SlideShare ist ein Scribd-Unternehmen logo
1 von 6
M.Marimuthu
Mobile : 7708426208 / 7418596723
Email : marishivasharan@gmail.com
OBJECTIVE
To take up a challenging position to constantly learn, contribute the best out of me and grow
along with the organization.
SUMMARY
 Currently working at GRUPO ANTOLIN INDIA Pvt Ltd., as an Senior Engineer in
Engineering.
 14 years of experience in the field of Engineering , projects & NPD.
 Proficient in software like Ms Project, AutoCAD,.
 Good problem solving, interpersonal and Decision making skills.
 Strong team working and multi-tasking skills.
WORK EXPERIENCE
SENIOR ENGINEER – ENGINEERING (Grupo Antolin IndiaPvtLtd.,
Sriperumbudur)
(Since AUG’2007)
Project Title : TRIM ROOF , SUNVISOR ,
Category : New product Development
Duration : 7year 8Months .
Customer : TOYOTA, RENAULT NISSAN ,FORD ,HYUNDAI,MAHINDRA, ASHOK
LEYLAND
Description:
Initial project kickoff, as per the customer SOP, requirement and timing plan, as per the plan
it was followed, once the design stage is completed, then we reviewed the drawing & DFMEA which
had covered the past customer problems and also reviewed with Renault Team, then moved to test
process as per the Customer Engineering specification and mold equipment shipments, once the
shipment delivered. Process validation is done and submission of PPAP to the customer for
commencing SOP as per the customer requested Date.
Company Profile:
The company is an ISO/TS16949, & ISO 14001 certified company with Spain as
the base Manufacturing and supplying automotive components to various OEM’s in the Four Wheeler
Segments.
Company present customers are
 Renault Nissan Automotive India Pvt Ltd.,
 Hyundai Motor India Pvt Ltd.,
 Toyota Kriloskar Motor Pvt Ltd.,
 Mahindera & Mahindera India Pvt Ltd.,
 Ford India Pvt Ltd.
Major Product:
 Window Regulator,
 Trim Roof,
 Sunvisor.
 Packaging tray
AREA OF EXPOSURE
 New product development
 Engineering change management
 Tool room management
 New machine erection and commissioning
 Bill of material improvements
 Method improvements
 Robot Programming
 CNC Programming
KEY RESPONSIBILTIES IN ABOVE ARAES
New Product Development
 RFQ Receipt from customer
 Quote submission to customer
 LOI receipt from customer
 Drawing study and engineering standard receipt
 Technical standard received from customer with reference to drawing
 Project risk analysis to be made
 Economical study report get from marketing
 Make or Buy decision report preparation
 Time plan preparation against customer time line
 Project review meeting organize with CFT
 Project team formation
 Tooling design review conduct with supplier
 Checking fixture concept preparation and get approval from customer
 Tool matrix data preparation
 Device launch authorization sheet sign off with project manager and
commercial head
 Project tracking sheet preparation and monitoring
 Bill of material sheet preparation
 SAP reference creation for All Bill of material
 Drawing get for all child parts against BOM
 Part cost get from supplier
 Tooling cost get from supplier
 Offer cost for Tools and parts get from marketing
 Child parts packaging sign off with supplier
 Request for purchase raised to direct material
 Request for purchase raised to Indirect material
 PO Release to supplier
 Tool pre delivery inspection at supplier end
 Tool trail to conducted
 Tool history card preparation and up dation
 Actual part Detailed lay out inspection report preparation
 Validation plan preparation and sign off with customer
 Testing quote receipt from test agency
 Testing completion test report shared to customer
 Proto type pallet preparation
 Color and grain shade receipt from customer
 Development shared to customer
 Packaging sign off with customer
 Packaging requirement quantity calculation made
 Trial part preparation and submission to customer on time
 Sample data sheet preparation
 Participate fitment trial at customer end
 Trial Part trouble data sheet preparation
 Countermeasure implementation against past trouble data
 Means and Flows Preparation
 Detailed work instruction preparation
 Technical specification sheet prepared and given to production quality
department
 Control plan preparation
 FMEA Preparation
 Product IMDS data sheet preparation
 Substance of concern Elements declaration sheet preparation
 SOC test conduct and report shared to customer
 LOW volume and High volume production trial conducted before SOP started
 PPAP Documents preparation & submission to customer
 PSW approval get from Customer
 Production process supporting documents preparation
 New product training provided to operator
 Cycle time freeze each stages
 Phase closure documents updation
 Project target monitoring sheet follow
 SOP Monitoring sheet preparation and up dation for first 3months production
 Lesson learned sheet preparation
Engineering change management
 Engineering change receipt from customer
 Feasible study to done
 Temporary modification done in tool
 Proto sample preparation and submission to customer
 Fitment trail conducted
 Revised drawing get from customer
 Modification Time plan submitted to customer
 Modification quote submission to customer
 New part number get from Head quarter’s
 Revised PO get from customer
 Part cost update in Internal SAP system
 Existing stock declared to customer
 Revised process supporting documents preparation
 Change cut off date communicate Internal CFT as well as customer
Tool room management
 New mould trials taken
 Mould modification to done for productivity, With out nailing
 Easy alignment, Clamping facility, Loading un loading position identification
done
 Mould lifing arrangement provided , stopper provision
 Mould modification done for Raw material size reduction
 Water jet Cutting fixture preparation
 Mould correction done based on any fitment feed back
 Assembly fixture preparation
 Assembly line setup preparation
New machine Erection and commissioning
 Detailed machine specification requirement discussed with supplier
 Like power , panel setup, software application usage
 Machine line setup layout approval get from plant head
 Electrical requirement panel , Cabling earthing , Ducting preparation
 Cooling lines routing preparation
 Air line routing preparation
 Foundation arrangement done in floor
 After completing commissioning trial to be taken
 Device acceptance report sign off with CFT
Bill of material improvements
 Raw material size reduction for cost savings
 Raw material thickness reduction for cost savings
 Scarp material elimination for cost savings
 Alternate supplier selection for cost savings
 Localisation of raw material supplier
 Trials conducted for all Bom improvement activity
 Validation conducted for all trials
Method improvements
 Analysis of machine man movement study
 Identify the bottle neck operation
 Process cycle time reduction to increase production qty
 Unwanted operator movement elimination
 Unwanted machine movements elimination
 Change operation sequence to reduce takt time
 Paralyses two or three actions to reduce cycle time
 Mould change over setup time reduction
 Machine feasibility to be done for production contingency purpose
Robot programming ABB IRC5 Controller
 Fixture preparation for programming
 Module creation
 Binary number freezing
 Work object creation
 Programming teaching to machine
 Manually run the program
 Auto cycle run the program
 Check the part in checking fixture
 Fine tuning done in the program
 Freeze the program for Regular production
CNC Programming
 Drawing study
 Programming sequence arrived
 Tool selection for program
 Program writing in machine
 Job clamping method preparation
 Work zero setting in machine
 Cutter offset given in program
 Tool length compensation provide
 Cutter nose radius compensation provided
Equcation Qualifiction
B.Tech Mechanical Engineering Completed in 2012 in Rajasthan vidyadeepth
university,
D.M.E completed in 2001 in Arul migu kalasalingam polytechnic with 87% first
class with honours,
Additional Qualifiction
CNC PROGRAMMING & APPLICATIONS COURSE IN GKD ITR INSTITUTE -- YEAR 2005,
ROBO PROGRAMMING TRAINING in FRANCE GRUPO ANTOLIN -- YEAR 2008 ,
ISO TS 16949 Certify auditor -- YEAR 2010,
SPC (Statistical process control) -- YEAR 2011,
APQP/PPAP -- YEAR 2011,
MSA (MEASUREMENT SYSTEM ANALYSIS) -- YEAR 2011,
7 QC TOOLS -- YEAR 2011,
EMS Training -- YEAR 2012,
COMPUTER KNOWLEDGE
AUTO CADD
MS OFFICE
POWER POINT
CAREER GRAPH:
 GRUPO ANTOLIN INDIA PVT LTD
Aug ’07 to till date SENIOR ENGINEER- NEW PRODUCTS & PRJOCETS
 INTEGRA AUTOMATION PVT LTD AMBATTUR
SEP 05 TO JULY 07 SUPERVISOR CNC PROGRAMMER (VMC & VTL)
 LAKSHMI VALVES PRIVATE LIMITED COIMBATORE
APR 03 TO AUG 05 SUPERVISOR VMC PROGRAMMER
 RAJA CAR CARE PVT LIMITED SIVAKASI
JUNE 01 TO MAR 03 WORKSHOP INCHARGE
PERSONAL DETAIL:
Father’s Name : R.Murugesan
Age & Date of Birth : 20.05.1982
Language Known : Tamil & English
Sex : Male
Marital Status : Married
Present address :Bharathi illam , plot no51 , sp avenue ,poonthamalli, Chennai,
Permanent Address : 5/426 samy puram colony ,Sivakasi-626189
DECLARATION:
I hereby declare that the above information’s are true and correct to the best of my
knowledge and belief.
Place: Yours Truly
M.MARIMUTHU

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Resume
ResumeResume
Resume
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitae
 
Rajan_SG_CV (1)
Rajan_SG_CV (1)Rajan_SG_CV (1)
Rajan_SG_CV (1)
 
TylerSi_CV
TylerSi_CVTylerSi_CV
TylerSi_CV
 
AppAA_ProjectQualityPlan_Ausenco.pdf
AppAA_ProjectQualityPlan_Ausenco.pdfAppAA_ProjectQualityPlan_Ausenco.pdf
AppAA_ProjectQualityPlan_Ausenco.pdf
 
resume
resumeresume
resume
 
Resume
ResumeResume
Resume
 
Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain resume (National) mod 3 (2)Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain resume (National) mod 3 (2)
 
APQP Application
APQP ApplicationAPQP Application
APQP Application
 
QUALITY PROFESSIONAL- 2016
QUALITY PROFESSIONAL- 2016QUALITY PROFESSIONAL- 2016
QUALITY PROFESSIONAL- 2016
 
My resume (1)
My resume  (1)My resume  (1)
My resume (1)
 
Besander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kwBesander Allen FINAL 011216 mr.rev.kw
Besander Allen FINAL 011216 mr.rev.kw
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Resume
ResumeResume
Resume
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
Jps16
Jps16Jps16
Jps16
 
Building a Better PPAP Experience
Building a Better PPAP ExperienceBuilding a Better PPAP Experience
Building a Better PPAP Experience
 
Resume.DOC
Resume.DOCResume.DOC
Resume.DOC
 
Experienced in Quality Control & Production
Experienced in Quality Control & ProductionExperienced in Quality Control & Production
Experienced in Quality Control & Production
 

Ähnlich wie MARINEW Resume

CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23Avinash Wadaskar
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTPraveen Pravin
 
D david thompson_resume_15_1
D david  thompson_resume_15_1D david  thompson_resume_15_1
D david thompson_resume_15_1Dave Thompson
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVsanjay kumar A M
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816Shanmu S
 
Resume_Development_Quality_Tushar_Karpe.PDF
Resume_Development_Quality_Tushar_Karpe.PDFResume_Development_Quality_Tushar_Karpe.PDF
Resume_Development_Quality_Tushar_Karpe.PDFTushar Karpe
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume Rakesh burman
 
Praneeth Introduction_Manuf. & PM.pdf
Praneeth Introduction_Manuf. & PM.pdfPraneeth Introduction_Manuf. & PM.pdf
Praneeth Introduction_Manuf. & PM.pdfpraneeth491311
 

Ähnlich wie MARINEW Resume (20)

CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENT
 
Resume
ResumeResume
Resume
 
D david thompson_resume_15_1
D david  thompson_resume_15_1D david  thompson_resume_15_1
D david thompson_resume_15_1
 
praveen
praveenpraveen
praveen
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
 
Production-
Production-Production-
Production-
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
SSK - Business Analyst
SSK - Business AnalystSSK - Business Analyst
SSK - Business Analyst
 
Rohit new resume
Rohit new resumeRohit new resume
Rohit new resume
 
Resume_Development_Quality_Tushar_Karpe.PDF
Resume_Development_Quality_Tushar_Karpe.PDFResume_Development_Quality_Tushar_Karpe.PDF
Resume_Development_Quality_Tushar_Karpe.PDF
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
Praneeth Introduction_Manuf. & PM.pdf
Praneeth Introduction_Manuf. & PM.pdfPraneeth Introduction_Manuf. & PM.pdf
Praneeth Introduction_Manuf. & PM.pdf
 
Naveen resume
Naveen resume Naveen resume
Naveen resume
 
Resume
ResumeResume
Resume
 
amol thakare -
amol thakare -amol thakare -
amol thakare -
 

MARINEW Resume

  • 1. M.Marimuthu Mobile : 7708426208 / 7418596723 Email : marishivasharan@gmail.com OBJECTIVE To take up a challenging position to constantly learn, contribute the best out of me and grow along with the organization. SUMMARY  Currently working at GRUPO ANTOLIN INDIA Pvt Ltd., as an Senior Engineer in Engineering.  14 years of experience in the field of Engineering , projects & NPD.  Proficient in software like Ms Project, AutoCAD,.  Good problem solving, interpersonal and Decision making skills.  Strong team working and multi-tasking skills. WORK EXPERIENCE SENIOR ENGINEER – ENGINEERING (Grupo Antolin IndiaPvtLtd., Sriperumbudur) (Since AUG’2007) Project Title : TRIM ROOF , SUNVISOR , Category : New product Development Duration : 7year 8Months . Customer : TOYOTA, RENAULT NISSAN ,FORD ,HYUNDAI,MAHINDRA, ASHOK LEYLAND Description: Initial project kickoff, as per the customer SOP, requirement and timing plan, as per the plan it was followed, once the design stage is completed, then we reviewed the drawing & DFMEA which had covered the past customer problems and also reviewed with Renault Team, then moved to test process as per the Customer Engineering specification and mold equipment shipments, once the shipment delivered. Process validation is done and submission of PPAP to the customer for commencing SOP as per the customer requested Date. Company Profile: The company is an ISO/TS16949, & ISO 14001 certified company with Spain as the base Manufacturing and supplying automotive components to various OEM’s in the Four Wheeler Segments. Company present customers are  Renault Nissan Automotive India Pvt Ltd.,  Hyundai Motor India Pvt Ltd.,  Toyota Kriloskar Motor Pvt Ltd.,  Mahindera & Mahindera India Pvt Ltd.,  Ford India Pvt Ltd.
  • 2. Major Product:  Window Regulator,  Trim Roof,  Sunvisor.  Packaging tray AREA OF EXPOSURE  New product development  Engineering change management  Tool room management  New machine erection and commissioning  Bill of material improvements  Method improvements  Robot Programming  CNC Programming KEY RESPONSIBILTIES IN ABOVE ARAES New Product Development  RFQ Receipt from customer  Quote submission to customer  LOI receipt from customer  Drawing study and engineering standard receipt  Technical standard received from customer with reference to drawing  Project risk analysis to be made  Economical study report get from marketing  Make or Buy decision report preparation  Time plan preparation against customer time line  Project review meeting organize with CFT  Project team formation  Tooling design review conduct with supplier  Checking fixture concept preparation and get approval from customer  Tool matrix data preparation  Device launch authorization sheet sign off with project manager and commercial head  Project tracking sheet preparation and monitoring  Bill of material sheet preparation  SAP reference creation for All Bill of material  Drawing get for all child parts against BOM  Part cost get from supplier  Tooling cost get from supplier  Offer cost for Tools and parts get from marketing  Child parts packaging sign off with supplier  Request for purchase raised to direct material  Request for purchase raised to Indirect material  PO Release to supplier  Tool pre delivery inspection at supplier end  Tool trail to conducted  Tool history card preparation and up dation
  • 3.  Actual part Detailed lay out inspection report preparation  Validation plan preparation and sign off with customer  Testing quote receipt from test agency  Testing completion test report shared to customer  Proto type pallet preparation  Color and grain shade receipt from customer  Development shared to customer  Packaging sign off with customer  Packaging requirement quantity calculation made  Trial part preparation and submission to customer on time  Sample data sheet preparation  Participate fitment trial at customer end  Trial Part trouble data sheet preparation  Countermeasure implementation against past trouble data  Means and Flows Preparation  Detailed work instruction preparation  Technical specification sheet prepared and given to production quality department  Control plan preparation  FMEA Preparation  Product IMDS data sheet preparation  Substance of concern Elements declaration sheet preparation  SOC test conduct and report shared to customer  LOW volume and High volume production trial conducted before SOP started  PPAP Documents preparation & submission to customer  PSW approval get from Customer  Production process supporting documents preparation  New product training provided to operator  Cycle time freeze each stages  Phase closure documents updation  Project target monitoring sheet follow  SOP Monitoring sheet preparation and up dation for first 3months production  Lesson learned sheet preparation Engineering change management  Engineering change receipt from customer  Feasible study to done  Temporary modification done in tool  Proto sample preparation and submission to customer  Fitment trail conducted  Revised drawing get from customer  Modification Time plan submitted to customer  Modification quote submission to customer  New part number get from Head quarter’s  Revised PO get from customer  Part cost update in Internal SAP system  Existing stock declared to customer  Revised process supporting documents preparation  Change cut off date communicate Internal CFT as well as customer
  • 4. Tool room management  New mould trials taken  Mould modification to done for productivity, With out nailing  Easy alignment, Clamping facility, Loading un loading position identification done  Mould lifing arrangement provided , stopper provision  Mould modification done for Raw material size reduction  Water jet Cutting fixture preparation  Mould correction done based on any fitment feed back  Assembly fixture preparation  Assembly line setup preparation New machine Erection and commissioning  Detailed machine specification requirement discussed with supplier  Like power , panel setup, software application usage  Machine line setup layout approval get from plant head  Electrical requirement panel , Cabling earthing , Ducting preparation  Cooling lines routing preparation  Air line routing preparation  Foundation arrangement done in floor  After completing commissioning trial to be taken  Device acceptance report sign off with CFT Bill of material improvements  Raw material size reduction for cost savings  Raw material thickness reduction for cost savings  Scarp material elimination for cost savings  Alternate supplier selection for cost savings  Localisation of raw material supplier  Trials conducted for all Bom improvement activity  Validation conducted for all trials Method improvements  Analysis of machine man movement study  Identify the bottle neck operation  Process cycle time reduction to increase production qty  Unwanted operator movement elimination  Unwanted machine movements elimination  Change operation sequence to reduce takt time  Paralyses two or three actions to reduce cycle time  Mould change over setup time reduction  Machine feasibility to be done for production contingency purpose Robot programming ABB IRC5 Controller  Fixture preparation for programming  Module creation
  • 5.  Binary number freezing  Work object creation  Programming teaching to machine  Manually run the program  Auto cycle run the program  Check the part in checking fixture  Fine tuning done in the program  Freeze the program for Regular production CNC Programming  Drawing study  Programming sequence arrived  Tool selection for program  Program writing in machine  Job clamping method preparation  Work zero setting in machine  Cutter offset given in program  Tool length compensation provide  Cutter nose radius compensation provided Equcation Qualifiction B.Tech Mechanical Engineering Completed in 2012 in Rajasthan vidyadeepth university, D.M.E completed in 2001 in Arul migu kalasalingam polytechnic with 87% first class with honours, Additional Qualifiction CNC PROGRAMMING & APPLICATIONS COURSE IN GKD ITR INSTITUTE -- YEAR 2005, ROBO PROGRAMMING TRAINING in FRANCE GRUPO ANTOLIN -- YEAR 2008 , ISO TS 16949 Certify auditor -- YEAR 2010, SPC (Statistical process control) -- YEAR 2011, APQP/PPAP -- YEAR 2011, MSA (MEASUREMENT SYSTEM ANALYSIS) -- YEAR 2011, 7 QC TOOLS -- YEAR 2011, EMS Training -- YEAR 2012, COMPUTER KNOWLEDGE AUTO CADD MS OFFICE POWER POINT CAREER GRAPH:  GRUPO ANTOLIN INDIA PVT LTD Aug ’07 to till date SENIOR ENGINEER- NEW PRODUCTS & PRJOCETS
  • 6.  INTEGRA AUTOMATION PVT LTD AMBATTUR SEP 05 TO JULY 07 SUPERVISOR CNC PROGRAMMER (VMC & VTL)  LAKSHMI VALVES PRIVATE LIMITED COIMBATORE APR 03 TO AUG 05 SUPERVISOR VMC PROGRAMMER  RAJA CAR CARE PVT LIMITED SIVAKASI JUNE 01 TO MAR 03 WORKSHOP INCHARGE PERSONAL DETAIL: Father’s Name : R.Murugesan Age & Date of Birth : 20.05.1982 Language Known : Tamil & English Sex : Male Marital Status : Married Present address :Bharathi illam , plot no51 , sp avenue ,poonthamalli, Chennai, Permanent Address : 5/426 samy puram colony ,Sivakasi-626189 DECLARATION: I hereby declare that the above information’s are true and correct to the best of my knowledge and belief. Place: Yours Truly M.MARIMUTHU