• A reason why the requirements management
process tends to be often unstructured with a
relatively shorter duration is because it is
primarily viewed as a documentation activity.
• It is also seen to only have a supportive role
in the context of broader project execution.
• The underlying assumption (albeit an
incorrect one) is that there will be little material
impact even if the requirements process is
rushed through or that requirements can be
detailed out subsequently without any adverse
impact on the project.
• This paper highlights the need to budget
adequate time and resources to the
requirements management process early in the
project execution lifecycle and the importance
of a mature requirements management process
to ensure project success.
Introduction :
• The quality and capability of the requirements management process followed in an
organization can be essentially measured through the functional effectiveness of project
implementation and whether the same was achieved within the defined budgetary and
time limits.
• Studies conducted to assess the relationship between an organization’s requirements
management process maturity and the success of projects indicate a strong correlation.
• Moreover, there is statistical evidence of improvement in project performance metrics as
an organization moved up the requirements maturity chain (IAG Consulting, 2009).
• The lack of complete detailed requirements and a change management plan are
considered to be the most common causes of project failure (Oberg, Probasco, & Ericsson,
2000).
Some Key Metrics :
Some Key Metrics :
Requirements Discovery and Management Maturity of Organization.
Source: Business Analysis Benchmark, 2009
Some Key Metrics :
• The amount of time and effort an organization spends at the requirements stage varies
based on the size and complexity of the concerned project, but typically this is predicted to
lie around the 10% mark.
• However, this proportion tends to be on a much higher side when only projects that
achieved business expectations within the initial estimates of cost and schedule are
considered.
• A sample study in the telecommunication and banking industries indicated that most
successful projects spent 28% of their resources on requirements management (Hofmann
& Lehner, 2001).
Some Key Metrics :
Requirements Effort versus Total Project Effort (Personnel Strength).
Source: Hofmann & Lehner, 2001
Requirements Management in Product Selection Context :
• An aspect especially relevant in a product selection scenario is the strong preference
clients may have towards particular products and vendors.
• The consequent impact in such a situation is that product selection dictates requirements
definition and refinement rather than business requirements directing product selection
and implementation.
• Product biases may often be influenced by economic considerations, but it is more likely
that such not so well thought out choices may actually hurt even financially when a slightly
longer time horizon is considered.
• It is true that in most instances, requirements cannot be fully defined at the beginning of
the project and that may lead to some unwillingness to devote serious time on carefully
drafting out a comprehensive requirements document.
• What is most necessary in this case is avoidance of a rigid insistence at the outset for a
final version and agreeing upon a basic criterion to move the work ahead without
compromising on the quality of effort spent on requirements investigation.
Requirements Management in Product Selection Context :
• What this means is that requirements management in general and more particularly in a
product selection context ought to be really well discussed out, and the views of all
potential parties that may be impacted by the new product have to be factored in.
• It is obvious that multiple stakeholders bring the need to investigate diverse business
aspects, constraints and perspectives; so some critical pain areas need to be identified,
agreed upon and prioritized for resolution.
• Moving beyond the internal considerations, an external evaluation of the organization’s
ability is also essential and then a business case for further course of action may be built
around the organization’s unique strengths and weaknesses.
• The importance of having a comprehensive requirements package prior to product
selection is covered in full detail in Maveric’s Point Of View titled “Importance of
Requirements Management in the Product Selection Process”.
Requirements Management in Product Selection Context :
• The next step in the requirements management lifecycle is building further upon the
agreed scope and needs to identify specific players who will co-ordinate on various aspects
– business, technical and administrative.
• The requirements gathered may have to be refined through additional questionnaires
and interviews and the channels and protocol for multiple rounds of communication must
be clear.
• The point that needs to be emphasized here is every bit of energy expended at this stage
is worth it because of its potential to prevent huge rework at a later point.
Pitfalls of Improper Requirements Management Process :
• An improperly and arbitrarily conducted requirements analysis process may not only
lead to non-fulfillment of functionality due to inaccurate choices of products and
implementation mechanisms but also cause significant budget overruns.
• Studies indicate that about 70% of quality related defects are introduced at the
requirements and design stage but a majority are detected only at user acceptance stage
leading to a sharp credibility question (Hewlett-Packard, 2008).
• Such delayed realization may lead to more than 50% higher redevelopment and
maintenance costs (IAG Consulting, 2009).
• It is no surprise then that organizations at a higher requirements maturity level
outperform peers significantly on the return on assets (ROA) parameter.
Pitfalls of Improper Requirements Management Process :
The Importance of Non-Functional Requirements :
• One of the key aspects of requirements definition that gets overlooked is non-functional
requirements (also referred to as “ancillary requirements” by author Mr. Murali
Chemuturi).
• Key aspects include performance, scalability and reliability related requirements.
• When non-functional requirements are being specified, it is important to ensure that
future business needs are factored in and the right stakeholders are involved in this
process.
• While business users would be best positioned to weigh in on performance and
scalability related requirements, portfolio and enterprise architects should be roped in to
provide their views on other aspects including reliability and backup related features.
Conclusion :
• Finally, it is important to underline that a mature requirements management process
and excellent requirements analysts together only can form the potent mix to lay the
foundation of successful achievement of business goals.
• A deficiency in either process or people is a setback, and both these facets need the
support of a strong intent to devote time and energy.
• Requirements management is not just a static documentation exercise but an
evolutionary activity that needs a committed, structured and dynamic approach.
Bibliography :
• Hewlett-Packard. (2008). Reducing risk through requirements-driven quality
management: an end-to-end approach. Hewlett-Packard Development Company, L.P.
• Hofmann, H., & Lehner, F. (2001). Requirements Engineering as a Success Factor in
Software Projects. IEEE Software.
• IAG Consulting. (2009). Business Analysis Benchmark.
• Oberg, R., Probasco, L., & Ericsson, M. (2000). Applying Requirements Management with
Use Cases. Rational Software Corporation.
Importance of early project requirements definition

Weitere ähnliche Inhalte

Was ist angesagt?

Business Impact Analysis
Business Impact AnalysisBusiness Impact Analysis
Business Impact Analysisdlfrench
 
Transition & Transformation Change
Transition & Transformation ChangeTransition & Transformation Change
Transition & Transformation ChangeAnand Subramaniam
 
EFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance ManagementEFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance ManagementTariq Chauhan
 
EFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance ManagementEFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance ManagementTariq Chauhan
 
BUSINESS IMPACT ‎ANALYSIS- DRM
BUSINESS IMPACT ‎ANALYSIS- DRMBUSINESS IMPACT ‎ANALYSIS- DRM
BUSINESS IMPACT ‎ANALYSIS- DRMLibcorpio
 
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...India Scrum Enthusiasts Community
 
Requirements Engineering Process Improvement
Requirements Engineering Process ImprovementRequirements Engineering Process Improvement
Requirements Engineering Process ImprovementIan Sommerville
 
Understanding requirements
Understanding requirementsUnderstanding requirements
Understanding requirementsTASKTC
 
CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2Ahmad Ammari
 
Kpi examples types of key performance indicators
Kpi examples   types of key performance indicatorsKpi examples   types of key performance indicators
Kpi examples types of key performance indicatorsPreeti Bhaskar
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Ricky Smith CMRP
 
Root cause analysis questionnaire
Root cause analysis questionnaireRoot cause analysis questionnaire
Root cause analysis questionnaireCenapSerdarolu
 
Integrated Performance Management
Integrated Performance ManagementIntegrated Performance Management
Integrated Performance ManagementGlen Alleman
 
Simonsen.vonnie
Simonsen.vonnieSimonsen.vonnie
Simonsen.vonnieNASAPMC
 
Chapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorChapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorSanat Maharjan
 

Was ist angesagt? (20)

Business Impact Analysis
Business Impact AnalysisBusiness Impact Analysis
Business Impact Analysis
 
Transition & Transformation Change
Transition & Transformation ChangeTransition & Transformation Change
Transition & Transformation Change
 
EFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance ManagementEFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance Management
 
EFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance ManagementEFS Facilities Services Group | Performance Management
EFS Facilities Services Group | Performance Management
 
BUSINESS IMPACT ‎ANALYSIS- DRM
BUSINESS IMPACT ‎ANALYSIS- DRMBUSINESS IMPACT ‎ANALYSIS- DRM
BUSINESS IMPACT ‎ANALYSIS- DRM
 
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...Agile Tour 2016 Chennai - Vendor selection  an interactive process by Karthik...
Agile Tour 2016 Chennai - Vendor selection an interactive process by Karthik...
 
Requirements Engineering Process Improvement
Requirements Engineering Process ImprovementRequirements Engineering Process Improvement
Requirements Engineering Process Improvement
 
Understanding requirements
Understanding requirementsUnderstanding requirements
Understanding requirements
 
Cause & Effect
Cause & EffectCause & Effect
Cause & Effect
 
CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2
 
Kpi examples types of key performance indicators
Kpi examples   types of key performance indicatorsKpi examples   types of key performance indicators
Kpi examples types of key performance indicators
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
 
GAP Analysis
GAP AnalysisGAP Analysis
GAP Analysis
 
Measuring corporate performance
Measuring corporate performanceMeasuring corporate performance
Measuring corporate performance
 
Root cause analysis questionnaire
Root cause analysis questionnaireRoot cause analysis questionnaire
Root cause analysis questionnaire
 
Integrated Performance Management
Integrated Performance ManagementIntegrated Performance Management
Integrated Performance Management
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Simonsen.vonnie
Simonsen.vonnieSimonsen.vonnie
Simonsen.vonnie
 
Project procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth EditionProject procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth Edition
 
Chapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorChapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success Factor
 

Andere mochten auch

Requirements = Scope, BA World Bengaluru 2011
Requirements = Scope, BA World Bengaluru 2011Requirements = Scope, BA World Bengaluru 2011
Requirements = Scope, BA World Bengaluru 2011Craig Brown
 
PM Humor - At Some Point You’re Going To Have To Break Down ...
PM Humor - At Some Point You’re Going To Have To  Break Down ...PM Humor - At Some Point You’re Going To Have To  Break Down ...
PM Humor - At Some Point You’re Going To Have To Break Down ...OSP International LLC
 
EMR Implementation Considerations Slides
EMR Implementation Considerations SlidesEMR Implementation Considerations Slides
EMR Implementation Considerations SlidesSaide OER Africa
 
Patterns For Effective Use Cases
Patterns For Effective Use CasesPatterns For Effective Use Cases
Patterns For Effective Use CasesMayflower GmbH
 
African Health OER Network Overview - 2 pages
African Health OER Network Overview - 2 pagesAfrican Health OER Network Overview - 2 pages
African Health OER Network Overview - 2 pagesKathleen Ludewig Omollo
 
Desirable software features simulation & modeling
Desirable software features simulation & modelingDesirable software features simulation & modeling
Desirable software features simulation & modelingShashwat Shriparv
 
PowerStory - a better way to define requirements and test cases
PowerStory - a better way to define requirements and test casesPowerStory - a better way to define requirements and test cases
PowerStory - a better way to define requirements and test casesPowerStory
 
Needs Assessment
Needs AssessmentNeeds Assessment
Needs AssessmentLynda Milne
 
6 Steps to an Effective Needs Assessment
6 Steps to an Effective Needs Assessment6 Steps to an Effective Needs Assessment
6 Steps to an Effective Needs AssessmentErin Lett
 
Needs Assessment Powerpoint 2007
Needs Assessment Powerpoint 2007Needs Assessment Powerpoint 2007
Needs Assessment Powerpoint 2007Johan Koren
 
From Use case to User Story
From Use case to User StoryFrom Use case to User Story
From Use case to User StoryKunta Hutabarat
 
Requirements Gathering And Management
Requirements Gathering And ManagementRequirements Gathering And Management
Requirements Gathering And ManagementAlan McSweeney
 
Lies, Damn Lies And Anti Statistics
Lies, Damn Lies And Anti StatisticsLies, Damn Lies And Anti Statistics
Lies, Damn Lies And Anti StatisticsAlan McSweeney
 
Alliance session 4373 risk management from on premise to the cloud – a foc...
Alliance session 4373    risk management from on premise to the cloud – a foc...Alliance session 4373    risk management from on premise to the cloud – a foc...
Alliance session 4373 risk management from on premise to the cloud – a foc...Smart ERP Solutions, Inc.
 
Slideshare Project Proposal
Slideshare Project ProposalSlideshare Project Proposal
Slideshare Project ProposalJeane Paguio
 

Andere mochten auch (20)

Requirements = Scope, BA World Bengaluru 2011
Requirements = Scope, BA World Bengaluru 2011Requirements = Scope, BA World Bengaluru 2011
Requirements = Scope, BA World Bengaluru 2011
 
PM Humor - At Some Point You’re Going To Have To Break Down ...
PM Humor - At Some Point You’re Going To Have To  Break Down ...PM Humor - At Some Point You’re Going To Have To  Break Down ...
PM Humor - At Some Point You’re Going To Have To Break Down ...
 
EMR Implementation Considerations Slides
EMR Implementation Considerations SlidesEMR Implementation Considerations Slides
EMR Implementation Considerations Slides
 
Creating Effective Use-cases
Creating Effective Use-casesCreating Effective Use-cases
Creating Effective Use-cases
 
Patterns For Effective Use Cases
Patterns For Effective Use CasesPatterns For Effective Use Cases
Patterns For Effective Use Cases
 
TAO DAYS - E-Assessment for Learning
TAO DAYS - E-Assessment for LearningTAO DAYS - E-Assessment for Learning
TAO DAYS - E-Assessment for Learning
 
African Health OER Network Overview - 2 pages
African Health OER Network Overview - 2 pagesAfrican Health OER Network Overview - 2 pages
African Health OER Network Overview - 2 pages
 
Desirable software features simulation & modeling
Desirable software features simulation & modelingDesirable software features simulation & modeling
Desirable software features simulation & modeling
 
PowerStory - a better way to define requirements and test cases
PowerStory - a better way to define requirements and test casesPowerStory - a better way to define requirements and test cases
PowerStory - a better way to define requirements and test cases
 
Needs Assessment
Needs AssessmentNeeds Assessment
Needs Assessment
 
Usecase
UsecaseUsecase
Usecase
 
How to Conduct a Needs Assessment
How to Conduct a Needs AssessmentHow to Conduct a Needs Assessment
How to Conduct a Needs Assessment
 
6 Steps to an Effective Needs Assessment
6 Steps to an Effective Needs Assessment6 Steps to an Effective Needs Assessment
6 Steps to an Effective Needs Assessment
 
Needs Assessment Powerpoint 2007
Needs Assessment Powerpoint 2007Needs Assessment Powerpoint 2007
Needs Assessment Powerpoint 2007
 
From Use case to User Story
From Use case to User StoryFrom Use case to User Story
From Use case to User Story
 
Requirements Gathering And Management
Requirements Gathering And ManagementRequirements Gathering And Management
Requirements Gathering And Management
 
Lies, Damn Lies And Anti Statistics
Lies, Damn Lies And Anti StatisticsLies, Damn Lies And Anti Statistics
Lies, Damn Lies And Anti Statistics
 
Alliance session 4373 risk management from on premise to the cloud – a foc...
Alliance session 4373    risk management from on premise to the cloud – a foc...Alliance session 4373    risk management from on premise to the cloud – a foc...
Alliance session 4373 risk management from on premise to the cloud – a foc...
 
Understanding Customer Needs
Understanding Customer NeedsUnderstanding Customer Needs
Understanding Customer Needs
 
Slideshare Project Proposal
Slideshare Project ProposalSlideshare Project Proposal
Slideshare Project Proposal
 

Ähnlich wie Importance of early project requirements definition

Regulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsRegulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsPaul Kuiken
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service IntroductionKeith Rackley
 
Linked in presentation
Linked in presentationLinked in presentation
Linked in presentationagplugge
 
NUR 350 Journal Guidelines and Rubric Journal ac.docx
NUR 350 Journal Guidelines and Rubric   Journal ac.docxNUR 350 Journal Guidelines and Rubric   Journal ac.docx
NUR 350 Journal Guidelines and Rubric Journal ac.docxvannagoforth
 
Importance of requirement assurance in product selection
Importance of requirement assurance in product selectionImportance of requirement assurance in product selection
Importance of requirement assurance in product selectionMaveric Systems
 
Sucessful BPO Through Technology Enablement
Sucessful BPO Through Technology EnablementSucessful BPO Through Technology Enablement
Sucessful BPO Through Technology EnablementACTIVE Network
 
Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...
Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...
Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...Dave Litwiller
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor managementRaminder Pal Singh
 
Killing Bureacracy
Killing Bureacracy Killing Bureacracy
Killing Bureacracy LucieColt
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Walgreens Boots Alliance, Inc.
 
Software Requirements development
Software Requirements developmentSoftware Requirements development
Software Requirements developmentkylan2
 
Core Skills for Change Agents
Core Skills for Change AgentsCore Skills for Change Agents
Core Skills for Change AgentsCaltech
 
A Research Paper On Customer Satisfaction Evaluation Process
A Research Paper On Customer Satisfaction Evaluation ProcessA Research Paper On Customer Satisfaction Evaluation Process
A Research Paper On Customer Satisfaction Evaluation ProcessTracy Drey
 
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...Biswadeep Ghosh Hazra
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studiesmeritweb
 
How to implement a strategic IT vendor management program
How to implement a strategic IT vendor management programHow to implement a strategic IT vendor management program
How to implement a strategic IT vendor management programJeff Kubacki
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and UpgradesPeter Ware PMP
 
SRE Lect (week 1).pptx
SRE Lect (week 1).pptxSRE Lect (week 1).pptx
SRE Lect (week 1).pptxalishazayyan5
 

Ähnlich wie Importance of early project requirements definition (20)

Regulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsRegulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and Models
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service Introduction
 
Linked in presentation
Linked in presentationLinked in presentation
Linked in presentation
 
Outsourcing.ppt
Outsourcing.pptOutsourcing.ppt
Outsourcing.ppt
 
NUR 350 Journal Guidelines and Rubric Journal ac.docx
NUR 350 Journal Guidelines and Rubric   Journal ac.docxNUR 350 Journal Guidelines and Rubric   Journal ac.docx
NUR 350 Journal Guidelines and Rubric Journal ac.docx
 
Importance of requirement assurance in product selection
Importance of requirement assurance in product selectionImportance of requirement assurance in product selection
Importance of requirement assurance in product selection
 
Sucessful BPO Through Technology Enablement
Sucessful BPO Through Technology EnablementSucessful BPO Through Technology Enablement
Sucessful BPO Through Technology Enablement
 
Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...
Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...
Market Volatility Considerations for Scale-up Stage Tech Companies in 2023 - ...
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor management
 
Killing Bureacracy
Killing Bureacracy Killing Bureacracy
Killing Bureacracy
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Software Requirements development
Software Requirements developmentSoftware Requirements development
Software Requirements development
 
Core Skills for Change Agents
Core Skills for Change AgentsCore Skills for Change Agents
Core Skills for Change Agents
 
A Research Paper On Customer Satisfaction Evaluation Process
A Research Paper On Customer Satisfaction Evaluation ProcessA Research Paper On Customer Satisfaction Evaluation Process
A Research Paper On Customer Satisfaction Evaluation Process
 
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
[Project] FRAMEWORK FOR SUPPORTING “BUSINESS PROCESS REENGINEERING “-BASED BU...
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
How to implement a strategic IT vendor management program
How to implement a strategic IT vendor management programHow to implement a strategic IT vendor management program
How to implement a strategic IT vendor management program
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and Upgrades
 
SRE Lect (week 1).pptx
SRE Lect (week 1).pptxSRE Lect (week 1).pptx
SRE Lect (week 1).pptx
 

Mehr von Maveric Systems

Critical functionality testing
Critical functionality testingCritical functionality testing
Critical functionality testingMaveric Systems
 
Standards models for setting up a robust t co-e
Standards models for setting up a robust t co-eStandards models for setting up a robust t co-e
Standards models for setting up a robust t co-eMaveric Systems
 
Agile & pmi project management mapping maveric systems
Agile & pmi project management mapping   maveric systemsAgile & pmi project management mapping   maveric systems
Agile & pmi project management mapping maveric systemsMaveric Systems
 
Transformation Assurance
Transformation AssuranceTransformation Assurance
Transformation AssuranceMaveric Systems
 
Test Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric SystemsTest Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric SystemsMaveric Systems
 
Requirements Practice - Maveric Systems
Requirements Practice - Maveric SystemsRequirements Practice - Maveric Systems
Requirements Practice - Maveric SystemsMaveric Systems
 
Standards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric SystemsStandards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric SystemsMaveric Systems
 
Automation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - MavericAutomation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - MavericMaveric Systems
 
Managed Test Services - Maveric Systems
Managed Test Services - Maveric SystemsManaged Test Services - Maveric Systems
Managed Test Services - Maveric SystemsMaveric Systems
 
Essential building blocks of a lean and efficient test process
Essential building blocks of a lean and efficient test processEssential building blocks of a lean and efficient test process
Essential building blocks of a lean and efficient test processMaveric Systems
 
Importance of program health checks
Importance of program health checksImportance of program health checks
Importance of program health checksMaveric Systems
 
Critical success factors for successful requirements manangement
Critical success factors for successful requirements manangementCritical success factors for successful requirements manangement
Critical success factors for successful requirements manangementMaveric Systems
 
Maveric - Automation of Release & Deployment Management
Maveric -  Automation of Release & Deployment ManagementMaveric -  Automation of Release & Deployment Management
Maveric - Automation of Release & Deployment ManagementMaveric Systems
 

Mehr von Maveric Systems (16)

Maveric Systems
Maveric Systems Maveric Systems
Maveric Systems
 
Model based testing
Model based testingModel based testing
Model based testing
 
Critical functionality testing
Critical functionality testingCritical functionality testing
Critical functionality testing
 
Standards models for setting up a robust t co-e
Standards models for setting up a robust t co-eStandards models for setting up a robust t co-e
Standards models for setting up a robust t co-e
 
Agile & pmi project management mapping maveric systems
Agile & pmi project management mapping   maveric systemsAgile & pmi project management mapping   maveric systems
Agile & pmi project management mapping maveric systems
 
Assurance
AssuranceAssurance
Assurance
 
Transformation Assurance
Transformation AssuranceTransformation Assurance
Transformation Assurance
 
Test Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric SystemsTest Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric Systems
 
Requirements Practice - Maveric Systems
Requirements Practice - Maveric SystemsRequirements Practice - Maveric Systems
Requirements Practice - Maveric Systems
 
Standards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric SystemsStandards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric Systems
 
Automation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - MavericAutomation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - Maveric
 
Managed Test Services - Maveric Systems
Managed Test Services - Maveric SystemsManaged Test Services - Maveric Systems
Managed Test Services - Maveric Systems
 
Essential building blocks of a lean and efficient test process
Essential building blocks of a lean and efficient test processEssential building blocks of a lean and efficient test process
Essential building blocks of a lean and efficient test process
 
Importance of program health checks
Importance of program health checksImportance of program health checks
Importance of program health checks
 
Critical success factors for successful requirements manangement
Critical success factors for successful requirements manangementCritical success factors for successful requirements manangement
Critical success factors for successful requirements manangement
 
Maveric - Automation of Release & Deployment Management
Maveric -  Automation of Release & Deployment ManagementMaveric -  Automation of Release & Deployment Management
Maveric - Automation of Release & Deployment Management
 

Kürzlich hochgeladen

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Kürzlich hochgeladen (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Importance of early project requirements definition

  • 1.
  • 2. • A reason why the requirements management process tends to be often unstructured with a relatively shorter duration is because it is primarily viewed as a documentation activity. • It is also seen to only have a supportive role in the context of broader project execution. • The underlying assumption (albeit an incorrect one) is that there will be little material impact even if the requirements process is rushed through or that requirements can be detailed out subsequently without any adverse impact on the project. • This paper highlights the need to budget adequate time and resources to the requirements management process early in the project execution lifecycle and the importance of a mature requirements management process to ensure project success. Introduction :
  • 3. • The quality and capability of the requirements management process followed in an organization can be essentially measured through the functional effectiveness of project implementation and whether the same was achieved within the defined budgetary and time limits. • Studies conducted to assess the relationship between an organization’s requirements management process maturity and the success of projects indicate a strong correlation. • Moreover, there is statistical evidence of improvement in project performance metrics as an organization moved up the requirements maturity chain (IAG Consulting, 2009). • The lack of complete detailed requirements and a change management plan are considered to be the most common causes of project failure (Oberg, Probasco, & Ericsson, 2000). Some Key Metrics :
  • 4. Some Key Metrics : Requirements Discovery and Management Maturity of Organization. Source: Business Analysis Benchmark, 2009
  • 5. Some Key Metrics : • The amount of time and effort an organization spends at the requirements stage varies based on the size and complexity of the concerned project, but typically this is predicted to lie around the 10% mark. • However, this proportion tends to be on a much higher side when only projects that achieved business expectations within the initial estimates of cost and schedule are considered. • A sample study in the telecommunication and banking industries indicated that most successful projects spent 28% of their resources on requirements management (Hofmann & Lehner, 2001).
  • 6. Some Key Metrics : Requirements Effort versus Total Project Effort (Personnel Strength). Source: Hofmann & Lehner, 2001
  • 7. Requirements Management in Product Selection Context : • An aspect especially relevant in a product selection scenario is the strong preference clients may have towards particular products and vendors. • The consequent impact in such a situation is that product selection dictates requirements definition and refinement rather than business requirements directing product selection and implementation. • Product biases may often be influenced by economic considerations, but it is more likely that such not so well thought out choices may actually hurt even financially when a slightly longer time horizon is considered. • It is true that in most instances, requirements cannot be fully defined at the beginning of the project and that may lead to some unwillingness to devote serious time on carefully drafting out a comprehensive requirements document. • What is most necessary in this case is avoidance of a rigid insistence at the outset for a final version and agreeing upon a basic criterion to move the work ahead without compromising on the quality of effort spent on requirements investigation.
  • 8. Requirements Management in Product Selection Context : • What this means is that requirements management in general and more particularly in a product selection context ought to be really well discussed out, and the views of all potential parties that may be impacted by the new product have to be factored in. • It is obvious that multiple stakeholders bring the need to investigate diverse business aspects, constraints and perspectives; so some critical pain areas need to be identified, agreed upon and prioritized for resolution. • Moving beyond the internal considerations, an external evaluation of the organization’s ability is also essential and then a business case for further course of action may be built around the organization’s unique strengths and weaknesses. • The importance of having a comprehensive requirements package prior to product selection is covered in full detail in Maveric’s Point Of View titled “Importance of Requirements Management in the Product Selection Process”.
  • 9. Requirements Management in Product Selection Context : • The next step in the requirements management lifecycle is building further upon the agreed scope and needs to identify specific players who will co-ordinate on various aspects – business, technical and administrative. • The requirements gathered may have to be refined through additional questionnaires and interviews and the channels and protocol for multiple rounds of communication must be clear. • The point that needs to be emphasized here is every bit of energy expended at this stage is worth it because of its potential to prevent huge rework at a later point.
  • 10. Pitfalls of Improper Requirements Management Process : • An improperly and arbitrarily conducted requirements analysis process may not only lead to non-fulfillment of functionality due to inaccurate choices of products and implementation mechanisms but also cause significant budget overruns. • Studies indicate that about 70% of quality related defects are introduced at the requirements and design stage but a majority are detected only at user acceptance stage leading to a sharp credibility question (Hewlett-Packard, 2008). • Such delayed realization may lead to more than 50% higher redevelopment and maintenance costs (IAG Consulting, 2009). • It is no surprise then that organizations at a higher requirements maturity level outperform peers significantly on the return on assets (ROA) parameter.
  • 11. Pitfalls of Improper Requirements Management Process :
  • 12. The Importance of Non-Functional Requirements : • One of the key aspects of requirements definition that gets overlooked is non-functional requirements (also referred to as “ancillary requirements” by author Mr. Murali Chemuturi). • Key aspects include performance, scalability and reliability related requirements. • When non-functional requirements are being specified, it is important to ensure that future business needs are factored in and the right stakeholders are involved in this process. • While business users would be best positioned to weigh in on performance and scalability related requirements, portfolio and enterprise architects should be roped in to provide their views on other aspects including reliability and backup related features.
  • 13. Conclusion : • Finally, it is important to underline that a mature requirements management process and excellent requirements analysts together only can form the potent mix to lay the foundation of successful achievement of business goals. • A deficiency in either process or people is a setback, and both these facets need the support of a strong intent to devote time and energy. • Requirements management is not just a static documentation exercise but an evolutionary activity that needs a committed, structured and dynamic approach.
  • 14. Bibliography : • Hewlett-Packard. (2008). Reducing risk through requirements-driven quality management: an end-to-end approach. Hewlett-Packard Development Company, L.P. • Hofmann, H., & Lehner, F. (2001). Requirements Engineering as a Success Factor in Software Projects. IEEE Software. • IAG Consulting. (2009). Business Analysis Benchmark. • Oberg, R., Probasco, L., & Ericsson, M. (2000). Applying Requirements Management with Use Cases. Rational Software Corporation.