SlideShare ist ein Scribd-Unternehmen logo
1 von 26
SUBMITTED BY GUIDED BY
M.KALAIMATHI (43309106011) Ms R.RADHA RAJESWARI
P.ILAKYA (43309106010) AP/ECE DEPARTMENT
E.SATHIAVATHY (43309106023)
A.R.ENGINEERING COLLEGE,
Villupuram.
ABSTRACT
 The main objective of this project is to provide the multi
sensor railway track geometry surveying system.
 Railway Bridge damage status is monitored by the sensor
and transfer through wireless modules.
 For easy surveying and with less delay the information can
be send to the authority.
 To avoid accident and to safeguard the people.
 ARM7 ,GSM,GPS and MEMS are used for geodetic
measurement.
Existing system
 Surveying manually.
 Infrared sensor are not suitable for external disturbance.
 LDR sensors cannot used on the slab of the tracks.
 It can be operated in tunnels with interruption.
Disadvantages:
 Delay in transmitting the information.
 Cost is high.
 Less accuracy.
Proposed system
 The project is cheap and it is suitable to the Indian scenario.
 The system can be operated at tunnels also, without interrupts.
 Ultrasonic sensors are used for monitoring the obstacles in tracks.
 MEMS sensor is used for detect the cracks and breakage of tracks.
 Transmitting the information to the current train which comes on the
track.
Advantages:
 Very accurate detection.
 Cost effective than the
existing system.
Block Diagram of Railway Track
Surveying System
In this process we using three section for surveying.
They are
 ROBOT SECTION
 TRAIN SECTION
 GATE SECTION
Robot section:
GPS
MEMS Sensor
Ultrasonic
sensor
GSM
Train Section:
Power Supply
ATMEL
Microcontroller
Gate Section
Microcontroller Driver Unit
Gate Control
Alert Unit
Block Diagram Description
 Bridge damage status is monitored by the
sensor and wireless modules.
 In track, any shake/tilt in parallel bridge
position sensed by MEMS.
 If any obstacles, crack on the track
detected by ultrasonic sensor.
 The GPS find the location of damage in
track.
 RF Module used to transmit and receive
signals from one section to another.
Cont.….
 RF receive signal from train section interface with µc.
 GSM used to send SMS to authority person.
 A relay is an electrical switch that opens and closes under
the control of another electrical circuit.
 LCD is used to display the which damage status occur on
the track.
 Transmit the signal to the gate level section and to control
the level crossings by DC motor interface with µc .
PIN Diagram
PIN Diagram Description
 Measurement range of 0 V to 3.3 V.
 It has 64 pins and 45 I/O pins.
 Two ports ,p0-30 and p1-15 pins for input/output.
 Port 0 Port pin Functions
p0.0 & p0.8 TXD( UART)
p0.1 & p0.9 RXR (UART)
 Low power consumption.
CONT…….
A
T
8
9
S
5
1
CONT…
 Special functions only in port-3.
 10-17 are Port 3 pins.
 Port 3 Port Pin Alternate Functions
P3.0 RXD (serial input port)
P3.1 TXD (serial output port)
P3.2 INT0 (external interrupt 0)
P3.3 INT1 (external interrupt 1)
P3.4 T0 (timer 0 external input)
P3.5 T1 (timer 1 external input)
P3.6 WR (external data memory write
strobe)
P3.7 RD (external data memory read
strobe)
Hardware and Software
Requirements
Hardware Required
 Power supply
 ARM processor
 GPS and GSM module
 MEMS and Ultrasonic Sensor
 Encoder/Decoder
 RF module
 LCD Display
Software Required
 KEIL C
 Flash Magic
 ORCAD
Literature Survey
“GNSS based Railway User Navigation(2009)”
 GPS to enable autonomous and reliable determination of train
position, velocity under practically all environmental conditions.
 Another ethnological approach for the train location function: the use
of GNSS signals integrated with inertial sensors.„
“LED-LDR Based Railway Crack Detection
Scheme(2010)”
 Ultrasonic Inspections to be the best solution to crack detection.
 However, LED-LDR cannot check for surface and near-surface
cracking where many of the faults are located.
Module Description
RAILWAY BRIDGE DAMAGE STATUS :
 In track, any shake/tilt in parallel bridge position sensed by
MEMS.
 If any obstacles, crack on the track detected by ultrasonic
sensor.
 Operated in both slab and ballast.
DAMAGED LOCATION CAN BE RECORD AND SENDING SMS PROCESS:
 A GPS receiver calculates its position by timing the signals
sent by GPS satellite
 Continually transmits messages of latitude and longitude
position.
 Satellite position at time of message transmission via GSM.
 The modem will respond with the message from sensors and
GPS, indicating that the message to train station.
Cont….
TRAIN RECEIVING INFORMATION:
 ATMEL microcontroller and write the code to initialize the
UART and use it to send and receive data.
 Display the message from RF receiver.
 A relay is an electrical switch that opens and closes under the
control of another electrical circuit. In the original form, the
switch is operated by an electromagnet to open or close one
or many sets of contacts.
 Alarm unit ON, For alert the stations.
GATE SECTION CONTROLLED:
 Train transmit the signal to the gate level section.
 The microcontroller interface with the DC motor to control the
gate level crossing.
 Alarm unit ON, For alert the rover.
Results
 ROBOT SECTION KIT TRAIN SECTION KIT
GATE SECTION KIT
ADVANTAGES:
 Its cost very low compared to existing system.
 Very accurate detection.
 It also checks surface and near surface of the cracking position.
 Transmitting signals are immediately transfer.
 Gate level controller.
 Accidents reduced.
 Wireless applications.
 Railway track damage detection applications.
 Industrial and access control.
 Other remote control system.
 Navigation systems.
APPLICATIONS:
FUTURE ENHANCEMENT
 In this project, we are using MEMS and Ultrasonic
sensors for detecting the cracks and obstacles in track.
 In future, we will also using the cctv systems with IP
based camera for monitoring the visual videos captured
from the track.
 It will also increase the security for the both rails and
passengers from terrorism, crime.
Conclusion:
 This project is a cost effective.
 Monitoring and maintenance by human is very difficult and
takes more time.
 Initially IR sensor used but, it is less efficiency after that uv-
sensors are used for slab on the track only not for the crack
detection.
 To avoid delays, our proposed system will immediately
notifies and informs the current train comes on the track
through wireless medium.
REFERENCES
 [1] Burakapikinar and Engingulla “Multisensor Railway Track
Geometry Surveying System” instrumentation and control in jan 2012.
 [2] J. Trehag, P. Handel, and M. Ögren, “On-board estimation and
classification of a railroad curvature,” IEEE Trans. Instr. Meas., vol.
59, no. 3,pp. 653-660, Mar. 2010.
 [3] B. Akpinar, “A new measurement system design for determining the
geometrical changes on railways,” Ph.D. dissertation, Yildiz Technical
Univ., Istanbul, Turkey, 2009.
 [4]Wang Xin-yu,Chen Zhang Ying-gui ,Tango Bo “The research on the
mechanism of limiting speed pick-up and set-out train on railway
transportation capacity loss”(2009)-Intelligent computation technology
and automation.
 [5]sania Bhatti,Jie Xu “Surveying of target tracking protocols using
wireless sensor network”(2009)- wireless and mobile communication.
 [6] B. Li, C. Rizos, H. K. Lee, and K. H. Lee, “A GPS-slaved time syn-
chronization system for hybrid navigation,” GPS Solutions, vol. 10, no.
3,pp. 207-217, Jul. 2006.
Cont.…
 [7] R. Glaus, G. Peels, U. Muller, and A. Geiger, “Precise rail
track survey-ing,” GPS World, pp. 12-18 2004, May 1.
 [8] I. Milev and L. Gruendig, “Rail track data base of
German rail—The future automated maintenance,” in Proc.
INGEO FIG Regional Central Eastern Eur. Conf. Eng.
Surv., Bratislava, Slovakia, Nov. 11-13, 2004,pp. 1-8.
 [9]Scoot R.Messenger, Edward A. Burke “The simulation of
damage tracks in silicon”IEEE transations on nuclear
science,vol 51, no.5,october 2004
 [10]Joery S.Dittrich ,Eric N.Johnson “multi-sensor navigation
system for an autonomous helicopter” IEEE 2002.
 [11]D.Bouvet,G.Garcia”Inproving the accuracy of dynamic
localization systems using RTK GPS by identifying the GPS
latency.
THANK YOU
QUERIES

Weitere ähnliche Inhalte

Was ist angesagt?

Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin systemASWATHY VG
 
Automatic railway gate control
Automatic railway gate controlAutomatic railway gate control
Automatic railway gate controlMohamed Magdy
 
Fire fighting Robot
Fire fighting RobotFire fighting Robot
Fire fighting RobotAnjan991
 
Automatic railway gate control
Automatic railway gate controlAutomatic railway gate control
Automatic railway gate controlAtchyuth Sonti
 
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEMAUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEMJOLLUSUDARSHANREDDY
 
Automatic Train collision and Accident Avoidance system
Automatic Train collision and Accident Avoidance systemAutomatic Train collision and Accident Avoidance system
Automatic Train collision and Accident Avoidance systemPradeepRaj
 
Design of Accident Detection and Alert System for Motor Cycles
Design of Accident Detection and Alert System for Motor Cycles Design of Accident Detection and Alert System for Motor Cycles
Design of Accident Detection and Alert System for Motor Cycles Dhanith Krishna
 
ACCIDENT DETECTION SYSTEM PPT
ACCIDENT DETECTION SYSTEM PPTACCIDENT DETECTION SYSTEM PPT
ACCIDENT DETECTION SYSTEM PPTJoshnasai
 
Accident Detection and Ambulance Triggered Traffic Management Systems
Accident Detection and Ambulance Triggered Traffic Management SystemsAccident Detection and Ambulance Triggered Traffic Management Systems
Accident Detection and Ambulance Triggered Traffic Management SystemsSachin Kumar Asokan
 
Simple Railway gate automation
Simple Railway gate automationSimple Railway gate automation
Simple Railway gate automationUJJWAL SHEKHAR
 
Automatic railway gate control using arduino uno
Automatic railway gate control using arduino unoAutomatic railway gate control using arduino uno
Automatic railway gate control using arduino unoselvalakshmi24
 
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMSACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMSKrishna Moparthi
 
Wireless mobile charger
Wireless mobile chargerWireless mobile charger
Wireless mobile chargernissy marla
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Suraj Talreja
 
Automatic Train Collision and Accidence Avoidance system
Automatic Train Collision and Accidence Avoidance systemAutomatic Train Collision and Accidence Avoidance system
Automatic Train Collision and Accidence Avoidance systemPradeepRaj
 

Was ist angesagt? (20)

Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin system
 
Automatic railway gate control
Automatic railway gate controlAutomatic railway gate control
Automatic railway gate control
 
Fire fighting Robot
Fire fighting RobotFire fighting Robot
Fire fighting Robot
 
Automatic railway gate control
Automatic railway gate controlAutomatic railway gate control
Automatic railway gate control
 
Automatic Vehicle Locator
Automatic Vehicle LocatorAutomatic Vehicle Locator
Automatic Vehicle Locator
 
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEMAUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
 
Automatic Train collision and Accident Avoidance system
Automatic Train collision and Accident Avoidance systemAutomatic Train collision and Accident Avoidance system
Automatic Train collision and Accident Avoidance system
 
Design of Accident Detection and Alert System for Motor Cycles
Design of Accident Detection and Alert System for Motor Cycles Design of Accident Detection and Alert System for Motor Cycles
Design of Accident Detection and Alert System for Motor Cycles
 
ACCIDENT DETECTION SYSTEM PPT
ACCIDENT DETECTION SYSTEM PPTACCIDENT DETECTION SYSTEM PPT
ACCIDENT DETECTION SYSTEM PPT
 
Accident Detection and Ambulance Triggered Traffic Management Systems
Accident Detection and Ambulance Triggered Traffic Management SystemsAccident Detection and Ambulance Triggered Traffic Management Systems
Accident Detection and Ambulance Triggered Traffic Management Systems
 
Simple Railway gate automation
Simple Railway gate automationSimple Railway gate automation
Simple Railway gate automation
 
Automatic railway gate control using arduino uno
Automatic railway gate control using arduino unoAutomatic railway gate control using arduino uno
Automatic railway gate control using arduino uno
 
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMSACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
ACCIDENT DETECTION AND VEHICLE TRACKING USING GPS,GSM AND MEMS
 
Automatic mall elevator
Automatic mall elevatorAutomatic mall elevator
Automatic mall elevator
 
Wireless mobile charger
Wireless mobile chargerWireless mobile charger
Wireless mobile charger
 
OBSTACLE AVOIDING CAR
OBSTACLE AVOIDING CAROBSTACLE AVOIDING CAR
OBSTACLE AVOIDING CAR
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
 
Railway Accident Avoiding System: A Safety Measure
Railway Accident Avoiding System: A Safety MeasureRailway Accident Avoiding System: A Safety Measure
Railway Accident Avoiding System: A Safety Measure
 
Vehicle tracking by gps gsm
Vehicle tracking by gps   gsm Vehicle tracking by gps   gsm
Vehicle tracking by gps gsm
 
Automatic Train Collision and Accidence Avoidance system
Automatic Train Collision and Accidence Avoidance systemAutomatic Train Collision and Accidence Avoidance system
Automatic Train Collision and Accidence Avoidance system
 

Ähnlich wie innovative railway track surveying with sensors and controlled by wireless communication

IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...
IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...
IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...IRJET Journal
 
railway risk assessment in IOT based systems
railway risk assessment in  IOT based systemsrailway risk assessment in  IOT based systems
railway risk assessment in IOT based systemsmbharshitha2001
 
Railway track crack detection based on GSM technique
Railway track crack detection based on GSM techniqueRailway track crack detection based on GSM technique
Railway track crack detection based on GSM techniqueIRJET Journal
 
Review on Railway track crack detection using ir transmitter and receiver
Review on Railway track crack detection using ir transmitter and receiverReview on Railway track crack detection using ir transmitter and receiver
Review on Railway track crack detection using ir transmitter and receiverIRJET Journal
 
Design and Development of Device Used for Detection of Cracks on Railway Tracks
Design and Development of Device Used for Detection of Cracks on Railway TracksDesign and Development of Device Used for Detection of Cracks on Railway Tracks
Design and Development of Device Used for Detection of Cracks on Railway TracksIRJET Journal
 
IRJET- Railway Track Fault Detection System using Robot Car
IRJET- Railway Track Fault Detection System using Robot CarIRJET- Railway Track Fault Detection System using Robot Car
IRJET- Railway Track Fault Detection System using Robot CarIRJET Journal
 
advanced raiway security system based on zigbee communication for track fault
advanced raiway security system based on zigbee communication for track fault advanced raiway security system based on zigbee communication for track fault
advanced raiway security system based on zigbee communication for track fault SHIVA PRASAD
 
Investigation of wireless magnetometer in sensing magnetic field changes at d...
Investigation of wireless magnetometer in sensing magnetic field changes at d...Investigation of wireless magnetometer in sensing magnetic field changes at d...
Investigation of wireless magnetometer in sensing magnetic field changes at d...journalBEEI
 
IRJET- Railway Track Crack and Obstacle Detection using Arduino
IRJET- Railway Track Crack and Obstacle Detection using ArduinoIRJET- Railway Track Crack and Obstacle Detection using Arduino
IRJET- Railway Track Crack and Obstacle Detection using ArduinoIRJET Journal
 
IRJET- Railway Track Crack and Obstacle Detection using Arduino
IRJET-  	  Railway Track Crack and Obstacle Detection using ArduinoIRJET-  	  Railway Track Crack and Obstacle Detection using Arduino
IRJET- Railway Track Crack and Obstacle Detection using ArduinoIRJET Journal
 
Intelligent Collision avoidance and monitoring system for railway using wirel...
Intelligent Collision avoidance and monitoring system for railway using wirel...Intelligent Collision avoidance and monitoring system for railway using wirel...
Intelligent Collision avoidance and monitoring system for railway using wirel...Editor IJMTER
 
Real time tracking based on gsm and ir module for running train
Real time tracking based on gsm and ir module for running trainReal time tracking based on gsm and ir module for running train
Real time tracking based on gsm and ir module for running traineSAT Journals
 
IRJET- Automatic Inspection Trolley for Railway Track Crack Detection wit...
IRJET-  	  Automatic Inspection Trolley for Railway Track Crack Detection wit...IRJET-  	  Automatic Inspection Trolley for Railway Track Crack Detection wit...
IRJET- Automatic Inspection Trolley for Railway Track Crack Detection wit...IRJET Journal
 
IRJET- Automatic Railway Crack Locator
IRJET-	 Automatic Railway Crack LocatorIRJET-	 Automatic Railway Crack Locator
IRJET- Automatic Railway Crack LocatorIRJET Journal
 
IRJET- Automatic Luggage Follower
IRJET- Automatic Luggage FollowerIRJET- Automatic Luggage Follower
IRJET- Automatic Luggage FollowerIRJET Journal
 
Iaetsd real time implementation of railway
Iaetsd real time implementation of railwayIaetsd real time implementation of railway
Iaetsd real time implementation of railwayIaetsd Iaetsd
 
IR based railway track fault detection system
IR based railway track fault detection systemIR based railway track fault detection system
IR based railway track fault detection systemKonirDom1
 
Collision Avoidance of Trains Using Arm7
Collision Avoidance of Trains Using Arm7Collision Avoidance of Trains Using Arm7
Collision Avoidance of Trains Using Arm7IJERA Editor
 
IJSRED-V2I2P31
IJSRED-V2I2P31IJSRED-V2I2P31
IJSRED-V2I2P31IJSRED
 
Research on alarm system of railway crossing based on gps and gprs
Research on alarm system of railway crossing based on gps and gprsResearch on alarm system of railway crossing based on gps and gprs
Research on alarm system of railway crossing based on gps and gprssudhakar5472
 

Ähnlich wie innovative railway track surveying with sensors and controlled by wireless communication (20)

IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...
IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...
IRJET- Automatic Gate Crossing and IoT based Train Track Crack Detection Syst...
 
railway risk assessment in IOT based systems
railway risk assessment in  IOT based systemsrailway risk assessment in  IOT based systems
railway risk assessment in IOT based systems
 
Railway track crack detection based on GSM technique
Railway track crack detection based on GSM techniqueRailway track crack detection based on GSM technique
Railway track crack detection based on GSM technique
 
Review on Railway track crack detection using ir transmitter and receiver
Review on Railway track crack detection using ir transmitter and receiverReview on Railway track crack detection using ir transmitter and receiver
Review on Railway track crack detection using ir transmitter and receiver
 
Design and Development of Device Used for Detection of Cracks on Railway Tracks
Design and Development of Device Used for Detection of Cracks on Railway TracksDesign and Development of Device Used for Detection of Cracks on Railway Tracks
Design and Development of Device Used for Detection of Cracks on Railway Tracks
 
IRJET- Railway Track Fault Detection System using Robot Car
IRJET- Railway Track Fault Detection System using Robot CarIRJET- Railway Track Fault Detection System using Robot Car
IRJET- Railway Track Fault Detection System using Robot Car
 
advanced raiway security system based on zigbee communication for track fault
advanced raiway security system based on zigbee communication for track fault advanced raiway security system based on zigbee communication for track fault
advanced raiway security system based on zigbee communication for track fault
 
Investigation of wireless magnetometer in sensing magnetic field changes at d...
Investigation of wireless magnetometer in sensing magnetic field changes at d...Investigation of wireless magnetometer in sensing magnetic field changes at d...
Investigation of wireless magnetometer in sensing magnetic field changes at d...
 
IRJET- Railway Track Crack and Obstacle Detection using Arduino
IRJET- Railway Track Crack and Obstacle Detection using ArduinoIRJET- Railway Track Crack and Obstacle Detection using Arduino
IRJET- Railway Track Crack and Obstacle Detection using Arduino
 
IRJET- Railway Track Crack and Obstacle Detection using Arduino
IRJET-  	  Railway Track Crack and Obstacle Detection using ArduinoIRJET-  	  Railway Track Crack and Obstacle Detection using Arduino
IRJET- Railway Track Crack and Obstacle Detection using Arduino
 
Intelligent Collision avoidance and monitoring system for railway using wirel...
Intelligent Collision avoidance and monitoring system for railway using wirel...Intelligent Collision avoidance and monitoring system for railway using wirel...
Intelligent Collision avoidance and monitoring system for railway using wirel...
 
Real time tracking based on gsm and ir module for running train
Real time tracking based on gsm and ir module for running trainReal time tracking based on gsm and ir module for running train
Real time tracking based on gsm and ir module for running train
 
IRJET- Automatic Inspection Trolley for Railway Track Crack Detection wit...
IRJET-  	  Automatic Inspection Trolley for Railway Track Crack Detection wit...IRJET-  	  Automatic Inspection Trolley for Railway Track Crack Detection wit...
IRJET- Automatic Inspection Trolley for Railway Track Crack Detection wit...
 
IRJET- Automatic Railway Crack Locator
IRJET-	 Automatic Railway Crack LocatorIRJET-	 Automatic Railway Crack Locator
IRJET- Automatic Railway Crack Locator
 
IRJET- Automatic Luggage Follower
IRJET- Automatic Luggage FollowerIRJET- Automatic Luggage Follower
IRJET- Automatic Luggage Follower
 
Iaetsd real time implementation of railway
Iaetsd real time implementation of railwayIaetsd real time implementation of railway
Iaetsd real time implementation of railway
 
IR based railway track fault detection system
IR based railway track fault detection systemIR based railway track fault detection system
IR based railway track fault detection system
 
Collision Avoidance of Trains Using Arm7
Collision Avoidance of Trains Using Arm7Collision Avoidance of Trains Using Arm7
Collision Avoidance of Trains Using Arm7
 
IJSRED-V2I2P31
IJSRED-V2I2P31IJSRED-V2I2P31
IJSRED-V2I2P31
 
Research on alarm system of railway crossing based on gps and gprs
Research on alarm system of railway crossing based on gps and gprsResearch on alarm system of railway crossing based on gps and gprs
Research on alarm system of railway crossing based on gps and gprs
 

Kürzlich hochgeladen

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 

Kürzlich hochgeladen (20)

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 

innovative railway track surveying with sensors and controlled by wireless communication

  • 1. SUBMITTED BY GUIDED BY M.KALAIMATHI (43309106011) Ms R.RADHA RAJESWARI P.ILAKYA (43309106010) AP/ECE DEPARTMENT E.SATHIAVATHY (43309106023) A.R.ENGINEERING COLLEGE, Villupuram.
  • 2. ABSTRACT  The main objective of this project is to provide the multi sensor railway track geometry surveying system.  Railway Bridge damage status is monitored by the sensor and transfer through wireless modules.  For easy surveying and with less delay the information can be send to the authority.  To avoid accident and to safeguard the people.  ARM7 ,GSM,GPS and MEMS are used for geodetic measurement.
  • 3. Existing system  Surveying manually.  Infrared sensor are not suitable for external disturbance.  LDR sensors cannot used on the slab of the tracks.  It can be operated in tunnels with interruption. Disadvantages:  Delay in transmitting the information.  Cost is high.  Less accuracy.
  • 4. Proposed system  The project is cheap and it is suitable to the Indian scenario.  The system can be operated at tunnels also, without interrupts.  Ultrasonic sensors are used for monitoring the obstacles in tracks.  MEMS sensor is used for detect the cracks and breakage of tracks.  Transmitting the information to the current train which comes on the track. Advantages:  Very accurate detection.  Cost effective than the existing system.
  • 5. Block Diagram of Railway Track Surveying System In this process we using three section for surveying. They are  ROBOT SECTION  TRAIN SECTION  GATE SECTION
  • 8. Gate Section Microcontroller Driver Unit Gate Control Alert Unit
  • 9. Block Diagram Description  Bridge damage status is monitored by the sensor and wireless modules.  In track, any shake/tilt in parallel bridge position sensed by MEMS.  If any obstacles, crack on the track detected by ultrasonic sensor.  The GPS find the location of damage in track.  RF Module used to transmit and receive signals from one section to another.
  • 10. Cont.….  RF receive signal from train section interface with µc.  GSM used to send SMS to authority person.  A relay is an electrical switch that opens and closes under the control of another electrical circuit.  LCD is used to display the which damage status occur on the track.  Transmit the signal to the gate level section and to control the level crossings by DC motor interface with µc .
  • 12. PIN Diagram Description  Measurement range of 0 V to 3.3 V.  It has 64 pins and 45 I/O pins.  Two ports ,p0-30 and p1-15 pins for input/output.  Port 0 Port pin Functions p0.0 & p0.8 TXD( UART) p0.1 & p0.9 RXR (UART)  Low power consumption.
  • 14. CONT…  Special functions only in port-3.  10-17 are Port 3 pins.  Port 3 Port Pin Alternate Functions P3.0 RXD (serial input port) P3.1 TXD (serial output port) P3.2 INT0 (external interrupt 0) P3.3 INT1 (external interrupt 1) P3.4 T0 (timer 0 external input) P3.5 T1 (timer 1 external input) P3.6 WR (external data memory write strobe) P3.7 RD (external data memory read strobe)
  • 15. Hardware and Software Requirements Hardware Required  Power supply  ARM processor  GPS and GSM module  MEMS and Ultrasonic Sensor  Encoder/Decoder  RF module  LCD Display Software Required  KEIL C  Flash Magic  ORCAD
  • 16. Literature Survey “GNSS based Railway User Navigation(2009)”  GPS to enable autonomous and reliable determination of train position, velocity under practically all environmental conditions.  Another ethnological approach for the train location function: the use of GNSS signals integrated with inertial sensors.„ “LED-LDR Based Railway Crack Detection Scheme(2010)”  Ultrasonic Inspections to be the best solution to crack detection.  However, LED-LDR cannot check for surface and near-surface cracking where many of the faults are located.
  • 17. Module Description RAILWAY BRIDGE DAMAGE STATUS :  In track, any shake/tilt in parallel bridge position sensed by MEMS.  If any obstacles, crack on the track detected by ultrasonic sensor.  Operated in both slab and ballast. DAMAGED LOCATION CAN BE RECORD AND SENDING SMS PROCESS:  A GPS receiver calculates its position by timing the signals sent by GPS satellite  Continually transmits messages of latitude and longitude position.  Satellite position at time of message transmission via GSM.  The modem will respond with the message from sensors and GPS, indicating that the message to train station.
  • 18. Cont…. TRAIN RECEIVING INFORMATION:  ATMEL microcontroller and write the code to initialize the UART and use it to send and receive data.  Display the message from RF receiver.  A relay is an electrical switch that opens and closes under the control of another electrical circuit. In the original form, the switch is operated by an electromagnet to open or close one or many sets of contacts.  Alarm unit ON, For alert the stations. GATE SECTION CONTROLLED:  Train transmit the signal to the gate level section.  The microcontroller interface with the DC motor to control the gate level crossing.  Alarm unit ON, For alert the rover.
  • 19. Results  ROBOT SECTION KIT TRAIN SECTION KIT GATE SECTION KIT
  • 20. ADVANTAGES:  Its cost very low compared to existing system.  Very accurate detection.  It also checks surface and near surface of the cracking position.  Transmitting signals are immediately transfer.  Gate level controller.  Accidents reduced.  Wireless applications.  Railway track damage detection applications.  Industrial and access control.  Other remote control system.  Navigation systems. APPLICATIONS:
  • 21. FUTURE ENHANCEMENT  In this project, we are using MEMS and Ultrasonic sensors for detecting the cracks and obstacles in track.  In future, we will also using the cctv systems with IP based camera for monitoring the visual videos captured from the track.  It will also increase the security for the both rails and passengers from terrorism, crime.
  • 22. Conclusion:  This project is a cost effective.  Monitoring and maintenance by human is very difficult and takes more time.  Initially IR sensor used but, it is less efficiency after that uv- sensors are used for slab on the track only not for the crack detection.  To avoid delays, our proposed system will immediately notifies and informs the current train comes on the track through wireless medium.
  • 23. REFERENCES  [1] Burakapikinar and Engingulla “Multisensor Railway Track Geometry Surveying System” instrumentation and control in jan 2012.  [2] J. Trehag, P. Handel, and M. Ögren, “On-board estimation and classification of a railroad curvature,” IEEE Trans. Instr. Meas., vol. 59, no. 3,pp. 653-660, Mar. 2010.  [3] B. Akpinar, “A new measurement system design for determining the geometrical changes on railways,” Ph.D. dissertation, Yildiz Technical Univ., Istanbul, Turkey, 2009.  [4]Wang Xin-yu,Chen Zhang Ying-gui ,Tango Bo “The research on the mechanism of limiting speed pick-up and set-out train on railway transportation capacity loss”(2009)-Intelligent computation technology and automation.  [5]sania Bhatti,Jie Xu “Surveying of target tracking protocols using wireless sensor network”(2009)- wireless and mobile communication.  [6] B. Li, C. Rizos, H. K. Lee, and K. H. Lee, “A GPS-slaved time syn- chronization system for hybrid navigation,” GPS Solutions, vol. 10, no. 3,pp. 207-217, Jul. 2006.
  • 24. Cont.…  [7] R. Glaus, G. Peels, U. Muller, and A. Geiger, “Precise rail track survey-ing,” GPS World, pp. 12-18 2004, May 1.  [8] I. Milev and L. Gruendig, “Rail track data base of German rail—The future automated maintenance,” in Proc. INGEO FIG Regional Central Eastern Eur. Conf. Eng. Surv., Bratislava, Slovakia, Nov. 11-13, 2004,pp. 1-8.  [9]Scoot R.Messenger, Edward A. Burke “The simulation of damage tracks in silicon”IEEE transations on nuclear science,vol 51, no.5,october 2004  [10]Joery S.Dittrich ,Eric N.Johnson “multi-sensor navigation system for an autonomous helicopter” IEEE 2002.  [11]D.Bouvet,G.Garcia”Inproving the accuracy of dynamic localization systems using RTK GPS by identifying the GPS latency.