‘Pull’ System of manufacturing
Traditional System of Manufacturing


                     Starts in factory
           •   Production plan based on demand forecast
           •   Material procurement to meet production plan
           •   Material receipt and inspection
           •   Storage of materials and components till
               required for processing
           •   Actual production in various process stations
               with stress on maximizing production
           •   Storage of components required for assembly
           •   Assembly , final inspection and packaging
           •   Storage of finished goods in company godowns
               and zonal depots
           •   On the shelf in retail outlets.




                        Ends with the customer
Since the product is pushed from factory to the customer, this system is also
                     known as ‘PUSH’ system.
Weakness of Traditional System



•    Risk related to forecasts.
•    Long overall business process cycle.
•    Good comfort level at various stages leading to slack in the system.
•    It hides the problems, waste and obstacles in the business flow.
•    Encourages departmental focus as their efficiency is judged on the basis of
     output. (departmental enterprise)




    Pushes up costs and affects competitiveness..
‘Pull’ system of Manufacturing

           Starts with customer



    • Order acquisition by marketing
    • Production planning
    • Just in time receipt of material
    • Pull system of production down the entire process chain by
      kanban, a control tool starting from sales dispatch section.


       Ends with primary producers


       Since the customer pulls the product, it is also called pull system of
       manufacturing.The ‘PULL’ system is used in Lean Manufacturing.
Key Principles
Key Principles




1. Minimize material handling. Preference should be given to low
or no-cost solutions such as gravity-feed slides. Handle product once
only.

2. Minimize distances . Avoid walking, carrying, etc. by creating
cells, combining operations within a work centre, better planning, and
so on.
Key Principles...




3. Minimize strain . Work centres should be ergonomically designed
to avoid back and other muscle strains.

4. Minimize clutter . Everything should have a home, from parts
and tools at a workstation, to equipment and product within
designated floor spaces.

5. Minimize storage . If you have the space, it will surely get filled.
Thus, continuously minimize your storage space for raw material,
WIP, finished goods and spare parts throughout the supply chain.
Key Principles...



6. Maximize utilization . Make optimal use of people, space, and
equipment to improve the return on investment.

7. Maximize flexibility . The key to lean is creating a layout that can
adapt quickly to changes in product, equipment, personnel, or material.

8. Maximize smooth flow . Continuously determine and eliminate
the bottlenecks, then re-balance the line.
Key Principles...




9. Maximize visibility . To quickly spot problems, maintain a clear
line of vision to anywhere, from anywhere.

10. Maximize communication . Lean requires constant training on
tools available to meet goals and objectives, and feedback on how
well things are going.
Pull system of manufacturing

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
Principle 4 heijunka
Principle 4 heijunkaPrinciple 4 heijunka
Principle 4 heijunka
 
Push vs pull
Push vs pullPush vs pull
Push vs pull
 
OEE
OEEOEE
OEE
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
The mystery of OEE
The mystery of OEEThe mystery of OEE
The mystery of OEE
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Smed smpl 1
Smed smpl 1Smed smpl 1
Smed smpl 1
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 

Andere mochten auch

The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...
The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...
The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...Minnesota Chamber of Commerce
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques Mohammad Younus
 
Lean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridgeLean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridgeSaket Bansal
 
Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015Glenton Thomas
 
Introduction to Pull system - November 2016
Introduction to Pull system - November 2016Introduction to Pull system - November 2016
Introduction to Pull system - November 2016W3 Group Canada Inc.
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )industrialengg
 
Implementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsImplementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsTKMG, Inc.
 
JUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASINGJUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASINGZamri Yahya
 
All About Beer
All About Beer All About Beer
All About Beer Ethos3
 

Andere mochten auch (15)

Pull push
Pull pushPull push
Pull push
 
The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...
The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...
The Economic Outlook for Manufacturers - Dr. Ernie Goss, economist, Creighton...
 
Welcome to Jeunesse
Welcome to JeunesseWelcome to Jeunesse
Welcome to Jeunesse
 
Pull Systems
Pull SystemsPull Systems
Pull Systems
 
Regular maintenance
Regular maintenanceRegular maintenance
Regular maintenance
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
 
Lean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridgeLean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridge
 
Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015
 
Introduction to Pull system - November 2016
Introduction to Pull system - November 2016Introduction to Pull system - November 2016
Introduction to Pull system - November 2016
 
Pull Test Presentation
Pull Test PresentationPull Test Presentation
Pull Test Presentation
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )
 
MIS Case Study
MIS Case StudyMIS Case Study
MIS Case Study
 
Implementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsImplementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service Environments
 
JUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASINGJUST- IN-TIME (LEAN) PURCHASING
JUST- IN-TIME (LEAN) PURCHASING
 
All About Beer
All About Beer All About Beer
All About Beer
 

Ähnlich wie Pull system of manufacturing

OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxThusharaVinay
 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPCThe Learning Hub
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean ManagementRuhi Beri
 
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsley Aduma
 
Production management_AFFAN.pptx
Production management_AFFAN.pptxProduction management_AFFAN.pptx
Production management_AFFAN.pptxaffan82
 
Production and Operation Management.pptx
Production and Operation Management.pptxProduction and Operation Management.pptx
Production and Operation Management.pptxSairaali51
 
Supply chain management
Supply chain management Supply chain management
Supply chain management ARif Khan
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11Eric
 
Operation management
Operation managementOperation management
Operation managementMamta Karanji
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operationsRajThakuri
 
Job shop production system final
Job shop production system finalJob shop production system final
Job shop production system finalar9530
 
Production and planning control
Production and planning controlProduction and planning control
Production and planning controlArpitha Aarushi
 
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesOm lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesvideoaakash15
 

Ähnlich wie Pull system of manufacturing (20)

Lean management
Lean managementLean management
Lean management
 
Lean management
Lean managementLean management
Lean management
 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptx
 
Pm1
Pm1Pm1
Pm1
 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPC
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
Production management
Production managementProduction management
Production management
 
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptx
 
Production management_AFFAN.pptx
Production management_AFFAN.pptxProduction management_AFFAN.pptx
Production management_AFFAN.pptx
 
Why Pull Manufacturing.ppt
Why Pull Manufacturing.pptWhy Pull Manufacturing.ppt
Why Pull Manufacturing.ppt
 
Production and Operation Management.pptx
Production and Operation Management.pptxProduction and Operation Management.pptx
Production and Operation Management.pptx
 
Supply chain management
Supply chain management Supply chain management
Supply chain management
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
 
Unit I.pdf
Unit I.pdfUnit I.pdf
Unit I.pdf
 
Operation management
Operation managementOperation management
Operation management
 
Just in time
Just in timeJust in time
Just in time
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operations
 
Job shop production system final
Job shop production system finalJob shop production system final
Job shop production system final
 
Production and planning control
Production and planning controlProduction and planning control
Production and planning control
 
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesOm lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
 

Mehr von Mohit Singla

Total productivity maintenance technique
Total productivity maintenance techniqueTotal productivity maintenance technique
Total productivity maintenance techniqueMohit Singla
 
The toyota way 14 mgmt principles
The toyota way 14 mgmt principlesThe toyota way 14 mgmt principles
The toyota way 14 mgmt principlesMohit Singla
 
The salary theorem
The salary theoremThe salary theorem
The salary theoremMohit Singla
 
The partition of india
The partition of indiaThe partition of india
The partition of indiaMohit Singla
 
The one minute manager
The one minute managerThe one minute manager
The one minute managerMohit Singla
 
The goal is zero defects
The goal is zero defectsThe goal is zero defects
The goal is zero defectsMohit Singla
 
The glass evaluation
The glass evaluationThe glass evaluation
The glass evaluationMohit Singla
 
The future of marketing & advertising
The future of marketing & advertisingThe future of marketing & advertising
The future of marketing & advertisingMohit Singla
 
The digestive system
The digestive systemThe digestive system
The digestive systemMohit Singla
 

Mehr von Mohit Singla (20)

Work vs. prison
Work vs. prisonWork vs. prison
Work vs. prison
 
Word of mouth
Word of mouthWord of mouth
Word of mouth
 
Why the moon
Why the moonWhy the moon
Why the moon
 
What if
What ifWhat if
What if
 
Vision mission
Vision missionVision mission
Vision mission
 
Value of food
Value of foodValue of food
Value of food
 
Universe
UniverseUniverse
Universe
 
Trust
TrustTrust
Trust
 
Total productivity maintenance technique
Total productivity maintenance techniqueTotal productivity maintenance technique
Total productivity maintenance technique
 
Time management
Time managementTime management
Time management
 
Three shakti’s
Three shakti’sThree shakti’s
Three shakti’s
 
The toyota way 14 mgmt principles
The toyota way 14 mgmt principlesThe toyota way 14 mgmt principles
The toyota way 14 mgmt principles
 
The salary theorem
The salary theoremThe salary theorem
The salary theorem
 
The partition of india
The partition of indiaThe partition of india
The partition of india
 
The one minute manager
The one minute managerThe one minute manager
The one minute manager
 
The lost mumbai
The lost mumbaiThe lost mumbai
The lost mumbai
 
The goal is zero defects
The goal is zero defectsThe goal is zero defects
The goal is zero defects
 
The glass evaluation
The glass evaluationThe glass evaluation
The glass evaluation
 
The future of marketing & advertising
The future of marketing & advertisingThe future of marketing & advertising
The future of marketing & advertising
 
The digestive system
The digestive systemThe digestive system
The digestive system
 

Pull system of manufacturing

  • 1. ‘Pull’ System of manufacturing
  • 2. Traditional System of Manufacturing Starts in factory • Production plan based on demand forecast • Material procurement to meet production plan • Material receipt and inspection • Storage of materials and components till required for processing • Actual production in various process stations with stress on maximizing production • Storage of components required for assembly • Assembly , final inspection and packaging • Storage of finished goods in company godowns and zonal depots • On the shelf in retail outlets. Ends with the customer Since the product is pushed from factory to the customer, this system is also known as ‘PUSH’ system.
  • 3. Weakness of Traditional System • Risk related to forecasts. • Long overall business process cycle. • Good comfort level at various stages leading to slack in the system. • It hides the problems, waste and obstacles in the business flow. • Encourages departmental focus as their efficiency is judged on the basis of output. (departmental enterprise) Pushes up costs and affects competitiveness..
  • 4. ‘Pull’ system of Manufacturing Starts with customer • Order acquisition by marketing • Production planning • Just in time receipt of material • Pull system of production down the entire process chain by kanban, a control tool starting from sales dispatch section. Ends with primary producers Since the customer pulls the product, it is also called pull system of manufacturing.The ‘PULL’ system is used in Lean Manufacturing.
  • 6. Key Principles 1. Minimize material handling. Preference should be given to low or no-cost solutions such as gravity-feed slides. Handle product once only. 2. Minimize distances . Avoid walking, carrying, etc. by creating cells, combining operations within a work centre, better planning, and so on.
  • 7. Key Principles... 3. Minimize strain . Work centres should be ergonomically designed to avoid back and other muscle strains. 4. Minimize clutter . Everything should have a home, from parts and tools at a workstation, to equipment and product within designated floor spaces. 5. Minimize storage . If you have the space, it will surely get filled. Thus, continuously minimize your storage space for raw material, WIP, finished goods and spare parts throughout the supply chain.
  • 8. Key Principles... 6. Maximize utilization . Make optimal use of people, space, and equipment to improve the return on investment. 7. Maximize flexibility . The key to lean is creating a layout that can adapt quickly to changes in product, equipment, personnel, or material. 8. Maximize smooth flow . Continuously determine and eliminate the bottlenecks, then re-balance the line.
  • 9. Key Principles... 9. Maximize visibility . To quickly spot problems, maintain a clear line of vision to anywhere, from anywhere. 10. Maximize communication . Lean requires constant training on tools available to meet goals and objectives, and feedback on how well things are going.