1. M.Marimuthu
Mobile : 7708426208 / 7418596723
Email : marishivasharan@gmail.com
OBJECTIVE
To take up a challenging position to constantly learn, contribute the best out of me and grow
along with the organization.
SUMMARY
Currently working at GRUPO ANTOLIN INDIA Pvt Ltd., as an Senior Engineer in
Engineering.
14 years of experience in the field of Engineering , projects & NPD.
Proficient in software like Ms Project, AutoCAD,.
Good problem solving, interpersonal and Decision making skills.
Strong team working and multi-tasking skills.
WORK EXPERIENCE
SENIOR ENGINEER – ENGINEERING (Grupo Antolin IndiaPvtLtd.,
Sriperumbudur)
(Since AUG’2007)
Project Title : TRIM ROOF , SUNVISOR ,
Category : New product Development
Duration : 7year 8Months .
Customer : TOYOTA, RENAULT NISSAN ,FORD ,HYUNDAI,MAHINDRA, ASHOK
LEYLAND
Description:
Initial project kickoff, as per the customer SOP, requirement and timing plan, as per the plan
it was followed, once the design stage is completed, then we reviewed the drawing & DFMEA which
had covered the past customer problems and also reviewed with Renault Team, then moved to test
process as per the Customer Engineering specification and mold equipment shipments, once the
shipment delivered. Process validation is done and submission of PPAP to the customer for
commencing SOP as per the customer requested Date.
Company Profile:
The company is an ISO/TS16949, & ISO 14001 certified company with Spain as
the base Manufacturing and supplying automotive components to various OEM’s in the Four Wheeler
Segments.
Company present customers are
Renault Nissan Automotive India Pvt Ltd.,
Hyundai Motor India Pvt Ltd.,
Toyota Kriloskar Motor Pvt Ltd.,
Mahindera & Mahindera India Pvt Ltd.,
Ford India Pvt Ltd.
2. Major Product:
Window Regulator,
Trim Roof,
Sunvisor.
Packaging tray
AREA OF EXPOSURE
New product development
Engineering change management
Tool room management
New machine erection and commissioning
Bill of material improvements
Method improvements
Robot Programming
CNC Programming
KEY RESPONSIBILTIES IN ABOVE ARAES
New Product Development
RFQ Receipt from customer
Quote submission to customer
LOI receipt from customer
Drawing study and engineering standard receipt
Technical standard received from customer with reference to drawing
Project risk analysis to be made
Economical study report get from marketing
Make or Buy decision report preparation
Time plan preparation against customer time line
Project review meeting organize with CFT
Project team formation
Tooling design review conduct with supplier
Checking fixture concept preparation and get approval from customer
Tool matrix data preparation
Device launch authorization sheet sign off with project manager and
commercial head
Project tracking sheet preparation and monitoring
Bill of material sheet preparation
SAP reference creation for All Bill of material
Drawing get for all child parts against BOM
Part cost get from supplier
Tooling cost get from supplier
Offer cost for Tools and parts get from marketing
Child parts packaging sign off with supplier
Request for purchase raised to direct material
Request for purchase raised to Indirect material
PO Release to supplier
Tool pre delivery inspection at supplier end
Tool trail to conducted
Tool history card preparation and up dation
3. Actual part Detailed lay out inspection report preparation
Validation plan preparation and sign off with customer
Testing quote receipt from test agency
Testing completion test report shared to customer
Proto type pallet preparation
Color and grain shade receipt from customer
Development shared to customer
Packaging sign off with customer
Packaging requirement quantity calculation made
Trial part preparation and submission to customer on time
Sample data sheet preparation
Participate fitment trial at customer end
Trial Part trouble data sheet preparation
Countermeasure implementation against past trouble data
Means and Flows Preparation
Detailed work instruction preparation
Technical specification sheet prepared and given to production quality
department
Control plan preparation
FMEA Preparation
Product IMDS data sheet preparation
Substance of concern Elements declaration sheet preparation
SOC test conduct and report shared to customer
LOW volume and High volume production trial conducted before SOP started
PPAP Documents preparation & submission to customer
PSW approval get from Customer
Production process supporting documents preparation
New product training provided to operator
Cycle time freeze each stages
Phase closure documents updation
Project target monitoring sheet follow
SOP Monitoring sheet preparation and up dation for first 3months production
Lesson learned sheet preparation
Engineering change management
Engineering change receipt from customer
Feasible study to done
Temporary modification done in tool
Proto sample preparation and submission to customer
Fitment trail conducted
Revised drawing get from customer
Modification Time plan submitted to customer
Modification quote submission to customer
New part number get from Head quarter’s
Revised PO get from customer
Part cost update in Internal SAP system
Existing stock declared to customer
Revised process supporting documents preparation
Change cut off date communicate Internal CFT as well as customer
4. Tool room management
New mould trials taken
Mould modification to done for productivity, With out nailing
Easy alignment, Clamping facility, Loading un loading position identification
done
Mould lifing arrangement provided , stopper provision
Mould modification done for Raw material size reduction
Water jet Cutting fixture preparation
Mould correction done based on any fitment feed back
Assembly fixture preparation
Assembly line setup preparation
New machine Erection and commissioning
Detailed machine specification requirement discussed with supplier
Like power , panel setup, software application usage
Machine line setup layout approval get from plant head
Electrical requirement panel , Cabling earthing , Ducting preparation
Cooling lines routing preparation
Air line routing preparation
Foundation arrangement done in floor
After completing commissioning trial to be taken
Device acceptance report sign off with CFT
Bill of material improvements
Raw material size reduction for cost savings
Raw material thickness reduction for cost savings
Scarp material elimination for cost savings
Alternate supplier selection for cost savings
Localisation of raw material supplier
Trials conducted for all Bom improvement activity
Validation conducted for all trials
Method improvements
Analysis of machine man movement study
Identify the bottle neck operation
Process cycle time reduction to increase production qty
Unwanted operator movement elimination
Unwanted machine movements elimination
Change operation sequence to reduce takt time
Paralyses two or three actions to reduce cycle time
Mould change over setup time reduction
Machine feasibility to be done for production contingency purpose
Robot programming ABB IRC5 Controller
Fixture preparation for programming
Module creation
5. Binary number freezing
Work object creation
Programming teaching to machine
Manually run the program
Auto cycle run the program
Check the part in checking fixture
Fine tuning done in the program
Freeze the program for Regular production
CNC Programming
Drawing study
Programming sequence arrived
Tool selection for program
Program writing in machine
Job clamping method preparation
Work zero setting in machine
Cutter offset given in program
Tool length compensation provide
Cutter nose radius compensation provided
Equcation Qualifiction
B.Tech Mechanical Engineering Completed in 2012 in Rajasthan vidyadeepth
university,
D.M.E completed in 2001 in Arul migu kalasalingam polytechnic with 87% first
class with honours,
Additional Qualifiction
CNC PROGRAMMING & APPLICATIONS COURSE IN GKD ITR INSTITUTE -- YEAR 2005,
ROBO PROGRAMMING TRAINING in FRANCE GRUPO ANTOLIN -- YEAR 2008 ,
ISO TS 16949 Certify auditor -- YEAR 2010,
SPC (Statistical process control) -- YEAR 2011,
APQP/PPAP -- YEAR 2011,
MSA (MEASUREMENT SYSTEM ANALYSIS) -- YEAR 2011,
7 QC TOOLS -- YEAR 2011,
EMS Training -- YEAR 2012,
COMPUTER KNOWLEDGE
AUTO CADD
MS OFFICE
POWER POINT
CAREER GRAPH:
GRUPO ANTOLIN INDIA PVT LTD
Aug ’07 to till date SENIOR ENGINEER- NEW PRODUCTS & PRJOCETS
6. INTEGRA AUTOMATION PVT LTD AMBATTUR
SEP 05 TO JULY 07 SUPERVISOR CNC PROGRAMMER (VMC & VTL)
LAKSHMI VALVES PRIVATE LIMITED COIMBATORE
APR 03 TO AUG 05 SUPERVISOR VMC PROGRAMMER
RAJA CAR CARE PVT LIMITED SIVAKASI
JUNE 01 TO MAR 03 WORKSHOP INCHARGE
PERSONAL DETAIL:
Father’s Name : R.Murugesan
Age & Date of Birth : 20.05.1982
Language Known : Tamil & English
Sex : Male
Marital Status : Married
Present address :Bharathi illam , plot no51 , sp avenue ,poonthamalli, Chennai,
Permanent Address : 5/426 samy puram colony ,Sivakasi-626189
DECLARATION:
I hereby declare that the above information’s are true and correct to the best of my
knowledge and belief.
Place: Yours Truly
M.MARIMUTHU