PRODUCTION SCHEDULING Meenu S Babu
Production Scheduling ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Why Linear Programming is Used? ,[object Object],[object Object],Component April May June 322A 1000 3000 5000 802B 1000 500 3000
[object Object],[object Object],[object Object],[object Object],Component April May June 322A 1000 3000 5000 802B 1000 500 3000
Formulating Linear Programming model : Let  X im  denote production volume  in units for product i in month m. i=1,2  m=1,2,3 i=1 means component 322A m=1 means April If 322A costs $20 per unit produced and 802B costs $10  per unit produced, then Total production cost =  20X 11  + 20X 12  +20X 13  +10X 21  +10X 22  +10X 23 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
Let  S im  denotes Inventory level  for product i at the end of month m. If Inventory Holding costa are 1.5 percentage of cost of product (i.e 0.015 * $20 = $0.30 per unit for 322A and .015 * $10 = $0.15 per unit for 802B) Inventory Holding Cost = 0.30s 11  +0.30s 12  +0.30s 13  +0.15S 21  + 0.15S 22  +0.15S 23 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
2 additional variables could be defined to incorporate fluctuations in production levels from month to month. I m  = increase in the total production level  necessary during month m. D m  = decrease in the total production level  necessary during month m. Let I m  for any month be 0.50 and D m  be 0.20  Change-in-production-level costs =  0.50I 1  + 0.50I 2  + 0.50I 3  + 0.20D 1  + 0.20D 2  + 0.20D 3 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
Combinig all the three costs, Objective function becomes : Min   20X 11  + 20X 12  +20X 13  +10X 21  +10X 22  +10X 23  +0.30s 11  +0.30s 12  +0.30s 13  +0.15S 21  + 0.15S 22  +0.15S 23  +0.50I 1  + 0.50I 2  + 0.50I 3  + 0.20D 1  + 0.20D 2  + 0.20D 3 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
Making the constraints : To guarantee schedule meets customer demand, it must me in the form : This Month's Demand = Ending Inventory From Previous Month + Current Production - Ending Inventory for This Month
Let the inventories at the beginning of 3 month scheduling period were 500 units for component 322A and 200 units for component 802B. Demand in first month : 500 + X 11  -S 11  = 1000 200 + X 21  -S 21  =1000 =>  X 11  – S 11  = 500 X 21 –  S 21  = 800 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
Demand in second month : S 11  + X 12  - S 12  = 3000 S 21  + X 22  - S 22  = 500 Demand in third month :   S 12  + X 13  - S 13  = 5000 S 22  + X 23  - S 23  = 3000 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
If the company specifies a minimum inventory level at the end of the 3 month period of at least 400 units of component 322A and at least 200 units of component 802B, then S 13  >= 400 S 23  >= 200
Following table shows machine,labor and storage capacity available: Following table shows machine,labor and storage space requirement needed: MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
Machine Capacity : 0.10X 11  + 0.08X 21  <= 400  Month 1 0.10X 12  + 0.08X 22  <= 500  Month 2 0.10X 13  + 0.08X 23 <= 600  Month 3 MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
Labor Capacity : 0.05X 11  + 0.07X 21  <= 300  Month 1 0.05X 12  + 0.07X 22  <= 300  Month 2 0.05X 13  + 0.07X 23 <= 300  Month 3 MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
Storage Capacity : 2X 11  + 3S 21  <= 10,000  Month 1 2X 12  + 3S 22  <= 10,000  Month 2 2X 13  + 3S 23 <= 10,000  Month 3 MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
Suppose the production levels for march had been 1500 units of component 322A and 1000 units of component 802B for a total production level of 1500 + 1000 = 2500 units Amount of change in production of April is :   April production – March production = Change (X 11  + X 21  ) -2500 = Change Change can be positive or negative (X 11  + X 21  ) -2500 = I 1  - D 1
Similarly, (X 12  + X 22  ) - (X 11  + X 21  ) = I 2  -  D 2   MAY (X 13  + X 23  ) - (X 12  + X 22  ) = I 3  -  D 3   JUNE Complete Set : (X 11  + X 21  ) -2500 - I 1  +  D 1  = 2500 (X 12  + X 22  ) - (X 11  + X 21  ) - I 2  +  D 2   = 0 (X 13  + X 23  ) - (X 12  + X 22  ) - I 3  +  D 3   = 0
Optimal Solution to the Bollinger Electronics Production Scheduling Problem : Variable Value Reduced Costs X 11 500 0 X 12 3200 0 X 13 5200 0 X 21 2500 0 X 22 2000 0 X 23 0 0.128 S 11 0 0.172 S 12 200 0 S 13 400 0
Variable Value Reduced Costs S 21 1700 0 S 22 3200 0 S 23 200 0 I 1 500 0 I 2 2200 0 I 3 0 0.072 D 1 0 0.700 D 2 0 0.700 D 3 0 0.628
Constraint Slack/Surplus Dual Prices 1 0 -20 2 0 -10 3 0 -20.128 4 0 -10.150 5 0 -20.428 6 0 -10.300 7 0 -20.728 8 0 -10.450 9 150 0
Constraint Slack/Surplus Dual Prices 10 20 0 11 80 0 12 100 0 13 0 1.111 14 40 0 15 4900 0 16 0 0 17 8600 0 18 0 0.500 19 0 0.500 20 0 0.428
Total Production,Inventory & production-smoothing cost  = $225,295 Activity April May  June PRODUCTION 322A 500 3200 5200 802B 2500 2000 0 TOTALS 3000 5200 5200 ENDING INVENTORY 322A 0 200 400 802B 1700 3200 200 MACHINE USAGE SCHEDULED HOURS 250 480 520 SLACK CAPACITY HOURS 150 20 80 LABOR USAGE SCHEDULED HOURS 200 300 260 SLACK CAPACITY HOURS 100 0 40 STORAGE USAGE SCHEDULED HOURS 5100 10,000 1400 SLACK CAPACITY 4900 0 8600
Conclusion ,[object Object],[object Object],[object Object],[object Object]
 

Weitere ähnliche Inhalte

Was ist angesagt?

Information System At Mrs
Information System At MrsInformation System At Mrs
Information System At Mrsinstitute
 
Proctor and gamble case study 2005
Proctor and gamble case study 2005Proctor and gamble case study 2005
Proctor and gamble case study 2005PiyushHirwani
 
Procter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance CaseProcter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance CaseYASSER ELSEDAWY
 
Macroeconomics 12th-edition-dornbusch-solutions-manual
Macroeconomics 12th-edition-dornbusch-solutions-manualMacroeconomics 12th-edition-dornbusch-solutions-manual
Macroeconomics 12th-edition-dornbusch-solutions-manualShannonHarlan
 
Statistics assignment 5
Statistics assignment 5Statistics assignment 5
Statistics assignment 5Ishaq Ahmed
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case StudyGourav Anvekar
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMANDaliyudhi_h
 
Apex corporation case study
Apex corporation case studyApex corporation case study
Apex corporation case studyUtkarsh Shivam
 
ChotuKool Case Study Solution.pptx
ChotuKool Case Study Solution.pptxChotuKool Case Study Solution.pptx
ChotuKool Case Study Solution.pptxVishal543707
 
Toyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyToyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyIshan Parekh
 
Case study kulicke and soffa industries inc - group 4
Case study   kulicke and soffa industries inc - group 4Case study   kulicke and soffa industries inc - group 4
Case study kulicke and soffa industries inc - group 4Piyush Sogra
 
Donner case Operations Management
Donner case Operations ManagementDonner case Operations Management
Donner case Operations ManagementHarish B
 
BMW Z3 Roadster Launch in USA
BMW Z3 Roadster Launch in USABMW Z3 Roadster Launch in USA
BMW Z3 Roadster Launch in USAAbhishek Kapoor
 
Cottle taylor : Expanding the oral care group in india case study
Cottle taylor : Expanding the oral care group in india case studyCottle taylor : Expanding the oral care group in india case study
Cottle taylor : Expanding the oral care group in india case studyBonny V Pappachan
 
Bill french case study
Bill french case studyBill french case study
Bill french case studyHimanshu Arya
 
420035368 pee buddy
420035368 pee buddy420035368 pee buddy
420035368 pee buddyPaula912226
 

Was ist angesagt? (20)

Information System At Mrs
Information System At MrsInformation System At Mrs
Information System At Mrs
 
Vohra case
 Vohra case Vohra case
Vohra case
 
Proctor and gamble case study 2005
Proctor and gamble case study 2005Proctor and gamble case study 2005
Proctor and gamble case study 2005
 
Procter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance CaseProcter & Gamble Supply Chain Finance Case
Procter & Gamble Supply Chain Finance Case
 
Macroeconomics 12th-edition-dornbusch-solutions-manual
Macroeconomics 12th-edition-dornbusch-solutions-manualMacroeconomics 12th-edition-dornbusch-solutions-manual
Macroeconomics 12th-edition-dornbusch-solutions-manual
 
Statistics assignment 5
Statistics assignment 5Statistics assignment 5
Statistics assignment 5
 
Harmon food
Harmon foodHarmon food
Harmon food
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case Study
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
 
Apex corporation case study
Apex corporation case studyApex corporation case study
Apex corporation case study
 
Foldrite
FoldriteFoldrite
Foldrite
 
ChotuKool Case Study Solution.pptx
ChotuKool Case Study Solution.pptxChotuKool Case Study Solution.pptx
ChotuKool Case Study Solution.pptx
 
Toyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyToyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case Study
 
Case study kulicke and soffa industries inc - group 4
Case study   kulicke and soffa industries inc - group 4Case study   kulicke and soffa industries inc - group 4
Case study kulicke and soffa industries inc - group 4
 
Donner case Operations Management
Donner case Operations ManagementDonner case Operations Management
Donner case Operations Management
 
LL Bean Case Study
LL Bean Case StudyLL Bean Case Study
LL Bean Case Study
 
BMW Z3 Roadster Launch in USA
BMW Z3 Roadster Launch in USABMW Z3 Roadster Launch in USA
BMW Z3 Roadster Launch in USA
 
Cottle taylor : Expanding the oral care group in india case study
Cottle taylor : Expanding the oral care group in india case studyCottle taylor : Expanding the oral care group in india case study
Cottle taylor : Expanding the oral care group in india case study
 
Bill french case study
Bill french case studyBill french case study
Bill french case study
 
420035368 pee buddy
420035368 pee buddy420035368 pee buddy
420035368 pee buddy
 

Andere mochten auch

Managing Risk in Business & Life
Managing Risk in Business & LifeManaging Risk in Business & Life
Managing Risk in Business & LifeTom Fox
 
Risk Management: Business Owners
Risk Management: Business OwnersRisk Management: Business Owners
Risk Management: Business Ownersalstraub
 
Identifying business risk aaron robertson
Identifying business risk   aaron robertsonIdentifying business risk   aaron robertson
Identifying business risk aaron robertsonadamsaddler
 
Will the Globally Harmonized System put your Business at Risk?
Will the Globally Harmonized System put your Business at Risk?Will the Globally Harmonized System put your Business at Risk?
Will the Globally Harmonized System put your Business at Risk?Sarah Sajedi
 
5 Ways to Reduce Your Business Risk with Workplace Health & Safety Programs
5 Ways to Reduce Your Business Risk with Workplace Health & Safety Programs5 Ways to Reduce Your Business Risk with Workplace Health & Safety Programs
5 Ways to Reduce Your Business Risk with Workplace Health & Safety ProgramsDrake International
 
Business Risk Analysis of INDIA
Business Risk Analysis of INDIABusiness Risk Analysis of INDIA
Business Risk Analysis of INDIAKashyap Shah
 
Developing competitive advantage and strategic focus
Developing competitive advantage and strategic focusDeveloping competitive advantage and strategic focus
Developing competitive advantage and strategic focusAshraf Hlouh
 
Business Risk Case Study Ba 32
Business Risk Case Study  Ba 32Business Risk Case Study  Ba 32
Business Risk Case Study Ba 32Sandip Sen
 
Business Risk Case Study Ba33
Business Risk Case Study Ba33Business Risk Case Study Ba33
Business Risk Case Study Ba33Sandip Sen
 
MANAGING RISK IN INTERNATIONAL BUSINESS
MANAGING RISK IN INTERNATIONAL BUSINESSMANAGING RISK IN INTERNATIONAL BUSINESS
MANAGING RISK IN INTERNATIONAL BUSINESSreynolds
 
Business Risks
Business RisksBusiness Risks
Business RisksNCVPS
 
Operational risk management (orm)
Operational risk management (orm)Operational risk management (orm)
Operational risk management (orm)Bushra Angbeen
 
Operational Risk Management
Operational Risk ManagementOperational Risk Management
Operational Risk Managementarsqureshi
 

Andere mochten auch (20)

Small Business Risk Factors in Today's Market
Small Business Risk Factors in Today's MarketSmall Business Risk Factors in Today's Market
Small Business Risk Factors in Today's Market
 
Managing Risk in Business & Life
Managing Risk in Business & LifeManaging Risk in Business & Life
Managing Risk in Business & Life
 
Risk Management: Business Owners
Risk Management: Business OwnersRisk Management: Business Owners
Risk Management: Business Owners
 
Business risk
Business riskBusiness risk
Business risk
 
Identifying business risk aaron robertson
Identifying business risk   aaron robertsonIdentifying business risk   aaron robertson
Identifying business risk aaron robertson
 
Business risk
Business riskBusiness risk
Business risk
 
Will the Globally Harmonized System put your Business at Risk?
Will the Globally Harmonized System put your Business at Risk?Will the Globally Harmonized System put your Business at Risk?
Will the Globally Harmonized System put your Business at Risk?
 
5 Ways to Reduce Your Business Risk with Workplace Health & Safety Programs
5 Ways to Reduce Your Business Risk with Workplace Health & Safety Programs5 Ways to Reduce Your Business Risk with Workplace Health & Safety Programs
5 Ways to Reduce Your Business Risk with Workplace Health & Safety Programs
 
Business risk & Insurance
Business risk & InsuranceBusiness risk & Insurance
Business risk & Insurance
 
Business Risk Analysis of INDIA
Business Risk Analysis of INDIABusiness Risk Analysis of INDIA
Business Risk Analysis of INDIA
 
Business risk
Business riskBusiness risk
Business risk
 
Developing competitive advantage and strategic focus
Developing competitive advantage and strategic focusDeveloping competitive advantage and strategic focus
Developing competitive advantage and strategic focus
 
Business Risk Case Study Ba 32
Business Risk Case Study  Ba 32Business Risk Case Study  Ba 32
Business Risk Case Study Ba 32
 
Business Risk Case Study Ba33
Business Risk Case Study Ba33Business Risk Case Study Ba33
Business Risk Case Study Ba33
 
MANAGING RISK IN INTERNATIONAL BUSINESS
MANAGING RISK IN INTERNATIONAL BUSINESSMANAGING RISK IN INTERNATIONAL BUSINESS
MANAGING RISK IN INTERNATIONAL BUSINESS
 
Ppt business risk
Ppt business riskPpt business risk
Ppt business risk
 
Business Risks
Business RisksBusiness Risks
Business Risks
 
Operational risk management (orm)
Operational risk management (orm)Operational risk management (orm)
Operational risk management (orm)
 
Operational Risk Management
Operational Risk ManagementOperational Risk Management
Operational Risk Management
 
Types of-risk
Types of-riskTypes of-risk
Types of-risk
 

Ähnlich wie Production scheduling

Practice topic 9 - answers (1)
Practice   topic 9 - answers (1)Practice   topic 9 - answers (1)
Practice topic 9 - answers (1)IrfanKhan679364
 
Production & Operation Management Chapter32[1]
Production & Operation Management Chapter32[1]Production & Operation Management Chapter32[1]
Production & Operation Management Chapter32[1]Hariharan Ponnusamy
 
Accounting for Properties Plant & Equipment
Accounting for Properties Plant & EquipmentAccounting for Properties Plant & Equipment
Accounting for Properties Plant & EquipmentMd. Mufidur Rahman
 
Akuntansi keuangan ii (c1) kelompok 2
Akuntansi keuangan ii (c1)   kelompok 2Akuntansi keuangan ii (c1)   kelompok 2
Akuntansi keuangan ii (c1) kelompok 2HennyTriyanaHasibuan
 
Rabab Ali Ahmed.pdf
Rabab Ali Ahmed.pdfRabab Ali Ahmed.pdf
Rabab Ali Ahmed.pdfRababAli31
 
233665105 eng-g-economy
233665105 eng-g-economy233665105 eng-g-economy
233665105 eng-g-economyBryan Yu
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV Systemsangeetkhule
 
LLP and Transportation problems solution
LLP and Transportation problems solution LLP and Transportation problems solution
LLP and Transportation problems solution Aditya Arora
 
Operation and Production Mgt Assignment.pdf
Operation and Production Mgt Assignment.pdfOperation and Production Mgt Assignment.pdf
Operation and Production Mgt Assignment.pdfSeetal Daas
 
Product job costing revision notes 0
Product job costing revision notes 0Product job costing revision notes 0
Product job costing revision notes 0Parthiban Ramalingam
 
Single Facility Lot Size Model Elsp
Single Facility Lot Size Model   ElspSingle Facility Lot Size Model   Elsp
Single Facility Lot Size Model Elsp3abooodi
 
Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...
Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...
Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...IRJET Journal
 
Design Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating SystemDesign Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating Systemsangeetkhule
 

Ähnlich wie Production scheduling (20)

Bsr3 a unit 1 2016
Bsr3 a unit 1   2016Bsr3 a unit 1   2016
Bsr3 a unit 1 2016
 
Practice topic 9 - answers (1)
Practice   topic 9 - answers (1)Practice   topic 9 - answers (1)
Practice topic 9 - answers (1)
 
Operation management problems
Operation management problemsOperation management problems
Operation management problems
 
CA Unit-4 (Overhead) Problems and Solutions
CA Unit-4 (Overhead) Problems and SolutionsCA Unit-4 (Overhead) Problems and Solutions
CA Unit-4 (Overhead) Problems and Solutions
 
Production & Operation Management Chapter32[1]
Production & Operation Management Chapter32[1]Production & Operation Management Chapter32[1]
Production & Operation Management Chapter32[1]
 
Cost accounting project
Cost accounting projectCost accounting project
Cost accounting project
 
Accounting for Properties Plant & Equipment
Accounting for Properties Plant & EquipmentAccounting for Properties Plant & Equipment
Accounting for Properties Plant & Equipment
 
Akuntansi keuangan ii (c1) kelompok 2
Akuntansi keuangan ii (c1)   kelompok 2Akuntansi keuangan ii (c1)   kelompok 2
Akuntansi keuangan ii (c1) kelompok 2
 
Rabab Ali Ahmed.pdf
Rabab Ali Ahmed.pdfRabab Ali Ahmed.pdf
Rabab Ali Ahmed.pdf
 
233665105 eng-g-economy
233665105 eng-g-economy233665105 eng-g-economy
233665105 eng-g-economy
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV System
 
LLP and Transportation problems solution
LLP and Transportation problems solution LLP and Transportation problems solution
LLP and Transportation problems solution
 
Operation and Production Mgt Assignment.pdf
Operation and Production Mgt Assignment.pdfOperation and Production Mgt Assignment.pdf
Operation and Production Mgt Assignment.pdf
 
Engineering Economy Final review-2011
Engineering Economy Final review-2011Engineering Economy Final review-2011
Engineering Economy Final review-2011
 
Ch 03
Ch 03Ch 03
Ch 03
 
Product job costing revision notes 0
Product job costing revision notes 0Product job costing revision notes 0
Product job costing revision notes 0
 
CMA-N6-2022.pptx
CMA-N6-2022.pptxCMA-N6-2022.pptx
CMA-N6-2022.pptx
 
Single Facility Lot Size Model Elsp
Single Facility Lot Size Model   ElspSingle Facility Lot Size Model   Elsp
Single Facility Lot Size Model Elsp
 
Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...
Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...
Analysis, Design, and Estimation of Multi-Storied Institutional Building by u...
 
Design Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating SystemDesign Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating System
 

Kürzlich hochgeladen

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 

Kürzlich hochgeladen (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 

Production scheduling

  • 2.
  • 3.
  • 4.
  • 5. Formulating Linear Programming model : Let X im denote production volume in units for product i in month m. i=1,2 m=1,2,3 i=1 means component 322A m=1 means April If 322A costs $20 per unit produced and 802B costs $10 per unit produced, then Total production cost = 20X 11 + 20X 12 +20X 13 +10X 21 +10X 22 +10X 23 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
  • 6. Let S im denotes Inventory level for product i at the end of month m. If Inventory Holding costa are 1.5 percentage of cost of product (i.e 0.015 * $20 = $0.30 per unit for 322A and .015 * $10 = $0.15 per unit for 802B) Inventory Holding Cost = 0.30s 11 +0.30s 12 +0.30s 13 +0.15S 21 + 0.15S 22 +0.15S 23 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
  • 7. 2 additional variables could be defined to incorporate fluctuations in production levels from month to month. I m = increase in the total production level necessary during month m. D m = decrease in the total production level necessary during month m. Let I m for any month be 0.50 and D m be 0.20 Change-in-production-level costs = 0.50I 1 + 0.50I 2 + 0.50I 3 + 0.20D 1 + 0.20D 2 + 0.20D 3 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
  • 8. Combinig all the three costs, Objective function becomes : Min 20X 11 + 20X 12 +20X 13 +10X 21 +10X 22 +10X 23 +0.30s 11 +0.30s 12 +0.30s 13 +0.15S 21 + 0.15S 22 +0.15S 23 +0.50I 1 + 0.50I 2 + 0.50I 3 + 0.20D 1 + 0.20D 2 + 0.20D 3 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
  • 9. Making the constraints : To guarantee schedule meets customer demand, it must me in the form : This Month's Demand = Ending Inventory From Previous Month + Current Production - Ending Inventory for This Month
  • 10. Let the inventories at the beginning of 3 month scheduling period were 500 units for component 322A and 200 units for component 802B. Demand in first month : 500 + X 11 -S 11 = 1000 200 + X 21 -S 21 =1000 => X 11 – S 11 = 500 X 21 – S 21 = 800 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
  • 11. Demand in second month : S 11 + X 12 - S 12 = 3000 S 21 + X 22 - S 22 = 500 Demand in third month : S 12 + X 13 - S 13 = 5000 S 22 + X 23 - S 23 = 3000 Component April May June 322A 1000 3000 5000 802B 1000 500 3000
  • 12. If the company specifies a minimum inventory level at the end of the 3 month period of at least 400 units of component 322A and at least 200 units of component 802B, then S 13 >= 400 S 23 >= 200
  • 13. Following table shows machine,labor and storage capacity available: Following table shows machine,labor and storage space requirement needed: MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
  • 14. Machine Capacity : 0.10X 11 + 0.08X 21 <= 400 Month 1 0.10X 12 + 0.08X 22 <= 500 Month 2 0.10X 13 + 0.08X 23 <= 600 Month 3 MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
  • 15. Labor Capacity : 0.05X 11 + 0.07X 21 <= 300 Month 1 0.05X 12 + 0.07X 22 <= 300 Month 2 0.05X 13 + 0.07X 23 <= 300 Month 3 MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
  • 16. Storage Capacity : 2X 11 + 3S 21 <= 10,000 Month 1 2X 12 + 3S 22 <= 10,000 Month 2 2X 13 + 3S 23 <= 10,000 Month 3 MONTH MACHNE CAPACITY (HOURS) LABOR CAPACITY (HOURS) STORAGE CAPACITY (HOURS) APRIL 400 300 10,000 MAY 500 300 10,000 JUNE 600 300 10,000 COMPONENT MACHINE (HOURS/UNIT) LABOR (HOURS/UNIT) STORAGE (SQUARE FEET/UNIT) 322A 0.10 0.05 2 802B 0.08 0.07 3
  • 17. Suppose the production levels for march had been 1500 units of component 322A and 1000 units of component 802B for a total production level of 1500 + 1000 = 2500 units Amount of change in production of April is : April production – March production = Change (X 11 + X 21 ) -2500 = Change Change can be positive or negative (X 11 + X 21 ) -2500 = I 1 - D 1
  • 18. Similarly, (X 12 + X 22 ) - (X 11 + X 21 ) = I 2 - D 2 MAY (X 13 + X 23 ) - (X 12 + X 22 ) = I 3 - D 3 JUNE Complete Set : (X 11 + X 21 ) -2500 - I 1 + D 1 = 2500 (X 12 + X 22 ) - (X 11 + X 21 ) - I 2 + D 2 = 0 (X 13 + X 23 ) - (X 12 + X 22 ) - I 3 + D 3 = 0
  • 19. Optimal Solution to the Bollinger Electronics Production Scheduling Problem : Variable Value Reduced Costs X 11 500 0 X 12 3200 0 X 13 5200 0 X 21 2500 0 X 22 2000 0 X 23 0 0.128 S 11 0 0.172 S 12 200 0 S 13 400 0
  • 20. Variable Value Reduced Costs S 21 1700 0 S 22 3200 0 S 23 200 0 I 1 500 0 I 2 2200 0 I 3 0 0.072 D 1 0 0.700 D 2 0 0.700 D 3 0 0.628
  • 21. Constraint Slack/Surplus Dual Prices 1 0 -20 2 0 -10 3 0 -20.128 4 0 -10.150 5 0 -20.428 6 0 -10.300 7 0 -20.728 8 0 -10.450 9 150 0
  • 22. Constraint Slack/Surplus Dual Prices 10 20 0 11 80 0 12 100 0 13 0 1.111 14 40 0 15 4900 0 16 0 0 17 8600 0 18 0 0.500 19 0 0.500 20 0 0.428
  • 23. Total Production,Inventory & production-smoothing cost = $225,295 Activity April May June PRODUCTION 322A 500 3200 5200 802B 2500 2000 0 TOTALS 3000 5200 5200 ENDING INVENTORY 322A 0 200 400 802B 1700 3200 200 MACHINE USAGE SCHEDULED HOURS 250 480 520 SLACK CAPACITY HOURS 150 20 80 LABOR USAGE SCHEDULED HOURS 200 300 260 SLACK CAPACITY HOURS 100 0 40 STORAGE USAGE SCHEDULED HOURS 5100 10,000 1400 SLACK CAPACITY 4900 0 8600
  • 24.
  • 25.