reasons for starting a project include market demand, customer request, technology advancement, legal or regulatory requirement, and new product design or development. After thoroughly investigating and analyzing the collective information, the individual or organization evaluates project selection methods, perform decision making [link] to determine and identify the desired end-state that will further drive the basis of the project. Remember, projects come in all sizes: designing a new product, building a house, catering a party, installing new services for a client, designing or providing training for a group, or anything that meets the definition of: it has a defined start, a defined outcome of a product(s) or service(s), and a planned end date and end-state (what does "done" look like: Scope). Outcome of Project Initiation The result of project initiation is the formal recognition and defining of a new project or that an existing project should move to its next phase. It is not unusual for there to be a phase to phase
  • 2. signoff process whereby the project sponsor/contract authority signs-off approving all the work completed to date and allowing the next phase (the next phase new project) to move forward. A Project Charter is the vehicle used to document and "formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities." (PMBOK Page 62) The Project Charter What's in it?At the least include the following information: name of the project; an initial scope statement; name/assign the project manager (PM); define the PM's role and responsibilities; provide initial risk, constraints (includes initial financial resources), and assumptions. Notate the internal and external stakeholders who will interact and influence the overall outcome of the project. These stakeholders may include the project team (if the team has not been assigned yet, then a simple reference to "The Project Team" is sufficient). The sponsor or source for the authority of the project is named and signs/dates the charter. Who develops and writes the charter? It should be the business/organization's brain trust and the sponsor that decided to create the project; however, more often than not, it is the PM and the project team that assemble the charter after the fact of the sponsor/leadership's decision making process. The PM/Team collects up all the pertinent data and assembles the charter with the information they need and submit it to the sponsor/contract manager for signature. Charter Described Business Need: Describe: It can be a problem statement or improvement need statement of a strategic importance to the company such as a newer more competitive product; it may be a need for a new process, it can be regarding a new construction project. It must at the least be a fundamental description of why this project is being pursued. What is driving the effort? Below are some of the background subcategories that can be included; however, the sponsor and the PM should include other subcategories as needed. Project selection criteria: This is especially important when a project is to develop or may need to develop multiple product or service options for further consideration. Feasibility Studies: This may only be a general comment followed by a reference to another more detailed "Feasibility Studies Report" assembled by the sponsor of the project. The study can be useful to the PM and the team in ensuring that the project results/output product or service doable for the company/business/government agency. Project General Description: These are characteristics of the product or service with high level requirements; a statement of the scope in general terms. This statement is often followed up by referencing the reader/PM/Team to a Design Specifications Document. Name the Project Sponsor/Contract Authority: This is the person with the authority to name and further authorize the PM to lead and manage the project effort. Include the sponsor's position and a line or block for the sponsor to sign-off as approving the Charter. Assign The Project Manager: Assign the PM as soon as possible, his/her role, the individual PM's responsibilities, level of authority, mechanism for status reporting, reference to project policies, procedures and financial management requirements. Many businesses have a published organization wide set of standard requirements that spells out the PM/Team responsibilities. If this
  • 3. is the case, a business may simply notate that the PM/Team will provide and reporting in accordance with the company's project standard operating procedures (SOP) document (include reference to the specific page or section of the SOP. Project Manager Authority and Responsibilities: Who is in charge of the project and what are his/her authority and responsibilities. This may be a simple authority statement with a reference to a corporate or organization's SOP. Risk: It's true that there will be risk throughout the project but there are some risk items that can be identified by the proponents or sponsor(s) of the project at the outset. Sometimes these are issues tied to the assumptions explained in the previous paragraph. In other cases, they may be tied to constraints; they will be covered in the next paragraph. Risk issues or items are those things that may, if they occur, affect the project either good or bad. Yes, that's right, even good. For example, if a business decides to try and create a new more competitive product and funds are limited to the project; however, there are some talks with a potential investor that could bolster the available project funds: that is a positive risk item. For the PM, it means that he/she may need to be prepared for expanding the project scope. Or, on the down side, the new investor drops out, other current investors drop out and funds become too tight to continue supporting the project, thus requiring the PM to kill the project and moth-ball the work completed to date. Remember, there will be plenty of other risk items that will be identified through the planning and execution of the project. In fact, the risk identification and management of same will continue through till the completion of the project. Some quick and easy risk items include: the start date may move; the end date may move; funding may be reduced or cut; additional funding may be available during the business budget review cycle; the might be the potential of a loss of key team members; there may be a concern as to the potential unavailability of material or equipment resources when they are need. These are just a few of the more obvious types of risk issues. Careful identify and document any potential risk items that have to be either, planned for through contingency planning, or at the least, kept in the back-of-the mind by the PM and the team: you know, those just in case type of things. I'll talk more on Project Risk in another article. Constraints: Look back at your risk items and determine whether or not some of these may also create constraints on the project. You should have established a baseline budget for the project and you may have already worked in some variance allowances such as a baseline budget of $500,000 with a variance of no more than 10 percent if funds are available; or, there it may be a max ceiling of $500,000 period end of discussion. Project and product specifications can be constraints if they are, for a lack or a better term or phrase, "do or die" requirements. Resources can be constraints. Let's say that the organization feels that they cannot provide internal expertise or team members and or equipment, this will require the PM to find the team and the resources from outside the organization and, somehow, he/she will need to work with the sponsor on funding the staffing unless the fixed budget is inclusive of all support requirements. A $500,000 budget will not go far in that case. A PM or organization, especially in government, may be required to use only certain vendors. This too will create a constraint and potential risk of availability. Assumptions: Factors that are considered to be true for the purpose of moving forward. As we all know, there are a lot of unknowns in business (and in government and the military). We assume we are going to get paid for our work and we assume that the car will start before work and we assume that we will wake up in the morning. However, all these events are not facts until proven or occur. We assume that the project will have all the budgeted funds for the full duration of the project - but it is not a fact until we reach the end, and then, only after the contracts have all been paid up. Thus,
  • 4. we have our assumptions that we, for the sake moving forward, we treat as facts until proven otherwise. Stakeholders: This is sometimes left out but is beneficial when establishing who can authorize contracts/funding for external resources such as contractors, as well as, naming those approved internal and external resources or interest/vested agents: for example, functional managers or other departments affected by the project. Project Charter Example [This is only a make believe example. It is also not a limitation to what can be in a project charter.] Military/Business Need: Warfighting in the 21st century requires economy of force with weapons systems that are universally adaptable to all branches of the military. Over these past several decades weapons, equipment and vehicles have become more complex, expensive and less versatile. Every branch of the military is scaling-down in numbers of personnel and equipment. In order to maintain the ability to react quickly to threats, in the most effective way, within the limits of our current and future warfighting resources, we need to pursue various unmanned weapon systems and weapon systems that will maximize the ability of a small force to conduct successful military action against a larger enemy force. The first step will be to develop an unmanned ground assault vehicle that can be remotely operated in a manner similar to that of the current unmanned drone. Project Description: Design and create a working prototype of an unmanned ground assault vehicle that incorporates the design specifications/mission essential capabilities as outlined in the Detailed Specifications Document (restricted). Project Sponsor: U. S. Grant, General, U.S. Army: Signed/Dated _________________ Contract Authority: G. A. Custer, Colonel, U.S. Army: Signed/Dated ______________ Project Manager (PM): Ima Grate, PMP; date assigned 1 February 2014. PM Responsible for ensuring all key milestones and objectives are met within the time, cost, performance and quality constraints of this project. PM is authorized to hire additional personnel resources in addition to the DOD provided team and manage all aspects of the project and issue appropriate directives as pertinent to the project. Constraints: Planned Budget = $4.5 million; Deadline for design model (concept model) is Apr 2015; Prototype completion date 15 October, 2016 with live fire demonstration test date of 15 November, 2016. Other constraints are listed in the Design Specification Document. Other: list other restrictions..... Risk: Annual and semi-annual budget reviews may require revision of the planned budget. Other: listed..... Assumptions: Design, development and prototype construction and testing are independent of current world threat events. Other: listed..... Stakeholders: Listed in separate appendix.... Review, reference, or enter stakeholder date as shown in the Project Charter.
  • 5. Final Word The beginning of the project determines the outcome of the project. Let's face it; if you have unclear requirements, customer expectations, a lack of commitment from all the stakeholders, or no dedicated and supportive sponsor, you have the makings of a troubled project. Do you know why many project managers and program manager's refer to their offices or team rooms as "War-Rooms"? It's because it is not unlike a military operations center or a tactical operations center. Sometimes leading and managing a project can seem like leading and managing a battlefield; there is a significant amount of reliance on information, cooperation and coordination. A project manager and the team must have as much information as possible as to a clearly defined outcome, a desired end-state. They must know who's sitting in their corner to aid in the accomplishment of the mission; and, they must know who their enemies or potential adversaries might be, to include risk, constraints and even assumptions. A bad start to a project or a military mission can spell a less than desired ending to the same. A bad start is one of the enemies to a successful project. Note: I will be presenting an article dedicated the Project "War-Room" in the future. It will include a comparison between a civilian project and that of a military operation. Current and former military veterans should particularly benefit from understanding how their military experience directly relates to the role and tasks of a project manager, program manager, coordinator, or project administrator. http://www.infobarrel.com/Project_Management_Practitioner_Project_Initiation