 In the last class, we have seen about the
tariff rate and the types of tariff rate which
is being utiliized for the certain power
requirement management and mainly the
agricultural activities.
 In today’s class, we will see how to remove
the already assigned value of power which
appears to be wrong and not satisfied by the
system with the help of power factor
triangle.
Active power actually performs the work and is measured in kW. This is
also what is read on a wattmeter.
Reactive power sustains the electromagnetic field and is measured in
kvar.
 Power Factor is the measurement of how effectively your business uses
the electricity supplied to your site
 Ideal Power Factor is unity or 1, anything less than 1 means that extra
power is required to achieve the necessary tasks.
The higher the power factor, the more effectively electrical power
is being used and vice versa.
 Low Power Factor is expensive and inefficient, with many utility
companies charging extra, (reactive power charge), for sites with a poor
power factor
 Low Power Factor can also reduce the capacity of your electrical
distribution system by increasing current flow and causing voltage
drops.
Power Factor is the ratio of true power to apparent power
Power Factor = KW
KVA
 Power Factor Correction is the term given to a technology to restore Power
Factor to as close to unity as economically viable
 This can be achieved by adding Power Factor Correction capacitors to the
distribution system which provide or compensate for the Reactive Power
demand of the inductive load, and thus reduce the burden on the supply
 Capacitors work as reactive current generators “providing” needed
reactive power (KVAr) into the power supply
 By supplying their own source of reactive power, the industrial user frees
the utility from having to supply it, and therefore the total amount of
apparent power supplied by the utility will be less.
 Power Factor Correction Capacitors reduce the total current drawn from
the distribution system and subsequently increase the system’s capacity
by raising the Power Factor level.
 A reduction in electricity charges
 Elimination of utility power factor penalties, which can increase electrical
bills by up to 20%
 Reduction in I²R losses of transformers and distribution equipment
 Prolonging the life of equipment from reduced heat in cables,
switchgear, transformers and alternators
 Reduced voltage drop in cables, allowing the same cable to supply a
larger motor and improving the starting of motors at the end of the
long cable runs
 With the help of PFC method, a reduction
in electricity charges
 Prolonging the life of equipment from
reduced heat in cables, switchgear,
transformers and alternators.
 Reduced voltage drop in cables, allowing
the same cable to supply a larger motor
and improving the starting of motors at
the end of the long cable runs.
1.11 power factor improvement

Weitere ähnliche Inhalte

Was ist angesagt?

1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
Navyasri Jiguru
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR Requirement
Ahmed Aslam
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
slmnsvn
 
power factor correction using smart relay
power factor correction using smart relaypower factor correction using smart relay
power factor correction using smart relay
Hatem Seoudy
 

Was ist angesagt? (20)

1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
 
Power factor
Power factorPower factor
Power factor
 
Power Factor Improvement
Power Factor ImprovementPower Factor Improvement
Power Factor Improvement
 
Power factor
Power factorPower factor
Power factor
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
Power factor(r)
Power factor(r)Power factor(r)
Power factor(r)
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentation
 
Power factor introduction and its correction final
Power factor introduction and its correction final Power factor introduction and its correction final
Power factor introduction and its correction final
 
Power factor
Power factorPower factor
Power factor
 
Power factor
Power factorPower factor
Power factor
 
Capacitor bank and improvement of power factor
Capacitor bank and improvement of power factorCapacitor bank and improvement of power factor
Capacitor bank and improvement of power factor
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR Requirement
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and Solutions
 
Power factor & Power factor correction
Power factor & Power factor correctionPower factor & Power factor correction
Power factor & Power factor correction
 
Project report soofi
Project report soofiProject report soofi
Project report soofi
 
Benifits of power factor improvement for industry
Benifits of power factor improvement for industryBenifits of power factor improvement for industry
Benifits of power factor improvement for industry
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
power factor correction using smart relay
power factor correction using smart relaypower factor correction using smart relay
power factor correction using smart relay
 
Power Factor Basics
Power Factor BasicsPower Factor Basics
Power Factor Basics
 

Ähnlich wie 1.11 power factor improvement

Power factor correction
Power factor correctionPower factor correction
Power factor correction
Jamilah Abbas
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
PoojaAnupGarg
 
2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf
2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf
2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf
asprilla mangombe
 

Ähnlich wie 1.11 power factor improvement (20)

Mohsin rana
Mohsin ranaMohsin rana
Mohsin rana
 
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
 
Importance of Power Factor.pptx
Importance of Power Factor.pptxImportance of Power Factor.pptx
Importance of Power Factor.pptx
 
PFI GUIDE
PFI GUIDEPFI GUIDE
PFI GUIDE
 
Power Factor & Utility Rates
Power Factor & Utility RatesPower Factor & Utility Rates
Power Factor & Utility Rates
 
Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...
 
MINOR PROJECT gb 08 (3).pdf
MINOR PROJECT gb 08 (3).pdfMINOR PROJECT gb 08 (3).pdf
MINOR PROJECT gb 08 (3).pdf
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
How Power Factor corection works.pdf
How Power Factor corection works.pdfHow Power Factor corection works.pdf
How Power Factor corection works.pdf
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
 
Apfc project 2016 17
Apfc project 2016 17Apfc project 2016 17
Apfc project 2016 17
 
Power factor
Power factorPower factor
Power factor
 
1.3
1.31.3
1.3
 
IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...
IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...
IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...
 
POWER FACTOR IMPROVEMENT OF INDUSTRIAL LOAD BY MATLAB SIMULATION
POWER FACTOR IMPROVEMENT OF INDUSTRIAL LOAD BY MATLAB SIMULATIONPOWER FACTOR IMPROVEMENT OF INDUSTRIAL LOAD BY MATLAB SIMULATION
POWER FACTOR IMPROVEMENT OF INDUSTRIAL LOAD BY MATLAB SIMULATION
 
IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonic
 
2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf
2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf
2006_18_spring_wiring_matters_power_factor_correction_pfc.pdf
 
Improvement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using CapacitorImprovement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using Capacitor
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor Improvement
 

Mehr von W3Edify (20)

class gd.pptx
class gd.pptxclass gd.pptx
class gd.pptx
 
P.maria sheeba 15 mco010
P.maria sheeba 15 mco010P.maria sheeba 15 mco010
P.maria sheeba 15 mco010
 
Symposium
SymposiumSymposium
Symposium
 
Unit 1
Unit 1Unit 1
Unit 1
 
Beie unit - 5
Beie unit - 5Beie unit - 5
Beie unit - 5
 
Unit 4
Unit 4Unit 4
Unit 4
 
Beie unit 2
Beie unit 2Beie unit 2
Beie unit 2
 
2.9
2.92.9
2.9
 
2.5
2.52.5
2.5
 
2.4 & 2.7
2.4 & 2.72.4 & 2.7
2.4 & 2.7
 
2.3, 2.8, 2.10, 2.11
2.3, 2.8, 2.10, 2.112.3, 2.8, 2.10, 2.11
2.3, 2.8, 2.10, 2.11
 
2.2
2.22.2
2.2
 
2.1
2.12.1
2.1
 
Beie unit-3
Beie  unit-3Beie  unit-3
Beie unit-3
 
3.1,3.2,3.3
3.1,3.2,3.33.1,3.2,3.3
3.1,3.2,3.3
 
Transformer introduction
Transformer   introductionTransformer   introduction
Transformer introduction
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformers
 
Transformer ratio & equivalent circuit of transformer
Transformer ratio & equivalent circuit of transformerTransformer ratio & equivalent circuit of transformer
Transformer ratio & equivalent circuit of transformer
 
Ideal transformer
Ideal transformerIdeal transformer
Ideal transformer
 
1.10 types of tariff
1.10 types of tariff1.10 types of tariff
1.10 types of tariff
 

Kürzlich hochgeladen

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Kürzlich hochgeladen (20)

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

1.11 power factor improvement

  • 1. 1
  • 2.  In the last class, we have seen about the tariff rate and the types of tariff rate which is being utiliized for the certain power requirement management and mainly the agricultural activities.  In today’s class, we will see how to remove the already assigned value of power which appears to be wrong and not satisfied by the system with the help of power factor triangle.
  • 3. Active power actually performs the work and is measured in kW. This is also what is read on a wattmeter. Reactive power sustains the electromagnetic field and is measured in kvar.
  • 4.  Power Factor is the measurement of how effectively your business uses the electricity supplied to your site  Ideal Power Factor is unity or 1, anything less than 1 means that extra power is required to achieve the necessary tasks. The higher the power factor, the more effectively electrical power is being used and vice versa.  Low Power Factor is expensive and inefficient, with many utility companies charging extra, (reactive power charge), for sites with a poor power factor  Low Power Factor can also reduce the capacity of your electrical distribution system by increasing current flow and causing voltage drops.
  • 5. Power Factor is the ratio of true power to apparent power Power Factor = KW KVA
  • 6.  Power Factor Correction is the term given to a technology to restore Power Factor to as close to unity as economically viable  This can be achieved by adding Power Factor Correction capacitors to the distribution system which provide or compensate for the Reactive Power demand of the inductive load, and thus reduce the burden on the supply  Capacitors work as reactive current generators “providing” needed reactive power (KVAr) into the power supply  By supplying their own source of reactive power, the industrial user frees the utility from having to supply it, and therefore the total amount of apparent power supplied by the utility will be less.  Power Factor Correction Capacitors reduce the total current drawn from the distribution system and subsequently increase the system’s capacity by raising the Power Factor level.
  • 7.
  • 8.  A reduction in electricity charges  Elimination of utility power factor penalties, which can increase electrical bills by up to 20%  Reduction in I²R losses of transformers and distribution equipment  Prolonging the life of equipment from reduced heat in cables, switchgear, transformers and alternators  Reduced voltage drop in cables, allowing the same cable to supply a larger motor and improving the starting of motors at the end of the long cable runs
  • 9.
  • 10.
  • 11.  With the help of PFC method, a reduction in electricity charges  Prolonging the life of equipment from reduced heat in cables, switchgear, transformers and alternators.  Reduced voltage drop in cables, allowing the same cable to supply a larger motor and improving the starting of motors at the end of the long cable runs.